25
ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING TO INDUSTRY Integrated Logistics Support Center (ILSC) Ms. Liz Miranda, Director 1 Feb 2017 1 The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired products and services."

ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

Embed Size (px)

Citation preview

Page 1: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

ABERDEEN PROVING GROUNDADVANCED PLANNING BRIEFING TO INDUSTRY

Integrated Logistics Support Center (ILSC)Ms. Liz Miranda, Director1 Feb 2017

1

“The forecast data is for planning purposes, does not represent apre-solicitation synopsis, does not constitute an invitation for bid orrequest for proposal, and is not a commitment by the government to purchase the desired products and services."

Page 2: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

ABERDEEN PROVING GROUNDADVANCED PLANNING BRIEFING TO INDUSTRY

Power & Engineering Directorate (P & E)Cecilia Black1 Feb 2017

2

“The forecast data is for planning purposes, does not represent apre-solicitation synopsis, does not constitute an invitation for bid orrequest for proposal, and is not a commitment by the government to purchase the desired products and services."

Page 3: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

3APBI OPPORTUNITIES UPDATE JANUARY 2017

TOTAL ACTIONS BRIEFED: 01

ACTIONS AWARDED:– No Action Awarded to Date

RFPs RELEASED:– Lithium Carbon mono-fluoride (Li-CFx) hybrid batteries, BA-5790 and BA-5795

Solicitation SPRBL115R0002 released on 30 Jun 2015 Source selection process underway. Anticipated contract award in 3QFY17

STRATEGY CHANGES:– No changes to original strategy. Competitive, Best Value with the potential for

two awardees

ANY ACTIONS NOT NOTED ABOVE HAVE RFP RELEASE DATES AFTER 31 DEC 2017 AND WILL BE ADDRESSED IN THE NOVEMBER 2018 APBI

Page 4: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

4

• The Combat Survivor Evader Locator (CSEL) nonrechargeable and rechargeable batteries support the Combat Survivor Evader Locator Radio.

• The CSEL Radio is utilized across the Department of Defense.

• Usage of the CSEL batteries is across all combat personnel of all services to transmit secure, digital GPS-derived location information and both keyed-in and scanned messages.

• This capability will allow rescue forces to receive the message from anywhere in the world via over-the-horizon communication satellites.

PROGRAM / PROJECT OVERVIEWCSEL NONRECHARGEABLE AND RECHARGEABLE BATTERIES

Page 5: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

5PROGRAM / PROJECT OVERVIEW

CSEL NONRECHARGEABLE AND RECHARGEABLE BATTERIES

• ILSC Power and Environmental is pursuing a 5 year IDIQ contract for the CSEL batteries.

• CSEL Rechargeable Battery requirement is for a total quantity of approximately 38,000 over a 5 year ordering period. Average monthly demand is approximately 620 per month.

• CSEL Non-Rechargeable Battery requirement is for IDIQ for a total quantity of 21,000 over a 5 year ordering period. Average monthly demand is approximately 334 per month.

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services

Page 6: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

6

CONTRACT TYPE: FFP IDIQ

ESTIMATED VALUE: $10M-$15M

CONTRACTING CONTACT:KO: Robert Brewer, [email protected], 443-861-4543

SOLICITATION #: TBD

ESTIMATED SOLICITATION RELEASE DATE: 2QFY17

PRIOR/CURRENT CONTRACT INFORMATION: Contract Number: SPRBL1-12-D-0001 (Rechargeable)Incumbent Contractor: Brentronics

Contract Number: SPRBL1-11-D-0017 (Non-Rechargeable)Incumbent Contractor: Boeing through Brentronics & Matthews Associates

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services

OPPORTUNITY: CSEL NONRECHARGEABLE AND RECHARGEABLE BATTERIES

Page 7: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

7ORGANIZATIONAL OVERVIEW / WAY AHEAD / FUTURE CONCEPTS:

The Power Environmental Directorate plans to work with industry to explore the following topics:

• Research on the availability of repair capabilities for components of the military generators such as engines and alternators

• Canvass the market for emerging technologies to enhance the current capabilities of Small Power Generators (3kW and 2kW)

Page 8: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

ABERDEEN PROVING GROUNDADVANCED PLANNING BRIEFING TO INDUSTRY

Field Support Directorate (FSD)Scott Mallette1 Feb 2017

8

“The forecast data is for planning purposes, does not represent apre-solicitation synopsis, does not constitute an invitation for bid orrequest for proposal, and is not a commitment by the government to purchase the desired products and services."

Page 9: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

9APBI OPPORTUNITIES UPDATE JANUARY 2017

TOTAL ACTIONS BRIEFED: 3

ACTIONS AWARDED:- none this FY

RFPs RELEASED:– Foreign Military Sales. ID04170008, released

Oct 2016. Anticipated Award date 29 JAN 2017.

STRATEGY CHANGES:- No change in strategy.

Page 10: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

10

CEDAT VLAR was tested extensively as part of the Army Condition Based Maintenance (CBM) program and has proven to be an effective means of isolating failing LRUs with high confidence.

- VLAR accepts direct sensor input with its inherent knowledge management, action report, and analysis capabilities.

• VLAR provides the critical field-level knowledge base for integration.

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services

CECOM Equipment Diagnostic Analysis Tool – Virtual LAR (CEDAT VLAR).

Program / Project Overview

Page 11: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

11

CONTRACT TYPE: CPFF, SB

ESTIMATED VALUE: $10-30M

CONTRACTING CONTACT (if known): Contracting Organization ACC-APG, Michael Monticello, (443)861-4905, [email protected]

SOLICITATION #: W56KGY16R0013

ESTIMATED SOLICITATION RELEASE DATE: 3QFY173 year, SB Set Aside

PRIOR/CURRENT CONTRACT INFORMATION: Contract Number: W15P7T-06-D-E405 0060 Incumbent Contractor: Leidos formerly Lockheed Martin

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services

Opportunity: CECOM Equipment Diagnostic Analysis Tool – Virtual LAR (CEDAT VLAR).

Page 12: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

12

- Training development and delivery for government provided systems, C4ISR systems, CYBER, Commercial off the Shelf (COTS) and unit requested training concepts.

- Fielding and Integration support and training for PEO agencies delivering products and services to the Warfighters in every region.

• Tactical Communications• CYBER technologies• Virtual applications for training enhancements• Mobile and Resident training capabilities

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services

Training and Fielding for Command, Control, Communications, Computers, Intelligence, Surveillance, Reconnaissance (C4ISR) and CYBER Security technology systems, platforms, system of systems, equipment, and programs.

Program / Project Overview

Page 13: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

13

CONTRACT TYPE: CPFF

ESTIMATED VALUE: $60-70M

CONTRACTING CONTACT (if known): Contracting Organization ACC-APG, Steve Foster, (443)861-4905 [email protected]

SOLICITATION #: W56KGY-16-R-0044

ESTIMATED SOLICITATION RELEASE DATE: 2QFY185 YEAR, FULL AND OPEN

PRIOR/CURRENT CONTRACT INFORMATION: Contract Number: W15P7T-06-D-E405 0060Incumbent Contractor: Leidos formerly Lockheed Martin

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services

Opportunity: Training and Fielding for Command, Control, Communications, Computers, Intelligence, Surveillance, Reconnaissance (C4ISR) and CYBER Security technology systems, platforms, system of systems, equipment, and programs.

Page 14: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

14

CECOM Field Support Directorate will continue to gauge the pulse of the emerging CYBER battlefield systems enhancements and seek efficiencies.

- FSD will continue to leverage the CECOM capability sets of • knowledge management, training curriculum

development, mission and training execution and delivery, technology insertions or upgrades associated to the fielding, maintenance, and training.

• maintenance and regional support will continue to be honed based on the fielded systems and product lines.

- FSD will continue to support C4ISR programs and systems of CECOM LCMC as well as command communications and Cyber training products for Department of Defense and other government agencies.

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services

Field Support Directorate Organizational Overview / Way Ahead / Future Concepts

Page 15: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

ABERDEEN PROVING GROUNDADVANCED PLANNING BRIEFING TO INDUSTRY

C3TTerry Deloney1 Feb 2017

15

“The forecast data is for planning purposes, does not represent apre-solicitation synopsis, does not constitute an invitation for bid orrequest for proposal, and is not a commitment by the government to purchase the desired products and services."

Page 16: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

16APBI OPPORTUNITIES UPDATE JANUARY 2017

TOTAL ACTIONS BRIEFED: 4

ACTIONS AWARDED: 1– Contract # SPRBL1-16-D-0031 for two SINCGARS Circuit Card

Assemblies (CCAs), RF CCA and Synthesizer CCA was awarded on 07/19/2016.

RFPs RELEASED: 1– Solicitation # SPRBL1-16-R-0039 for the Mounting Bases for SINCGARS

and EPLRS Radio Sets was released on 9/8/2016.

RFPs PENDING RELEASE: 2

STRATEGY CHANGES: 0

ANY ACTIONS NOT NOTED ABOVE HAVE RFP RELEASE DATES AFTER 31 DEC 2017 AND WILL BE ADDRESSED IN THE NOVEMBER 2018 APBI

Page 17: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

17Program / Project Overview: SINCGARS Cable Assemblies & Wiring HarnessesThis contract will consist of three (3) various Cable Assemblies / Branched Wiring Harnesses, which are components of either the Interconnecting Group ON-373B/GRC or the Accessory Kit, AVIM, GRM-122. This will be competitive, SB set-aside.

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services

The ON-373B/GRC is an interconnecting group used in conjunction with Radio Test Set AN/GRM-122 to provide the direct maintenance for Ground SINCGARS Line-Replaceable Units. ON-373B/GRC consists of various RF cables, branched wiring harnesses, toolkits, anti-static table runner, grounding straps and power supply.

The Accessory Kit, AVIM, GRM-122 is an accessory kit used in conjunction with Radio Test Set AN/GRM-122 to test and troubleshoot the Airborne SINCGARS radio set components. This accessory kit consists of various RF cables, branched wiring harnesses, alignment tool, and various wrenches.

Page 18: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

18OPPORTUNITY: SINCGARS Cable Assemblies & Wiring Harnesses

CONTRACT TYPE: Firm Fixed Price, 5-year IDIQ

ESTIMATED VALUE: $1M-$4M

CONTRACTING CONTACT (if known): DLA-APG, Matthew Woolstenhulme, 443-861-4541, [email protected]

SOLICITATION #: TBA

ESTIMATED SOLICITATION RELEASE DATE: 2QFY17

PRIOR/CURRENT CONTRACT INFORMATION: Contract Number: SPRBL1-14-C-0001 / SPRBL1-14-P-0003 Incumbent Contractor: Harris Corporation / Federal Prison Industries Inc.

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services

Page 19: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

19Program / Project Overview:Two SINCGARS Installation KitsThis contract will consist of two SINCGARS Installation Kits (MK-3092/VRC & MK-3094/VRC). This is a follow-on contract for the existing contract W15P7T-11-D-0078, which was expired on Aug 18, 2016. This will be a full and open competition.

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services

The MK-3092/VRC is an installation kit, electronic equipment, installation of antenna adapter brackets and tower for curbside antennas with rear shoulder harness in a 4 door M998, M1097 high mobility multi-purpose wheeled vehicles (HMMWV)

The MK-3094/VRC is an installation kit, rack and frame assembly, multi-net rack, for electronic equipment, installations of C4ISR equipment, for use in M1151, M1152, M1165 high mobility multi-purpose wheeled vehicles (HMMWV)

Page 20: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

20Opportunity: Two SINCGARS Installation Kits

CONTRACT TYPE: Firm Fixed Price, 5-year IDIQ

ESTIMATED VALUE: $1M-$2M

CONTRACTING CONTACT (if known): DLA-APG, Matthew Woolstenhulme, 443-861-4541, [email protected]

SOLICITATION #: TBD

ESTIMATED SOLICITATION RELEASE DATE: 2QFY17

PRIOR/CURRENT CONTRACT INFORMATION: Contract Number: W15P7T-11-D-0078 Incumbent Contractor: Centron Industries Inc.

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services

Page 21: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

21Program / Project Overview:SINCGARS Handset H-250B/G and HS0071 Earphone PlugThis contract is for the acquisition of H-250B/G.

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services

The H-250B/G handset is a lightweight noise cancelling handset designed to meet U.S.A. military Specification MIL-PRF-49078A. The handset voice signal includes a built-in volume control. The rotary volume control is positioned for easy access for either thumb or finger operation. It includes a built-in 2.5mm phone jack and an audio jack. This handset is used with a vast number of radios in the Army Fleet.

Page 22: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

22Opportunity: SINCGARS Handset H-250B/G and HS0071 Earphone Plug

CONTRACT TYPE: Firm Fixed Price, 5-year IDIQ

ESTIMATED VALUE: $3M-$5.34M

CONTRACTING CONTACT (if known): DLA-APG, KO Matthew Woolstenhulme, 443-861-4541, [email protected]

SOLICITATION #: TBA

ESTIMATED SOLICITATION RELEASE DATE: 2QFY17

PRIOR/CURRENT CONTRACT INFORMATION: Contract Number: SPRBL115D0018Incumbent Contractor: Sonetronics Inc.

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services

Page 23: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

23Program / Project Overview:SINCGARS Installation KitsThis contract will consist of the various SINCGARS Installation Kits.

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services

The contract will consist of the various SINCGARS Installation Kits, which may be included but not limited to MK-3148/VRC; MK-2328/VRC; MK-2327/VRC; MK-2361/VRC; MK-2334/VRC; MK-2177/VRC; MK-2616/VRC; MK-3124/VRC; MK-3099/VRC; MK-2408/VRC; MK-2838/VRC; MK3078/VRC; MK-3093/VRC; MK-2384/VRC; MK-3077/VRC; MK-3142/VRC and MK-2383/VRC. These IKs are used for the installations of the C4ISR equipment for use in the various vehicles. Most of these IKs are consisting of the Mounting Base MT-6352/VRC or MT-6353/VRC; Antenna AS-3900A/VRC or AS-3916/VRC; Loudspeaker LS-671/VRC; Handset H-250/U; the various Cable Assemblies and the hardware kits, such as the mounting plates, mounting brackets, clamps, straps, screws, washers and nuts.

Page 24: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

24Opportunity: SINCGARS Installation Kits

CONTRACT TYPE: Firm Fixed Price, 5-year IDIQ

ESTIMATED VALUE: $1M-$10M

CONTRACTING CONTACT (if known): DLA-APG, Matthew Woolstenhulme, 443-861-4541, [email protected]

SOLICITATION #: TBA

ESTIMATED SOLICITATION RELEASE DATE: 4QFY17

PRIOR/CURRENT CONTRACT INFORMATION: Contract Number: W15P7T11D0078 / W15P7T06DK210 / W15P7T11CC208 / SPRBL113F0002 / SPRBL112P0045 / SPRBL113F0002 / W15P7T11CC208Incumbent Contractor: Centron Industries, Inc. (for Contract # W15P7T11D0078 only) / Federal Prison Industries Inc.

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services

Page 25: ABERDEEN PROVING GROUND ADVANCED PLANNING BRIEFING …tob.missiontix.com/pdf/apbi2017/day3/Day 3.013 - CEC… ·  · 2017-02-10aberdeen proving ground advanced planning ... aberdeen

25C3T Overview / Way Ahead / Future Concepts

• C3T Directorate will continue to post market surveys for future opportunities to include requirements for replenishment spares and repairs on programs such as WIN-T Increment 1.

• The C3T Directorate is currently working with the DLA contracting center on the acquisition strategy, timeframes and dollar values for this requirement. Anticipate this requirement to be defined in the FY17/18 timeframe.

The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired

products and services