Page 1: Countdown to 2016: Your Task List to Get BIM Ready

The countdown to 2016:Your action list to be ready

Daniel Walsh

Senior BIM Author

@DanWalsh82

Page 2: Countdown to 2016: Your Task List to Get BIM Ready

Countdown to Level 2 BIM

B/555 Roadmap

Level 2 BIM Timeline

Action List

Your checklist to be ready

Today’sAgenda

Page 3: Countdown to 2016: Your Task List to Get BIM Ready

Government Construction Strategy - May 2011

History of Mandate

2011 20162012 2013 2014 2015

Page 4: Countdown to 2016: Your Task List to Get BIM Ready

Government Construction Strategy - May 2011

Now = March 2015

History of Mandate

2011 20162012 2013 2014 2015

You are Here

Page 5: Countdown to 2016: Your Task List to Get BIM Ready

Government Construction Strategy - May 2011

Now = March 2015

Level 2 BIM by early 2016

History of Mandate

2011 20162012 2013 2014 2015

You are Here

Page 6: Countdown to 2016: Your Task List to Get BIM Ready

B/555 Roadmap

Page 7: Countdown to 2016: Your Task List to Get BIM Ready

B/555 Roadmap

Page 8: Countdown to 2016: Your Task List to Get BIM Ready

B/555 Roadmap

Page 9: Countdown to 2016: Your Task List to Get BIM Ready

Level 2 BIM Timeline

2011 20162012 2013 2014 2015

Government Construction Strategy

Now

Page 10: Countdown to 2016: Your Task List to Get BIM Ready

1192 Standards

2011 20162012 2013 2014 2015

BS 1192:2007Collaborative production of architectural,

engineering and construction information. Code of practice

Now

Page 11: Countdown to 2016: Your Task List to Get BIM Ready

2011 20162012 2013 2014 2015

PAS 1192-2:2013Specification for information management

for the capital/delivery phase of construction projects using building

information modelling

1192 Standards

Now

Page 12: Countdown to 2016: Your Task List to Get BIM Ready

2011 20162012 2013 2014 2015

PAS 1192-3:2014Specification for information management

for the operational phase of assets using building information modelling

1192 Standards

Now

Page 13: Countdown to 2016: Your Task List to Get BIM Ready

2011 20162012 2013 2014 2015

BS 1192-4:2014Fulfilling employers information exchange

requirements using COBieCode of practice

1192 Standards

Now

Page 14: Countdown to 2016: Your Task List to Get BIM Ready

2011 20162012 2013 2014 2015

PAS 1192-5:DraftSpecification for security-minded building

information modelling, digital built environments and smart asset management.

PAS 1192-5

DRAFT

1192 Standards

PAS 1192-5

DRAFTNow

Page 15: Countdown to 2016: Your Task List to Get BIM Ready

PAS 1192-5

DRAFT

2011 20162012 2013 2014 2015

BS 8541-1:2012Library objects for architecture, engineering and

construction - Identification and classification.

8541 Standards

Now

Page 16: Countdown to 2016: Your Task List to Get BIM Ready

PAS 1192-5

DRAFT

2011 20162012 2013 2014 2015

BS 8541-2:2011Library objects for architecture, engineering and

construction – Recommended 2D symbols of building elements for use in Building Information

Modelling.

8541 Standards

Now

Page 17: Countdown to 2016: Your Task List to Get BIM Ready

PAS 1192-5

DRAFT

2011 20162012 2013 2014 2015

BS 8541-3:2012Library objects for architecture, engineering and

construction – Shape and measurement

8541 Standards

Now

Page 18: Countdown to 2016: Your Task List to Get BIM Ready

PAS 1192-5

DRAFT

2011 20162012 2013 2014 2015

BS 8541-4:2012Library objects for architecture, engineering and construction –Attributes for specification and

assessment

8541 Standards

Now

Page 19: Countdown to 2016: Your Task List to Get BIM Ready

PAS 1192-5

DRAFT

BS 8541-5

TBD

2011 20162012 2013 2014 2015

BS 8541-5:TBDLibrary objects for architecture, engineering and

construction – Assemblies

8541 Standards

PAS 1192-5

TBDNow

Page 20: Countdown to 2016: Your Task List to Get BIM Ready

PAS 1192-5

DRAFT

2011 20162012 2013 2014 2015

BS 8541-6:TBDLibrary objects for architecture, engineering and

construction – Product Declarations

8541 StandardsBS 8541-6

TBD

PAS 1192-5

TBD

PAS 1192-6

TBDNow

Page 21: Countdown to 2016: Your Task List to Get BIM Ready

PAS 1192-5

DRAFT

2011 20162012 2013 2014 2015

BS 7000-4:2013Design Management Systems:

Guide to managing design in construction

7000 Standards

PAS 1192-5

TBD

PAS 1192-6

TBDNow

Page 22: Countdown to 2016: Your Task List to Get BIM Ready

PAS 1192-5

DRAFT

2011 20162012 2013 2014 2015

BIP 2207Building Information Management – A standard

framework and guide to BS 1192

BIP 2207 Guide

PAS 1192-5

TBD

PAS 1192-6

TBDNow

Page 23: Countdown to 2016: Your Task List to Get BIM Ready

PAS 1192-5

DRAFT

2011 20162012 2013 2014 2015

Uniclass 1 & 1.4 & 2 & TBDClassification system for structuring

construction information.

Uniclass Classification

PAS 1192-5

TBD

PAS 1192-6

TBD

1

2 TBDUniclass

TBDNow

Page 24: Countdown to 2016: Your Task List to Get BIM Ready

PAS 1192-5

DRAFT

2011 20162012 2013 2014 2015

NRM 1Order of Cost Estimating and Cost Planning for

Capital Building Works

Method of Measurement

PAS 1192-5

TBD

PAS 1192-6

TBD

1

2 TBDUniclass

TBDNow

Page 25: Countdown to 2016: Your Task List to Get BIM Ready

PAS 1192-5

DRAFT

2011 20162012 2013 2014 2015

NRM 2Detailed Measurement for Building Works

Method of Measurement

PAS 1192-5

TBD

PAS 1192-6

TBD

1

2 TBDUniclass

TBDNow

Page 26: Countdown to 2016: Your Task List to Get BIM Ready

PAS 1192-5

DRAFT

2011 20162012 2013 2014 2015

NRM 3Order of cost estimating and cost planning for

building maintenance works

Method of Measurement

PAS 1192-5

TBD

PAS 1192-6

TBD

1

2 TBDUniclass

TBDNow

Page 27: Countdown to 2016: Your Task List to Get BIM Ready

PAS 1192-5

DRAFT

2011 20162012 2013 2014 2015

CESMM4Civil Engineering Standard Method of

Measurement 4th edition

Method of Measurement

PAS 1192-5

TBD

PAS 1192-6

TBD

1

2 TBDUniclass

TBDNow

Page 28: Countdown to 2016: Your Task List to Get BIM Ready

PAS 1192-5

DRAFT

2011 20162012 2013 2014 2015

DPoWDigital Plan of Work

Delivery

PAS 1192-5

TBD

PAS 1192-6

TBD

1

2 TBDUniclass

TBDNow

Page 29: Countdown to 2016: Your Task List to Get BIM Ready

Pre-Qualification Questionnaire

Be able to respond to the 4 BIM questions that form table 8 of PAS 91.

PAS 91

Action List

Page 30: Countdown to 2016: Your Task List to Get BIM Ready

Employer’s Information Requirements

Be able to prepare, contribute to or respond to EIRs.

EIR

Action List

Page 31: Countdown to 2016: Your Task List to Get BIM Ready

BIM Execution Plan

Be able to prepare or contribute to pre and post contract BEPs.

BEP

Action List

Page 32: Countdown to 2016: Your Task List to Get BIM Ready

CIC BIM Protocol

Aware of implications of, and have willingness and ability to append BIM Protocol to contracts and PI insurances.

BIM Protocol

Action List

Page 33: Countdown to 2016: Your Task List to Get BIM Ready

Common Data Environment

Able to work within a CDE that is capable of achieving the processes outlined within 1192 suite of documents.

CDE

Action List

Page 34: Countdown to 2016: Your Task List to Get BIM Ready

Able to produce graphical and / or information BIM data in the format required by all project participants, including IFC and COBie.

Producing BIM Data

Action List

Page 35: Countdown to 2016: Your Task List to Get BIM Ready

Able to interrogate the BIM data produced by all project participants, using findings to inform decisions.

Interrogating BIM Data

Action List

Page 36: Countdown to 2016: Your Task List to Get BIM Ready

Able to produce or contribute to BIM uses required for project: Clash resolution; programme analysis; cost analysis; etc

BIM Uses

Action List

Page 37: Countdown to 2016: Your Task List to Get BIM Ready

Digital Plan of Works

Use the Digital Plan of Works to be able to define, manage and interact with the management processes and Levels of Development required for the project.

DPoW

Action List

Page 38: Countdown to 2016: Your Task List to Get BIM Ready

PAS 91

EIR

BEP

BIM Protocol

CDE

Producing BIM Data

Interrogating BIM Data

BIM Uses

DPoW

Action List