FAST DETECTORS AND CAMERAS --- PHILIPPE FEAUTRIER, JEAN-LUC GACH, PHILIPPE BALARD, CHRISTIAN GUILLAUME, MARK DOWNING, ERIC STADLER, YVES MAGNARD, SANDY DENNEY, WOLFGANG SUSKE, PAUL JORDEN, PATRICK WHEELER, MICHAEL SKEGG, PETER POOL, RAY BELL, DAVID BURT, JAVIER REYES, MANFRED MEYER, NORBERT HUBIN, DIETRICH BAADE, MARKUS KASPER, ROBIN ARSENAULT, THIERRY FUSCO [email protected] 21/05/2010 Fast detectors - Opticon Board Malta 1

21/05/2010Fast detectors - Opticon Board Malta1. The conclusion of FP6 21/05/2010Fast detectors - Opticon Board Malta2

  • View
    219

  • Download
    4

Embed Size (px)

Citation preview

FAST DETECTORS AND CAMERAS ---

PHILIPPE FEAUTRIER, JEAN-LUC GACH, PHILIPPE BALARD, CHRISTIAN GUILLAUME, MARK DOWNING, ERIC STADLER, YVES MAGNARD, SANDY

DENNEY, WOLFGANG SUSKE, PAUL JORDEN, PATRICK WHEELER, MICHAEL SKEGG, PETER POOL, RAY BELL, DAVID BURT, JAVIER REYES, MANFRED MEYER, NORBERT HUBIN, DIETRICH BAADE, MARKUS KASPER, ROBIN

ARSENAULT, THIERRY FUSCO

[email protected]

21/05/2010 Fast detectors - Opticon Board Malta 1

Fast detectors FP6

The conclusion of FP6

21/05/2010 Fast detectors - Opticon Board Malta 2

Demonstration of the e2v CCD220 AO detector with OCam Thursday at Coffee/Lunch breaksESO council room

21/05/2010 3Fast detectors - Opticon Board Malta

StoreArea

Image Area

240x12024 µm

StoreArea

Image Area

240x12024 µm

OP 1

OP 2 GainRegisters

OP 3

OP 4 GainRegisters

OP 8GainRegisters

OP 7

OP 6GainRegisters

OP 5

StoreAreaStoreArea

Image Area

240x12024 µm

StoreArea

Image Area

240x12024 µm

OP 1OP 1

OP 2 GainRegisters

OP 2 GainRegisters

OP 3OP 3

OP 4 GainRegisters

OP 4 GainRegisters

OP 8GainRegisters

OP 8GainRegisters

OP 7OP 7

OP 6GainRegisters

OP 6GainRegisters

OP 5OP 5

Split frame transfer 8-output back-illuminated e2v-L3Vision CCD.

240 x 240 pixels 8 EMCCD ouputs Frame rate: 1300 frames/sec Noise ~ 0.5 e Peltier cooled @ - 45 °C

21/05/2010 Fast detectors - Opticon Board Malta 4

21/05/2010 Fast detectors - Opticon Board Malta 5

JRA2 FP6

Multiplication gain and Dark

21/05/2010 6Fast detectors - Opticon Board Malta

HV (Volt) Multiplication Gain

Dark (e/pixel/frame) Noise (e-)

Input referred

noise (e-)

Amp 043.5

1474 0.013 827 0.56

Amp 1 1459 0.012 460 0.32

Amp 243.4

1351 0.011 416 0.31

Amp 3 1406 0.010 663 0.47

Amp 444.9

1204 0.008 944 0.78

Amp 5 1165 0.009 419 0.36

Amp 643.9

909 0.008 498 0.55

Amp 7 963 0.004 821 0.85

Mean 43.9 1240 0.010 630 0.52

0 1 2 3

7 6 5 4

Standard siliconTemperature: -40°CFrame rate: 1360 fps

Dark events Amp 5

Single dark + CIC events CCD temperature: -40°C Standard Si One of the 8 outputs Frame rate: 1360 fps Multiplication gain: x 1150 65 dark events / output (120 x 60 pixels)

21/05/2010 Fast detectors - Opticon Board Malta 7

Typical Dark Signals for ESO-WFS. Operation at 1500fps.

0.0001

0.001

0.01

0.1

1

-50 -40 -30 -20 -10 0 10 20

Temperature (°C)

Dar

k Si

gnal

(e/p

ix/fr

ame)

gain = 1000

gain = 100

gain = 10

Gain=1000

Gain=10

- 45°C

Minimum specification

Temperature (°C)

Dark Current(e/pixel/frame)

CCD220 results with Ocam, T=-40°C

21/05/2010 Fast detectors - Opticon Board Malta 8

Test Result Spec

Read noise (@gain 1000 1500 fps) 0.26 – 0.9 e(0.5 e mean)

< 1 e

Read noise (@gain 1000 25 fps) 0.38 – 0.97 < 1 e

Dark signal @ 1500 fps 0.004 – 0.01 e/s/frame

< 0.01 e/s/frame

Dark signal @ 25 fps 0.04 e/s/frame <0.04 e/s/frame

Parallel CTE 0.999959 >0.99995

Serial CTE 0.99996 >0.9998

Image Full Well 292000 e > 5000

Traps, dark and bright defects 0 0

CCD220 measured QE (standard Si)

21/05/2010 9Fast detectors - Opticon Board Malta

0

20

40

60

80

100

500 550 600 650 700 750 800 850 900

QE measuredQE spec

QE

mea

sure

d (

%)

Wavelength (nm)

OCam technology in Europe

21/05/2010 10Fast detectors - Opticon Board Malta

ESO WFS camera based on the Ocam technology.

Ocam : WFS camera for GrantecanDelivery of 2 systems Sept 2010

Creation of a startup company

21/05/2010 11Fast detectors - Opticon Board Malta

21/05/2010 Fast detectors - Opticon Board Malta 12

OCam I

Ocam II is the commercial version of Ocam I Improved reliability Improved performances Improved environmental conditions (can work with

air and water temperature up to 40°C) Detector safety (over-illumination) More compact for integration on telescope

FAST DETECTORS FOR LGS

The beginning of FP7

21/05/2010 Fast detectors - Opticon Board Malta 13

LGSD specifications

LGSD = Laser Guide Star Detector• 24 µm pixels, 100% fill-factor

• 84 x 84 sub-apertures (goal 126 x 126)

• 20 x 20 pixels per sub-aperture (to cover spot elongation) 1680x1680 pixels

• 400-800 Hz (for various AO modules)

• RON < 3e- (goal 1 e-), QE > 85%

• Good image lag, charge diffusion, PRNU, cross-talk, non-linearity, cosmetics, RON and dark current variations, stability w.r.t. environment (for centroiding quality)

• Low latency, fully packaged

• Goal: Possible re-use for NGSs WF Sensing

LLT

Sodium layer

Detector plane

Pupil plane

21/05/2010 14Fast detectors - Opticon Board Malta

Previous ESO developments 2007: 4 Feasibility studies for EELT LGS WFS detector, 50 k€ each, 2 of

them funded by FP6-ELT Design Study “Market survey”

2008-2009: 3 Technology Demonstrator contracts, 400 k€ each, 2 of them funded by FP6-ELT Design Study “Manufacture of a small array of pixels to prove noise performance”

E2v (UK)

Teledyne (USA)

Sarnoff (USA)

21/05/2010 15Fast detectors - Opticon Board Malta

The current FP7 phase : NGSD

Natural Guide Star Detector = Scaled Down Demonstrator for the LGSD.

Its purpose is :1) To develop a detector that can be used for first light NGS application for the EELT2) To demonstrate the feasibility of the LGSD, without the high costs associated with more engineering tasks such as:

Integral Peltier package, and/or Extension of the dimensions of the device such that stitching is

required.

Specifications are identical to the LGSD ones, except for: 672 x 672 pixels instead of 1680 x1680 4 e- RON instead of 3 e- Relaxed image lag (5 % instead of 2 %) Manufacturers standard package (simple packaging to keep costs down) No Peltier cooler

21/05/2010 16Fast detectors - Opticon Board Malta

NGSD Call for TendersFollowing ESO procurement rules: December ‘09: CfT sent to 34 companies/institutes in Member states and

USA February ‘10: 2 Tenders received 10th March ’10: Technical, Managerial and Contractual evaluations

provided to a Contract Awarding Committee May 5th : recommendation from the Contract Awarding Committee to ESO

Finance Committee to award one NGSD contract to e2v (UK). Approval by ESO FC.

May XXth: contract signed with e2v

21/05/2010 17Fast detectors - Opticon Board Malta

Stabilize the World leadership of Europe on Fast Detectors and Cameras

Plans for the future

21/05/2010 Fast detectors - Opticon Board Malta 18

Fast detectors - Opticon Board Malta 19

Firsts of this technology:

- Visible CMOS detector for the first time in astronomy- Back-side illuminated CMOS- Build-in Digital Outputs

But no real testing possibility of this detector outside e2v and production camera not planned, just prototypes .

21/05/2010

XAO detectors for 3rd generation of instruments and ELT À compléter….

21/05/2010 Fast detectors - Opticon Board Malta 20

Fast detectors - Opticon Board Malta 21

Opticon FP7 call 2 detector proposal : beyond what was already developped (à revoir…).

Same philosophy as previous successful detector activities : few goals, few partners with world class know how …

1. WP1 Upgrade of OCam to operate the CCD220 at 2.5-3 kHz frame rate for XAO instruments such as SPHERE and EPICS (following FP6 activities), improve noise (<< 1e), and characterize the system. Industrialize it.

2. WP2 Develop a production camera system for LGS CMOS detectors to test the detector in the labs and that will be used afterward on the VLT and E-ELT (following FP7 call 1 activities). Develop interface with Sparta RTC. Industrialize it.

Actors (preliminary): LAOG: management/system, camera head, detector/system characterization LAM : camera controllers, interface with Sparta. ESO (interface CMOS controller/Sparta, specifications, end user on telescope) Industrial partners

21/05/2010

WP description for FP7 Phase 2 Fast Dectors and cameras

21/05/2010 Fast detectors - Opticon Board Malta 22

WP2 Organization

21/05/2010 23Fast detectors - Opticon Board Malta

WP 2.1 Management

CNRS/LAOG (P. Feautrier)

WP2.2

CCD220/Ocam 2.5 kHz

LAM (JL Gach)

Front end

OHP

Digital electronics

LAM

Software

LAM

Camera head

LAOG

WP2.3

Full digital CMOS controller

Controller prototype

LAM

FPGA controller

Industrial partner

WP2.1 Management Scope : management of the WP Fast

Detectors and Cameras. Lead : CNRS (LAOG – P. Feautrier) CNRS/LAOG will coordinate the WP2

activity, prepare the key specifications for the other WPs, monitor the WPs, organize study and design reviews, prepare the regular reports and detailed work plans for the OPTICON management.

Funding: 50 K€.

21/05/2010 Fast detectors - Opticon Board Malta 24

WP2.2 CCD220/Ocam 2.5 kHz Scope: upgrade 3rd gen VLT Instruments and prepare XAO for

ELT (EPICS) Goal: decrease Ocam current noise down to 0.1-0.2 e and

increase speed to 2.5 kHz (goal 3 kHz) with redesign of the controller. Prepare industrialization.

New generation of amplifiers and gained experience during FP6 allows to increase speed and noise performances of Ocam allowing to use the CCD220 for the third generation of XAO system and prepare XAO for ELT.

This means a complete redesign of Ocam for this goal.

Partners:

LAM (lead), controller.

LAOG : camera head, camera testing

21/05/2010 Fast detectors - Opticon Board Malta 25

Type To For 2012 2013 2014 EC Match

HW CNRS/LAM CCD220 detector (engineering, science grades)

100k 100k --

HW CNRS/LAM Controller 80k 80k 80k 160k 80k

FTE CNRS/LAOG Design/Testing 80k 80k 80k 160k 80k

Total cost = 580 k - EC contribution : 420 k

WP2.3 All-Digital C-MOS Controller Scope: upgrade for 3rd gen VLT Instruments.

Goal of the WP: create a flexible architecture by combining the new technology CMOS controller with an FPGA and fast programmable I/O.

- The new CMOS detector developed in the framework of the FP7 WP2 allows for an all-digital controller. A very high miniaturization can be achieved by companies operating in the high-end embedded computing that are able to pack the detector with a powerful FPGA in the same PCB and equipping it with programmable fast I/O. - The presence of the FPGA allows for intelligent fast on-the-fly processing as well as allowing for different protocols and interfaces to be used for different applications. - The primary goal of this WP is to integrate the CMOS detector and controller , an FPGA and several fast I/O ports industrializing the prototype under development at LAM. - Secondary goal: implement  SPARTA+ interfaces and prototype advanced features like pixel multiplexing and switching, while allowing LAM interfaces to be implemented.

Partners: ESO: partner, lead LAM: partner, owner of prototype implementation to be industrialized

21/05/2010 26Fast detectors - Opticon Board Malta

WP 2.3 All-Digital C-MOS Controller Partners: ESO: partner, lead LAM: partner, owner of prototype implementation to be industrialised Nallatech: partner, industrial partner

Plan

Type To For 2012 2013 2014

FTE Nallatech NRE 0.5 0.5

FTE LAM Follow-up/Testing

FTE ESO Follow-up /Testing 0.1 0.1

Type To For 2012 2013 2014 EC Match

HW ESO CMOS detector 100k 100k ?

HW Nallatech HW to be delivered to ESO 40k 30k 10k

FTE Nallatech NRE 50k 50k 75k 25k

FTE LAM Follow-up/Testing

FTE ESO Follow-up /Testing 10k 10k 15k 5k

Total = xx k + detector