CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013 ASSIGNMENT 02 FULL SIZE FINAL REPORT OPTION 2. IN SITU NAME: ZEYU LI (VICKY) STUDENT NUMBER: 634091 INTRODUCTION This report is based on the obervation of the site which is located on 329 Melbourne Road, Newport. This 3 stories private house is designed by local architectural company # TPH Construction PTY LTD. The budget of this house is $500,000, and is planed to be finished before February, 2014. WEEKLY TEMPLATES CATEGORY (select) _ 1.FOUNDATION & FOOTING SYSTEM // 2. FLOOR SYSTEM // 3.WALL SYSTEM // 4.ROOF SYSTEM 1_STRUCTURE ·WALL SYSTEM Timber structural system Masonry structural system ·FLOOR SYSTEM

A02 final report

  • Upload
    melon

  • View
    241

  • Download
    3

Embed Size (px)

DESCRIPTION

Assignment 2 Constructing Environments University of Melbourne

Citation preview

Page 1: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

INTRODUCTION

This report is based on the obervation of the site which is located on 329 MelbourneRoad, Newport. This 3 stories private house is designed by local architecturalcompany # TPH Construction PTY LTD. The budget of this house is $500,000, and isplaned to be finished before February, 2014.

WEEKLY TEMPLATES

CATEGORY (select) _ 1.FOUNDATION & FOOTING SYSTEM // 2.FLOOR SYSTEM // 3.WALL

SYSTEM // 4.ROOF SYSTEM

1_STRUCTURE

·WALL SYSTEM

Timber structural system

Masonry structural system

·FLOOR SYSTEM

Page 2: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

Steel structural system

Timber structural system

2_MATERIALS

Timber

Page 3: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

Timber frames require diagonal bracing or shear planes for lateral stability and mayqualify as heavy timber construction if used with noncombustible, fire-resistiveexterior walls.(Ching 2008, page5.03)

Masonry---Bricks

Masonry walls consist of modular building blokcs bonded together with mortar toform walls that are durable, fire-resistant, and structurally efficient in compression.The most common types of masonry units are bricks, which are heat-hardenedunits.(Ching 2008 Page5.14)

Steel

Cement/concrete

Page 4: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

3_CONSTRUCTION SYSTEM AND FUNCTION OF MEMBERS

·Frame construction system

Exterior walls: protect shield against the weather for the interior spaces of a building.their construction should control the passage of heat, infiltrating air, sound,moisture, and water vapor. The exterior skin, which may be either applied to orintegral with the wall structure,should be durable and resistant to the weatheringeffects of sun, wind, and rain. (Ching 2008 page5.02)

The interior walls (partitions): subdivide the space within a building,may be eitherstructural or nonloadbearing, their construction should be able to support thedesired finish materials, provide the required degree of acoustical separation, andaccommodate when necessary the distribution and outlets of mechanical andelectrical services. (Ching 2008 page5.02)

Stud: studs carry vertical loads while sheathing or diagonal bracing stiffens the planeof the wall.(Ching 2008, page5.03)

Cross bracing: resist shear loads.

Nogging: horizontal members which run parallel with the top and bottom platesbetween the studs and used to straighten the centre of the wall and provide lateral

Page 5: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

support to the studs. Certain numbers of noggings are required depending upon thestud height.(Abis 2013, Nogging)

Prefabricated wood trusses: used in the place of dimension lumber to frame floorsbecause its generally lighter and more dimensionally stable than sawn lumber, aremanufactured in greater depths and lengths, and can span longer distances.(Ching2008, page4.33)

Joist: the horizontal members that span two walls and/or beams—have to carry theweight of the walls, people, furniture, appliances and other stuff.

4_PHOTOS OF BUILDING PROGRESS (Address:329 Tregutha Way, Newport,Victoria)

Week 3: They just finish the ground floor and start to build second floor.

Cross bracingNogging

Page 6: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

Week4: This week they focus on the bedroom for owner’s child which located abovethe garage, and they refix the downpipes.

Week 5: Because the owner wants to discuss some changes with the designer, sothey don’t work this week.

Week 6: This week they start to build the floor for fisrt story.

Downpipes---PVC

Page 7: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

Steel jointHorizontal diagonal bracing

Steel beam Joist

Prefabric wood trusses

Page 8: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

Week 7:During this week they start to install the stairs.

Week 8: this week they finished the roof of child’s bedroom, and begin to build thefloor of second story. But I can not get upstairs, because they still installing the stairs.

Stairs --- not finished

Page 9: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

Roof

Page 10: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

5_DIAGRAMS, DETAILS AND ANNOTATIONS

Page 11: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

Relative to Ching page 4.21

Page 12: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

Relative to Ching page 4.21

Page 13: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

6_AESTHETIC DESIGN. SKETCHES AND DETAILS

·three stories.

·It uses bricks to contribute exterior wall, and the colour of this material is very closeto nature, most people like masonry building as it’s connect with naturalenvironments.

·The owner put their spa in the backyard, they are really enjoy the life.

Bedroom

Over there is study room

Study room

Living room & Meals & Kitchen

Page 14: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

SPA

Garage

Page 15: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

(Ground floor plan)

(First floor plan)

Page 16: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

7_STAGE OF WORKS. DESCRIPTION AND IMPLICATIONS

Week 3 ~ Week 5: wall system

Week 6 ~ Week 8: floor system (because they’ve already finished the ground floor,the floor in here means first floor and second floor)

Stage of Works: frame stage.

This stage is important because the either wall or first(second) floor support all thedead loads(roof etc.) and live loads (people, furnitures etc.) around the house, and itdecides the stability of a building. It have to resist the shear load, such as wind orearthquakes.

CONCLUSION

Above content are the obervation I noticed during these 6 weeks, I’ve learnt manythings about materials, constructural types and structural systems of wall and floorsystems from tracing a full-scale process.

Page 17: A02 final report

CONSTRUCTING ENVIRONMENTS SEMESTER 2 2013

ASSIGNMENT 02 FULL SIZE FINAL REPORT

OPTION 2. IN SITU

NAME: ZEYU LI (VICKY)

STUDENT NUMBER: 634091

REFERENCES

Abis 2013, Nogging, viewed 26th September 2013,

<http://www.abis.com.au/nogging>

Ching F 2008, Building construction illustrated, John Wiley & Sons, Inc., Hoboken

The Family Handyman 2013,How joints work,viewed 11th August 2013,

<http://www.familyhandyman.com/floor/how-joists-work/view-all>