Upload
the-nbs
View
1.047
Download
0
Embed Size (px)
Citation preview
The countdown to 2016:Your action list to be ready
Daniel Walsh
Senior BIM Author
@DanWalsh82
Countdown to Level 2 BIM
B/555 Roadmap
Level 2 BIM Timeline
Action List
Your checklist to be ready
Today’sAgenda
Government Construction Strategy - May 2011
History of Mandate
2011 20162012 2013 2014 2015
Government Construction Strategy - May 2011
Now = March 2015
History of Mandate
2011 20162012 2013 2014 2015
You are Here
Government Construction Strategy - May 2011
Now = March 2015
Level 2 BIM by early 2016
History of Mandate
2011 20162012 2013 2014 2015
You are Here
B/555 Roadmap
B/555 Roadmap
B/555 Roadmap
Level 2 BIM Timeline
2011 20162012 2013 2014 2015
Government Construction Strategy
Now
1192 Standards
2011 20162012 2013 2014 2015
BS 1192:2007Collaborative production of architectural,
engineering and construction information. Code of practice
Now
2011 20162012 2013 2014 2015
PAS 1192-2:2013Specification for information management
for the capital/delivery phase of construction projects using building
information modelling
1192 Standards
Now
2011 20162012 2013 2014 2015
PAS 1192-3:2014Specification for information management
for the operational phase of assets using building information modelling
1192 Standards
Now
2011 20162012 2013 2014 2015
BS 1192-4:2014Fulfilling employers information exchange
requirements using COBieCode of practice
1192 Standards
Now
2011 20162012 2013 2014 2015
PAS 1192-5:DraftSpecification for security-minded building
information modelling, digital built environments and smart asset management.
PAS 1192-5
DRAFT
1192 Standards
PAS 1192-5
DRAFTNow
PAS 1192-5
DRAFT
2011 20162012 2013 2014 2015
BS 8541-1:2012Library objects for architecture, engineering and
construction - Identification and classification.
8541 Standards
Now
PAS 1192-5
DRAFT
2011 20162012 2013 2014 2015
BS 8541-2:2011Library objects for architecture, engineering and
construction – Recommended 2D symbols of building elements for use in Building Information
Modelling.
8541 Standards
Now
PAS 1192-5
DRAFT
2011 20162012 2013 2014 2015
BS 8541-3:2012Library objects for architecture, engineering and
construction – Shape and measurement
8541 Standards
Now
PAS 1192-5
DRAFT
2011 20162012 2013 2014 2015
BS 8541-4:2012Library objects for architecture, engineering and construction –Attributes for specification and
assessment
8541 Standards
Now
PAS 1192-5
DRAFT
BS 8541-5
TBD
2011 20162012 2013 2014 2015
BS 8541-5:TBDLibrary objects for architecture, engineering and
construction – Assemblies
8541 Standards
PAS 1192-5
TBDNow
PAS 1192-5
DRAFT
2011 20162012 2013 2014 2015
BS 8541-6:TBDLibrary objects for architecture, engineering and
construction – Product Declarations
8541 StandardsBS 8541-6
TBD
PAS 1192-5
TBD
PAS 1192-6
TBDNow
PAS 1192-5
DRAFT
2011 20162012 2013 2014 2015
BS 7000-4:2013Design Management Systems:
Guide to managing design in construction
7000 Standards
PAS 1192-5
TBD
PAS 1192-6
TBDNow
PAS 1192-5
DRAFT
2011 20162012 2013 2014 2015
BIP 2207Building Information Management – A standard
framework and guide to BS 1192
BIP 2207 Guide
PAS 1192-5
TBD
PAS 1192-6
TBDNow
PAS 1192-5
DRAFT
2011 20162012 2013 2014 2015
Uniclass 1 & 1.4 & 2 & TBDClassification system for structuring
construction information.
Uniclass Classification
PAS 1192-5
TBD
PAS 1192-6
TBD
1
2 TBDUniclass
TBDNow
PAS 1192-5
DRAFT
2011 20162012 2013 2014 2015
NRM 1Order of Cost Estimating and Cost Planning for
Capital Building Works
Method of Measurement
PAS 1192-5
TBD
PAS 1192-6
TBD
1
2 TBDUniclass
TBDNow
PAS 1192-5
DRAFT
2011 20162012 2013 2014 2015
NRM 2Detailed Measurement for Building Works
Method of Measurement
PAS 1192-5
TBD
PAS 1192-6
TBD
1
2 TBDUniclass
TBDNow
PAS 1192-5
DRAFT
2011 20162012 2013 2014 2015
NRM 3Order of cost estimating and cost planning for
building maintenance works
Method of Measurement
PAS 1192-5
TBD
PAS 1192-6
TBD
1
2 TBDUniclass
TBDNow
PAS 1192-5
DRAFT
2011 20162012 2013 2014 2015
CESMM4Civil Engineering Standard Method of
Measurement 4th edition
Method of Measurement
PAS 1192-5
TBD
PAS 1192-6
TBD
1
2 TBDUniclass
TBDNow
PAS 1192-5
DRAFT
2011 20162012 2013 2014 2015
DPoWDigital Plan of Work
Delivery
PAS 1192-5
TBD
PAS 1192-6
TBD
1
2 TBDUniclass
TBDNow
Pre-Qualification Questionnaire
Be able to respond to the 4 BIM questions that form table 8 of PAS 91.
PAS 91
Action List
Employer’s Information Requirements
Be able to prepare, contribute to or respond to EIRs.
EIR
Action List
BIM Execution Plan
Be able to prepare or contribute to pre and post contract BEPs.
BEP
Action List
CIC BIM Protocol
Aware of implications of, and have willingness and ability to append BIM Protocol to contracts and PI insurances.
BIM Protocol
Action List
Common Data Environment
Able to work within a CDE that is capable of achieving the processes outlined within 1192 suite of documents.
CDE
Action List
Able to produce graphical and / or information BIM data in the format required by all project participants, including IFC and COBie.
Producing BIM Data
Action List
Able to interrogate the BIM data produced by all project participants, using findings to inform decisions.
Interrogating BIM Data
Action List
Able to produce or contribute to BIM uses required for project: Clash resolution; programme analysis; cost analysis; etc
BIM Uses
Action List
Digital Plan of Works
Use the Digital Plan of Works to be able to define, manage and interact with the management processes and Levels of Development required for the project.
DPoW
Action List
PAS 91
EIR
BEP
BIM Protocol
CDE
Producing BIM Data
Interrogating BIM Data
BIM Uses
DPoW
Action List