16
DRAWN BY: CWB JOB: CDRAFT.COM: ORIGINAL REV: 1 REV: 2 REV: 3 REV: 4 REV: 5 REV: 6 REV: 7 REV: 8 ARCHITECT JOB: HARTFORD PUBLIC LIBRARY PARK BRANCH 10-21-19 130901 9086 [email protected] CDRAFT CASEWORK DRAWINGS COVER Submittal drawings indicate the products to be custom manufactured and adjacent work effecting fabrication and / or installation. Refer to most recent quote for the exact items to be provided. Fabrication begins after submittal drawings are approved and returned. CaseworkDrawings.com will field measure wall to wall dimensions and verify jobsite conditions prior to fabrication. To avoid misinterpretations and possible delivery delays, please review and return in a timely manner. If these drawings are revised, CaseworkDrawings.com reserves the right to amend price and / or delivery schedules. WARRANTIES VOID: If damage caused by others and / or climatic conditions fail to meet AWI specification. NOT FOR FABRICATION: ECONOMY CUSTOM PREMIUM N/A 1st 2nd 3rd AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER: GENERAL CONTRACTOR: CASEWORK / MILLWORK FABRICATOR: JOB: #5174 HARTFORD PUBLIC LIBRARY PARK BRANCH 585-603 PARK STREET HARTFORD, CT MOBILE: FAX: CONTACT: PHONE: EMAIL: WEBSITE: MOBILE: FAX: CONTACT: PHONE: EMAIL: WEBSITE: TSKP STUDIO One Hartford Square West, 146 Wyllys Street, Bldg 1-203 Hartford, CT 06106 860.547.1970 MOBILE: FAX: CONTACT: PHONE: EMAIL: WEBSITE: MOBILE: FAX: CONTACT: PHONE: EMAIL: WEBSITE: PO BOX: 7987 COLUMBUS, GA 31908 Ph: 706.221.7979 Contact: BARRY IVEY Email: [email protected] CDRAFT CASEWORK DRAWINGS

#5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

COVER

Submittal drawings indicate the products to be custom manufactured and adjacent work effecting fabrication

and / or installation. Refer to most recent quote for the exact items to be provided. Fabrication begins after

submittal drawings are approved and returned. CaseworkDrawings.com will field measure wall to wall

dimensions and verify jobsite conditions prior to fabrication. To avoid misinterpretations and possible delivery

delays, please review and return in a timely manner. If these drawings are revised, CaseworkDrawings.com

reserves the right to amend price and / or delivery schedules.

WARRANTIES VOID: If damage caused by others and / or climatic conditions fail to meet AWI specification.

NOT FOR FABRICATION:

ECONOMY CUSTOM PREMIUM

N/A 1st 2nd 3rd

AWI GRADE REQUIREMENTS:

PROJECT PHASING:

4th

INSTALLATION FIRM:

SAME AS CASEWORK / MILLWORK FABRICATOR

OWNER:

ARCHITECT / DESIGNER:

GENERAL CONTRACTOR:

CASEWORK / MILLWORK FABRICATOR:

JOB: #5174

HARTFORD PUBLIC LIBRARY

PARK BRANCH

585-603 PARK STREET

HARTFORD, CT

MOBILE:

FAX:

CONTACT:

PHONE:

EMAIL:

WEBSITE:

MOBILE:

FAX:

CONTACT:

PHONE:

EMAIL:

WEBSITE:

TSKP STUDIO

One Hartford Square West, 146 Wyllys Street, Bldg 1-203

Hartford, CT 06106

860.547.1970

MOBILE:

FAX:

CONTACT:

PHONE:

EMAIL:

WEBSITE:

MOBILE:

FAX:

CONTACT:

PHONE:

EMAIL:

WEBSITE:

PO BOX: 7987

COLUMBUS, GA 31908

Ph: 706.221.7979

Contact: BARRY IVEY

Email: [email protected]

CDRAFT CASEWORKDRAWINGS

Page 2: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

INDEX

DRAWING INDEX: NOTE PAD:

#: ROOM: DESCRIPTION: SHEET:

S1 - S8SECTIONS & DETAILS

5201C KITCHENETTE BASE & WALL CABINETS, COUNTER

4201 COMMUNITY ROOM BASE CABINETS, COUNTER, WOOD TRIM

3105 STORAGE ROOM ADJUSTABLE SHELVING

1 - 2103 CHILDREN'S AREA BASE & WALL CABINETS, COUNTER, WOOD TRIM1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

Page 3: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

SPEC

NOTE: These submittal drawings indicate materials and finishes in accordance with our most recent quote and interpretation of the architect's plans

and specifications. Please thoroughly review and mark any corrections. Project materials and finishes will be per shop drawings, unless noted otherwise.

PL-1

WD-1

ALIKE

MASTER

.028" PLASTIC LAMINATE

.018" PVC

HARDWOOD

FACE EDGE:

1/4"

1/2"

3/4"

BACK PANEL THICKNESS:SUBSTRATE MATERIAL:

WOOD DOWELS

SCREWS

GLUED

3/4" PARTICLE BOARD

3/4" PLYWOOD

.028" PLASTIC LAMINATE

WOOD VENEER

EXTERIOR FINISH: INTERIOR FINISH:

3mm PVC

SUBSTRATE MATERIAL:

3/4" PARTICLE BOARD

3/4" PLYWOOD

EDGEBAND:

DRAWER BOX MATERIALS:

1/2" PARTICLE BOARD

DRAWER BOX FINISH:

MATCH SEMI-EXPOSED

SHELF FINISH: SHELF MATERIALS:

3/4" PARTICLE BOARD

3/4" PLYWOOD

3/4" PARTICLE BOARD

3/4" PLYWOOD, TYPICAL AT WET AREAS

SQUARE RADIUS

BULLNOSE

.050" PLASTIC LAMINATE

3mm PVC

SQUARE

BULLNOSE

SOLID SURFACE

HARDWOOD

15/16" PARTICLE BOARD

15/16" PLYWOOD

BULLNOSE

QUARTZ SURFACE

HARDWOOD

11/16" PARTICLE BOARD

11/16" PLYWOOD

.020" PLAM BACKER SHEET

BLACK

GRAY

WHITE

ALMOND

PLASTIC LAMINATE WOOD VENEER

CORE: 3/4" PARTICLE BOARD

CORE: 3/4" PLYWOOD

CORE: 3/4" PARTICLE BOARD

CORE: 3/4" PLYWOOD

EDGE / PROFILE: FINISHED EDGE MATERIALS: COUNTER & SPLASH MATERIALS:

EDGE / PROFILE:

EDGE / PROFILE:

FINISHED EDGE MATERIALS: COUNTER SUB-TOPS:

COUNTER SUB-TOPS:

FLUSH OVERLAY

REVEAL OVERLAY

DRAWER EDGEBAND: DRAWER BOTTOM PANELS:

CONSTRUCTION ADHESIVES:

1mm PVC

.018" PVC

NAUF FSC LEED

1/2" PLYWOOD

.028" PLASTIC LAMINATE

WOOD VENEER

EXPOSED SURFACES:

MELAMINE

.028" PLASTIC LAMINATE

.018: PVC

HARDWOOD

1mm PVC

3/4" PLYWOOD

3/4" PARTICLE BOARD

EB-1

INTEGRAL

.028" PLASTIC LAMINATE

3mm PVC

.018 PVCMELAMINE

BIRCH VENEER 1/4" PLYWOOD

3mm PVC HARDWOOD

1mm PVC.018 PVC

PG SG

INTEGRAL

SEPARATE LADDER STYLE UNFINISHED

PLASTIC LAMINATE

3/4" PARTICLE BOARD

3/4" EXTERIOR PLYWOOD

2x SOLID WOOD

5/4" PRESSURE TREATED

FLUSH INSET

FACE FRAME

NO-DRIP

3/4" MDF

PVC EDGEBAND TO CORE BONDING ADHESIVE - ETHYLENE-VINYL ACETATE, EVA, HOT ROLLER

3cm 2cm

A&M METAL BRACKETS: 15" x 21"

3/4" PARTICLE BOARD SOLID SURFACE 3/4" PLYWOODPLASTIC LAMINATE

CABINET ASSEMBLY - WATER BASED, WATERPROOF, WOOD GLUE

HIGH PRESURE PLASTIC LAMINATE TO CORE BONDING ADHESIVE - POLY-VINYL ACETATE, PVA COLD PRESS

COUNTER JOINTS: 3 1/2", 20 GA. DRAW BOLTS #49600

ANCHOR CABINET TO CABINET: #10 X 1 1/4" ROUND WASHER HEAD

ANCHOR CABINET TO FLOOR BLOCKS: #10 X 2 1/2" SCREWS, 6" O.C COUNTERSUNK

ANCHOR TO CABINET FLOOR BLOCKING: #10 X 3" RHWS SCREWS, 6" O.C.

ANCHOR TO CONCRETE FLOOR: 3/8" DIA. HILTI KWIK, BOLT TZICC - ESR 1917L, 8" O.C.

ANCHOR TO METAL STUDS: #14 X 3" SELF TAPING TRUSS HEAD SCREWS, 16" O.C.

ASSEMBLY & INSTALLATION FASTENERS: CONSTRUCTION ADHESIVES:

EDGEBAND: SHELF CORES: SHELF HARDWARE:

WALL SHELVING:

COUNTER SUPPORTS:

QUARTZ SURFACE:

RADIUSSQUARE

1/2" SOLID SURFACE:

COUNTER TOPS & SPLASH:

RADIUS

NO-DRIP

HARDWOOD

PLASTIC LAMINATE:

SHELF ADJUSTMENT:

FILE DRAWER SLIDES:

SEE MANUFACTURE'S CUT-SHEET

DRAWER SLIDES:

SEE MANUFACTURE'S CUT-SHEETSEE MANUFACTURE'S CUT-SHEET

HINGES:

CABINET HARDWARE:

STYLE: FINISH: BASE MATERIAL:

SHELF EDGEBAND: 1 EDGE

JOINERY:

CABINET CONSTRUCTION: WOOD PANEL COMPONENTS:

2" DIAMETER, BLACKPLEASE MARK LOCATIONS OF

GROMMETS ON PLAN VIEWS:

PROJECT SPECIFICATION:

GENERAL NOTES:

MISCELLANEOUS ITEMS:

GROMMETS:

UNDERMOUNT

DOUBLE BOWL

SINGLE BOWL

REST ROOM

SINK SCHEDULE:

RANGE HOOD

RANGE

ICE-MAKER

DISHWASHER

MICROWAVE

U/C REFRIGERATOR

REFRIGERATOR:

DESCRIPTION:TEMPLATES:SINK MATERIALS:MODEL #:MANUFACTURER:SINK TYPE:

DEPTH:HEIGHT:WIDTH:MODEL #:MANUFACTURER:APPLIANCES:

APPLIANCE SCHEDULE:

FINISH SCHEDULE: PLEASE MARK COLOR LOCATIONS ON ELEVATIONS

PLASTIC LAMINATE: STANDARD COLORS

EDGE BAND FOR PLASTIC LAMINATE:

PL-2

PL-3

PL-4

EB-2

EB-3

EB-4

SS-1

SOLID SURFACE:

SS-2

SS-3

SS-4

QS-1

QUARTZ SURFACE:

QS-2

QS-3

QS-4

WV-1 WE-1

WOOD VENEER:EDGE BAND FOR WOOD VENEER:

WV-2

WV-3

WV-4

WE-2

WE-3

WE-4

WOOD TRIM ITEMS:

WD-2 PG SG

WD-3 PG SG

WD-4 PG SG

WINDOW SILLS

HARDWOOD

1mm PVC

HARDWOOD

1mm PVC

SHELF SUPPORT:

DOOR LOCK & CATCH:

STRIKE PLATES:

DRAWER LOCKS:

STRIKE PLATES:

KEYING:

CABINET BASES:

CABINET SHELVES:

DRAWER BOXES:

DOORS / DRAWER

FRONTS:

CABINET STYLE:

ADJUSTABLE

FIXED

COAT ROD & FLANGE:

ROLLER CATCHES:

32mm LINEBORE

5mm NICKEL PLATED STEEL PIN, 4 PER SHELFSEE MANUFACTURE'S CUT-SHEET

ACCURIDE #3823

STANDARDS: KV #85

BRACKETS: KV #185

FINISHED EDGE MATERIALS:

.028" PLASTIC LAMINATE

MAPLE VENEER

WHITE MELAMINE

WOOD VENEER MATCH EXPOSED

MATCH SEMI-EXPOSED

OPEN INTERIORS:EXPOSED SURFACES: SEMI-EXPOSED SURFACES: CONCEALED SURFACES:

WHITE MELAMINE

WOOD VENEER

1/4" WHITE MELAMINE

MATCH EXPOSED

MATCH SEMI-EXPOSED

PG SG

PG SG

PG SG

PG SG

PULLS:

Page 4: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

IN-WALL BLOCKING

CENTERLINE

CAB WIDTH

183618

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

SAMPLE

PLAN:

ELEV:

SECT: 4/A6.01

12/A4.01

1/A2.03

1

BREAK ROOM 105

DETAIL:

COUNTER:

CABINET EXTERIORS:

CLOSED INTERIORS:

SOLID SURFACE

PLASTIC LAMINATE

MELAMINE

-

VERIFY

COLORS

SS-1

PL-1

3/8" = 12"

1

34

30

20

84

1

18 36 18 1

FE

FE

74

FE FE

24

2

S3

1

S2

2

S2

1

S5

2

S5

12

25

74

WALL CABINET

CASE DEPTH

COUNTER

DEPTH

SINK SYMBOLS INDICATE

LOCATIONS ONLY, REFER TO

PLUMBING SUBMITTAL FOR

SINK INFORMATION

IN-WALL BLOCKING

CENTERLINE

SECTION REFERENCE

FILLER REQUIRED FOR

DOORS CLEARANCE

FILLER REQUIRED FOR

DRAWER CLEARANCE

ELEVATION NUMBER

SCALE

ARCHITECTURAL

REFERENCES

ROOM NUMBER

SECTION REFERENCE

FINISH SELECTIONS

MATERIALS

ROOM DESCRIPTION

IN-WALL BLOCKING

CENTERLINE

IN-WALL BLOCKING

CENTERLINE

DOOR WIDTH

BLOCKING HEIGHT

BLOCKING HEIGHT

BLOCKING HEIGHT

CA

B H

EIG

HT

DO

OR

H

EIG

HT

C

A

B

D

E

P

T

H

56

81

30

FIELD VERIFY INTERIOR DIMENSIONS OF FREIGHT ELEVATOR

CAB & DOOR OPENING TO DETERMINE MAXIMUM ALLOWABLE

SIZES FOR SHIPPING & HANDLING OF CASEWORK / MILLWORK.

DOOR OPENING:

WIDTH:

HEIGHT:

ELEVATOR CAB:

WIDTH:

HEIGHT:

DEPTH:

SAMPLE PLAN & ELEVATION BELOW EXPLAINS THE VARIOUS ITEMS

ASSOCIATED WITH A TYPICAL PLAN & ELEVATION AND IS NOT PART

OF THE ACTUAL SCOPE OF WORK FOR THIS PROJECT.

SAMPLE ELEVATION: FREIGHT ELEVATOR:

6

Page 5: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

3232

BY OTHERS

REFRIG.

A9.01

6/A8.01

A1.01

1

CHILDREN'S AREA 103

COUNTER & SPLASH:

CABINET EXTERIORS:

CLOSED INTERIORS:

OPEN INTERIORS:

PLASTIC LAMINATE

WOOD VENEER

MELAMINE

WOOD VENEER-

VERIFY

COLORS

NORTH

PLAN:

ELEV:

SECT:

DETAIL:

3/8" = 12"

66

FIELD VERIFY

3010

FE

FE

215

FE

34

84

30

20

66

FIELD VERIFY

2

S3

1

S3

1 1

2

S4

12

25

82

56

30

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

1

Page 6: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

-

7 & 8/A8.01

A1.01

1

CHILDREN'S AREA 103

WOOD TRIM:

-

VERIFY

COLORS

EAST & SOUTH

PLAN:

ELEV:

SECT:

DETAIL:

3/8" = 12"

363

3

4

FIELD VERIFY

11

0

1x2 CONTINUOUS WOOD TRIM

@ TOP OF BOOKCASES & WALL

1x2 CONTINUOUS WOOD TRIM

@ TOP OF BOOKCASES & WALL

1

S7

1

S7

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

2

Page 7: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

12 48

62

FIELD VERIFY

72

13

16

73

13

16

FIE

LD

V

ER

IF

Y

1

3

2

3

-

-

A1.01

1

STORAGE ROOM 105

ADJUSTABLE SHELVING:

STANDARDS:

BRACKETS:

PLASTIC LAMINATE

KV 85 EXTRA HEAVY DUTY

KV 185 EXTRA HEAVY DUTY

-

VERIFY

COLORS

WEST

PLAN:

ELEV:

SECT:

DETAIL:

3/8" = 12"

8

1

2

8

1

2

28

7

16

28

7

16

73

13

16

FIELD VERIFY

88

4

ST

AN

DA

RD

L

EN

GT

H

1

2

1

2

72

13

16

SHELF WIDTH

-

-

A1.01

2

STORAGE ROOM 105

ADJUSTABLE SHELVING:

STANDARDS:

BRACKETS:

PLASTIC LAMINATE

KV 85 EXTRA HEAVY DUTY

KV 185 EXTRA HEAVY DUTY

-

VERIFY

COLORS

NORTH

PLAN:

ELEV:

SECT:

DETAIL:

3/8" = 12"

8

1

2

8

1

2

32

1

2

62

88

4

ST

AN

DA

RD

L

EN

GT

H

12

1

2

48

1

2

SHELF WIDTH

1

2

1

2

12

1

2

FIELD VERIFY

REQUIRED 2x IN-WALL

VERTICAL BLOCKING

REQUIRED 2x IN-WALL

VERTICAL BLOCKING

1

S8

1

S8

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

3

Page 8: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

REMOVABLE

PANELS

7/A9.01

16/A8.02

A1.02

1

COMMUNITY ROOM 201

COUNTER & SPLASH:

CABINET EXTERIORS:

CLOSED INTERIORS:

WOOD VENEER

WOOD VENEER

MELAMINE

-

VERIFY

COLORS

EAST

PLAN:

ELEV:

SECT:

DETAIL:

3/8" = 12"

102

FIELD VERIFY

11

102

FIELD VERIFY

11

204

FIELD VERIFY

33 48 48

102

FIELD VERIFY

5151

102

FIELD VERIFY

GWB

38

1

S5

2

S5

1

S6

WALL PANEL

& WOOD TRIM

WALL PANEL

& WOOD TRIM

CONTROL

PANEL

UPSTAGE

INTERFACE

1 G.H.

WALL PANEL

& WOOD TRIM

WALL PANEL

& WOOD TRIM

1

S6

34

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

4

Page 9: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

32

1

2

BY OTHERS

REFRIG.

32

1

2

32

3

4

1, 3/A9.01

17/A8.02

A1.02

1

KITCHENETTE 201C

COUNTER & SPLASH:

CABINET EXTERIORS:

CLOSED INTERIORS:

PLASTIC LAMINATE

WOOD VENEER

MELAMINE

-

VERIFY

COLORS

SOUTH

PLAN:

ELEV:

SECT:

DETAIL:

3/8" = 12"

12

25

80

1 8

FIE

LD

V

ER

IF

Y

47

3

4

FIELD VERIFY

2

5

1

5

1

34

30

20

84

1

21

FE

25

3

4

47

3

4

FIELD VERIFY

122

1

S4

2

S4

1, 4/A9.01

18/A8.02

A1.02

2

KITCHENETTE 201C

COUNTER & SPLASH:

CABINET EXTERIORS:

CLOSED INTERIORS:

PLASTIC LAMINATE

WOOD VENEER

MELAMINE

-

VERIFY

COLORS

WEST

PLAN:

ELEV:

SECT:

DETAIL:

3/8" = 12"

25

34

25

COUNTER

84

12 2

30

20

1

1

8

2

S4

21

34

1

8

1

S3

80

1

8

FIELD VERIFY

30

56

82

30

56

82

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

5

Page 10: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

TYPICAL CONSTRUCTIONS DETAILS: REFER TO PROJECT SPECIFICATION FOR MATERIALS & FINISHES

BASE CABINET DETAIL -

E

3" = 12"

BASE / TOE KICK

BASE CABINET DETAIL -

F

3" = 12"

BASE / BACK WALL

BASE CABINET DETAIL -

A

3" = 12"

COUNTER / DRAWER

BASE CABINET DETAIL -

B

3" = 12"

COUNTER / BACK WALL

WALL CABINET DETAIL -

G

3" = 12"

BOTTOM AT DOOR

WALL CABINET DETAIL -

H

3" = 12"

BOTTOM AT BACK WALL

WALL CABINET DETAIL -

C

3" = 12"

TOP AT DOOR

WALL CABINET DETAIL -

D

3" = 12"

TOP AT BACK WALL

DOOR PULL

CONCEALED

HINGE

DRAWER PULL

#14 x 3" SELF

TAPING SCREWS

REQUIRED IN-WALL

BLOCKING BY OTHERS

1/2" DRAWER BOX

EXTERIOR GRADE

PLYWOOD BASE

SCHEDULED BASE

FINISH BY OTHERS

CONCEALED HINGE

32mm LINEBORE

2

4

1/2" BACK PANEL

TOP PANEL

DOOR

1/2" BACK PANEL

DOOR PULL

1/2" BACK PANEL

32mm LINEBORE

32mm LINEBORE

1/2" BACK PANEL

32mm LINEBORE

32mm LINEBORE

3

4

3

4

3

4

COUNTER

SPLASH

1/2" DRAWER

BOX

1/4" DRAWER

BOTTOM

SPLASH

COUNTER

1/4" DRAWER BOTTOM

CONCEALED HINGE

#14 x 3" SELF

TAPING SCREWS

REQUIRED IN-WALL

BLOCKING BY OTHERS

4

1

1 2

#14 x 3" SELF

TAPING SCREWS

REQUIRED IN-WALL

BLOCKING BY OTHERS

CONCEALED HINGE

32mm LINEBORE

#14 x 3" SELF

TAPING SCREWS

REQUIRED IN-WALL

BLOCKING BY OTHERS

6

1 8

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

S1

Page 11: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

TYPICAL CABINET DETAIL

3" = 12"

-

A

FINISHED END

TYPICAL CABINET DETAIL

3" = 12"

-

B

FILLER AT WALL

TYPICAL CABINET DETAIL

3" = 12"

-

C

ADJOINING CABINETS

TYPICAL CABINET DETAILS

3" = 12"

-

D

BASE CABINETS AT CORNER

TYPICAL CABINET DETAILS

3" = 12"

-

E

WALL CABINETS AT CORNER

TYPICAL CONSTRUCTIONS DETAILS: REFER TO PROJECT SPECIFICATION FOR MATERIALS & FINISHES

3

3

1/2" BACK PANEL

CONCEALED HINGE

3/4" SIDE PANEL

INSIDE CORNER

FILLER

DOOR

1/2" BACK PANEL

CONCEALED HINGE

3/4" SIDE PANEL

DOOR

FILLER @ WALL

DRAWER FRONT

DRAWER SLIDE

1/2" DRAWER BOX

3/4" SIDE PANEL

1/2" BACK PANEL

DOOR

3/4" SIDE PANEL

1/2" BACK PANEL

#10 x 1 3/8" SCREWS

CONCEALED HINGE

CONCEALED HINGE

CONCEALED HINGE

DOOR

#10 x 1 3/8" SCREWS

2

2

1/2" BACK PANEL

CONCEALED HINGE

3/4" SIDE PANEL

INSIDE CORNER

FILLER

DOOR

CONCEALED HINGE

#10 x 1 3/8" SCREWS

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

S2

Page 12: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

4

34

25

5/A9.01

-

-

1

SINK COUNTER SECTION -

-

REFERENCE ELEVATIONS FOR FINISH SELECTIONS

PLAN:

ELEV:

SECT:

DETAIL:

1 1/2" = 12"

24

1

4

25

4

1

1 2

3

4

COUNTER & SPLASH:

APRON RAIL:

PLASTIC LAMINATE

WOOD VENEER

4

2

23

1

2

CASE DEPTH

34

28

1 2

SCHEDULED BASE

BY OTHERS

5/A9.01

-

-

2

BASE CABINET SECTION -

-

REFERENCE ELEVATIONS FOR FINISH SELECTIONS

PLAN:

ELEV:

SECT:

DETAIL:

1 1/2" = 12"

24

1

4

25

4

1

1 2

3

4

COUNTER & SPLASH:

CABINET EXTERIORS:

OPEN INTERIORS:

PLASTIC LAMINATE

WOOD VENEER

WOOD VENEER

3

1 2

1

1

2

1

1

2

23

1

2

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

S3

Page 13: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

30

12

CASE DEPTH

1/A9.01

-

-

2

WALL CABINET SECTION -

CABINET EXTERIORS:

CLOSED INTERIORS:

WOOD VENEER

MELAMINE

-

REFERENCE ELEVATIONS FOR FINISH SELECTIONS

PLAN:

ELEV:

SECT:

DETAIL:

1 1/2" = 12"

4

34

2

23

1

2

CASE DEPTH

6

1 8

4

20

22

3 8

SCHEDULED BASE

BY OTHERS

3/A9.01

-

-

1

BASE CABINET SECTION -

-

REFERENCE ELEVATIONS FOR FINISH SELECTIONS

PLAN:

ELEV:

SECT:

DETAIL:

1 1/2" = 12"

24

1

4

25

4

1

1 2

3

4

COUNTER & SPLASH:

CABINET EXTERIORS:

CLOSED INTERIORS:

PLASTIC LAMINATE

WOOD VENEER

MELAMINE

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

S4

Page 14: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

4

38

2

9

1

2

CASE DEPTH

32

1 2

SCHEDULED BASE

BY OTHERS

7/A9.01

-

-

1

BASE CABINET SECTION -

-

REFERENCE ELEVATIONS FOR FINISH SELECTIONS

PLAN:

ELEV:

SECT:

DETAIL:

1 1/2" = 12"

11

1

1 2

COUNTER & SPLASH:

CABINET EXTERIORS:

CLOSED INTERIORS:

WOOD VENEER

WOOD VENEER

MELAMINE

ACOUSTIC PANELS

& TRIM BY OTHERS

4

38

2

9

1

2

CASE DEPTH

32

1 2

SCHEDULED BASE

BY OTHERS

-

-

-

2

BASE CABINET SECTION -

-

REFERENCE ELEVATIONS FOR FINISH SELECTIONS

PLAN:

ELEV:

SECT:

DETAIL:

1 1/2" = 12"

11

1

1 2

COUNTER & SPLASH:

CABINET EXTERIORS:

CLOSED INTERIORS:

WOOD VENEER

WOOD VENEER

MELAMINE

ACOUSTIC PANELS

& TRIM BY OTHERS

REMOVABLE PANEL

ON Z-CLIPS

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

S5

Page 15: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

11

9/A9.01

-

-

1

WALL EXTENSION SECTION -

WOOD TRIM:

WALL PANEL:

-

REFERENCE ELEVATIONS FOR FINISH SELECTIONS

PLAN:

ELEV:

SECT:

DETAIL:

1 1/2" = 12"

3/4" WOOD VENEER

PLYWOOD

WOOD TRIM

ACOUSTIC PANELS

& TRIM BY OTHERS

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

S6

Page 16: #5174 AWI GRADE REQUIREMENTS: PROJECT PHASING ...AWI GRADE REQUIREMENTS: PROJECT PHASING: 4th INSTALLATION FIRM: SAME AS CASEWORK / MILLWORK FABRICATOR OWNER: ARCHITECT / DESIGNER:

-

7 & 8/A8.01

A1.01

1

TRIM @ BOOKCASES -

WOOD TRIM:

-

REFERENCE ELEVATIONS FOR FINISH SELECTIONS

PLAN:

ELEV:

SECT:

DETAIL:

1 1/2" = 12"

3

4

1

1 2

WOOD TRIM

DRAWN BY:

CWB JOB:

CDRAFT.COM:

ORIGINAL

REV: 1

REV: 2

REV: 3

REV: 4

REV: 5

REV: 6

REV: 7

REV: 8

ARCHITECT JOB:

HA

RT

FO

RD

P

UB

LIC

LIB

RA

RY

P

AR

K B

RA

NC

H

10-21-19

130901

9086

[email protected]

CDRA

FT C

ASEW

ORK

DRAW

INGS

S7