PORTFOLIO - MLADEN LUKIC- “Sogeco “ - bigger and more important projects -

-PORTFOLIO MLADEN LUKIC

Embed Size (px)

Citation preview

Page 1: -PORTFOLIO     MLADEN LUKIC

PORTFOLIO - MLADEN LUKIC- “Sogeco “- bigger and more important projects -

Page 2: -PORTFOLIO     MLADEN LUKIC

.

2007 - Avenue Hasan II – Malabo, E. Guinea, value of the project - 9 million EUR

My responsibility: senior site superintendent.

Page 3: -PORTFOLIO     MLADEN LUKIC

My job: earthworks, excavation, subbase, base, pipeline, buried networks, curbs, sidewalks, fit-out, finishing. Direct supervision of 30 workmen and four groups contractors.

2008 - Expressway Malabo II, E. Guinea, value of the project - 72 million EUR

Page 4: -PORTFOLIO     MLADEN LUKIC

My responsibility: senior site superintendent.

My job: earthworks,sewer lines, curbs, concrete form work, concrete finishing, fit-out, finishing. Direct supervision of 20 workmen and five groups contractors.

Page 5: -PORTFOLIO     MLADEN LUKIC

2009 and 2010 - Highway Bata - Mongomo , E. Guinea, value of the project - 720million EUR

Page 6: -PORTFOLIO     MLADEN LUKIC

My responsibility: senior site superintendent.

My job: Site installation, Camp Building, capacity of 300 workers, earthworks, concrete form work, concrete finishing, installing Concrete factory, installation workshops, accompanying facilities for the quarry, Installation precasт concrete factory ,overpass, bridge . . Direct supervision of 75 workmen and four groups contractors.

Page 7: -PORTFOLIO     MLADEN LUKIC

2011- “ Sipopo” Urbanisation exclusive diplomatic Village, Malabo, E. Guinea,value of the project - 80million EUR

My responsibility: senior site superintendent

My job: earthworks,preparation for 28 km streets asphalting, subbase and base, landscaping and buried networks (cable lines, pipeline, sewerlines ) fit-out, finishing. Direct supervision of 25 workmen and five groups contractors.

Page 8: -PORTFOLIO     MLADEN LUKIC

2012 -2013 - “Santa Maria” The urbanization part of town, Malabo, E. Guinea, value of the project - 21million EUR

My responsibility: senior site superintendent

My job: earthworks, excavation, subbase, base, pipeline, buried networks, curbs, sidewalks, fit-out, finishing. Direct supervision of 15 workmen and four groups contractors.

Page 9: -PORTFOLIO     MLADEN LUKIC

2013 - 2014 - “Streets reconstruction- Malabo”, E. Guinea, value of the project - 34million EUR

My responsibility: senior site superintendent

My job: demolition, cleaning, preparation for streets asphalting, subbase and base, cable lines, pipeline, sewerlines,fit-out, finishing. Direct supervision of 15 workmen and seven groups contractors.

Page 10: -PORTFOLIO     MLADEN LUKIC

Jobs for “Besix”: (as a subcontractor within SOGECO) 2012 -management building Marathon- company, Malabo, value of the project- unknown My responsibility: senior site superintendent My job : Building parking lot . (no pictures) 2016: Protection of the Punta Cristina Cliffs –Malabo value of the project-unknown

My responsibility: senior site superintendent

My job: earthworks, incorporation approximately 60 000 m3 of compacted material. Direct supervision of 6-8 heavy machinery operator and 15 truck driver

All projects listed in the portfolio have been constructed successfully and according to all the r equirements of investors and in within the stipulated timeframe.                                                           The truthfulness of the data in the portfolio and the quality of my work, you can check with:

Мr. Vlastimir  Radovic  CEO of "SOGECO-ECOCSA"   Equatorial Guinea e-mail [email protected] tel. +240 222 258505  and +240 222 555 267284        

Mr. Predrag Milenkovic Deputy General Manager "SOGECO-ECOCSA" [email protected]   tel.+240 222 268922 