Owner Vietnam Oil and Gas Group (PVN) Client Petrovietnam Construction Joint Stock Corporation (PVC) Chimney EPC Contractor Balanced Engineering & Construction Pte Ltd Lining System Pennguard Borosilicate Lining System Project Participants CASE STUDY THAI BINH 2, VIETNAM PROJECT Challenges Delay in handover of the site The remote location of this stack required importing all materials and equipment for the construction. Detail of work by BEC BEC was awarded the Design & Build package for the 250 meter RC chimney comprising 2 x 6.5m internal diameter flues including piling works, pile cap, slipform, heavy lifting of roof, floors, and flues, flue internal lining, painting of external windshield, installation of internal rack and pinion hoist, AWLs, internal lighting, lightning conductor and earthing works. Thai Binh 2 Project, Vietnam The Thai Binh 2 thermal power plant is being developed by Vietnam’s state oil and gas group Petrovietnam (PVN), which currently generates around 13% of the country’s power capacity. It is a greenfield project using pulverised coal fuelled boilers powering conventional steam turbine generators, with modern pollution control technology that makes this project environmentally complaint to Vietnamese and international emissions standards. The plant is estimated to provide 7.8 billion kilowatt hours to the national grid annually. The Thai Binh 2 Thermal Power Plant is a $1.6 billion 1,200-megawatt power station. The project is being developed by Vietnam's state oil and gas group Petrovietnam.The project is located on 43 hectares of land in My Loc commune, Thai Thuy district, Thai Binh northern Province in Vietnam. Construction commenced in March 2011 THAI BINH 2, VIETNAM PROJECT BEC Group of Companies c/o 18 Boon Lay Way #10-159/162 TradeHub 21 Singapore 609966 Tel: +65 6778 6858 Fax: +(65) 6690 9259 Website: www.be-con.com Email: [email protected]

1199PVC Case Study - be-con.com · CASE STUDY THAI BINH 2, VIETNAM PROJECT Challenges • Delay in handover of the site • The remote location of this stack required importing all

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1199PVC Case Study - be-con.com · CASE STUDY THAI BINH 2, VIETNAM PROJECT Challenges • Delay in handover of the site • The remote location of this stack required importing all

Owner

Vietnam Oil and Gas Group (PVN)

Client

Petrovietnam Construction Joint Stock Corporation (PVC)

Chimney EPC Contractor

Balanced Engineering & Construction Pte Ltd

Lining System

Pennguard Borosilicate Lining System

Project

Participants

CASE STUDY THAI BINH 2, VIETNAM

PROJECT

Challenges

• Delay in handover of the site

• The remote location of this stack required importing all materials and equipment for the construction.

Detail of work by BEC

BEC was awarded the Design & Build package for the 250 meter RC chimney comprising 2 x 6.5m internal diameter flues including piling works, pile cap, slipform, heavy lifting of roof, floors, and flues, flue internal lining, painting of external windshield, installation of internal rack and pinion hoist, AWLs, internal lighting, lightning conductor and earthing works.

Thai Binh 2 Project, Vietnam

The Thai Binh 2 thermal power plant is being developed by Vietnam’s state oil and gas group Petrovietnam (PVN), which currently generates around 13% of the country’s power capacity. It is a greenfield project using pulverised coal fuelled boilers powering conventional steam turbine generators, with modern pollution control technology that makes this project environmentally complaint to Vietnamese and international emissions standards. The plant is estimated to provide 7.8 billion kilowatt hours to the national grid annually.

The Thai Binh 2 Thermal Power Plant is a $1.6 billion 1,200-megawatt power station. The project is being developed by Vietnam's state oil and gas group Petrovietnam.The project is located on 43 hectares of land in My Loc commune, Thai Thuy district, Thai Binh northern Province in Vietnam. Construction commenced in March 2011

T

HA

I B

INH

2,

VIE

TN

AM

PR

OJE

CT

BEC Group of Companies c/o 18 Boon Lay Way #10-159/162 TradeHub 21 Singapore 609966

Tel: +65 6778 6858 Fax: +(65) 6690 9259 Website: www.be-con.com Email: [email protected]

Page 2: 1199PVC Case Study - be-con.com · CASE STUDY THAI BINH 2, VIETNAM PROJECT Challenges • Delay in handover of the site • The remote location of this stack required importing all

Chimney Data

Height 250m

No. of internal steel flue 2

No. of internal platforms 6

Diameter of internal flue 6.5m

External concrete diameter 25.270m – 18.000m

Piles

78 Nos. x 1,000mm dia.

Pile Cap

40,000mm dia. x 4,000mm thk

THAI BINH 2, Stack elevation

Concrete Windshield Slip-Forming in progress

Borosilicate Lining System Application

Lifting and Installation of Flue Liners Complete Chimney

Windshield Painting