ITM Power (AIM: ITM), the energy storage and clean fuel company, announces its audited results for the year ended 30 April 2014. The Company currently has £6.550m of projects under contract. Summary Commercial Progress in year - £5.140m of projects under contract at year end - Won £2.800m contract to supply three refuelling stations in London - A total of £2.000m refueller build contracts won with Californian Energy Commission - Thüga Group’s Power-to-Gas plant officially commissioned and operational on schedule - Successful injection of hydrogen into the German gas grid - Participation in the UK, US, Swiss and French Hydrogen Infrastructure Programmes - Optimisation of standard product platforms and reduction in standard product cost - Partnership with NRM, Germany for Power-to-Gas projects -Gas network optimisation contract with AMEC and National Grid Full release here: http://www.itm-power.com/news-item/results-for-the-year-ended-30-april-2014/

Citation preview

Page 1: ITM Power Results Presentation

FINAL RESULTS PRESENTATION:

FOR THE YEAR ENDING APRIL 2014 30TH JULY 2014 | TAVISTOCK | FINSBURY PAVEMENT | LONDON

Page 2: ITM Power Results Presentation

Contents:

• Introduction

• Power-to-Gas Energy Storage

• Power-to-Gas Projects

• Clean Fuel Projects

• Corporate Development

• Key Performance Indicators

• Results

• Summary

FINAL RESULTS PRESENTATION:

FOR THE YEAR ENDING APRIL 2014 30TH JULY 2014 | TAVISTOCK | FINSBURY PAVEMENT | LONDON

Page 4: ITM Power Results Presentation

HFUEL: REFUELLING STATIONS

HYDROGEN ENERGY SYSTEMS

RAPID RESPONSE ELECTROLYSER

Scalable | Rapid Response | Self pressurising

Page 5: ITM Power Results Presentation

HGAS: POWER-TO-GAS

HYDROGEN ENERGY SYSTEMS

RAPID RESPONSE ELECTROLYSER

Scalable | Rapid Response | Self pressurising

Page 6: ITM Power Results Presentation

REFERENCE PLANT

REFERENCE PLANT | GERMANY | UK | USA

A major barrier to entry has been overcome

• NRE has been invested

• Products have been standardised

• Compliance in UK | EU | USA

• Power-to-Gas and Refuelling Stations

HYDROGEN ENERGY SYSTEMS

Page 7: ITM Power Results Presentation

REGULATIONS, CODES & STANDARDS

A leading role in shaping hydrogen deployment

• Secretary of BCGA Technical Steering Committee 9

• Secretary and UK Expert to ISO Technical Committee 197

• UK Expert to ISO working groups…

• …for electrolysers, dispensers & H2 quality

• Next Chair of BSI PVE/3/8

HYDROGEN ENERGY SYSTEMS

COMPLIANCE

Code of Practice 41: H2 Fuelling Stations Design & Construction Maintenance & Operation

ISO 19880-1: H2 Fuelling Stations ISO 22734: Electrolyser ISO 14687: H2Quality

BSI PVE/3/8: H2 Systems Standardisation Production & Storage Transport, Measurement & Use

Page 8: ITM Power Results Presentation

P2G RATIONALE

P2G RATIONALE

MARKET SIZE

Page 9: ITM Power Results Presentation

GROWING WIND GENERATION

ENERGY STORAGE: THE NEED

HYDROGEN ENERGY SYSTEMS

• Evidence of grid balancing problems

from Germany and Denmark

• Problems start at 20% capacity

• UK hit this threshold at the

end of 2013

• Energy Storage is a Market Pull

Source: ITM Power plc, data from BWEA

Page 10: ITM Power Results Presentation

THE NEED: GRID BALANCING

BALANCING SUPPLY AND DEMAND:

• A total of £725m paid for balancing services in 2010–11

• Estimates in 2020 are: circa £1.9bn – £5.9bn pa

• Tariffs already operational in the UK: FCDM response sub 2 seconds

HYDROGEN ENERGY SYSTEMS

Page 11: ITM Power Results Presentation

WHY POWER-TO-GAS?

POWER-TO-GAS RATIONALE

Electricity cannot be stored easily | Hydrogen can be stored easily in the gas grid

Source: ITM Power plc

HYDROGEN ENERGY SYSTEMS

Page 12: ITM Power Results Presentation

ENERGY STORAGE TECHNOLOGIES

ENERGY STORAGE TECHNOLOGIES

Power-to-gas is efficient | long term | low energy cost

Source: ITM Power plc

HYDROGEN ENERGY SYSTEMS

Page 13: ITM Power Results Presentation

0%

5%

10%

15%

20%

25%

30%

35%

0.0%

0.5%

1.0%

1.5%

2.0%

2.5%

3.0%

3.5%

0 2 4 6 8 10 12

Frac

tio

n w

ind

ou

tpu

t cu

rtai

led

Hyd

roge

n f

ract

ion

(vo

l%)

Excess wind (TWh pa)

725 TWh p.a. natural gas consumption, 30 GW wind capacity (2020)

Hydrogen fraction

Curtailment

HYDROGEN FRACTION VS EXCESS WIND LEVELS

ENERGY STORAGE | CLEAN FUEL

• Capturing 2.8 TWh pa of excess wind (ie 4% of 2020 output)

• Requiring 978MW of electrolysis at 30% utilisation (£1.7bn market)

• Results in average national hydrogen content of 0.5%, reducing carbon footprint by 0.2%

Source: ITM Power plc

POWER-TO-GAS IN THE UK

Page 14: ITM Power Results Presentation

P2G PROJECTS

THÜGA PROJECT

METHANATION

UREA

USA | CALIFORNIA

Page 15: ITM Power Results Presentation

FIRST P2G SALE: THÜGA GROUP

Won competitive tender on performance and price

• One of the world’s largest utility groupings

• 18,200 employees

• 5.7m customers (electricity, 3.6m, gas 2.1m)

• Sales of €21.3bn

• Plant located at Mainova AG in Frankfurt

• A pipeline of potential customers

360KW POWER-TO-GAS MODULE

Source: Thüga-Gruppe

HYDROGEN ENERGY SYSTEMS

Page 16: ITM Power Results Presentation

A challenging time frame

• Discussions April 2011

• Competitive tender process

• Order March 2013

• On site in September 2013

• CE marked in December 2013

• TÜV permit in December 2013

• Hydrogen injected in December 2013

THE SCHEDULE

THE SCHEDULE

HYDROGEN ENERGY SYSTEMS

Page 17: ITM Power Results Presentation

A challenging time frame

• Discussions April 2011

• Competitive tender process

• Order March 2013

• On site in September 2013

• CE marked in December 2013

• TÜV permit in December 2013

• Hydrogen injected in December 2013

THE SCHEDULE

THE SCHEDULE

HYDROGEN ENERGY SYSTEMS

Build

• Procurement

• Manufacture

• Control system design

CE Mark

• PED

• EMC

• Machinery

• ATEX

Commission

• Loop checks

• Acceptance

• Performance

Permit

• Documentation

• Audit

• Certificate

Page 18: ITM Power Results Presentation

P2G PLANT & VISITOR CENTRE

HYDROGEN ENERGY SYSTEMS

Page 19: ITM Power Results Presentation

MIXING PLANT

HYDROGEN ENERGY SYSTEMS

Page 20: ITM Power Results Presentation

Beyond the Thüga project

• Thüga II

• P2G in Germany, USA and UK

• Methanation | BioGas upgrading

• Ammonia | Urea (2% of global energy)

POWER-TO-GAS PROJECTS PIPELINE

POWER-TO-GAS PROJECTS PIPELINE

HYDROGEN ENERGY SYSTEMS

Page 21: ITM Power Results Presentation

CPUC Sets the energy storage mandate for the power sector

• Energy storage target of 1,325 megawatts

• 3 major CA utilities by 2020

• Optimization of the grid, including peak reduction

• Integration of renewable energy

• Reduction of GHG emissions to 80% below 1990 levels by 2050

“This decision represents an important first step in encouraging

the storage market and supporting grid reliability,” Commissioner Carla J. Peterman, the lead Commissioner for this proceeding.

CALIFORNIA ENERGY STORAGE

1.3GW ENERGY STORAGE MANDATE IN CALIFORNIA

HYDROGEN ENERGY SYSTEMS

Page 22: ITM Power Results Presentation

CLEAN FUEL

WHAT IS A FCEV

OEM ALLIANCES

THE CARS

Page 23: ITM Power Results Presentation

FUEL CELL CARS

WHAT IS A FUEL CELL CAR?

An EV drive train that’s refuelled rather than recharged

• Refuel in 3 minutes

• Range 400 miles

• Managed export of

energy from the grid

HYDROGEN ENERGY SYSTEMS

Page 24: ITM Power Results Presentation

FCEV ALLIANCES

2013 | FCEV ALLIANCES

Four fuel cell manufacturers have

emerged; with 8 OEM’s rolling out cars

• Hyundai

• Nissan: Ford | Daimler

• Toyota: BMW

• Honda: GM

HYDROGEN ENERGY SYSTEMS

Page 25: ITM Power Results Presentation

HYUNDAI IX35 FCEV

Launched in 2013

California, Germany and UK

Lease $499/month

HYDROGEN ENERGY SYSTEMS

Page 26: ITM Power Results Presentation

TOYOTA FCEV

Launch in 2015

California, Germany and UK

Sale $70k

HYDROGEN ENERGY SYSTEMS

Page 27: ITM Power Results Presentation

ISLAND HYDROGEN

UKH2MOBILITY

HYFIVE

CHINO CA

RIVERSIDE CA

CLEAN FUEL

PROJECTS

Page 28: ITM Power Results Presentation

Hydrogen Energy Storage Smart Grid

• £2.4m TSB consortium grant

• Installation of 80kg/day and 15kg/day refuellers at 350bar

• Fleet of 20 vehicles (HICE and FC)

• Hydrogen energy storage system

• Balancing supply and demand

ISLAND HYDROGEN

HYDROGEN ENERGY SYSTEMS

Page 29: ITM Power Results Presentation

ISLAND HYDROGEN

HYDROGEN ENERGY SYSTEMS

Page 30: ITM Power Results Presentation

UK REFUELLING STATIONS

UK REFUELLING STATIONS

EcoIsland (TSB)

1x80kg | 1x15kg

£1.5m

HyFive (EU)

3x80kg

€3.0m

OLEV £10m Call

6x80kg

Tender

H2Mobility

65x80kg

Tender

H2Mobility

1,000 Stations

Tender

Development of a UK Infrastructure Business

• Grant funded Capex and Opex

• Maintenance contract with each award

• OLEV £10m call in Sept | OLEV £60m call in early 2015

• OLEV have indicated £100m allocated for hydrogen (un-announced)

HYDROGEN ENERGY SYSTEMS

Page 31: ITM Power Results Presentation

Selected by the LHP as the 2013 HRS partner

• LHP Funded the ITM Power 2013 JTI submission

• 100 Fuel Cell Electric Vehicles from 5 OEMs

• ITM to build 3 refuelling stations in London

• Backing from the Mayor’s office

• €18m total EU (JTI) funding

• £2.8m to ITM Power

LONDON HYDROGEN PARTNERSHIP

HYDROGEN ENERGY SYSTEMS

Page 32: ITM Power Results Presentation

WWW.HYFIVE.EU

HYDROGEN ENERGY SYSTEMS

Page 33: ITM Power Results Presentation

FCH JU 2: 2014

FCH JU 2: 2014

HYDROGEN ENERGY SYSTEMS

FCH budget €1.4bn, managed by the New Energy World

• Development: 100% of the total eligible cost

• Demonstrations: 70% maximum will apply for profit making entities

Pillar 1: FCH technologies for Transportation Systems

• Road transport

• FCEV

• HRS infrastructure

Pillar 2: FCH Technologies for Energy Systems

• Hydrogen as a flexible link between renewable energy both mobile and stationary systems.

• Storage of renewable electricity and grid balancing, including hydrogen blending in the natural gas grid

• Fuel cells in power

• Power systems for domestic, commercial, municipal and industrial applications

Page 34: ITM Power Results Presentation

CALIFORNIA REFUELLING STATIONS

CALIFORNIA REFUELLING STATIONS

2013 PON

Hyundai Chino

Won $1.3m

2014 PON

Riverside

Won $2.1m Bid

2015 PON

10x100kg

Tender

8 More PON’s

80x100kg

Annual Tender

California Hydrogen Infrastructure Deployment

• Fund of $200m for 100 hydrogen stations with up to $20m a year for 10yrs

• 2012: ITM Power Inc. established in California

• 2013: ITM Power Inc. wins H2 station award with 2 North American partners at Hyundai, Chino

• 2014: ITM Power Inc. wins H2 station award with 2 North American partners at the City of Riverside

HYDROGEN ENERGY SYSTEMS

Page 35: ITM Power Results Presentation

BOARD

AWARENESS

KPI’S

CORPORATE

Page 36: ITM Power Results Presentation

THE BOARD

HYDROGEN ENERGY SYSTEMS

THE BOARD

Page 37: ITM Power Results Presentation

AWARENESS

AWARENESS

HYDROGEN ENERGY SYSTEMS

Source: Thuega

National and International Coverage

• Radio 4: Costing the Earth

• Guardian: Power-to-Gas energy storage

• Royal Academy of Engineering presentation

• Platts on Power-to-Gas energy storage

Page 38: ITM Power Results Presentation

KEY PERFORMANCE INDICATORS

KEY PERFORMANCE INDICATORS

Clear measures of business performance

• Technology

• Cumulative test hours KPI 1

• Technology

• Cumulative installed capacity KPI 2

• Commercial

• Product sales KPI 3

• Commercial

• Project income KPI 4

• Commercial

• Projects under contract KPI 5

• Financial

• Headcount and staff costs KPI 6

HYDROGEN ENERGY SYSTEMS

Page 39: ITM Power Results Presentation

KPI 1: CUMULATIVE TEST HOURS

ENERGY STORAGE | CLEAN FUEL

KPI 1: CUMULATIVE TEST HOURS

Cumulative test hours

• Test stands fully automated & data logged

• Qualifying performance of key cell & stack components

• Developing predictive tools

Page 40: ITM Power Results Presentation

KPI 2: INSTALLED CAPACITY

KPI 2: INSTALLED CAPACITY

Cumulative capacity

• Tracks the technology deployment

• Tracks available reference plant

• Installed capacity is a key metric in tender documents

HYDROGEN ENERGY SYSTEMS

Page 41: ITM Power Results Presentation

KPI 3: PRODUCT SALES & PROJECT INCOME

KPI 3: PRODUCT SALES & PROJECT INCOME

Customers are often confidential; we announce when

possible. Order book needs strong balance sheet

For year ending April 30th 2012

• £1.46m total inflow

• £0.48m product sales

• £0.98m grant funding

For year ending April 30th 2013

• £1.45m total inflow

• £0.09m product sales

• £1.36m grant funding

For year ending April 30th 2014

• £3.08m total inflow

• £1.13m product sales

• £1.96m project funding

£0

£500,000

£1,000,000

£1,500,000

£2,000,000

£2,500,000

£3,000,000

£3,500,000

2010 2011 2012 2013 2014

Sales Revenue

Project Income

HYDROGEN ENERGY SYSTEMS

Page 42: ITM Power Results Presentation

KPI 4: PROJECT INCOME

KPI 4: PROJECT INCOME

Customers are often confidential; we announce when

possible. Order book needs strong balance sheet

For year ending April 30th 2012

• £1.46m total inflow

• £0.48m product sales

• £0.98m grant funding

For year ending April 30th 2013

• £1.45m total inflow

• £0.09m product sales

• £1.36m grant funding

For year ending April 30th 2014

• £3.08m total inflow

• £1.13m product sales

• £1.96m project funding

£0

£500,000

£1,000,000

£1,500,000

£2,000,000

£2,500,000

£3,000,000

£3,500,000

£4,000,000

2010 2011 2012 2013 2014 2015 2016 2017

Collaborative Project Funding

Applied For

Negotiation

Secured

Paid

HYDROGEN ENERGY SYSTEMS

Page 43: ITM Power Results Presentation

KPI 5: PROJECTS UNDER CONTRACT

KPI 5: PROJECTS UNDER CONTRACT

Contract Project To be paid Project Type User

EcoIsland 360kW £760k £1.5m Grant SSE

Chino I 360kW £621k £773k Sale Hyundai

Phaedrus 120kW £536k £731k Grant Shell/Diamler

Common E 120kW £260k £279k Grant ITM

HyFive 3x 360kW £2.75m £2.75m Grant GLA

DECC 100kW £78k £325k Grant ITM

HMGS Hpac40+ £100k £100k Sale HMGS

HMGS II Hpac40+ £74k £74k Sales HMGS

Riverside 60kW+ £1,265k £1,265k Grant CoR

Other Smaller £105k Sales -

Total £6,550k

Pipeline of projects is rapidly growing

• £9.56m of projects under contract or in the final stages of negotiation

• £6.55m of projects under contract

• £3.01m of contracts in final negotiation

• Rapidly growing pipeline

HYDROGEN ENERGY SYSTEMS

Page 44: ITM Power Results Presentation

KPI 6: HEAD COUNT | STAFF COSTS

KPI 6: HEAD COUNT | STAFF COSTS

Staff and Country Reps | £4m pa

• Headcount has only increased by <10% despite a 100% increased grant take and revenue

• £1.2m of costs (labour and overhead) funded by grants

• Increase in staff in production and field engineer teams – service delivery

£0

£50,000

£100,000

£150,000

£200,000

£250,000

£300,000

£350,000

£400,000

May

13

Jun

e 1

3

July

13

Au

g 1

3

Sep

-13

Oct

-13

No

v-1

3

De

c-1

3

Jan

-14

Feb

-14

Mar

-14

Ap

r-1

4

Staff costs per month

Repsand BD

StaffCosts

-

10

20

30

40

50

60

70

80

90

May

-13

Jun

-13

Jul-

13

Au

g-1

3

Sep

-13

Oct

-13

No

v-1

3

De

c-1

3

Jan

-14

Feb

-14

Mar

-14

Ap

r-1

4

Staff Numbers per month

Repsand BD

Staff

HYDROGEN ENERGY SYSTEMS

Page 45: ITM Power Results Presentation

Key Financial Results for the year ended 30 April 2014:

Total Income incorporating sales revenue and projects income £3.077m (2013: £1.44m) up 114%

Sales Revenue £1.127 (2013: £0.087m) up £1.040m

Collaborative projects income £1.370m (2013: £1.35m)

Additional capitalised project income £0.58m (2013: £nil)

Increase in fixed assets to £1.755m from £1.463m, up 20%

Loss from operations £7.978m (2013: £6.518)

Cash burn £7.568m (2013: £6.1m)

Cash balance £9.763m (2013: £5.94m)

Two placings creating proceeds of £12.0m before expenses

FINAL RESULTS PRESENTATION:

FOR THE YEAR ENDING APRIL 2014 30TH JULY 2014 | TAVISTOCK | FINSBURY PAVEMENT | LONDON

Page 46: ITM Power Results Presentation

Commercial progress to date:

A Total of £9.56m of projects under contract or in the final stages of negotiation

£6.55m of projects under contract

£3.01m of contracts in the final stages of negotiation

Strongly developing pipeline of commercial sales and funded projects

FINAL RESULTS PRESENTATION:

FOR THE YEAR ENDING APRIL 2014 30TH JULY 2014 | TAVISTOCK | FINSBURY PAVEMENT | LONDON

Page 47: ITM Power Results Presentation

FINAL RESULTS PRESENTATION:

FOR THE YEAR ENDING APRIL 2014 30TH JULY 2014 | TAVISTOCK | FINSBURY PAVEMENT | LONDON