1800 1800 2500 2500 2500 2500 / E-C50 CH / E-C34 CH / E-C51 CG 397 335 200 57 122 175 1593 22 203 30 22 / E-C61 CAA 212 57 6500 5700 4500 1800 2500 2500 1300 1800 1300 1800 600 1300 1300 1300 450 300 4500 600 1300 1300 1300 D-L E-A 13 14 15 16 17 18 SG:4 HANDRAILS TO INTERMEDIATE LIFTS OMITTED FOR CLARITY DESIGN BASED RESIDUAL HAZARD Design Based Hazards are actively eliminated where possible in the Design Process. Where Hazards cannot be eliminated, this symbol on the drawing with attached note means: 1. Design Based Hazards exist within this proposal. 2. Action is required by the person supervising the work to manage the design hazards during construction. In accordance with Brogan Group Procedures the PERSON SUPERVISING the construction MUST CONTACT the Design office, BEFORE WORK COMMENCES, for CLARIFICATION of the Identified Hazards. PLAN LAYOUT 1:50 ELEVATION 1:50 SECTION A-A DETAIL 1:25 A A 92.60kN 26.10kN 49.10kN 780 ALLOY BEAMS - PRIMARY BEAMS TO BE LACED AND PLAN BRACED AND FIXED TO SUPPORT LOCATIONS, AS PER THE BEAM DETAILS IN GENERAL NOTES SECTION. 780 ALLOY BEAMS - SECONDARY BEAMS TO BE LACED AND PLAN BRACED AND FIXED TO SUPPORT LOCATIONS, AS PER THE BEAM DETAILS IN GENERAL NOTES SECTION. 9.20kN 40.10kN 31.30kN SUPPORT TOWERS SUPPORT TOWERS ERECTED OFF OF LEVEL 05 SLAB AREA LOCATED ABOVE COLUMN LOCATIONS BELOW. MAXIMUM LOADS AT TOWER LOCATIONS NOTED SUPPORT TOWERS SUPPORT TOWERS ERECTED OFF OF LEVEL 05 SLAB AREA LOCATED ABOVE COLUMN LOCATIONS BELOW. MAXIMUM LOADS AT TOWER LOCATIONS NOTED 780 ALLOY BEAMS - PRIMARY BEAMS TO BE LACED AND PLAN BRACED AND FIXED TO SUPPORT LOCATIONS, AS PER THE BEAM DETAILS IN GENERAL NOTES SECTION. 780 ALLOY BEAMS - PRIMARY BEAMS TO BE LACED AND PLAN BRACED AND FIXED TO SUPPORT LOCATIONS, AS PER THE BEAM DETAILS IN GENERAL NOTES SECTION. 780 ALLOY BEAMS - SECONDARY BEAMS TO BE LACED AND PLAN BRACED AND FIXED TO SUPPORT LOCATIONS, AS PER THE BEAM DETAILS IN GENERAL NOTES SECTION. 780 ALLOY BEAMS - SECONDARY BEAMS TO BE LACED AND PLAN BRACED AND FIXED TO SUPPORT LOCATIONS, AS PER THE BEAM DETAILS IN GENERAL NOTES SECTION. BEAM CONNECTION DETAIL SUPPLEMENTARY COUPLERS ADDITIONAL LOAD BEARING COUPLERS TO BE FIXED IN LOCATIONS INDICATED. 780 ALLOY BEAMS BEAMS TO BE LACED AND PLAN BRACED AND FIXED TO SUPPORT LOCATIONS, AS PER THE BEAM DETAILS IN GENERAL NOTES SECTION. SUPPORT TOWERS SUPPORT TOWERS ERECTED OFF OF LEVEL 05 SLAB AREA LOCATED ABOVE COLUMN LOCATIONS BELOW. MAXIMUM LOADS AT TOWER LOCATIONS NOTED SUPPORT TOWERS SUPPORT TOWERS ERECTED OFF OF LEVEL 05 SLAB AREA LOCATED ABOVE COLUMN LOCATIONS BELOW. MAXIMUM LOADS AT TOWER LOCATIONS NOTED 3D DETAIL

07872-BRO-S-ZZ-DR-X-0008-C01 A1 Vertical · - BS EN 39:2001 – Tube Type 4 - BS EN 74-1:2005 – Scaffolding Fittings - BS EN 131:1993 – Ladders - BS EN 1991-1-4:2005+A1:2010 –

  • Upload
    others

  • View
    16

  • Download
    0

Embed Size (px)

Citation preview

  • 1800 1800 2500 2500 2500 2500

    /E-C

    50C

    H

    /E-C

    34C

    H

    /E-C

    51C

    G

    397

    335

    200

    57

    122

    1751593

    22 203

    30

    22

    /E-C

    61C

    AA

    21257

    6500 5700

    4500

    1800 2500 2500 1300 1800 1300 1800

    600

    1300

    1300

    1300 450

    300

    4500

    600 1300 1300 1300

    D-L

    E-A

    13 14 15 16 17 18

    BGROUPROGAN

    London:The Railway SidingsOakleigh Road South

    London N11 1HJ

    www.brogangroup.com

    Total ties

    6.4 TEST PROCEDURESTG4:11

    Table of proof test sample

    on the job

    0 - 60

    61 - 100

    101 - 120

    121 - 140

    141 - 160

    161 - 180

    181 - 200

    200 - 220

    221 - 240

    3

    number ofproof test

    5

    6

    7

    8

    9

    10

    11

    12

    50mm Min.150mm Max. 1200mm 1200mm 1200mm

    50mm Min.150mm Max.

    WORKINGDRAWING

    For Construction Purposes

    REV CHANGES BY CHK DATE

    STANDARD 3.9m BOARDTRANSOM SUPPORT DETAIL

    +100mm TOLLERANCE IN ACCORDANCE WIT TG20 TABLE 8

    This drawing is confidential and is the property of Brogan Group. The drawing is supplied subject to the Company'sstandard conditions as applicable. No unauthorised use, copy or disclosure is to be made without written permission.

    (C) Brogan Group

    This drawing has been prepared from information supplied to us, by or on behalf of the Client, who should check that theirrequirements have been correctly interpreted and that all loadings, dimensions, details, erection and striking sequences, etc. are asrequired and practicable.

    The following documents have been used to prepare this scheme:

    Design Basis

    This drawing has been prepared in accordance with the following:

    - BS 1139* Metal scaffolding- BS 2482:2009 Timber scaffold boards- BS 5950-1:2000 Structural Steelwork- BS 5975:2008+A1:2011 - Code of practice for temporary works procedures and the permissible stress design of falsework- BS EN 39:2001 – Tube Type 4- BS EN 74-1:2005 – Scaffolding Fittings- BS EN 131:1993 – Ladders- BS EN 1991-1-4:2005+A1:2010 – Eurocode: Wind Loads- BS EN 1991-1-3:2003+A1:2015 – Eurocode: Snow Loading- BS EN 10210-1:2006 – Tube Grade S355- BS EN 12811:2003 – for Tube & Fittings Scaffolding- BS EN 13374:2004 – for Temporary Edge Protection Systems- BS EN 12810-1:2003 – Façade scaffolds made of prefabricated elements – products specifications- BS EN 12811-1:2003 – Temporary Works Equipment – Performance requirements and general- BS EN 12811-4:2013 – Temporary Works Equipment – Protection fans for scaffolds.- BS EN 13374:2013 – Temporary Edge Protection Systems – Product Specification, test methods- NASC TG4:11 – Anchorage systems for scaffolding- NASC TG20:13 – Technical Guidance on the use of BS EN 12811-1

    Table 2.2 Erection tolerancesTG20:13

    Feature

    Standards Vertical to within ± 20mm in 2m (subject to max. deviation of 50mm)

    Bay length and width ± 200mm on designated lengths (smaller lengths are permitted)

    Lift height ± 100mm on designated height (smaller lengths are permitted)

    Nodes < 150mm between coupler centres,

    Bracing < 300mm from the node

    Levl to within ± 20mm in 2m (subject to max. deviation of 50mm) (1)

    Note (1) Foot ties may follow the general slope of the ground on which the scaffold is founded.

    This scaffold has been design for the following:___ No. Lifts @ ___ kN/m²___ No. Lifts @ ___ kN/m²Total No. of Boarded Lifts = ___

    Design Loads

    The Client must ensure that the foundations provided are adequate and that they are capable of taking the imposed scaffold loads.Where Brogan Group equipment is supported, anchored, suspended or tied to an existing structure or the ground, the Client mustensure that the structure is adequate to safely support the additional imposed loads. Undermining of the scaffold must be avoided atall times by the Client.Maximum Calculated Leg Load = ___ kNMaximum Lift Height = ___ m

    Foundations/Supports

    Ties on Plan, Elevation and Section are denoted thus __________________________ Minimum number of ties: ___The Client is to ensure that no ties or braces are removed without the prior approval of Brogan Group.Where proprietary anchors are specified they should be fixed and tested in accordance with the manufacturer’s recommendationsand NASC Technical Guidance TG4:11 Anchorage systems for scaffolding.Maximum anchor load = 6.10 kN

    Tying

    The following assumptions affecting the use of equipment shown on this drawing have been made:--

    Assumptions

    Brogan Group cannot and will not pass comment on the building structure being scaffolded as this involves matters beyond ourknowledge. It is the responsibility of the Client to ensure that the existing structure can safely withstand all additional imposed loadsfrom the scaffold structure.

    Permanent Structure

    No wind protection, sheeting or fans, etc. are to be added to the scaffolding structure unless otherwise stated on this drawing oragreed with Brogan Group.

    Sheeting/Fans

    No alterations to components, assembly, loading or any other aspect are to be made to the scaffold structure detailed on thisdrawing except by Brogan Group operatives authorised to do so.

    Modifications

    Written dimensions shall take precedence over scaled dimensions.The Client should verify all site dimensions and notify Brogan Group of any discrepancies.The Client is responsible for accurately setting the position of the scaffold structure.

    Dimensions

    Working Drawing - for construction purposes.Preliminary Drawing - should not be used for construction.

    Drawing Status

    The Client is responsible for obtaining all permits and permissions necessary prior to construction.Client to supply and carry out all ancillary work to scaffold structures, e.g. hoarding, lighting, baulk timber, kentledge, electricalearthing, etc.

    Permits

    Drawing to be read in conjunction with Method statement and Risk Assessment

    GENERAL NOTES

    Brogan Group drawing constitutes Design Risk assessment in accordance with Regulation 11 of CDM Regulations 2015.Refer to relevant Guides Codes and HSE publications for guidance of elimination of general risk in use of temporary works andgood practice. Wherever possible risk is designed out of this proposal.

    Design Risk

    SG:4 HANDRAILS TOINTERMEDIATE LIFTS

    OMITTED FOR CLARITY

    UBIX BEAMLACING AND BRACING DETAIL

    1000 MAX 1000 MAX 1000 MAX

    2000 MAX

    The scaffold will be erected in accordance with the requirements of NASC Safety Guidance SG4:15, SG6:15, SG25:14 and allother relevant NASC guidance.

    Erection

    DESIGN BASED RESIDUAL HAZARDDesign Based Hazards are actively eliminated where possiblein the Design Process. Where Hazards cannot be eliminated,

    this symbol on the drawing with attached note means:

    1. Design Based Hazards exist within this proposal.2. Action is required by the person supervising the

    work to manage the design hazards during construction.

    In accordance with Brogan Group Procedures the PERSON SUPERVISINGthe construction MUST CONTACT the Design office, BEFORE WORK

    COMMENCES, for CLARIFICATION of the Identified Hazards.

    Unless otherwise noted or specified by Brogan Group, all connections between structural members and standards are to be madeusing Class A right angle or swivel couplers manufactured to meet BS 1139 specifications.

    Connections

    Customer:

    Prepd By:

    Depot:

    Date:

    Title:Title:

    Project:

    Scale:

    Revision:

    Check By: Sheet:

    -Origin:

    -Volume:

    -Level:

    -Type:

    -Role:

    -Number:

    REDCLYFFE ROADBLOCK E LEVEL 05 NORTH

    ELEVATION SUPPORT DETAIL

    TELFORD HOMES

    LONDON AS SHOWN @ A1

    RB DG 13/09/17 01 OF 01

    07872 BRO S ZZ DR X 0001 C01

    PLAN LAYOUT1:50

    ELEVATION1:50

    SECTION A-A DETAIL1:25A

    A

    92.60kN

    26.10kN49.10kN

    780 ALLOY BEAMS - PRIMARYBEAMS TO BE LACED AND PLAN BRACED AND FIXED TO

    SUPPORT LOCATIONS, AS PER THE BEAM DETAILSIN GENERAL NOTES SECTION.

    780 ALLOY BEAMS - SECONDARYBEAMS TO BE LACED AND PLAN BRACED AND FIXED TOSUPPORT LOCATIONS, AS PER THE BEAM DETAILSIN GENERAL NOTES SECTION.

    9.20kN40.10kN31.30kN SUPPORT TOWERSSUPPORT TOWERS ERECTED OFF OF LEVEL 05 SLAB

    AREA LOCATED ABOVE COLUMN LOCATIONS BELOW.MAXIMUM LOADS AT TOWER LOCATIONS NOTED

    SUPPORT TOWERSSUPPORT TOWERS ERECTED OFF OF LEVEL 05 SLABAREA LOCATED ABOVE COLUMN LOCATIONS BELOW.MAXIMUM LOADS AT TOWER LOCATIONS NOTED

    780 ALLOY BEAMS - PRIMARYBEAMS TO BE LACED AND PLAN BRACED AND FIXED TO

    SUPPORT LOCATIONS, AS PER THE BEAM DETAILSIN GENERAL NOTES SECTION.

    780 ALLOY BEAMS - PRIMARYBEAMS TO BE LACED AND PLAN BRACED AND FIXED TO

    SUPPORT LOCATIONS, AS PER THE BEAM DETAILSIN GENERAL NOTES SECTION.

    780 ALLOY BEAMS - SECONDARYBEAMS TO BE LACED AND PLAN BRACED AND FIXED TO

    SUPPORT LOCATIONS, AS PER THE BEAM DETAILSIN GENERAL NOTES SECTION.

    780 ALLOY BEAMS - SECONDARYBEAMS TO BE LACED AND PLAN BRACED AND

    FIXED TO SUPPORT LOCATIONS, AS PER THEBEAM DETAILS IN GENERAL NOTES SECTION.

    BEAM CONNECTIONDETAIL

    SUPPLEMENTARY COUPLERSADDITIONAL LOAD BEARING COUPLERS TO BE FIXED IN

    LOCATIONS INDICATED.

    780 ALLOY BEAMSBEAMS TO BE LACED AND PLAN BRACED AND

    FIXED TO SUPPORT LOCATIONS, AS PER THEBEAM DETAILS IN GENERAL NOTES SECTION.

    SUPPORT TOWERSSUPPORT TOWERS ERECTED OFF OF LEVEL 05 SLAB

    AREA LOCATED ABOVE COLUMN LOCATIONS BELOW.MAXIMUM LOADS AT TOWER LOCATIONS NOTED

    SUPPORT TOWERSSUPPORT TOWERS ERECTED OFF OF LEVEL 05 SLAB

    AREA LOCATED ABOVE COLUMN LOCATIONS BELOW.MAXIMUM LOADS AT TOWER LOCATIONS NOTED

    3D DETAIL

    C01 First issue to client RB DG 13/09/17