3.500 MEN WORKER CAMP 3.500 MEN WORKER CAMP RAS LAFFAN / QATARRAS LAFFAN / QATAR

Type of Contract: Construction

Scope of Work: Building construction works, Electrical works, Mechanical works, Water heater units, A/Cunits

Total Building Area : 34 379 72 m²Total Building Area : 34.379,72 m

Duration of the Work: September 2006 ‐ January 2007

Page 3: Dorce camps 2
Page 4: Dorce camps 2

2 400 PERSON CAMP PROJECT FOR2 400 PERSON CAMP PROJECT FOR2.400 PERSON CAMP PROJECT FOR 2.400 PERSON CAMP PROJECT FOR SOUTH YOLOTEN PIPELINE INST. PROJECT SOUTH YOLOTEN PIPELINE INST. PROJECT 

TURMENISTANTURMENISTAN

Page 5: Dorce camps 2

2.400 PERSON CAMP PROJECT FOR SOUTH 2.400 PERSON CAMP PROJECT FOR SOUTH YOLOTEN PIPELINE INST. PROJECT YOLOTEN PIPELINE INST. PROJECT TURMENISTAN TURMENISTAN 

Type of Contract: Engineering & Supply

Scope of Work: Design works, Electrical works, Mechanical works, Water heater units, HVAC systems,Fire Fighting systems, Assembly supervision, Furnishing

Total Building Area: 30 188 86 m²Total Building Area: 30.188,86 m

Duration of the Work:May 2011‐ October 2011

Page 6: Dorce camps 2
Page 7: Dorce camps 2

KPO B.V. HEAD OFFICE BUILDING KPO B.V. HEAD OFFICE BUILDING AKSAIAKSAI KAZAKHSTAKAZAKHSTANNAKSAI, AKSAI, KAZAKHSTAKAZAKHSTANN

Page 8: Dorce camps 2

KPO B.V. HEAD OFFICE BUILDING KPO B.V. HEAD OFFICE BUILDING AKSAI, KAZAKHSTANAKSAI, KAZAKHSTAN

Type of Contract: Design & Build

T f W k KPO Offi d h b ildiType of Work : KPO Office and warehouse buildings.

Scope of Work: Building construction works, civil works , Electrical works, Mechanical works

Total Building Area: 9,512 m2

Duration of the Work: October 2007 ‐ February 2008 

Page 9: Dorce camps 2
Page 10: Dorce camps 2

KPO B.V. KPO B.V. OFFICE BUILDING OFFICE BUILDING AKSAI / KAZAKHSTANAKSAI / KAZAKHSTAN

Type of Work : KPO Office and warehouse buildings.yp g

Scope of Work : As the main contractor, supply of prefabricated modular and pre‐engineered steel construction buildings; electrical, sanitary and heating installation, transportation and assembly.

Total Building Area: 11.622,10 m2

Duration of the Work: September 2009‐March 2010

Page 11: Dorce camps 2
Page 12: Dorce camps 2

PALOUGE OPERATION BASE CAMP PALOUGE OPERATION BASE CAMP EXTENSIONEXTENSION PROJECTPROJECTEXTENSION EXTENSION PROJECTPROJECT

SUDANSUDAN

Page 13: Dorce camps 2

OPERATING OPERATING BASE CAMP BASE CAMP ADAR / SUDANADAR / SUDAN

Type of ontract : Design & Build

Type of Work: Pre‐Engineered Steel Construction Buildings yp g g

Scope of Work : Building construction works, Electrical works, Mechanical works

Total Building Area:  5.835 m2g

Duration of the Work: January 2011‐April 2011

Page 14: Dorce camps 2
Page 15: Dorce camps 2
Page 16: Dorce camps 2

FERTILIZER PLANT MOBILIZATIONFERTILIZER PLANT MOBILIZATIONFERTILIZER PLANT MOBILIZATION FERTILIZER PLANT MOBILIZATION PROJECTSPROJECTS

MARY / TURKMENISTANMARY / TURKMENISTAN

Page 17: Dorce camps 2

FERTILIZER PLANT MOBILIZATION PROJECTSFERTILIZER PLANT MOBILIZATION PROJECTSMARY / TURKMENISTANMARY / TURKMENISTAN

Type of Contract: Engineering & Supply

Scope of Work: Electrical works, Mechanical works, Assembly supervision

Total Building Area: 6,022 m²

Duration of the Work:May 2011‐ October 2011

Page 18: Dorce camps 2
Page 19: Dorce camps 2

TENGIZ CHEVROIL MANAGEMENTTENGIZ CHEVROIL MANAGEMENTTENGIZ CHEVROIL MANAGEMENT TENGIZ CHEVROIL MANAGEMENT BUILDING BUILDING 

TENGIZ / TENGIZ / KAZAKHSTANKAZAKHSTAN

Page 20: Dorce camps 2

TENGIZ CHEVROIL MANAGEMENT BUILDING TENGIZ CHEVROIL MANAGEMENT BUILDING TENGIZ / KAZAKHSTANTENGIZ / KAZAKHSTAN

Type of Contract: Engineering & Supply

Scope of Work: Electrical works, Mechanical works, Assembly supervision

Total Building Area: 6.700 m²

Duration of the Work: February 2004 ‐ April 2004

Page 21: Dorce camps 2
Page 22: Dorce camps 2
Page 23: Dorce camps 2

ENRICHMENT PLANT GUELB II PROJECTENRICHMENT PLANT GUELB II PROJECTENRICHMENT PLANT GUELB II PROJECT ENRICHMENT PLANT GUELB II PROJECT 

WORKSHOPS WORKSHOPS AND ADMINISTRATION AND ADMINISTRATION BUILDINGS BUILDINGS ZOUERATE, MAURITANIAZOUERATE, MAURITANIAZOUERATE, MAURITANIAZOUERATE, MAURITANIA

Page 24: Dorce camps 2

Type of Contract: Design & Build

Type of Work : Pre‐engineered Workshops and Concrete Administration Buildings

Scope of Work: Infrastructure works Building construction works Civil Works Electrical works MechanicalScope of Work: Infrastructure works, Building construction works, Civil Works, Electrical works, Mechanical works, Furnishing, Finishing works

Total Building Area: 8.555 m2Total Building Area:  8.555 m2

Duration of the Work: November 2010‐May 2012

Page 25: Dorce camps 2
Page 26: Dorce camps 2
Page 27: Dorce camps 2
Page 28: Dorce camps 2

URANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTNIGERNIGER

Page 29: Dorce camps 2

URANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTNIGERNIGER

Type of Contract: Design & Build

S f W k B ildi i k El i l k M h i l k F i hiScope of Work: Building construction works, Electrical works, Mechanical works, Furnishing

Total Building Area: 1.848 m²

D i f h W k J l 2012 N b 2012Duration of the Work: July 2012‐November 2012

Page 30: Dorce camps 2
Page 31: Dorce camps 2

500 MENWORKER CAMP PROJECT FOR AL500 MENWORKER CAMP PROJECT FOR AL500 MEN WORKER CAMP PROJECT FOR AL 500 MEN WORKER CAMP PROJECT FOR AL KHAIRAT GAS TURBINE POWER PLANT KHAIRAT GAS TURBINE POWER PLANT 

KARBALA / IRAQ KARBALA / IRAQ 

Page 32: Dorce camps 2

500 MEN WORKER CAMP PROJECT FOR AL KHAIRAT 500 MEN WORKER CAMP PROJECT FOR AL KHAIRAT GAS TURBINE POWER PLANT KARBALA / IRAQ GAS TURBINE POWER PLANT KARBALA / IRAQ 

Type of Contract: Design & Build

S f W k D i i Di i h ll Ki h WC Sh U i L d i B ildi i kScope of Work: Dormitories , Dining halls, Kitchens, WC‐Shower Units , Laundries, Building construction works

Total Building Area: 8.775 m²

D i f h W k A il 2011 S b 2011Duration of the Work: April 2011 – September 2011

Page 33: Dorce camps 2
Page 34: Dorce camps 2

700 MENWORKER CAMP PROJECT FOR700 MENWORKER CAMP PROJECT FOR700 MEN WORKER CAMP PROJECT FOR 700 MEN WORKER CAMP PROJECT FOR NAINAWA GAS TURBINE POWER PLANT NAINAWA GAS TURBINE POWER PLANT 

MOSUL / MOSUL / IRAQIRAQ

Page 35: Dorce camps 2

700 MEN WORKER CAMP PROJECT FOR NAINAWA 700 MEN WORKER CAMP PROJECT FOR NAINAWA GAS TURBINE POWER PLANT MOSUL / IRAQ  GAS TURBINE POWER PLANT MOSUL / IRAQ  

Type of Contract: Design & Build

Scope of Work: Dormitories , Dining halls, Kitchens, WC‐Shower Units, Laundries, Building constructionworks

Total Building Area: 10 356 m²Total Building Area: 10.356 m

Duration of the Work: June 2011 – September 2011

Page 36: Dorce camps 2
Page 37: Dorce camps 2

MODULAR BUILDINGS PROJECTMODULAR BUILDINGS PROJECTMODULAR BUILDINGS PROJECT MODULAR BUILDINGS PROJECT BAKOUDOU / BAKOUDOU / GABONGABON

Page 38: Dorce camps 2

MODULAR BUILDINGS PROJECT MODULAR BUILDINGS PROJECT BAKOUDOU / BAKOUDOU / GABONGABON

What is the role of DORCE in Gold Bakoudou Project?

Type of ContractConstruction

j

Scope of WorkBuilding construction works, septic tanks, Water tanks, Electrical works, Mechanical works, A/C units,Water heatersWater heaters

Total Building Area: 5.263,70 m2

Duration of the WorkNovember 2006 ‐May 2007

Page 39: Dorce camps 2
Page 40: Dorce camps 2

OFFSHORE PROJECTOFFSHORE PROJECTOFFSHORE PROJECT OFFSHORE PROJECT BALKANABAT / BALKANABAT / TURKMENISTATURKMENISTANN

Page 41: Dorce camps 2

OFFSHORE PROJECT OFFSHORE PROJECT BALKANABAT / TURKMENISTANBALKANABAT / TURKMENISTAN

What is the role of DORCE in Offshore Project?

Type of Contract: Construction

j

Scope of Work: Building construction works, Septic tanks, Water tanks, Electrical works , Mechanicalworks , A/C units , Water heaters

Total Container Area: 677 82 m2Total Container Area: 677,82 m2

Duration of the Work: November 2006 ‐May 2007

Page 42: Dorce camps 2
Page 43: Dorce camps 2

QIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQUAIBOE / QUAIBOE / NIGERIANIGERIA

Page 44: Dorce camps 2

QIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQUAIBOE / QUAIBOE / NNIGERIAIGERIA

Type of Work : 6 Units of single‐storey Modular Sandwich Panel System Prefabricated Office & Canteen Buildings

Scope of Work : Supply of Modular Prefabricated Building including, floor covering, electrical and sanitary installation materials, A/C units  & Water Heaters  & Exhaust Fan Units, Addressable Fire Alarm System, transportation and supervision of erection

Total Building Area: 5.000 m2

Duration of the Work:  April 2010 ‐ June 2010

Page 45: Dorce camps 2
Page 46: Dorce camps 2

PREFABRICATED MODULAR OFFICEPREFABRICATED MODULAR OFFICEPREFABRICATED MODULAR OFFICE PREFABRICATED MODULAR OFFICE BUILDINGBUILDING

LUBUMBASHI / LUBUMBASHI / CONGOCONGO

Page 47: Dorce camps 2

PREFABRICATED MODULAR OFFICE BUILDINGPREFABRICATED MODULAR OFFICE BUILDINGLUBUMBASHI LUBUMBASHI / / CONGOCONGO

Type of Work : Prefabricated Modular Office Buildings

Scope of Work : Production, Transportation from Ankara to Tanzania Port, Erection and Electrical  & mechanical works on site

Total Building Area: 9 024 m2Total Building Area:  9.024 m2

Duration of the Work: February 2011‐May 2011 (120 Days)

Page 48: Dorce camps 2
Page 49: Dorce camps 2

HEAD OFFICE:Aşağı öveçler Mahallesi 1325. Sokak No:6, 06460, Ankara / TÜRKİYEPhone: +90 312 472 82 10 (pbx)  Fax    : +90 312 472 82 18‐19Web : www dorce com tr E‐mail: dorce@dorce com tr

FACTORY:

Ankara‐İstanbul Kara yolu, 29.km 06105 Sarayköy, Ankara / Türkiye

Phone: +90 312 815 51 65 ‐ 72 Fax  : +90 312 815 51 71 Web  :  www.dorce.com.tr E mail: [email protected]