PREPAYMENT METERING IN RURAL UAE AREAS

Prof. Dr. E. El-ShirbeenyElectric Power Research Laboratory

Abu Dhabi Water & Electricity Authority

ADWEAADWEAADWEAADWEA

2

IN THIS PAPER

• National Overview

• Drivers

• Technology & Barriers

• Pilot Scheme

• Future Developments

3

Abu Dhabi Emirate

?

4

DISTRIBUTION REGIONS IN ABU DHABI

5

ADWEA

TAW

UmNar

ADWEC

TRANSCO

Bainounah

MRF

ADDC

AADC

GENERATION DISTRIBUTIONTRANSMISSION

6

ADWEA SYSTEM

One Million Customers67,340 Km2 Area

12% An. L. G. Rate

7

LOCAL CONDITIONS

Maximum ambient temperature: 50 degCHumidity could reach 100% LV AC operating voltage 415 VFarms are scattered on wide desert areasDifficult transport and accessHigh callout costs

8

TYPICAL RURAL LOADS

7 kW0.90 p f

water ne twork

60 kW0.85 p f

water we lls

320 kW0.79 p f

greenhouses

FARM Swith

9

11 kV/415V Rural

Substation

10

METER FOR SMALL FARM

11

METER IN FARM WORKER HOUSE

12

METER FOR WATER PUMP LOADS

13

METER FOR FARM WITH WATER NET

14

METER WITH CT’s At GREENHOUSE FARM

Meter and supply panels

Metering Current Transformer box

15

REVENUE MANAGEMENT PROBLEMS

• Delays in payment due to customer apathy

• Social values and difficulty in disconnecting

• High rate of debt accumulation

• Use of old inaccurate meters

• Difficult meter reading

• Illegal reconnections

• Unmetered supply

16

WHY PREPAY METERS• Cut down bad debts

• Protect revenue

• Reduce operating costs

• Simplify sales operations

• Higher metering accuracy

• Encourage energy saving

• Enhance customer services

17

Coin operated Token Key Smart card Keypad

ONLINE

AVAILABLE TECHNOLOGIES

18

SUPPORTING SYSTEMS

• Vending/Payment Terminals

• Billing System

• Databases

• Operating Platforms

• Communication Networks

19

SELECTION CRITERIA

• Minimum customer interaction• Simplicity and ease of installation• Maximum utilization of available facilities• Efficiency• Reliability• Minimum maintenance• Scalability• Security• Cost

20

SECURITY MEASURES

1. No access for Unauthorized party

2. Alternative means in case of system failure

3. Concurrent operation with a redundant system

21

CHALLENGES1. Prepayment is not “off-the-shelf” technology

2. Prepayment = shift in mind of service provider

3. Community acceptance

4. Modification cost of metering & billing system

5. Need of strong technical support and training

6. Reliable communications and IT systems

7. Harsh local operating environment

8. Higher farm loads

9. Extra protection

22

PILOT SYSTEM <online payment>

Control Center

DBBilling System

Data Concentrator

Local Transreceiver

MeterDisconnect Load

CustomerPayment Terminal

CustomerPayment Terminal

Data Concentrator

Local Transreceiver

MeterDisconnect Load

23

ADVANTAGES OF SELECTED SCHEME

• Simpler software and hardware• Real-time integration with billing system• Centralized database and security modules• More vending points at a lower cost of ownership• Easier system management• More efficient arrears collection• Increased database and encryption security• Easier data management and scalability• Very quick setup of online vendor at lower cost

24

FUURE DEVELOPMENT1. Extension to water & gas services

Data Concentrator

Electricity Meter

Electricity Meter

Electricity Meter

11/0.415 kV Distribution SS

Electricity Meter

Water Meter

Gas Meter

Radio Receiver

PLC Modem

Radio Transmitter

Data Collector

25

FUTURE DEVELOPMENT

2. Applying online prepayment scheme to:

– large commercial customers

– Governmental buildings

3. Upgrading to AMR

4. Integration in distribution management

26