Tesmont PROJE MÜHENDİSLİK ELEKTRİK MEKANİK TAAHHÜT PROJECT ENGINEERING ELECTRIC MECHANIC CONTRACTS INC. Firma Tanıtım Dosyası Company Introduction File

Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

Embed Size (px)

Citation preview

Page 1: Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

T E S M O N T

Tesmont PROJE MÜHENDİSLİK ELEKTRİK MEKANİK TAAHHÜT

PROJECT ENGINEERING ELECTRIC MECHANIC CONTRACTS INC.

Firma Tanıtım Dosyası

Company Introduction File

T E S M O N T

Tesmont PROJE MÜHENDİSLİK ELEKTRİK MEKANİK TAAHHÜT

PROJECT ENGINEERING ELECTRIC MECHANIC CONTRACTS INC.

Firma Tanıtım Dosyası

Company Introduction File

Page 2: Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

TESMONT TESMONTSyf / Page 2 Syf / Page 3

T E S M O N T

Syf / Page 1

TESMONT Mühendislik, öncelikle uzmanlığı olan gıda, ilaç, kimya, petrokimya, demirçelik, plastik ve otomotiv sektörleri olmak üzere, tüm sektörlerde mühendislik, müşavirlik ve taahhüt hizmetleri vermek üzere kurulmuştur.

Kurucularının 20 yılın üzerindeki endüstriyel tesis proje ve yatırım tecrübelerini bir araya getirmesi ile, elektrik, otomasyon ve mekanik sistemlerde müşterilerine komple çözümler sunabilecek bir yapı oluşturulmuş ve ihtiyaç sahiplerinin hizmetine sunulmuştur. Firmamızın bu yapı içerisinde sağladığı hizmetler temel olarak;

Proje ve Mühendislik Proje Yönetimi & Kontrolörlük Taahhüt Ekipman İmalatı Tesis bakım

TESMONT Mühendislik, yatırımcıların üzerindeki proje yükünü alarak, anahtar teslim tesisler üretmeyi amaç edinmiştir.

ŞŞŞiiirrrkkkeeettt ppprrrooofffiiillliii

T E S M O N T

Syf / Page 2

TESMONT Engineering, was founded to fulfill engineering, consulting and contracting services at all industries, primarily chemical, pharmaceutical, petrochemical, food, steel, plastic and automotive industries that it specializes.

By bringing together, over 20 years experiences of its founders at industrial projects and investments, have been constituted a structure that will be able to offer complete solutions to customers regarding electrical, automation and mechanical systems and it has been presented to investors. These services basically are,

Project and Engineering Project Management & Supervision Contracting Equipment Manufacturing Maintenance

TESMONT Engineering, by taking the burden of investors on projects, aims to produce turnkey plants.

CCCooommmpppaaannnyyy ppprrrooofffiiillleee

Page 3: Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

TESMONT TESMONTSyf / Page 4 Syf / Page 5

T E S M O N T

Syf / Page 3

Vizyonumuz TESMONT Mühendislik, çalışmalarında iş güvenliği, çevre ve kaliteyi ön

planda tutarak müşterilerinin memnuniyetini, ülke taahhüt sektörünün gelişiminde pay sahibi olarak uluslararası alanda ülkesini temsil edebilmeyi ve çalışanlarının gurur duyabileceği bir firma olmayı hedef edinmiştir.

Misyonumuz

Kaliteli hizmet anlayışı ile en kısa sürede müşterilerinin ihtiyaçlarına cevap verebilmek, Teknolojiyi yakından takip ederek, müşterilerine verdiği hizmette en yeni ve en

ekonomik çözümleri üretmek, Tedarikçileri ve müşterileri ile birlikte ekip halinde çalışarak, zaman ve malzeme

israfını önlemek, Faaliyetlerinde, doğal kaynakların verimli kullanılmasını sağlamak. Çalışanlarını, çevre

ve enerjinin verimli kullanımı hakkında bilinçlendirmek, İş güvenliğinden taviz vermeden çalışanlarının güven içinde çalışmalarını temin

etmek, Personeline ekip ruhunu aşılayarak, yaptığı işlerde farkını müşterilerine hissettirmek.

VVViiizzzyyyooonnn

MMMiiisssyyyooonnn

T E S M O N T

Syf / Page 4

Our Vision

TESMONT Engineering, aims to satisfy its clients by prioritizing safety, environment and quality at its works, aims to represent his country in international area by sharing the development of contract sector and aims to be a company that the employees proud of.

Our Mission

Quick response to customer requirements by quality in mind, To produce the new and most economical solutions to its customers by following the

technology closely, To prevent time and wastage of material by working as team with customers and

suppliers, To provide effecient usage of natural sources at its activities. To make employees

conscious regarding environment and effecient energy usage, To provide reliable environment for employees without concession from health and

safety, To make sure that clients feel the difference at its works by injecting a spirit of

teamwork to its employees.

VVViiisssiiiooonnn

MMMiiissssssiiiooonnn

Page 4: Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

TESMONT TESMONTSyf / Page 6 Syf / Page 7

T E S M O N T

Syf / Page 5

Proje & Mühendislik:

Firmamızın uygulama projesi hazırladığı, proje yönetimi, kontrolörlük ve müşavirlik hizmetleri verdiği konular ana başlıkları ile aşağıdaki gibidir;

Mekanik

Borulama ve Enstrüman diyagramları (P&I)

Proses akış diyagramları (PFD) Ekipman data sheetleri ve spesifikasyonlarının hazırlanması

Ekipman ve boru layout planları Basınçlı hava sistemleri Hvac sistemleri Salamura Soğutma / sıcak, ve soğuk su sistemleri

Ekipman imalat çizimleri Çelik konstrüksiyon planları

Elektrik / Otomasyon

Orta gerilim (34,5kV) sistemleri Alçak gerilim (0,4kV) sistemleri Zayıf akım sistemleri (Telefon, Cctv, Yangın algılama&ihbar, data vb.)

Dahili / Harici Aydınlatma sistemleri Jeneratör sistemleri Kompanzasyon sistemleri Topraklama & paratoner sistemleri Motor kontrol panoları PLC / Sürücü panoları Enerji Dağıtım panoları Exproof Sistemler Saha enstrüman kablo planları Otomasyon sistemleri PLC / Scada yazılım

HHHiiizzzmmmeeetttllleeerrriiimmmiiizzz

T E S M O N T

Syf / Page 6

Project & Engineering:

The main subjects that our company provides service for, regarding application project preparation, project management and consulting, are as following;

Mechanic

Piping and Instrument Diagrams (P&I) Process Flow Diagrams (PFD) Preparations of Equipment Data Sheets and Specifications

Equipment and Pipe Layout Plans Compressed air systems Hvac systems Briny Refrigiration/hot and cold water systems

Equipment manufacturing drawings Steel Construction Plans

Electrical / Automation

Medium Voltage (34,5kV) systems Low Voltage (0,4kV) systems Weak Current Systems (Telephone, Cctv, Fire Detection&Alarm, Data etc.)

Internal / External Lighting Plans Generator Systems Compansation Systems Grounding & Lightning Systems Motor Central Control Panels (MCC) PLC / Inverter Panels Energy Distribution Panels Exproof Systems Site instrumentation cable plans Automations Systems PLC / Scada Software

OOOuuurrr ssseeerrrvvviiiccceeesss

Page 5: Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

TESMONT TESMONTSyf / Page 8 Syf / Page 9

T E S M O N T

Syf / Page 7

Taahhüt: Firmamız yukarıdaki ana konularda

hazırladığı veya hazırlanmış olan projelerde taahhüt hizmeti verir. Taahhüt hizmetimiz, iş güvenliği esas alınarak şantiye organizasyonun yapılması, gerekli taşıma, kaldırma ekipmanların şantiyeye sevki, boru köprülerinin, kanal taşıyıcılarının imalatı ve montajı, projesine göre imalatı yapılmış elektrik panel, mekanik ekipmanlar vs. yerlerine montajı ve devreye alınması dahil tüm tesisin ihtiyacı olan teknik çalışmaları kapsamaktadır.

Ekipman İmalatı: İlaç, gıda ve kimya sanayi için

reaktör, tank, silo, ısı değiştiriciler, filtrasyon ekipmanları, platformlar, bu sektörlerde ve diğer tüm sektörler için ihtiyaca göre belirlenecek ekipmanların tasarım, projelendirme ve imalatı.

HHHiiizzzmmmeeetttllleeerrriiimmmiiizzz

T E S M O N T

Syf / Page 8

Contracting Service: Our company provides contracting

services for projects those prepared by itself or already prepared, regarding above main subjects. Human safety based contract services include all required technical works together with site organisation, transferring the necessary lifting equipments to site, manufacturing and installation of the pipe bridges and duct supports, installations of the electrical panels and mechanical equipments etc. those prepared according to their projects and start-up of the systems.

Equipment Manufacturing:

Design, Project and Manufacturing of reactor, tank, silo, heat exchangers, filtration equipments, platforms for pharma, food, chemical industries and all required equipments for these industries and others.

OOOuuurrr ssseeerrrvvviiiccceeesss

Page 6: Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

TESMONT TESMONTSyf / Page 10 Syf / Page 11

T E S M O N T

Syf / Page 9

Tesis Bakım: İsterseniz komple işletmenizin bakımı,

isterseniz kısmi olarak peryodik, kestirimci ve arızi bakımların yapılması ekiplerimiz tarafından gerçekleştirilir. Komple bakımı alınan işletmelerde, bakım planları dahilinde çalışmalar yapılarak hedeflere ulaşılması amaçlanır. Çalışmalarda prosesin durumuna göre periyodik veya kestirimci bakımlara önem verilerek, arızalar düşürülür, işletme verimliliği artırılır.

TPM i esas almış işletmelerde, bakım düzeni TPM e göre kurulur ve uygun vasıflarda ekip görevlendirilir.

Fabrika Montaj / Demontaj:

Firmamız, her sektör için geçerli olmak üzere, satın aldığınız veya yurtiçi / yurtdışından demonte edilerek fabrikanıza monte edilecek makinelerin sorunsuz biçimde kurulumunu gerçekleştirmektedir. Uzman elektrik ve mekanik ekiplerle, sadece makinalarınız değil, dilerseniz tüm fabrikanızı bir yerden diğer bir yere taşıyarak montajını yapar ve devreye alır.

HHHiiizzzmmmeeetttllleeerrriiimmmiiizzz

T E S M O N T

Syf / Page 10

Maintenance: If you want for all your plant, if you

want partly; preventive, predictive and corrective maintenance is performed by our teams. At the plants that we completely took maintenance jobs, intended to reach to targets by making periodical plans. Failure rates are decreased by emphasising preventive and predictive maintenance according to process conditions and increased effeciency of your plant. If the customers

have TPM at their plant, the maintenance organisation is established according to TPM rules and assigned suitable team.

Plant Installation / Deinstallation:

Our company implements machine installation and deinstallations for all industrial machines those you buy new or used from local or abroad. Expert electrical and mechanical teams not only transport your machines and also transport your all plant from one place to another and make their start-up.

OOOuuurrr ssseeerrrvvviiiccceeesss

Page 7: Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

TESMONT TESMONTSyf / Page 12 Syf / Page 13

T E S M O N T

Syf / Page 11

TTTaaammmaaammmlllaaannnaaannn ppprrrooojjjeeellleeerrr

T E S M O N T

Syf / Page 12

CCCooommmpppllleeettteeeddd ppprrrooojjjeeeccctttsss

Page 8: Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

TESMONT TESMONTSyf / Page 14 Syf / Page 15

T E S M O N T

Syf / Page 13

KİMYA ENDÜSTRİSİ

MUSTAFA NEVZAT İLAÇ SAN. TİC. A.Ş. / PAK HOLDİNG

Proje kapsamı: FDA, GMP kurallarına uygun olarak, iİlaç hammadde üretim tesisi elektrik/mekanik projelendirme, uygulama (Açık alan: 60.000m²)

Mekanik

Proses ekipmanları (reaktörler, tanklar, filtreler, öğütme ve kırma ekipmanları vs) projelendirme, imalat, montaj ve devreye alma

Proses ekipmanları (gl reaktörler, tanklar, pompalar, filtreler, santrifujler, kurutma ekipmanları) boyutlandırma, montaj ve devreye alma

Paslanmaz çelik, seramik, cam ve özel plastiklerden oluşan proses hatlarının projelendirilmesi, imalat ve montajı

Üretim utility sistemlerinin kapasitelerinin belirlenmesi, projelendirme, tesisat proje ve montajı (salamuralı soğutma sistemi, soğuk su sistemi, sıcak su ve buhar sistemleri, basınçlı hava sistemi, azot sistemi, vakum sistemleri)

Hijyen odaları ve kontrollu alanlar için HVAC sistemleri projelendirme, santral ve kanal montajları

Elektrik

2x2000 kVA tranformatör tesisi projelendirme

2x1250 kVA jeneratör ve transfer panosu tesisi projelendirme

Ana dağıtım panelleri projelendirme İdari bina elektrik tesisatı

projelendirme Exproof bölge sınıflandırma Exproof tesisat projelendirme MCC panel projelendirme Topraklama / paratoner tesisatı

projelendirme Tali dağıtım panelleri projelendirme Aydınlatma tesisatı projelendirme

T E S M O N T

Syf / Page 14

PHARMACEUTICAL INDUSTRY

MUSTAFA NEVZAT İLAÇ SAN. TİC. A.Ş. / PAK HOLDİNG

Project Scope: Electrical / mechanical project and application of Pharmaceutical production plant according to FDA, GMP rules, (Open area: 60.000m²)

Mechanical

Process equipments (reactors, tanks, filters, milling and crushing equipments etc.) projecting, manufacturing, erection and commissioning

Process equipments (gl reactors, tanks, pumps, filters, centrifuges, drying equipments) dimensioning, erection and commissioning

Stainless steel, ceramic, glass and special plastic process lines projecting, erection and commissioning

Utility system capacity design, projecting, installation projects and erection (briny refrigeration systems, cold water, hot water and steam systems, compressed air, nitrogen and vacuum systems)

Hvac project for clean rooms and controlled areas, Hvac units and ducts installations

Electrical

2x2000 kVA tranformer station projecting

2x1250 kVA generator and transfer panel projecting

Main distribution panels projecting Administration building electrical

installations Exproof zone classifications Exproof installation projecting MCC panel projects Grounding / Lightning installation

projecting Distribution panels projecting Internal / external lighting installation

projecting

Page 9: Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

TESMONT TESMONTSyf / Page 16 Syf / Page 17

T E S M O N T

Syf / Page 15

KİMYA / İLAÇ ENDÜSTRİSİ

ULKAR KİMYA SAN. TİC. A.Ş. / NOBEL İLAÇ

Proje kapsamı: FDA, GMP kurallarına uygun olarak, ilaç hammadde üretim tesisi mekanik projelendirme, uygulama

Proses ekipmanları (reaktörler, tanklar, filtreler, öğütme ve kırma ekipmanları vs) projelendirme, imalat, montaj ve devreye alma

Proses ekipmanları (gl reaktörler, gl tanklar, pompalar, filtreler, santrifujler, kurutma ekipmanları) boyutlandırma, montaj ve devreye alma

Saf su ünitesi projesi, dağıtım ringleri

imalatı ve montajı; Ön filtrasyon, Saflaştırma unitesi, Saf su depolama ve dağıtım ringleri

Üretim utility sistemlerinin kapasitelerinin belirlenmesi, projelendirilmesi, tesisat proje ve montajı. (salamuralı soğutma sistemi, soğuk su sistemi, sıcak su ve buhar sistemleri, basınçlı hava sistemi, azot sistemi, vakum sistemleri, hvac sistemleri)

Paslanmaz çelik, seramik, cam ve özel plastiklerden oluşan proses hatları projelendirme, imalat ve montajı

T E S M O N T

Syf / Page 16

PHARMACEUTICAL INDUSTRY

ULKAR KİMYA SAN. TİC. A.Ş. / NOBEL İLAÇ

Project Scope: Electrical / mechanical project and application of Pharmaceutical production plant according to FDA, GMP rules,

Process equipments (reactors, tanks, filters, milling and crushing equipments etc.) projecting, manufacturing, erection and commissioning

Process equipments (gl reactors, tanks, pumps, filters, centrifuges, drying equipments) dimensioning, erection and commissioning

Pure water unit project, distribution

rings manufacturing and installation;

Pre-filtration, purification unit, pure water storage and distribution rings.

Utility system capacity design, projecting, installation projects and erection (briny refrigeration systems, cold water, hot water and steam systems, pressurized air, nitrogen and vacuum systems) Hvac project for clean rooms and controlled areas, Hvac units and ducts installations

Stainless steel, ceramic, glass and special plastic process lines projecting, erection and commissioning

Page 10: Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

TESMONT TESMONTSyf / Page 18 Syf / Page 19

T E S M O N T

Syf / Page 17

PETROKİMYA ENDÜSTRİSİ

PETKİM / ALİAĞA

Proje kapsamı: Güriş Makine – Gemsan Konsorsiyumunda Aliağa – Petkim de 5 adet 1600 m3 küresel tank ile 1 adet 170 m3’ lük yatay silindirik tankın imalatı, montajı ve boru bağlantılarının yapılması.

T E S M O N T

Syf / Page 18

PETROCHEMICAL INDUSTRY

PETKİM / ALİAĞA

Project Scope: 5 x 1.600 m³ spherical tank and 1 x 170 m³ horizontal cylindrical tank manufacturing, erection and pipe connections with Güriş Makine – Gemsan Consortium at Aliağa - Petkim

Page 11: Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

TESMONT TESMONTSyf / Page 20 Syf / Page 21

T E S M O N T

Syf / Page 19

KİMYA ENDÜSTRİSİ

BASF TÜRK KİMYA SAN. Ve TİC. A.Ş.

Proje kapsamı: Tesisin bilimum noktalarında borulama, ekipman yerleşim projeleri, P&I diyagramları ve boru izometriklerinin çizilmesi, enstrüman montajlarının yapılması.

Proses ekipmanları için projelendirme

ve mühendislik çalışmarı Proses boruları, proses akış

diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması

Ekipman yerleşim planlarının (layout plan) hazırlanması

Ekipman data sheet ve spesifikasyon sayfalarının oluşturulması

T E S M O N T

Syf / Page 20

CHEMICAL INDUSTRY

BASF TÜRK KİMYA SAN. Ve TİC. A.Ş.

Project Scope: Piping projects, equipment placement projects, P&I diagrams and pipe isometric drawings, instrumentation projects and installations at various points of the plant. Project and engineering works for

process equipments Preparing of process pipes, process

flow diagrams (PFD) and pipe instrumentation diagrams (P&ID)

Preparing of equipment layout plans Preparing of equipment data sheet

and specifications

Page 12: Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

TESMONT TESMONTSyf / Page 22 Syf / Page 23

T E S M O N T

Syf / Page 21

GIDA ENDÜSTRİSİ

EKMEK UNLU GIDA SAN. TİC. A.Ş. / ATA HOLDİNG

Proje Kapsamı: HACCP e uygun olarak, Burger King hamburger ve tost ekmeği Gebze üretim tesisleri elektrik / mekanik projelendirme, uygulama (Açık Alan: 40.000 m²)

Elektrik

2x1600 ve 2x1000kVA 34,5/0,4kV transformatör tesisi proje, uygulaması

2x1250kVA jeneratör tesisi proje, uygulaması

AG ana dağıtım panelleri, kompanzasyon panelleri, transfer panoları, tali dağıtım panoları proje ve tesisi

Dahili / harici aydınlatma tesisatı proje ve uygulaması

Topraklama / paratoner tesisatları proje ve uygulaması

Zayıf akım tesisatları yapımı (data, telefon,cctv,yangın algılama)

Continue hamburger ve tost ekmeği hatları MCC panelleri ve kablo montajları

Fırın enstruman montajları ve kablo bağlantıları

Mekanik

HVAC sistemleri proje, kurulumu Isıtma ve buhar kazanları proje, kurulumu Sıcak / Soğuk su sistemleri proje, kurulumu Basınçlı hava hattı tesisi proje, kurulumu Hava, su, doğalgaz proje, borulama Yangın su hatları proje, borulama, Paslanmaz platform imalat ve montajları Konveyör hatları, üretim makineleri

montajları 4x30m³ paslanmaz silo imalatı, montajı

T E S M O N T

Syf / Page 22

FOOD INDUSTRY

EKMEK UNLU GIDA SAN. TİC. A.Ş. / ATA HOLDİNG

Project Scope: Electrical / mechanical project and application of Burger King bun and toast bread production plant according to HACCP (Open Area: 40.000 m²)

Electrical

2x1600 ve 2x1000kVA 34,5/0,4kV transformer stations projecting, commissioning

2x1250kVA generator facility projecting, erection and commissioning

LV main distribution panels,compensation panels, transfer panels, distribution panels projecting, erection and commissioning

Internal / external lighting project and installation

Grounding / lightning project and installations

Weak current installations (data, telephone, cctv, fire detection/alarm)

Continue bun and toast bread lines MCC panels and cable installations

Oven instrumentation and cable connections

Mechanical

HVAC systems projecting, erection Heating/steam boiler projecting, erection Hot / Cold water projecting, erection Pressurised air system projecting, erection Air, water, natural gas projecting, pipe

installation Fire water lines installation SS platforms manufacturing and erection Conveyor lines, production machines

installation 4x30m³ SS silo manufacturing, erection

T E S M O N T

Syf / Page 22

FOOD INDUSTRY

EKMEK UNLU GIDA SAN. TİC. A.Ş. / ATA HOLDİNG

Project Scope: Electrical / mechanical project and application of Burger King bun and toast bread production plant according to HACCP (Open Area: 40.000 m²)

Electrical

2x1600 ve 2x1000kVA 34,5/0,4kV transformer stations projecting, commissioning

2x1250kVA generator facility projecting, erection and commissioning

LV main distribution panels,compensation panels, transfer panels, distribution panels projecting, erection and commissioning

Internal / external lighting project and installation

Grounding / lightning project and installations

Weak current installations (data, telephone, cctv, fire detection/alarm)

Continue bun and toast bread lines MCC panels and cable installations

Oven instrumentation and cable connections

Mechanical

HVAC systems projecting, erection Heating/steam boiler projecting, erection Hot / Cold water projecting, erection Pressurised air system projecting, erection Air, water, natural gas projecting, pipe

installation Fire water lines installation SS platforms manufacturing and erection Conveyor lines, production machines

installation 4x30m³ SS silo manufacturing, erection

Page 13: Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

TESMONT TESMONTSyf / Page 24 Syf / Page 25

T E S M O N T

Syf / Page 23

DEMİR ÇELİK ENDÜSTRİSİ

TEZCAN GALVANİZLİ YAPI ELEMANLARI A.Ş.

Proje Kapsamı: Fırınlama yöntemi ile sıcak daldırma continue galvanizleme tesisi kurulumu, elektrik montajları.

Boy kesme hatları MCC panelleri ve kontrol kabloları montajları

Dilme, trapez, gofraj, profil hatları MCC panelleri ve kontrol kabloları montajları

Galvaniz hattı fırın enstrüman ve kontrol kabloları montajları

Galvaniz hattı MCC panelleri ve kontrol kabloları montajları

Boya hattı MCC panelleri ve kontrol kabloları montajları

Galvaniz hattı hız artırımı upgrade projeleri

34,5/0,5kV, 500kVA transformatör montajı

T E S M O N T

Syf / Page 24

STEEL INDUSTRY

TEZCAN GALVANİZLİ YAPI ELEMANLARI A.Ş.

Project Scope: Electrical installations of flat steel plant which makes hot dip galvanizing with oven process.

Cut-to-cut lines MCC panels and control cables installations

Slitting, trapeze, embossing, profile lines MCC panels and control cables installations

Galvanizing line oven instrumentation and control cable installations

Galvanizing line MCC panels and control cables installations

Painting line MCC panels and control cables installations

Galvanizing line up grade projects

34,5/0,5kV, 500kVA transformer station installations

Page 14: Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

TESMONT TESMONTSyf / Page 26 Syf / Page 27

T E S M O N T

Syf / Page 25

OTOMOTİV ENDÜSTRİSİ

YAZAKI WIRING TECHNOLOGIES

Proje Kapsamı: Yazaki Mudanya tesisi elektrik / mekanik sistemleri modernizasyon projelendirme, uygulama

Açık Alan: 20.000 m²

Mekanik

İşletmenin basınçlı hava hatlarının, ısıtma sisteminin, lay-out unun projelendirilerek yenilenmesi ve çelik konstrüksiyon ofis imalatı işi;

Basınçlı hava kompresörleri boyutlandırma ve montajları

Basınçlı hava tankı boyutlandırma, imalatı ve montajı

Basınçlı hava tesisatı borulama Isıtma tesisatı borulama Üretim makineleri mekanik montajları Çelik konstrüksiyon ofis yapımı

Elektrik

İşletmenin tüm elektrifikasyonunun projelendirilerek yenilenmesi işi;

Aydınlatma busbar projelendirme ve montajı

Enerji dağıtım busbar projelendirme ve montajı

Alçak gerilim Ana dağıtım, kompanzasyon panoları proje, imalat, montaj ve tesisatları

Aydınlatma panoları proje, imalat, montaj ve tesisatları

250kVA jeneratör ve transfer panosu proje, montajı ve devreye alma

2x40kVA UPS montajı, tesisatı Zayıf akım tesisatı (data, telefon) Üretim makinaları besleme tesisatları

T E S M O N T

Syf / Page 26

AUTOMOTIVE INDUSTRY

YAZAKI WIRING TECHNOLOGIES

Project Scope: Electrical / mechanical projecting and application of automotive harness plant(Open Area: 20.000 m²)

Mechanical

Rebuild the plant mechanical systems by projecting complete pressurised air lines, heating systems and production machines erection & commissioning according to new layout;

Air compresors dimensioning and installations

Compressed air tank dimensioning, manufacturing, erection & commissioning

Compressed air lines installations Heating lines installations Production machines mechanical

erection & commissioning Steel construction offices

manufacturing

Electrical

Rebuild complete electrical systems

Lighting busbars projectings and installations

Energy distribution busbars projectings and installations

LV main distribution panel, compansation panel projectings, manufacturing and installations

Lighting panels projectings, manufacturing and installations

250kVA generator and transfer panel projecting, erection&commissioning

2x40kVA UPS erection, installation Weak current installations (data,

telephone) Production machines energy supply

installations

Page 15: Tesmonttesmont.com/tr/tesmont-katalog.pdf · Proses boruları, proses akış diyagramının ve boru enstrümantasyon diagramının (P&ID) hazırlanması Ekipman yerleşim planlarının

T E S M O N T

Syf / Page 27

TESMONT Mühendislik

Karabaş Mh. Belde Sk. Ekşi İş Merkezi No: 5 İzmit / Kocaeli / Türkiye Tel/Faks: +90 (0262) 311 06 92 - +90 (0532) 385 62 16/17

Web Page: www.tesmont.com E-Mail: [email protected]