32
2G. Company Presentation. 24.10.2017 2G. Cogeneration.

2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

  • Upload
    lyngoc

  • View
    227

  • Download
    1

Embed Size (px)

Citation preview

Page 1: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

2G. Company Presentation.

24.10.20172G. Cogeneration.

Page 2: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

2G Energy AG

Agenda

24.10.2017 2

1. Combined Heat & Power

2. 2G Energy AG

3. Leading Gas Engine Technology

4. Finances

5. Outlook

6. Partner Concept

2G. Kraft-Wärme-Kopplung.

Page 3: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

2G Energy AG

Agenda

24.10.2017 3

1. Combined Heat & Power

2. 2G Energy AG

3. Leading Gas Engine Technology

4. Finances

5. Outlook

6. Partner Concept

2G. Kraft-Wärme-Kopplung.

Page 4: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Combined Heat & Power

Decentral & central generation.

24.10.2017 42G. Kraft-Wärme-Kopplung.

Page 5: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Combined Heat & Power

Functionality of a Combined Heat and Power Plant (CHP).

24.10.2017 52G. Kraft-Wärme-Kopplung.

GasWarmth

Technical advantages CHP:

• The heat of the combustion process can be used (more than 90% total efficiency) • Decentral and highly flexible• Reliable System (Security of Supply)

Electricity

Page 6: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Combined Heat & Power

Fields of application.

24.10.2017 62G. Kraft-Wärme-Kopplung.

Schools anduniversities

Food Industrial companies

Sewage plants

Hospitals Retirement homes Hotels Landfills

Residental buildingsSwimming pools Heating grids Biogas plants

Page 7: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

2G Energy AG

Agenda

24.10.2017 7

1. Combined Heat & Power

2. 2G Energy AG

3. Leading Gas Engine Technology

4. Finances

5. Outlook

6. Partner Concept

2G. Kraft-Wärme-Kopplung.

Page 8: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

2G Energy AG

Eckdaten.

24.10.2017 82G. Kraft-Wärme-Kopplung.

• Founded 1995 - Headquarters in Heek in North West of Germany

• Solution provider: development, project engineering, production, service, financing

• plants for biogas and natural gas applications20 – 4,000 kW electrical power

• Strong focus on R&D

• 10 national and international subsidiaries

• Since 2007 listed at the German stock market

• 600 employees

• 4,500 CHP plants in more than 43 countries worldwide

Page 9: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

2G Energy AG

Industrial area Heek.

24.10.2017 92G. Kraft-Wärme-Kopplung.

Page 10: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

2G Energy AG

The company´s milestones.

24.10.2017 102G. Kraft-Wärme-Kopplung.

Your cogeneration company…

1995 2000 2007 2009 2009 2011 2015

Foundation of thecompany

Introduction EEG in Germany (RenewableEnergies Act)

Stock marketlaunch

New headquartersincludingproduction facilities

Integration of2G Home into the2G group

Foundation ofsubsidiaries in Poland, UK andItaly

Foundation of 2G Rental GmbH

1996 2002 2008 2009 2010 2012 2015

Commissioning ofthe first2G plant

Moving toindustrial areaHeek-West

Foundation 2G SolutionsBeginning of optimization of gas engines

Agenitor

Participation in 2G Cenergy inc.commissioning offirst 2G plant in USA

Foundation of ownR&D subsidiary2G Drives GmbH

Own productionsite in the US:2G Manufacturing Inc.

100% participationin 2G Cenergy Inc.; Renaming: 2G Energy Inc.

Page 11: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

2G Energy AG

Overview.

24.10.2017 112G. Kraft-Wärme-Kopplung.

2G Energy AG

2G Energietechnik GmbH Heek 100% Foundation: 1995

2G Home GmbH Heek 90% Foundation: 1999

2G Drives GmbH Heek 80% Foundation: 2010

2G Rental GmbH Heek 100% Foundation: 2015

2G Solutions S.L. Vic Barcelona 90% Foundation: 2008

2G Italia Srl Verona 100% Foundation: 2011

2G Energy Ltd. Sutton Weaver 100% Foundation: 2011

2G Polska Sp. z.o.o. Bielsko-Biala 100% Foundation: 2011

2G Energy Inc. St. Augustine 100% Foundation: 2009*

2G Energie SAS Nantes 100 % Foundation: 2016

Page 12: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

2G Energy AG

More than 4,500 plants worldwideand partners around the globe.

24.10.2017 122G. Kraft-Wärme-Kopplung.

Page 13: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

2G Energy AG

Agenda

24.10.2017 13

1. Combined Heat & Power

2. 2G Energy AG

3. Leading Gas Engine Technology

4. Finances

5. Outlook

6. Partner Concept

2G. Kraft-Wärme-Kopplung.

Page 14: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Leading Gas Engine Technology

Core competence: gas engine technology(2G Drives GmbH).

24.10.2017 142G. Kraft-Wärme-Kopplung.

• 40 technicians and engineers

• Modification of the combustion process

• Modification of piston geometry (own patent)

• Development of own engine components (spark plugs, valves with rotocap, cylinder heads, gas mixer, top land ring…)

• Development of own CHP periphery (Activated carbon filter, gas cooling,…)

• Individual adaptation of the compression ratio according to gas quality

• A first hydrogen project has been realized

Page 15: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Leading Gas Engine Technology

Preliminary results of the efficiency improvement.

24.10.2017 152G. Kraft-Wärme-Kopplung.

Elektr.

Wirkungsgrad

Modul(elektr. Leistung)

37.4%

39.6% 39.8%

41.8%

35%

36%

37%

38%

39%

40%

41%

42%

43%

patruus 200(Natural gas, 200kW)

agenitor 206(Natural gas, 220 kW)

agenitor 306(Natural gas, 250 kW)

agenitor 406(Natural gas, 250 kW)

Page 16: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Leading Gas Engine Technology

Savings as a result of engine optimization.

24.10.2017 162G. Kraft-Wärme-Kopplung.

-> zusätzliche CO2 Einsparungen durch geringen Gasverbrauch: ca. 95 Tonnen pro Jahr

Non-optimized engine vs. agenitor

patruus 250 NG agenitor 406 NG

Electrical power: 250 kW 250 kW

Electrical effeciency: 37.5 % 41.8 %

Gas consumption per hour: 667 kW 589 kW

Gas price: 0.05 EUR/kWh 0.05 EUR/kWh

Gas costs per year: 200,100 EUR 179,400 EUR

Additional invest agenitor 406: 30,000 EUR

Annual Savings: 20,700 EUR

ROI of additional invest: 1.45 years

Page 17: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Leading Gas Engine Technology

Portfolio.

24.10.2017 172G. Kraft-Wärme-Kopplung.

Product Group Power Range Type of fuel

g-box 20 to 50 kW Natural Gas / Liquid Gas

filius 50 to 150 kW Biogas

aura 100 to 150 kW Natural Gas

patruus 50 to 400 kW Natural Gas / Biogas

agenitor 80 to 450 kW Natural Gas / Biogas

avus 400 to 4.000 kW Natural Gas / Biogas

Page 18: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Leading Gas Engine Technology

Specialized in container solutions.

24.10.2017 182G. Kraft-Wärme-Kopplung.

Page 19: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Leading Gas Engine Technology

Increasing focus on natural gas CHPs.

24.10.2017 192G. Kraft-Wärme-Kopplung.

Then Now

Page 20: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Leading Gas Engine Technology

Customer tailored solutions –application example dairy.

24.10.2017 202G. Kraft-Wärme-Kopplung.

Cold Heat Steam Electricity

Page 21: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Leading Gas Engine Technology

References.

24.10.2017 212G. Kraft-Wärme-Kopplung.

Page 22: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

2G Energy AG

Agenda

24.10.2017 22

1. Combined Heat & Power

2. 2G Energy AG

3. Leading Gas Engine Technology

4. Finances

5. Outlook

6. Partner Concept

2G. Kraft-Wärme-Kopplung.

Page 23: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Finances

Development of turnover and EBIT.

24.10.2017 232G. Kraft-Wärme-Kopplung.

Page 24: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

2G Energy AG

Agenda

24.10.2017 26

1. Combined Heat & Power

2. 2G Energy AG

3. Leading Gas Engine Technology

4. Finances

5. Outlook

6. Partner Concept

2G. Kraft-Wärme-Kopplung.

Page 25: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Outlook

Changing Role of CHP technology –Based on Demand.

24.10.2017 272G. Kraft-Wärme-Kopplung.

2010

2020e

2050e

Red:

Power RequirementGreen:

Total Wind and Solar

Virtual Power Plant

Page 26: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Outlook

Power to Gas / Hydrogen applicationsof the future.

24.10.2017 282G. Kraft-Wärme-Kopplung.

Warmth

Electricity

Warmth

Electricity

Fluctuating electricity generation from renewable energies

Elektrolysis MethanationH2

H2

CH4

Natural gas network

H2

Gas storage

Page 27: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Outlook

Outlook.

24.10.2017 292G. Kraft-Wärme-Kopplung.

• CHP• Energy Efficiency• Renewables

Page 28: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

2G Energy AG

Agenda

24.10.2017 30

1. Combined Heat & Power

2. 2G Energy AG

3. Leading Gas Engine Technology

4. Finances

5. Outlook

6. Partner Concept

2G. Kraft-Wärme-Kopplung.

Page 29: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Vision.

Cuál es nuestro objetivo?

www.2-g.de 312G. Kraft-Wärme-Kopplung.

„2G es El proveedor de unidades de cogeneración y

de soluciones orientadas al cliente, en el rango de

potencia de 20 – 4,000 kW para el suministro de

energía distribuida“

-> Para conseguir este objetivo necesitamos establecer una red de socios con contacto directo al cliente, en todo el mundo

Page 30: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Main Contract Types. Win-Win

32

Partner Concept.

www.2-g.com 2G. Cogeneration.

Page 31: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

my.2-g.com

Die Toolbox für 2G Partner.

www.2-g.de 2G. Kraft-Wärme-Kopplung. 38

Page 32: 2G. Company Presentation. - ccila- · PDF fileFoundation 2G Solutions Beginning of optimization of gas engines Agenitor Participation in 2G Cenergy inc. commissioning of first 2G plant

Thank you very much for your attention!

2G Energy AG | Benzstrasse 3| 48619 | HeekTel: +49 2568 9347-0 | [email protected] | www.2-g.comJudit Serra Marsal |Anselm Clavé 2| Vic (BCN)|+34 659 03 07 15| [email protected]