McKenney’s installed a new prefabricated chiller plant and piping loop to support up to nine megawatts of critical load for a colocation data center in North Carolina.

Citation preview

Page 2: Data Center Colocation in Durham, North Carolina

Project NameColocation Data Centers

Project LocationDurham, North Carolina

Project TeamOwner: Data CentersGeneral Contractor: Holder Construction

Mission Critical

Specializations

Markets

Engineer: DLB AssociatesConsulting Engineers, P.C.Contractor: McKenney’s, Inc.

Architect: O’Brien/Atkins Associates, PA

Pipe Shop PrefabBuilding Information Modeling

Sheet Metal Shop Prefab

Page 3: Data Center Colocation in Durham, North Carolina

McKenney’s installed a new prefabricated chiller plant and piping loop to support up to nine megawatts of critical load for a colocation data center in North Carolina.

Page 4: Data Center Colocation in Durham, North Carolina

The ChallengeThe project had a very aggressive schedule coupled with extensive scope in a small area making the jobsite congested with both personnel and materials. At times, the workforce on the project exceeded 200 people.

The SolutionMcKenney’s utilized Building Information Modeling (BIM)—along with prefabricating nearly all of the steel piping mains—to minimize on-site congestion and optimize installation efficiency. Pipe deliveries weresequenced just-in-time and set in place upon arrival, reducing on-site storage. To ensure an on-time installation of the chiller plant, theconstruction team created a detailed installation schedule utilizing heavy BIM coordination, numerous trips to the factory and major collaboration with all trades.

The content of this document is not intended as an endorsement.

Page 5: Data Center Colocation in Durham, North Carolina

The ResultsWith the exception of the chiller plant installation which took two rather than the scheduled four weeks—on-site pipe-fitting crew size was kept under 10.

Page 6: Data Center Colocation in Durham, North Carolina

1056 Moreland Industrial BoulevardAtlanta, Georgia 30316P: 404-622-5000

[email protected]

3601 Performance RoadCharlotte, North Carolina 28214P: 704-357-1200

Atlanta Office:

Charlotte Office:

www.mckenneys.com