27
09/03 09/03 Page Page 1 FAA AMHS Implementation Plan FAA AMHS Implementation Plan Bangkok, Thailand Bangkok, Thailand November 19, 2003 November 19, 2003

09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

Embed Size (px)

Citation preview

Page 1: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 11

FAA AMHS Implementation PlanFAA AMHS Implementation PlanBangkok, ThailandBangkok, Thailand

November 19, 2003November 19, 2003

FAA AMHS Implementation PlanFAA AMHS Implementation PlanBangkok, ThailandBangkok, Thailand

November 19, 2003November 19, 2003

Page 2: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 22

Outline

• ATN/AMHS Routing Concept• US and Asia/Pac ATN/AMHS Routing Architecture • FAA ATN/AMHS Service with Alternative Route• Asia/Pacific ATN Router Plan• Relationship between FTI and ATN• Global ATN Internet• FAA Fully Redundant ATN Router• FAA AMHS System• FAA AMHS Interconnection Diagram• FAA ATN Router and AMHS System in Salt Lake City NNCC• FAA ATN/AMHS Network Management Position in Salt Lake City NNCC• FAA NADIN MSN Processor with GPS Time Server• FAA/JCAB ATN/AMHS Addressing and Naming• FAA/JCAB ATN Router Site Acceptance Test• FAA/JCAB ATN/AMHS Site Acceptance Test• ATN BIS Router ICD• ATN/AMHS ICD• FAA AMHS Implementation Plan• Conclusion

Page 3: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 33

ATN/AMHS Routing Concept

R D 1

R

R R

R D 3

R D 4

R D n

R D 2

R

R R

ID R P

ID R P

ID R P

R

A M H S E S - IS

E S - IS

IS - IS

IS - IS

A M H S

IS - IS

E S - IS A M H S

IS - IS

IS - IS

ID R P

ID R P

ID R P

ID R P

Page 4: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 44

US and Asia/Pac ATN/AMHS/AFTN Routing Architecture

JapanJapan

New ZealandNew ZealandAustraliAustraliaa

FijiFiji

SingaporeSingapore

Hong KongHong Kong

USUS

ATNATN

AFTNAFTN

AFTNAFTN

AFTNAFTN

AFTNAFTN

ATNATN

ATNATN

ATNATN

AFTNAFTN

Page 5: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 55

F i j i

J a p a n

R O A K

K

R S L C

R in t r a

R in t r a M T A

IS - IS

IS - IS

IS - IS

E S - IS

ID R P

ID R P

U .S . F A A D o m a in ID R P R

R

R

E S - IS

FAA ATN/AMHS Service with Alternative Route

Page 6: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 66

Page 7: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 77

Page 8: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 88

Page 9: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 99

Relationship between FTI and ATNIDRPIDRP

FTI

ATNRouter

RIU

ATNRouter

RIU

ATNRouter

RIU

ATNRouter

RIU

IS-IS

IS-ISIS-IS

IS-IS

IDRP

IDRP

IDRP

IDRP

R

R

R

RRR

R

R

R

R

RRR

R

R

R

R

R

R

R

IDRP

International Connection

IDRP

International Connection

• ATN Router is used as access point for IDRP

• Using FTI Router to optimize bandwidth

• Using FTI to monitor/divert traffic

RIU: Radio Interface Unit

Page 10: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 1010

Global ATN Internet

ATN

RIU

RIU

RIU

RIU

IDRP

IDRP

IDRP

IDRP

R

R

R

RRR

R

R

R

R

RRR

R

R

R

R

R

R

R

IDRP

Hong Kong

IDRP

U.S.

IDRP

Fiji

IDRP

IDRP

IDRPIDRP

IDRP

IDRP

IDRP

U.K.

RIU

Japan

Page 11: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 1111

FAA Fully Redundant ATN Router

ATN Router

ATN Router

Line Exchange

FAA ATN Router

X.25 Switch

ATN Router

ATN Router

ATN Router

Intra-Domain Router

FAA Domain Other Domain

ATN Router

Page 12: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 1212

FAA AMHS System

MTA C

Mail Box

ControlPosition

AFTNProcessor

ASMTP

AMHSPop3

X.25

Out/IncomingMessage

AFTN

• MTA (Message Transfer Agent) CSend out ATN Message

• MTA DListen incoming message

• AFTN (Aeronautical Fixed Telecommunication Network)Handle message to control position

• AMHS (ATN Message Handling System) Pop3Retrieve email message

• ASMTP (ATN Simple Mail Transfer Protocol)Handle incoming and outgoing local email message

MTA D

ATN Mail User

LOG

Router

Page 13: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 1313

FAA AMHS Interconnection Diagram

ATN Router

LAN

TCP/IP/CLNP

Control Position

X.25 NADINPSN

MTA

ATN

Network Network Management

FAA AMHS

ES-IS

NADINMSN

Host

X.25X.25

AFTN

Page 14: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 1414

FAA ATN Router and AMHS Systemin Salt Lake City NNCC

Page 15: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 1515

FAA ATN/AMHS Network ManagementPosition in Salt Lake City NNCC

Page 16: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 1616

FAA NADIN MSN Processor with GPS Time Server

Page 17: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 1717

FAA/JCAB ATN/AMHS AddressingAnd Naming

ID Routing Domain Prefix NSAP or NET (not including the prefix) System Name

System Type

Point of Contact Location

1 470027+8181.524A.0001.0101         Japan

1.1   .0302.0000.0000.0000.00   BIS    

1.2   .0302.1280.0109.1001.01 jpamhs AMHS    

2 470027+8185.4B00.0001.0101         USA

2.1   .0302.0000.0001.0001.00   BIS    

2.2   .0302.0000.0001.0001.01 kslcmta AMHS    

Page 18: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 1818

FAA/JCAB ATN Router Site Acceptance Test

ATN Router

: L ine in Operation

: L ine for Testing

Narita Salt Lake City

SDECC

9.6 Kbps

Simulated ES

Simulated ES ATN

Router

AFTN

Center AFTAX

64 Kbps

• ATN Router Site Acceptance Test Configuration

Page 19: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 1919

Item No.

Test Item Notes

1 BIS Connection Establishment Establish LAPB, X.25 VC and IDRP connections between BIS routers.

2 BIS Connection Maintenance Exchange of KEEPALIVE PDUs

3 NPDU Transmission Tests to confirm correct NPDU relaying using ERQ NPDUs, and validation of routeing of PDUs with invalid security option parameter.

4 BIS Disconnection and Re-establishment Manual BIS disconnection and re-establishment.

5 Failure and Recovery X.25 circuit failure and recovery.BIS failure and recovery

* Detail of Test procedure is in the Test Procedure for ATN Router Connection Test via ATN Router between the United States and Japan.

FAA/JCAB ATN Router Site Acceptance Test (Cont.)

• ATN Router Site Acceptance Test Items

Page 20: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 2020

ATN Router

: L ine in Operation

: L ine for Testing

Narita Salt Lake City

SDECC

9.6 Kbps

AFTN Test System AMHS

AMHS ATN Router

AFTN

Center AFTAX

64 Kbps

FAA/JCAB ATN/AMHS Site Acceptance Test

• ATN/AMHS Site Acceptance Test Configuration

Page 21: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 2121

Item No. Test Item Schedule

1 Confirmation of transmission/reception of messages  

2 Confirmation transmission/reception of messages when error occurred in adjacent AMHS

 

3 Stress Test on Bandwidth Oct. to Nov. 2003

4 Confirmation of Switching to Back Up System  

5 Continuous Operation (24 hours)  

* Detail of Test procedure is in the Test Procedure for AMHS Connection Test via ATN Router between the United States and Japan.

• ATN/AMHS Site Acceptance Test Items

FAA/JCAB ATN/AMHS Site Acceptance Test (Cont.)

Page 22: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 2222

ATN BIS Router ICD

• Compliant with ICAO DOC 9705 version 3.0– CLNP as routed protocol– IDRP as routing protocol– SNDCF for ISO 8208 sub-layer

• Using X.25 Switch Virtual Circuit as ATN sub-network– ISO 8208 Packet Layer Protocol– LAPB as Data Link Layer– Physical Layer is local issue

• Detail refers to Asia/Pac Regional Router ICD for ATN G-G Router

Page 23: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 2323

Compliant with ICAO DOC 9705 version 3.0• Application Layer: MHS (ITU-T, X.400), RTSE

(ISO 9066-2) and ACSE (ISO 8650)• Presentation Layer: ISO 8823, and support

mandatory function of normal model in ISO/IEC ISP 10611-2

• Session Layer: ISO 8327 • Transport Layer: COTP specified in ICAO DOC

9705/AN-956

AMHS ICD

Page 24: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 2424

AMHS ICD (Cont.)

• Network Layer: CLNP routed protocol, ES-IS as routing protocol and SNDCF for ISO 8802 sub-layer

• Data Link Layer: LAPB• Physical Layer: is local issue• Detail refers to Asia/Pac Regional AMHS ICD

Page 25: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 2525

FAA ATN/AMHS Implementation Plan

• Japan Start Finish– Site Acceptance Test 09/03 01/04

– Initial Operation (Cut Over) 03/04

– De-Commission of AFTN Service 09/04

• Fiji– Site Acceptance Test 09/04 10/04

– Initial Operation (Cut Over) 12/04

– De-Commission of AFTN Service 01/05

Page 26: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 2626

FAA ATN/AMHS Implementation Plan (Cont.)

• Hong Kong (China)– Technical Interchange Meeting for dial-up trial

• China – Technical Interchange Meeting and agreement is pending

Page 27: 09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003

09/0309/03

Page Page 2727

Conclusion

• The AMHS Service using X.25 IDRP Router is planned to be in operation as of 03/04

• Plan to expand router site in Oakland ARTCC is in process to provide diversity

• Plan to use ATN router’s IS-IS function to support IP sub-network for AMHS Service

• FAA is currently developing a plan to replace its AFTN switching equipment (NADIN MSN) which will fully integrate AMHS functions