11
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 691405 Smart TSO-DSO interaction schemes, market architectures and ICT Solutions for the integration of ancillary services from demand side management and distributed generation A cost-benefit analysis approach for analysing TSO-DSO coordination schemes Carlos Madina (Tecnalia)

A cost-benefit analysis approach for analysing TSO-DSO ...smartnet-project.eu/wp-content/uploads/2017/10/6-EUW17-Madina.pdf · This project has received funding from the European

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A cost-benefit analysis approach for analysing TSO-DSO ...smartnet-project.eu/wp-content/uploads/2017/10/6-EUW17-Madina.pdf · This project has received funding from the European

This project has received funding from the European Union’s Horizon 2020

research and innovation programme under grant agreement No 691405

Smart TSO-DSO interaction schemes, market architectures and ICT Solutions for the integration of ancillary services from demand side

management and distributed generation

A cost-benefit analysis approach for analysing TSO-DSO coordination schemes

Carlos Madina (Tecnalia)

Page 2: A cost-benefit analysis approach for analysing TSO-DSO ...smartnet-project.eu/wp-content/uploads/2017/10/6-EUW17-Madina.pdf · This project has received funding from the European

Agenda

Objective of SmartNet CBA

CBA link to other SmartNet activities

Structure of the analysis: Macro + Micro

Macro-level analysis

Micro-level analysis

2

Page 3: A cost-benefit analysis approach for analysing TSO-DSO ...smartnet-project.eu/wp-content/uploads/2017/10/6-EUW17-Madina.pdf · This project has received funding from the European

3

Objective of SmartNet CBA

Assessment of different coordination schemes in the

three countries Cost Benefit Analysis

Page 4: A cost-benefit analysis approach for analysing TSO-DSO ...smartnet-project.eu/wp-content/uploads/2017/10/6-EUW17-Madina.pdf · This project has received funding from the European

CBA link to other SmartNet activities

4

Network model Formal

specifications

Simulation platform realization

Lab test with HW controller

Return of experience

Regulatory Analysis (guidelines)

National scenarios definition

Three pilots: • DSO area data monitoring • Flexibility from thermal inertia • Flexibility from Radio Base Stations

Market model

ICT model

CBA with different architectures

Personalization with three national

cases

Reference architectures definition

Page 5: A cost-benefit analysis approach for analysing TSO-DSO ...smartnet-project.eu/wp-content/uploads/2017/10/6-EUW17-Madina.pdf · This project has received funding from the European

5

TSO-DSO

coordination

schemes

Transmission and

distribution networks

and operation

ICT specifications

and planning

Country specific

aspects and

peculiarities

Flexible device

power profiles and

parameters

Energy devices

aggregation and

specifications

DER

DSOTSO

Aggr.

Simulation TSO-DSO

coordination

schemes

Transmission and

distribution networks

and operation

ICT specifications

and planning

Country specific

aspects and

peculiarities

Flexible device

power profiles and

parameters

Energy devices

aggregation and

specifications

DER

DSOTSO

Aggr.

TSO-DSO

coordination

schemes

Transmission and

distribution networks

and operation

ICT specifications

and planning

Country specific

aspects and

peculiarities

Flexible device

power profiles and

parameters

Energy devices

aggregation and

specifications

DER

DSOTSO

Aggr.

Analysis of TSO-DSO coordination schemes

Country-specific aspects and regulation

ICT specification and planning

Structure of the CBA

System-wide benefits and costs (Macro)

Appropriate allocation of costs and benefits (Micro)

Page 6: A cost-benefit analysis approach for analysing TSO-DSO ...smartnet-project.eu/wp-content/uploads/2017/10/6-EUW17-Madina.pdf · This project has received funding from the European

6

Simulation

Macro-level analysis

Calculation of metrics

Monetisation TSO-DSO

coordination

schemes

Transmission and

distribution networks

and operation

ICT specifications

and planning

Country specific

aspects and

peculiarities

Flexible device

power profiles and

parameters

Energy devices

aggregation and

specifications

DER

DSOTSO

Aggr.

ICT requirements

Cost estimation

System-wide CBA

Page 7: A cost-benefit analysis approach for analysing TSO-DSO ...smartnet-project.eu/wp-content/uploads/2017/10/6-EUW17-Madina.pdf · This project has received funding from the European

7

Macro-level analysis. Metrics Calculation

of metrics

Complete

Simple

Realistic Applicable

Objective

System-

oriented

Non-overlapping

Reproducible

& documentable

o Enhanced provision of ancillary services: total balancing cost (vs social welfare)

o Cost due to network limitations: comparing costs taking network into account with ideal situation (busbar)

o Reduction of unwanted measures: unexpected congestions solved with curtailment of load/generation, etc. Monetized at imbalance price or associated resource costs

o Reduced network losses o Emissions savings: with standard emission

rates for each generation technology and CO2 prices forecasted at studied horizon

EPRI/JRC REALISEGRID e-Highway2050

Literature

review

Proposed indicators

Page 8: A cost-benefit analysis approach for analysing TSO-DSO ...smartnet-project.eu/wp-content/uploads/2017/10/6-EUW17-Madina.pdf · This project has received funding from the European

8

Macro-level analysis. ICT costs ICT costs

Running consultation with the Advisory Board on the topic

smartnet-project.eu/consultations/consultation-3/

TSO-DSO

coordination

schemes

Transmission and

distribution networks

and operation

ICT specifications

and planning

Country specific

aspects and

peculiarities

Flexible device

power profiles and

parameters

Energy devices

aggregation and

specifications

DER

DSOTSO

Aggr.

ICT costs include communication, market clearing software)…. Steps: 1. Comparison of the coordination schemes in terms of

functionalities and ICT 2. Convert each ICT system into a cost at target year Main focus on issues that can differ between coordination schemes.

Page 9: A cost-benefit analysis approach for analysing TSO-DSO ...smartnet-project.eu/wp-content/uploads/2017/10/6-EUW17-Madina.pdf · This project has received funding from the European

9

Micro-level analysis

System-wide CBA

Micro-level CBA

• Identification of the value chain

• Allocation of cost and benefits for each stakeholder

• Sensitivity analysis

Page 10: A cost-benefit analysis approach for analysing TSO-DSO ...smartnet-project.eu/wp-content/uploads/2017/10/6-EUW17-Madina.pdf · This project has received funding from the European

SmartNet-Project.eu This presentation reflects only the author’s view and the Innovation and Networks

Executive Agency (INEA) is not responsible for any use that may be made of the information it contains.

Page 11: A cost-benefit analysis approach for analysing TSO-DSO ...smartnet-project.eu/wp-content/uploads/2017/10/6-EUW17-Madina.pdf · This project has received funding from the European

Thank You

Carlos Madina

Contact Information

Affiliation: Tecnalia

Phone: +34 667 165 473 Email: [email protected]