1
SECTION Y2 - Y2 02-03-2015 1 : 100 STARTING DATE DATE SCALE DRAWN BY CHECKED BY MEASURED BY DRAWING NO. SHEET NO. PROJECT TITLE 19-01-2015 KOH JING HAO & SANJEH KUMAR RAMAN PENANG GROUP DRAWING TITLE LHCO. 010 10 40 LEGENDS : 1 FIVE FOOT WALKWAY 2 HALL 1 3 AIR WELL 1 4 HALL 2 5 BASIN 6 TOILET 7 HALL 3 8 AIR WELL 3 9 HALL 4 10 UTILITIES ROOM 11 INACCESSIBLE ROOM 12 ROOM 1 13 ROOM 2 14 ROOM 3 15 AIR WELL 2 ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG LIAN HUAT COMPANY 16 ROOM 4 17 INACCESSIBLE SPACE 18 ROOM 5 19 ROOM 6 20 KITCHEN 21 TERRACE PENANG GROUP A1 1 1 FFL : 0.000 SPACE NO. FINISH FLOOR LEVEL TIMBER DRAWING SHEET NO. DRAWING NAME TILES FINISHING

10 Final Section y2 Ready Plot y2 y2

Embed Size (px)

Citation preview

Page 1: 10 Final Section y2 Ready Plot y2 y2

SECTION Y2 - Y2

02-03-2015

1 : 100

STARTING DATE

DATE

SCALE

DRAWN BY

CHECKED BY

MEASURED BY

DRAWING NO. SHEET NO.PROJECT TITLE

19-01-2015

KOH JING HAO & SANJEH KUMAR RAMAN

PENANG GROUP

DRAWING TITLE

LHCO. 010

10

40

LEGENDS :

1 FIVE FOOT WALKWAY

2 HALL 1

3 AIR WELL 1

4 HALL 2

5 BASIN

6 TOILET

7 HALL 3

8 AIR WELL 3

9 HALL 4

10 UTILITIES ROOM

11 INACCESSIBLE ROOM

12 ROOM 1

13 ROOM 2

14 ROOM 3

15 AIR WELL 2

ARC1215

METHODS OF DOCUMENTATION AND

MEASURED DRAWINGS

LIAN HUAT COMPANY, 140 LEBUH

CARNARVON, GEORGETOWN

PENANG

LIAN HUAT COMPANY

16 ROOM 4

17 INACCESSIBLE SPACE

18 ROOM 5

19 ROOM 6

20 KITCHEN

21 TERRACE

PENANG GROUP

A1

1

1

FFL : 0.000

SPACE NO.

FINISH FLOOR LEVEL

TIMBER

DRAWING SHEET NO.

DRAWING NAME

TILES FINISHING