13.10.2003 MG meeting Paris 1
SAMARIS SAMARIS STRUCTURES STRUCTURES WP 15WP 15
13.10.2003 MG meeting Paris 8
WP 15 – WP 15 – SurveySurveyObjectiveObjective
• TTo provide an updated inventory and o provide an updated inventory and assessment of highway structures in assessment of highway structures in selected EEA and CE countries. selected EEA and CE countries.
13.10.2003 MG meeting Paris 9
WP 15 – WP 15 – SurveySurveyTasksTasks
15.1 Data collection15.1 Data collection
15.2 Condition assessment15.2 Condition assessment
15.3 Loading15.3 Loading
15.4 Structural safety15.4 Structural safety
15.5 Survey15.5 Survey
13.10.2003 MG meeting Paris 10
WP 15 – WP 15 – SurveySurvey 15.1 15.1 Data collectionData collection
• the most active task up to now the most active task up to now • subtasks:subtasks:
• 15.1.1: Detailed work programme15.1.1: Detailed work programme• 15.1.2: Review of existing 15.1.2: Review of existing
questionnairesquestionnaires• 15.1.3: Preparation of questionnaires15.1.3: Preparation of questionnaires• 15.1.4: Meeting with subcontractors15.1.4: Meeting with subcontractors• 15.1.5: Submission of questionnaires15.1.5: Submission of questionnaires• 15.1.6: Collection of structural data15.1.6: Collection of structural data
M11: Collection of structural data M11: Collection of structural data completedcompleted
• 15.1.7: Compilation of results15.1.7: Compilation of results
13.10.2003 MG meeting Paris 11
WP 15 – SurveyWP 15 – Survey 15.1 15.1 Data collectionData collection
subtasks:subtasks: • associated with subcontractorsassociated with subcontractors
meeting in July in Viennameeting in July in Vienna many useful commentsmany useful comments all contracts signed and 1all contracts signed and 1stst year money year money
paidpaid
• problem:problem: How to make a questionnaire that will be How to make a questionnaire that will be
easy as possible to fill in and evaluate?easy as possible to fill in and evaluate?
13.10.2003 MG meeting Paris 12
WP 15 – SurveyWP 15 – Survey 15.2 Condition Assessment15.2 Condition Assessment
Subtasks: Subtasks: • 15.2.1: Literature survey15.2.1: Literature survey• 15.2.2: Evaluation of questionnaires15.2.2: Evaluation of questionnaires
Assessment of codesAssessment of codes Assessment of tools & proceduresAssessment of tools & procedures Assessment of condition rating proceduresAssessment of condition rating procedures
• 15.2.3: Handbook of damages15.2.3: Handbook of damages Reorganisation of existing COST 345 handbookReorganisation of existing COST 345 handbook Updating the softwareUpdating the software Testing the softwareTesting the software Feeding the dataFeeding the data
13.10.2003 MG meeting Paris 13
WP 15 – SurveyWP 15 – Survey 15.15.33 LoadingLoading
Subtasks: Subtasks: • 15.3.1: Dead loads15.3.1: Dead loads
Evaluation of existing proceduresEvaluation of existing procedures Assessment of dataAssessment of data Demonstration of dead load evaluation Demonstration of dead load evaluation
• subtask 15.3.2: True traffic loadingsubtask 15.3.2: True traffic loading Evaluation of available WIM dataEvaluation of available WIM data Evaluation of measured WIM dataEvaluation of measured WIM data
• subtask 15.3.3: Live load modellingsubtask 15.3.3: Live load modelling Evaluation of existing load modelsEvaluation of existing load models Development of load modelsDevelopment of load models
13.10.2003 MG meeting Paris 14
WP 15 – SurveyWP 15 – Survey 15.3 Loading15.3 Loading
Subtasks: Subtasks: • subtask 15.3.4: Dynamic loadingsubtask 15.3.4: Dynamic loading
Evaluation of dynamic loading on bridge 1Evaluation of dynamic loading on bridge 1 Evaluation of dynamic loading on bridge 2Evaluation of dynamic loading on bridge 2
• subtask 15.3.5: Experimentssubtask 15.3.5: Experiments PolandPoland
– From October 9 to 18, 2003From October 9 to 18, 2003– ZAG + PhD student from TCDZAG + PhD student from TCD
SloveniaSlovenia– In 2004In 2004
13.10.2003 MG meeting Paris 15
WP 15 – SurveyWP 15 – Survey 15.3 Loading15.3 Loading
• meeting in Ljubljana on August 22meeting in Ljubljana on August 22ndnd::• discussed detailed work plan, including discussed detailed work plan, including
experimentsexperiments• 2004 long-term experiment to record 2004 long-term experiment to record
dynamic behaviour of a bridge under dynamic behaviour of a bridge under different conditions:different conditions: traffictraffic before and after major repairbefore and after major repair a few possible bridges identifieda few possible bridges identified
13.10.2003 MG meeting Paris 16
WP 15 – SurveyWP 15 – Survey 15.3 Loading15.3 Loading
13.10.2003 MG meeting Paris 17
WP 15 – SurveyWP 15 – Survey 15.4/5 Safety 15.4/5 Safety
Assessment/SurveyAssessment/Survey
Task 15.4 - Safety AssessmentTask 15.4 - Safety Assessment• 15.4.1: State-of-the-art report on procedures used15.4.1: State-of-the-art report on procedures used• 15.4.2: Selection of countries for detailed study15.4.2: Selection of countries for detailed study• 15.4.3: Comparative study of selected EU, EEA and 15.4.3: Comparative study of selected EU, EEA and
CECECC • 15.4.4: Proposed safety assessment methodology15.4.4: Proposed safety assessment methodology
Task 15.5 - SurveyTask 15.5 - Survey• 15.15.55..11: State-of-the-art report of assessment of : State-of-the-art report of assessment of
structures in selected EEA and CE countriesstructures in selected EEA and CE countries• 15.5.15.5.22: Guidelines for optimised assessment of : Guidelines for optimised assessment of
highway structureshighway structures
13.10.2003 MG meeting Paris 18
WP 15 – SurveyWP 15 – Survey Plan for Plan for Oct-Dec 2003Oct-Dec 2003 period period
Task 15.1 – Data collectionTask 15.1 – Data collection• Dissemination of questionnairesDissemination of questionnaires• Collection of questionnairesCollection of questionnaires• Beginning of compilation of results Beginning of compilation of results
Task 15.2 – Condition assessmentTask 15.2 – Condition assessment• Finishing assessment of codes and Finishing assessment of codes and
proceduresprocedures• Beginning or reorganisation of Handbook Beginning or reorganisation of Handbook
of damagesof damages
13.10.2003 MG meeting Paris 19
WP 15 – SurveyWP 15 – Survey Plan for Plan for Oct-Dec 2003Oct-Dec 2003 period period
Task 15.3 – LoadingTask 15.3 – Loading• Evaluation of existing procedures (cont.)Evaluation of existing procedures (cont.)• Completion of Polish experimentCompletion of Polish experiment• Evaluation of available and measured WIM dataEvaluation of available and measured WIM data• Evaluation of dynamic loading of Polish bridgeEvaluation of dynamic loading of Polish bridge• PhD students PhD students Nóra ÁineNóra Áine (TCD) and Abraham (TCD) and Abraham
Getachew (UCD)Getachew (UCD)
Task 15.4 – SafetyTask 15.4 – Safety• Selection of countries for detailed analysisSelection of countries for detailed analysis
Task 15.5 – SurveyTask 15.5 – Survey
13.10.2003 MG meeting Paris 20
SAMARIS web pageSAMARIS web page
• New documents database in addition to New documents database in addition to public documentspublic documents
• Different level of users related to UN Different level of users related to UN and PW:and PW:• power userspower users• normal usersnormal users• sub-contractors?sub-contractors?• VisitorsVisitors
• 2 step process of uploading2 step process of uploading