Upload
etta
View
36
Download
0
Embed Size (px)
DESCRIPTION
Aberdeen-Stavanger Gateway. DOF Subsea. Welcome Giovanni Corbetta, Managing Director DOF Subsea, part of the DOF Group. “To be a world class integrated offshore company, delivering marine services and subsea solutions responsibly, without risk, together, every day ”. - PowerPoint PPT Presentation
Citation preview
Aberdeen-Stavanger Gateway
DOF Subsea
DOF Subsea 2
• Welcome
• Giovanni Corbetta, Managing Director
• DOF Subsea, part of the DOF Group
DOF Subsea 3
4DOF Subsea
“To be a world class integrated offshore company, delivering marine services and subsea solutions responsibly, without risk, together, every day”
5
• Steady business• Time charter/ROV contracts• Long-term contracts
DOF Subsea
DOF Subsea business model
Company Capabilities• Integrated Subsea Construction
• Engineering
• Flexible & Umbilical Installation
• Subsea Structure Installation
• Mooring & Riser Installation
• Inspection Maintenance & Repair
• Tie-in & Diverless Intervention Capabilities
• Field Abandonment & Decommissioning
• Seabed Mapping
• Positioning Services
DOF Subsea
DOF Subsea Atlantic fleet
DOF Subsea 7
Skandi Skolten Skandi SkansenNormand Reach
Geosund Skandi InspectorGeoholm
DOF Subsea in Aberdeen
• Moved into Aberdeen in 2006
• Opportunities in subsea / marine construction
• Success to date
• Followed by a trend of vessel owners moving towards a more projects-based approach
DOF Subsea 8
Aberdeen – Norway
• Working together as a region
• 350 staff working in Atlantic operations
• People synergies
• Skills transfer and maximising knowledge
• Lessons learned
DOF Subsea 9
Challenges
• Cultural differences- office culture- business
relationships
• Communication- language barriers- physical distance
DOF Subsea 10
DOF Subsea
Focus regionsGlobal Locations
Current projects
DOF Subsea
Gina Krog FSO Field Development
Scope:
•Installation of TM Buoy
•Installation of Riser and Riser Base
•Design, Fabrication and Installation of Spool and Covers
•Offshore installation May and June 2016
Vessels:
•Skandi Skolten
•Normand Reach
DOF Subsea 13
Maersk Riser Replacement, North Sea
Scope:
•Removal of existing flexible riser system on the Dunbarton field
•Installation of new riser system
•Associated surveys
Offshore installation will commence July 2014
Vessel:
•Normand Reach
DOF Subsea 14
Shell – Corrib Natural Gass Field, Ireland
Scope:
•Disconnecting of the redundant flexible flowlines
•Install two flexible flowlines
•Tie-ins of the new flowlines to the wellhead and subsea manifold using the GE Icarus tie-in tool
Offshore Installation August 2014
Vessel:
•Normand Reach
DOF Subsea 15