  • Pearl GTL Project

    LINDE ENGINEERING

    Contractor Project No : 5887 Shell Project No: HP-3000-QAT

    Project Document Number: T- 4.234.540 Project Rev.: A Page 2 of 13

    Purchase Order Number: 2MH127

    N/A Tag/Item Number(s):

    ASU Unit(s):

    Z PCWBS:

  • QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION

    D A 14.02.2008 Ready For Construction SB UA MC/ZG RFC

    C O 02.10.2007 Issued for Company Comments IO UA MC/ZG ICC

    B Issued for Review IO UA MC/ZG IFR

    A Issued for Internal Review IO UA MC/ZG IIR

    Approved By

    GAMA Project Rev Rev. Date Description

    Prepared By

    Checked By Status

    No. No. ORIGINATOR

    Document Title:

    LINDE ENGINEERING AG

    PROCEDURE FOR INSTALLATION OF FENCE AND GATE

    Document No.

    GAM PRO QAC GTL 022 D LOC470

    Contractor

    Gama Qatar Co. W. L. L. Org.

    Code Doc. Type

    Disc. Code

    Geogr. Area

    Seq. No

    Rev. No Vendor Code

    Project Document Number: T-4.234.540 Rev No: A

  • Doc. Title : GAM-PRO-QAC-GTL-022 Rev. D PROCEDURE FOR INSTALLATION OF FENCE AND GATE Date : 14.02.2008

    T-4.234.540Rev. A Page 4 of 13

    QQQ AAA TTT AAA RRR

    TABLE OF CONTENTS 1 SCOPE................................................................................................................................................5 2 PURPOSE ..........................................................................................................................................5 3 REFERENCES ..................................................................................................................................5 4 DEFINITIONS ....................................................................................................................................7 5 HSSE...................................................................................................................................................7 6 RESPONSIBILITIES ........................................................................................................................8 7 PROCEDURE ....................................................................................................................................8

    7.1 TYPE OF FENCING AND MATERIALS............................................................................................9 7.1.1 General Requirements of Materials ................................................................................................................ 9 7.1.2 Foundation.......................................................................................................................................................... 9

    7.2 INSTALLATION...................................................................................................................................10 8 QUALITY ASSURANCE................................................................................................................11 9 ATTACHMENT................................................................................................................................11

  • Doc. Title : GAM-PRO-QAC-GTL-022 Rev. D PROCEDURE FOR INSTALLATION OF FENCE AND GATE Date : 14.02.2008

    T-4.234.540Rev. A Page 5 of 13

    QQQ AAA TTT AAA RRR

    1 SCOPE

    This Quality Control Procedure relates to the Verification of all construction activities for Installation of Fencing. This specification covers the minimum inspection requirements for fencing installation for the PEARL GTL ASU PROJECT. The fencing inside the Temporary facilities is not in the scope of this procedure.

    2 PURPOSE This Quality Control Procedure defines the documentation to be collated and the inspections to be carried out in order to verify and record that all fencing installation activities are conformant to the requirements in the Project Specification.

    3 REFERENCES

    ACI 116 Cement and Concrete Terminology ACI 117 Standard Specification for Tolerances for Concrete

    Construction and Materials ACI 121 Quality Management System for Concrete

    Construction ACI 201 Guide to Durable Concrete ACI 207 Mass Concrete ACI 209 Prediction of Creep, Shrinkage, and Temperature

    Effects in Concrete Structures ACI 211 Standard Practice for Selecting Proportions for

    Normal, Heavyweight, and Mass Concrete ACI 212 Chemical Admixtures for Concrete ACI 214 Recommended Practice for Evaluation of Strength

    Test Results of Concrete ACI 221 Guide for Use of Normal Weight and Heavyweight

    aggregates in Concrete ACI 222 Corrosion of Metals in Concrete ACI 224 Control of Cracking in Concrete Structures ACI 234 Guide for the Use of Silica Fume in Concrete ACI 301 Specifications for Structural Concrete ACI 302 Guide for Concrete Floor and Slab Construction ACI 304 Guide for Measuring, Mixing, Transporting, and

    Placing Concrete ACI 305 Hot Weather Concreting ACI 308 Standard Practice for Curing Concrete ACI 309 Guide for Consolidation of Concrete ACI 311 Guide for Concrete Inspection ACI 315 Details and Detailing of Concrete Reinforcement ACI 318 Building Code Requirements for Structural Concrete

    and Commentary

  • Doc. Title : GAM-PRO-QAC-GTL-022 Rev. D PROCEDURE FOR INSTALLATION OF FENCE AND GATE Date : 14.02.2008

    T-4.234.540Rev. A Page 6 of 13

    QQQ AAA TTT AAA RRR

    ACI 325 Guide for Construction of Concrete Pavements and Bases

    ACI 347 Guide to Formwork for Concrete ACI 355 State-of-the-Art Report on Anchorage to Concrete ACI 503 Use of Epoxy Compounds With Concrete ACI 504 Guide to Sealing Joints in Concrete Structures ACI 533 Guide for Precast Concrete Panels ACI 543 Design, Manufacture, and Installation of Concrete

    Piles ACI 544 State-of-the-Art Report on Fiber Reinforced Concrete ACI 546 - 22 Measurements of Properties of Fiber Reinforced

    Concrete ACI 548 Guide for the Use of Polymers in Concrete ACI 546 Concrete Repair Guide ASTM A 36 Standard Specification for Carbon Structural Steel ASTM A 36 Specification for Steel Wire, Plain, for Concrete

    Reinforcement ASTM A 153 Specification for Zinc Coating (Hot-Dip) on Iron and

    Steel Hardware ASTM A 185 Specification for Welded Steel Wire Fabric for

    Concrete Reinforcement ASTM A 354 Standard Specification for Quenched and Tempered

    Alloy Steel Bolts, Studs, and Other Externally Threaded Fasteners

    ASTM A 370 Test Methods and Definitions for Mechanical Testing of Steel Products

    ASTM C 31 Standard Practice for Making and Curing Concrete

    Test Specimens in the Field ASTM C 33 Specifications for Concrete Aggregates ASTM C 39 Test Method for Compressive Strength of Cylindrical

    Concrete Specimens ASTM C 40 Test Method for Organic Impurities in Fine

    Aggregates for Concrete ASTM C 88 Test Method for Soundness of Aggregates by Use of

    Sodium Sulfate or Magnesium Sulfate ASTM C 94 Standard Specification for Ready Mixed Concrete ASTM C 117 Test Method for Material Finer Than 75 Micrometer

    Sieve in Mineral Aggregates by Washing ASTM C 127-128 Test Method for Specific Gravity and Absorption of

    Fine & Coarse Aggregates ASTM C 131 Test Method for Resistance to Degradation of Small-

    Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine

    ASTM-A392 Zinc-Coated Steel Chain-Link Fence Fabric QCS Qatar Construction Standard

  • Doc. Title : GAM-PRO-QAC-GTL-022 Rev. D PROCEDURE FOR INSTALLATION OF FENCE AND GATE Date : 14.02.2008

    T-4.234.540Rev. A Page 7 of 13

    QQQ AAA TTT AAA RRR

    BS 1722 Fences Part 1 : specification for Chain Link Fences

    BS 4102 Steel Wire and Wire Products for Fences BS 4360 Weldable Structural Steels BS 4848 Hot-Rolled Structural Steel Sections

    Part 2 : Hot Finished Hollow Sections

    4 DEFINITIONS Company : PEARL GTL Contractor : LINDE AG Sub Contractor : GAMA QATAR Contract : Pearl GTL ASU Project ITP : Inspection and Test Plan QCR : Quality Control Record QCP : Quality Control Procedure QA/QC : Quality Assurance / Quality Control TPI : Third Party Inspection

    5 HSSE

    All works shall be in compliance with the State of Qatar laws and regulations, Ras Laffan Industrial City and International standards, codes, Contractor and Company requirements and instructions. In addition, all employees on site will go through Gama Safety Induction, Linde Site Safety Induction and Company Safety Induction for site safety, health, environmental and security prior to work activities. Other training courses will be attended as required by Linde and/or Company. At a minimum, a Risk Assessment as per Project Procedures will be prepared by the Risk Assessment Team (RAT) ranking the hazards associated with project works and control measures to be taken to mitigate the hazards to an acceptable level. Such Risk Assessment is attached herewith as part of the Job Safety Analysis (JSA). Such tasks

  • Doc. Title : GAM-PRO-QAC-GTL-022 Rev. D PROCEDURE FOR INSTALLATION OF FENCE AND GATE Date : 14.02.2008

    T-4.234.540Rev. A Page 8 of 13

    QQQ AAA TTT AAA RRR

    will be carried out as per GTL-GM-001-A-5626 Job Safety Analysis and Hazard Identification Procedure. Each work scope or task will have a completed and approved Job Safety Analysis (JSA) identifying the potential hazards and control measures that will be implemented to protect people and environment. The JSA will be used by Supervisor as the basis of conducting his Pre-Task meetings, TBT and TSTI. All employees on site will have full PPE (Coverall, Safety Helmet, Safety Shoes, Safety Goggles, High-Visibility Vest and Gloves). All PPE will comply with project requirements and GTL-GM-001-A-5602 Personal Protective Equipment Procedure. To attend to the First Aid Cases and minor wounds, First Aid Kits will be provided.

    6 RESPONSIBILITIES

    1. The Section or Site Engineer is responsible for the construction activities of fence installation.

    2. The Section or Site Engineer is responsible to ensure that Request for Inspection of

    Fence Installation submitted to Quality Department, 24 hours before the proposed time of inspection to avoid delay with other activities and proper scheduling, if required.

    3. The Section or Site Engineer and QC inspector will ensure that inspections are

    carried out according to the required specifications and standards.

    4. The Laboratory Technician will ensure that all information, with respect to the result of Test carried out, is immediately conveyed to the section or Site Engineer and QC Engineer for appropriate action.

    7 PROCEDURE

    Fences shall be installed and inspected in accordance with related specifications, the design drawings and Fencing Data sheet(s).

    Shop Drawings including complete details of fence and gate construction, fence

    height, post spacing, dimensions and unit weights of framework, schedule of components, and concrete footing details shall be available prior to commence of the work.

    Subcontractor shall use existing survey monuments for horizontal and vertical

    alignment of the fence. All surveying required to locate the final fence position shall be established.

    Where fences are to run through drainage areas, culverts or troughs shall be provided to carry off water. The resulting openings below the bottom of the

  • Doc. Title : GAM-PRO-QAC-GTL-022 Rev. D PROCEDURE FOR INSTALLATION OF FENCE AND GATE Date : 14.02.2008

    T-4.234.540Rev. A Page 9 of 13

    QQQ AAA TTT AAA RRR

    fence shall be closed by proper barriers. Each barrier shall allow the flow of water while minimizing the collection of debris.

    Electrical substation fences shall be grounded in accordance with, and meet the requirements of the relevant electrical specifications.

    7.1 TYPE OF FENCING AND MATERIALS

    7.1.1 General Requirements of Materials All materials shall be new. No used, re-rolled, or open seam material will be

    acceptable.

    Gate fabric shall match fence fabric and shall be attached to the gate frame by stretcher bars. The gate frames shall be properly braced and trussed in relation to their size to prevent sagging and twisting. All joints shall be shop seal welded to provide watertight construction.

    The galvanizing for all bolts, washers, nuts, mesh screens, metal frames, fittings, barbed wire, tension wire, stirrup wire, tie wires, wire fabric and metal components of the fence shall be done by the hot-dip process and shall meet the requirements of ASTM A153.

    Zinc coating for the fabric and the barbed wire shall conform to ASTM A392 and A121, respectively.

    The details for all items such as Posts (Line posts, Terminal posts, Intermediate pull posts, Corner, end and pull posts), Gates and hardware, Braces, Extension Arms are referred in the manufacturer drawings and RLIC Security Requirements.

    7.1.2 Foundation All concrete materials mix and construction shall be in accordance with the

    project specifications. Concrete for the fencing and gate foundation shall be of plain concrete.

    Footings shall be cylindrical in shape with a top of concrete being 100 mm above finished grade as measured at the post and sloping away from the post with at least a 12 mm drop.

    The minimum footing dimensions shall be as per manufacturer recommendations

    or below Table 1 may be used if there is no recommendation available. The depth shall be measured from finished grade to bottom of concrete. The bottom of concrete shall be at least 100 mm below the bottom of the line post and 150 mm below the bottom of the corner/end post, pull post and gate post.

  • Doc. Title : GAM-PRO-QAC-GTL-022 Rev. D PROCEDURE FOR INSTALLATION OF FENCE AND GATE Date : 14.02.2008

    T-4.234.540Rev. A Page 10 of 13

    QQQ AAA TTT AAA RRR

    Table 1 MINIMUM FOOTING DIMENSIONS POST DESCRIPTION DEPTH

    mm DIAMETER

    mm Line Posts 1000(1150) 300 Corner/End post 1250(1400) 450 Pull posts 1250(1400) 450 Gate posts for gate leaf up to 1.5 m width 1250(1400) 450 Gate posts for gate leaf between 1.5 m and 3.0 m 1500 600 Gate posts for gate leaf between 3.0 m and 5.0 m width 1500 700 Figures in parenthesis shall be applied to Perimeter Fencing.

    7.2 INSTALLATION

    a) Fence installation shall be in conformance with design drawings. b) All fence components shall not infringe adjacent property lines. c) Prior to start of fence installation, Subcontractor shall inspect the site to verify

    that installation can properly commence according to the design drawings. d) Subcontractor shall use excavating machinery with caution in areas where

    existing underground lines, electrical and instrument cables, or ducts may be buried. Where there is danger of damage to such installations, hand excavation shall be used.

    e) When below grade facilities not previously indicated on the drawings are encountered, Subcontractor shall immediately notify Contractor for disposition and protect these facilities in a manner approved by Contractor before proceeding.

    f) If ground water is encountered, Subcontractor shall not proceed with work until the method for handling the water has been approved by Contractor.

    g) Subcontractor shall locate the fence lines, gates, and terminal posts with suitable stakes.

    h) Subcontractor shall perform all necessary site clearing and grading to provide an adequate clearance on both sides of the fence line, prior to the start of the fence installation.

    i) The fabric bottom shall follow finished grade. j) After fence erection, Subcontractor will be responsible for any additional grading

    required to eliminate any excessive gaps or openings between the bottom of the fabric and the finished grade. In ungraded areas, the existing ground line shall be followed. Minor irregularities shall be removed or filled in by grading for a distance of 600 mm on each side of the fence.

    k) Subcontractor shall string barbed wire across drainage ditches, and other depressions to prevent ingress into the property.

    l) The outside face of the fabric shall be considered as the fence line and shall follow this line within a tolerance of 12 mm.

    m) Fences shall not deviate from specified fence lines by more than 12 mm and shall follow contours of finished grades with 50 mm maximum clearance below the bottom of the fence, bottom rail, or tension wire at any post location.

  • Doc. Title : GAM-PRO-QAC-GTL-022 Rev. D PROCEDURE FOR INSTALLATION OF FENCE AND GATE Date : 14.02.2008

    T-4.234.540Rev. A Page 11 of 13

    QQQ AAA TTT AAA RRR

    n) All posts shall be installed plumb and true and each post shall be checked for top alignment. Bracing assemblies shall be installed so posts are plumb when the diagonal rod is under proper tension.

    o) Fabric shall be pulled taut to eliminate all slack edges and warped sections. Fabric shall be tied to posts, rails, braces and tension wires. Fabric shall be installed so that the posts are enclosed and anchored to framework so that fabric remains in tension after pulling force is released.

    p) Gates shall be installed plumb, level and secure for full opening without interference. Hardware shall be adjusted for smooth operation.

    q) Any installation that does not meet the requirements of this specification as determined by Contractor shall be promptly corrected by Subcontractor.

    r) Concrete forms shall be used in granular soils and where concrete surface coating is required.

    s) All excess material from footing excavations shall be disposed of by Subcontractor as guided by Contractor.

    t) All water and debris shall be removed from the excavation prior to pouring concrete.

    u) Footings shall be of plain concrete. v) Posts shall be adequately secured against misalignment during pouring of

    concrete and for 24 hours thereafter. w) Concrete shall be rammed solidly into the excavation and around the posts.

    8 QUALITY ASSURANCE

    A Quality Assurance System shall be operated conforming to related standards. Controls and checks shall be established and documented through relevant QCP, ITP and QCRs.

    9 ATTACHMENT

    GAM-QCR-QAC-GTL-006

    GAM-QCR-QAC-GTL-134

  • INSPECTION CHECKLIST

    SURVEYORS REPORT.

    FORM NO: GAM-QCR-QAC-GTL-006

    Rev. 0

    ITP REF. NO: GAM-ITP-QAC-GTL- REV. 0

    DATE :

    Location Bldg/Area:

    No :

    SIGN OFF WILL CONFIRM RELEASE TO EXCAVATE.

    GAMA QATAR LINDE PEARL GTL Name Position Signature Date

    0.

    Briefly describe the intention of the Survey and purpose giving details of the utility/ excavation.

    Drawing Numbers For Location give Marked up copy of Drawing:

    1. Confirm that surveying equipment is calibrated

    Calibration Cert No :

    2. Check that the drawings noted above are approved for use. N/A YES NO

    3. Check all existing utilities are clearly identified and staked out N/A YES NO

    4. Confirm that the proposed excavation is clearly staked/ Marked out. N/A YES NO

    5. Confirm depth of excavation. N/A YES NO

    Surveyors Comments plus any additional survey information.

  • PEARL GTL DEVELOPMENT PROJECT.

    INSPECTION FORM FOR FENCE & GATES

    Drawing No.: Date:

    Location: Serial No.:

    Type of Structure: ITP No.: GAM-ITP-QAC-GTL-

    GAMA QATAR CONSTRUCTION

    GAMA QATAR QA/QC LINDE CONS. LINDE QA/QC REMARKS

    Item No. TYPE OF ACTIVITY SIGN. DATE SIGN. DATE SIGN. DATE SIGN. DATE

    1.0 Foundation

    1.1 Survey, setting-out and excavation

    1.2 Formworks (if applicable)

    1.3 Fence/Gate Post Installation

    1.4 Concrete pouring & finishing

    1.5 Concrete surface preparation

    2.0 Fencing and Gate

    2.1 Installation of Fence/Gate fabric

    2.2 Installation of Barbed Wire

    3.0 Final inspection

    Form No.: GAM-QCR-QAC-GTL-134

    PRO for INSTALLATION OF FENCE & GATE-14.02.08.doc1 SCOPE 2 PURPOSE 3 REFERENCES 4 DEFINITIONS 5 HSSE 6 RESPONSIBILITIES 7 PROCEDURE 7.1 TYPE OF FENCING AND MATERIALS 7.1.1 General Requirements of Materials 7.1.2 Foundation

    7.2 INSTALLATION 8 QUALITY ASSURANCE A Quality Assurance System shall be operated conforming to related standards. Controls and checks shall be established and documented through relevant QCP, ITP and QCRs. 9 ATTACHMENT

    006-checklist surveyors report.doc Surveyors Comments plus any additional survey information.

    134-Check list for fence & gate.doc