CONC PIPE 300 DIA
CONC PIPE 450 DIA
CONC PIPE 3
00 DIA
BOX CULVERT 600X1200
CON C P
IPE 450
DIA
CON C P
IPE 300
DIA
CON C P
IPE 825
DIA
CON C PI
PE 825
DIA
BOX CULVERT 200X450
> >
TBM 101 PIN IN DUMPY RL 317.52
TBM 102 PIN IN DUMPY RL 308.56
TBM 103 PIN IN DUMPY RL 302.10
TBM 110 PIN IN DUMPY
RL 291.27
CONC PIPE 300 DIA
CONC PIPE 350 DIA
PV C P
IPE 10
0 D IA
BO X/
C 30
0X 11
50
CO NC
P IP
E 30
0 D IA
CONC PIPE DIA 350
CO NC
PI PE
D IA
12 00
CONC PIPE
DIA 3 00
CONC PIPE DIA 220
TBM 104 PIN IN DUMPY RL 299.62
TBM 105 PIN IN DUMPY
RL 294.31
TBM 107 PIN IN DUMPY
RL 282.49
TBM 108 PIN IN DUMPY RL 270.42
TBM 111 RIVET IN W'WALL RL 283.96
TBM 112 SPIKE
RL 281.17
TBM 113 SPIKE
RL 278.82
TBM 114 PIN IN DUMPY RL 271.59
TBM 115 SPIKE
RL 274.69
>TBM 116PIN IN DUMPYRL 301.28 01
02
03
AMENDMENTS
SURVEY NOTES DOCUMENT CONTROL
CITY OF GREATER BENDIGO
Approved Date
DRAFT
Date
DRAFT Revision B
CONSTRUCTION
DRAFT Revision A
TENDER Revision C
TENDER Revision D
CONSTRUCTION Revision A
12-04-19
26-06-19
- -
Tomkinson Group March 2019
Survey reference 1159201
GB4364
Tomkinson Group
Peter Seller
Andrew Smith
Mar 19
Apr 19
Apr 19
1 OF 31
REV D
Survey
Approved
Design
Checked
Bearing Datum:
vide GPS net
Height Datum:
vide Mandurang PM 127 & PM 74
(AHD)
MGA Coordinate Datum:
vide STN 1007
Ground coords shown for all other features
GB4364 DIAMOND HILL ROAD,
MANDURANG
BLACKSPOT SAFETY UPGRADES
APRIL 2019
LOCALITY PLAN
AS CONSTRUCTED
-
TENDER
- Road widening
- Line marking
- Realign intersection
- Increase bend radius
- Guard rails
PROJECT INCLUSIONS
C
a
h
i
l
l
s
R
d
DOCUMENT CONTROL
P L
A N
D E
S C
.
1 2 - 0 4 - 1 9
1 2 - 0 4 - 1 9
1 7 - 0 5 - 1 9
1 3 - 0 6 - 1 9
4 - 0 7 - 1 9
-
Set Draft Draft Draft Tender Tender Construction
ISSUE ISSUE ISSUE ISSUE ISSUE ISSUE
1
Title page
- Rev A Rev B Rev C Rev D -
2 Details & Notes - Rev A Rev C Rev D -
3 - 11 Plans - Rev A Rev C Rev D -
12 - 13
Long Sections
- Rev A Rev C Rev D -
14 - 23 Cross Sections - Rev A Rev C Rev D -
24
Long Section
- Rev A Rev C Rev D -
13-06-19
17-05-19
-
-
MG A
94
ZO NE
55 D
i a
m
o
n
d
H
i l l
R
d
K
a
n
g
a
r o
o
G
u
l l y
R
d
N
a
n
k
e
r v
i s
R
d
D i a
m o
n d
H i l l R
d
D
i
a
m
o
n
d
H
i
l
l
R
d
H o
l l i d
a y s R
d
P
e
n
t
l
a
n
d
s
R
d
P
i c
c
a
n
i n
n
y
R
d
Part A Diamond Hill Rd - Kangaroo Gully Rd to Hollidays Rd
Part C Diamond Hill Rd - Kangaroo Gully Rd Intersection Upgrade
Part B Diamond Hill Rd - Nankervis Rd
25 - 31 Cross Sections - Rev A Rev C Rev D -
Rev B
Rev B
Rev B
Rev B
Rev B
Rev B
2 OF 31
SERVICE INFORMATION
The location of underground services shown have been derived from available information, however
accuracy cannot be guaranteed. All existing service information should therefore be treated as
indicative only, and service locations must be arranged prior to commencement of any excavation.
The contractor will be held responsible for any damage caused to underground services.
Survey
Approved
Design
Checked
TENDER
PAVEMENT DETAILS:
SEAL: 7mm Primer seal
BASE: 150mm Class 1 FCR (20mm)
Compact to a min. of 98% MMDD
(min CBR 80)
SUB BASE: 150mm Class 3 FCR (40mm)
Compact to a min. of 96% MMDD
(min CBR 30)
SUB GRADE: Varies Approved clean fill compacted to a
min. of 100% SMDD.
EXISTING SUBGRADE: Where existing surface is less than
200mm below the Sub Base, the existing
surface is to be tined to a min. depth of
200mm below the Sub Base layer
before being compacted to 100% SMDD
- All other fill areas are to be filled with approved clean material
free of vegetative matter and compacted to 100% SMDD
- See notes this page for all compaction and testing requirements
Pavement / Fill Notes
1. Compaction and testing of road pavements is to be in accordance with the requirements of VicRoads Standard Specifications for Roadworks (Section
304) unless noted otherwise.Testing must be carried out by a N.A.T.A. approved laboratory, or by calibrated nuclear densometer test to the relevant
Australian Standard.
2. Compaction tests are to be undertaken in the following locations:
- At
2
3
depth of the pavement layer
- At alternating sides of the road
- 1.0m in from the seal edge or lip of kerb
- At even spacings.
3. The number of compaction tests shall comply with the table below:
Location Number of Compaction tests
Straights and curves 1 per 100m length of works (alternate sides for widening only areas)
4. Copies of the geo technical results are to be submitted to the Superintendent
5. Subbase and base materials are to be at 85% Optimum Moisture Content (OMC) during compaction, and maintained at 85% OMC until proof rolling
6. Typical Compaction levels required (unless noted otherwise):
- Subgrade: To be compacted to a minimum density ratio of 100% of the Standard Maximum Dry Density (SMDD)
- Subbase: To be compacted to a minimum density ratio of 96% of the Modified Maximum Dry Density (MMDD)
- Base: To be compacted to a minimum density ratio of 98% of the Modified Maximum Dry Density (MMDD)
5. Proof Rolling of the subgrade, sub base and base must be undertaken at the expense of the Contractor in accordance with AS3798 and the
requirements of section 173 and 204.12 of the VicRoads Specification. The Superintendent must be present during the proof rolling. The subgrade
must not deflect more than 2mm vertically within 300mm of the test roller in isolated locations.
6. Identification and treatment of soft areas during proof rolling shall be dealt with as per Sections 12.7.11 and 12.7.12 of the IDM or at the discretion of
the Superintendent.
7. All fill earthworks are to be in accordance with VicRoads Specification Section 204.
8. All fill materials are to be approved by the Superintendent prior to being imported onto the works site, and unless noted otherwise are to be a clean
clay based material free of vegetation matter or contaminants.
9. Compaction shall comply with the requirements of VicRoads Specification Section 204.
10. All filling is to comply with AS3798-1996 Appendix B, Level 1 (or 2) as specified
11. The Contractor is responsible for ensuring that all imported fill material, including topsoil, satisfies the description for clean fill material in EPA Bulletin
Publication No 448 (Sep 95) and subsequent revisions. The Contractor shall if required provide verification including test certificates to the
Superintendent
12. Where fill is required over an existing sealed road, the seal must first be removed. The remaining existing pavement is then to be tyned to a depth of
200mm prior to any fill being placed/compacted.
Spray Seal notes:
1. All Works relating to the construction of a spray seal shall comply with VicRoads
Specification 408.
2. The Contractor shall determine the design rates of application for any primer,
primerbinder, binder, surface pre-treatments, remedial works, and aggregate in
accordance with the procedures set out in the current Austroads Sprayed Seal Design
Method as listed in Section 175
3. At least 1 week prior to the commencement of sealing, the Contractor shall submit the
rates of application for bituminous material, aggregate, and rates for pre treatment for
review by the Superintendent. This should be done via submission in writing of the
form: 408.16 'Schedule of Details' in VicRoads Specification 408.
4. At the completion of Works, a job completion