1 2010 – 2011 End of year Shutdown 2010 – 2011 End of year Shutdown Safety activities Safety activities Safety shifts organization Safety shifts organization

2010 – 2011 End of year Shutdown Safety activities Safety shifts organization

  • Upload
    takara

  • View
    36

  • Download
    0

Embed Size (px)

DESCRIPTION

2010 – 2011 End of year Shutdown Safety activities Safety shifts organization. Activities related to Safety. Sniffer maintenance (all experiments) FPIAA support maintenance Experimental area safety lines maintenance Implementation of the new ODH/ Evacuation matrix for point 1 - PowerPoint PPT Presentation

Citation preview

Page 1: 2010 – 2011 End of year Shutdown Safety activities  Safety shifts organization

1

2010 – 2011 End of year Shutdown2010 – 2011 End of year Shutdown

Safety activities Safety activities

Safety shifts organizationSafety shifts organization

Page 2: 2010 – 2011 End of year Shutdown Safety activities  Safety shifts organization

2

Activities related to Safety Activities related to Safety Sniffer maintenance (all experiments)Sniffer maintenance (all experiments) FPIAA support maintenance FPIAA support maintenance Experimental area safety lines maintenance Experimental area safety lines maintenance Implementation of the new ODH/ Evacuation matrix for point 1Implementation of the new ODH/ Evacuation matrix for point 1 General safety systems maintenance (ODH, FG, Fire, Evacuation,..)General safety systems maintenance (ODH, FG, Fire, Evacuation,..) DSS software update and test all alarm/action matrixes DSS software update and test all alarm/action matrixes Water leak or Smoke detection upgrades (to be analyzed) Water leak or Smoke detection upgrades (to be analyzed) Foam system maintenance (?)Foam system maintenance (?) SSA / LASS annual maintenanceSSA / LASS annual maintenance DSO tests (2 days) , … DSO tests (2 days) , …

RPE / RPA shiftsRPE / RPA shifts Patrollers shifts (?) Patrollers shifts (?) SLIMOS shifts SLIMOS shifts Safety team shifts Safety team shifts

Page 3: 2010 – 2011 End of year Shutdown Safety activities  Safety shifts organization

Radioprotection strategy Radioprotection strategy

Shutdown Day 1 : Shutdown Day 1 :

Buffer zone ready to receive material in SX1Buffer zone ready to receive material in SX1

UX15 general RP surveyUX15 general RP survey

Collect of some of the material sampling (ID) and Collect of some of the material sampling (ID) and spectroscopy analysis to control the RP calculationsspectroscopy analysis to control the RP calculationsThe results of the material samples analysis will determine the need to wear or The results of the material samples analysis will determine the need to wear or not protective equipment (masks, gloves ,..). This is not expected today not protective equipment (masks, gloves ,..). This is not expected today

Classification of the radioactive waste area with RP (inform all Classification of the radioactive waste area with RP (inform all concerned teams)concerned teams)

Definition of the operational radioactive zone (inform all the Definition of the operational radioactive zone (inform all the concerned teams)concerned teams)

Page 4: 2010 – 2011 End of year Shutdown Safety activities  Safety shifts organization

4

RPE / RPA interventions RPE / RPA interventions

At each relevant step of the opening scenario and detectors At each relevant step of the opening scenario and detectors activities, RPE / RP will intervene to do RP measurements and collect activities, RPE / RP will intervene to do RP measurements and collect dust for analysis.dust for analysis.

RPE will be in charged to measure, trace and assist transport of all RPE will be in charged to measure, trace and assist transport of all material coming from the radioactive waste area.material coming from the radioactive waste area.

Note that additional persons from the intervening teams and from Note that additional persons from the intervening teams and from safety team will be trained to perform RP measurement and safety team will be trained to perform RP measurement and traceability for the material coming from the conventional area.traceability for the material coming from the conventional area.

Reminder : all material exiting the radioactive and operational zones Reminder : all material exiting the radioactive and operational zones shall not exit the Toroid area, shall be transported via crane to the shall not exit the Toroid area, shall be transported via crane to the radioactive buffer zone on surface, shall be removed and transported radioactive buffer zone on surface, shall be removed and transported under RPE supervisionunder RPE supervision

Page 5: 2010 – 2011 End of year Shutdown Safety activities  Safety shifts organization

RPE / RPA interventions RPE / RPA interventions

The RPE major interventions schedule will be agreed with Michel The RPE major interventions schedule will be agreed with Michel for the opening scenarios and the detectors activity responsible.for the opening scenarios and the detectors activity responsible.

The activity responsible will communicate the detailed schedule The activity responsible will communicate the detailed schedule at least 1 hour before the beginning of the required intervention at least 1 hour before the beginning of the required intervention

The detailed opening scenario will be daily updated by Michel The detailed opening scenario will be daily updated by Michel and accessible through the ATLAS web pages and accessible through the ATLAS web pages

Page 6: 2010 – 2011 End of year Shutdown Safety activities  Safety shifts organization

6

RPE / RPA interventions RPE / RPA interventions

RPE shifts proposalRPE shifts proposal

From 6.12 to 29.12: shifts of 2 days including weeks end and From 6.12 to 29.12: shifts of 2 days including weeks end and holidays. holidays.

From 29.12 to end of the shutdown: shifts of 5 days including week From 29.12 to end of the shutdown: shifts of 5 days including week end and holidaysend and holidays

Page 7: 2010 – 2011 End of year Shutdown Safety activities  Safety shifts organization

7

Safety team assistance Safety team assistance

The presence of safety team in situ to assist the intervening teams and The presence of safety team in situ to assist the intervening teams and control safety conditions is mandatory. control safety conditions is mandatory. We need presence during the major interventions and at least few hours We need presence during the major interventions and at least few hours per days.per days. During the Xmas shutdown, some specific safety and infrastructure During the Xmas shutdown, some specific safety and infrastructure systematic checks could be added.systematic checks could be added.

Safety team shifts proposal: Safety team shifts proposal:

During all shutdown: 2 days shifts including week ends and hollidays. During all shutdown: 2 days shifts including week ends and hollidays.

Concerned persons : Safety team, ADO engineers, TSOs, Safety officersConcerned persons : Safety team, ADO engineers, TSOs, Safety officers..

Specific training and instructions will be provided.Specific training and instructions will be provided.

Page 8: 2010 – 2011 End of year Shutdown Safety activities  Safety shifts organization

8

SLIMOSSLIMOS

During all shutdown period :During all shutdown period :

2 SLIMOS shifts per day (nights covered by OPM)2 SLIMOS shifts per day (nights covered by OPM)

Beginning of shift at least ½ hour before the Access team shifts Beginning of shift at least ½ hour before the Access team shifts

End of shift at least ½ hour after the Access team shifts End of shift at least ½ hour after the Access team shifts