Page 1: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

ACCELERATED CONSTRUCTION AND EMERGENCY REPLACEMENT OPTIONS FOR PRE-

ENGINEERED STRUCTURES

Michigan Bridge ConferenceMarch 24, 2010

David E. Keaffaber, P.E.

Steve Matheny, P.E.

Page 2: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Bridge, Drainage, Erosion Control, Retaining Walls, Sanitary, Soil Stabilization, Stormwater

CONTECH Engineered Site Solutions

Page 3: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Plate:

Precast:

Truss:

Page 4: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Plate:•MULTI-PLATE®/Aluminum Structural Plate

•Aluminum Box Culvert

•SUPER-SPAN™/SUPER-PLATE®

Precast:•CON/SPAN®

•BEBO®

Truss:•Steadfast Bridges®

•Continental® Bridge

Page 5: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Span (ft) 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

Plate 5-52 ft

Precast 12-102 ft

Vehicular Steel Truss Bridges 10-150 ft

Pedestrian Steel Truss Bridges 10–250 ft and more

Bridge Span Ranges

Page 6: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Truss Bridge Styles

Archway® Capstone® Keystone®

Connector® Link® Steel Stringer

*Cable Stayed*Expressway® *Gateway®

*Pedestrian Only

Page 7: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Structural Plate Shapes

Page 8: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

(SQUARE FEET)

14

SPAN (FT.)

12(FT.)

6

7

5

RISE

8

9

10

4

11

SHORT SPAN SERIES

WATERWAY AREA

16

(SQUARE FEET)

WATERWAY AREA

10

9

8

RISE

5

7

6

(FT.)

(FT.)SPAN

20 24

INTERMEDIATE SPAN SERIES

36 42

13

14

WATERWAY AREA(SQUARE FEET)

4828

11

12

9

10

(FT.)

8

RISE (FT.)SPAN

32

LONG SPAN SERIES

CON/SPAN® WATERWAY CHARTS

Page 9: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

BEBO® WATERWAY CHARTS

Waterway Area (ft²)

Rise (ft) Arch Series

E12 E16 E20 E24 E30 E36 E42 E48 E54T E60T E66T E72T E78T E84T

4 34 42 * * * * * * * * * * * *

5 46 57 67 * * * * * * * * * * *

6 58 73 85 * * * * * * * * * * *

7 * 89 105 120 * * * * * * * * * *

8 * * 125 143 * * * * * * * * * *

9 * * 145 167 197 229 * * * * * * * *

10 * * * 191 226 264 300 * * * * * * *

11 * * * 215 256 300 341 * * * * * * *

12 * * * * 286 335 382 427 * * * * * *

13 * * * * 316 371 424 475 * * * * * *

14 * * * * * * * * 588 * * * * *

15 * * * * * * * * 641 * * * * *

16 * * * * * * * * 695 * * * * *

17 * * * * * * * * 749 807 * * * *

18 * * * * * * * * 803 867 * * * *

19 * * * * * * * * 857 927 992 * * *

20 * * * * * * * * 911 987 1058 1131 * *

21 * * * * * * * * * 1047 1124 1203 * *

22 * * * * * * * * * 1107 1190 1275 1349 *

23 * * * * * * * * * * 1256 1347 1427 1502

24 * * * * * * * * * * 1322 1419 1505 1586

25 * * * * * * * * * * * 1491 1583 1670

26 * * * * * * * * * * * * 1661 1754

27 * * * * * * * * * * * * 1739 1838

28 * * * * * * * * * * * * * 1922

29 * * * * * * * * * * * * * 2006

SPAN

RIS

E

BEBOSINGLE LEAF

E-SERIES

BEBOTWIN LEAF

E-SERIES

Waterway Area (ft²)

Rise (ft) Arch Series

C30T C36T C42T C54T

11 250 * * *

12 280 * * *

13 310 * * *

14 339 383 * *

15 369 419 * *

16 399 454 * *

17 429 490 549 *

18 459 526 590 *

19 * 562 632 *

20 * 598 674 791

21 * 634 716 844

22 * 670 758 897

23 * 706 800 950

24 * * 842 1004

25 * * 884 1058

26 * * 926 1112

BEBOTWIN LEAF

C-SERIES

SPAN

RIS

E

E-Series C-Series

Page 10: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-88 Emergency Bridge Replacement NYSDOT: Sidney, NY

Page 11: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Project Details

• Temporary Bridge originally considered

• 60 – Precast 42’ span x 12’ rise CON/SPAN arch units

• Cast-in-place pedestal wall foundations on piles

• 21’ of fill on top of arch units, 9’ of which were lightweight

• 3 precast units cast each day to meet schedule

Page 12: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-88 Emergency Bridge Replacement

Page 13: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-88 Emergency Bridge Replacement

Page 14: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-88 Emergency Bridge Replacement

Page 15: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-88 Emergency Bridge Replacement

Page 16: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-88 Emergency Bridge Replacement

Page 17: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-88 Emergency Bridge Replacement

Page 18: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-88 Emergency Bridge Replacement

Page 19: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-88 Emergency Bridge Replacement

Page 20: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

• Culvert washed out on June 27th

• A week later the precaster started fabrication

• Last of arch units installed August 19th

• NYSDOT got buy-in from all stakeholders on schedule

• Use of a pre-approved Precast Modular System allowed

for rapid construction

Summary & Conclusions

I-88 Emergency Bridge Replacement

Page 21: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

INDOT SEYMOUR DISTRICT: Morgan County, INSR 144 Emergency Culvert Replacement

Page 22: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Project Details

• Culvert washed out on June 7th, 2008 during 100 year

plus rainfall event

• 100’ – 20’-7” span x 13’-2” rise MULTI-PLATE Pipe

arch

• Culvert produced and delivered with 15 days of July 29th

order

• Two days to assemble and install structure

• Road opened on September 6th

Page 23: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SR 144 Emergency Culvert Replacement

Page 24: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SR 144 Emergency Culvert Replacement

Page 25: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SR 144 Emergency Culvert Replacement

Page 26: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SR 144 Emergency Culvert Replacement

Page 27: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SR 144 Emergency Culvert Replacement

Page 28: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SR 144 Emergency Culvert Replacement

Page 29: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SR 144 Emergency Culvert Replacement

Page 30: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SR 144 Emergency Culvert Replacement

Page 31: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SR 144 Emergency Culvert Replacement

Page 32: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SR 144 Emergency Culvert Replacement

Page 33: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

• Replacement structure provided larger hydraulic opening

and improved alignment

• DOT sense of urgency and available technical support

helped reduce construction time

• Use of “off the shelf” multi-plate structure allowed for

speedy replacement

Summary & Conclusions

SR 144 Emergency Culvert Replacement

Page 34: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

CALTRANS: Lucerne Valley, CASR 18 Emergency Culvert Replacement

Page 35: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Project Details

• 10 – Precast 12’ span x 10’ rise CON/SPAN arch units

w/ precast headwalls and wingwalls

• Precast units diverted from another project

• Cast-in-place slab foundation

• CALTRANS director committed to reopening highway in

2 weeks

SR 18 Emergency Culvert Replacement

Page 36: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Typical Cross Section

SR 18 Emergency Culvert Replacement

Page 37: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SR 18 Emergency Culvert Replacement

Page 38: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SR 18 Emergency Culvert Replacement

Page 39: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SR 18 Emergency Culvert Replacement

Page 40: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

• Replacement structure provided larger hydraulic opening

and improved alignment

• Emergency nature of the project helped clear obstacles

that would have increased project time

• Use of “off the shelf” precast structure allowed for 2

week replacement

Summary & Conclusions

SR 18 Emergency Culvert Replacement

Page 41: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SEPTA Accelerated Bridge Replacement

Page 42: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Project Details

• SEPTA could not afford extended down time to replace the structure

• 35 – Precast 32’ span x 13’ rise CON/SPAN arch units including

wingwalls, foundations and headwalls

• The South Eastern Pennsylvania Transportation Authority, or

SEPTA, provides commuter rail service throughout Philadelphia and

its four suburban counties

• Replacement of the existing structure to accommodate both the

private road for the college and the shared use path for the township

SEPTA Accelerated Bridge Replacement

Page 43: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SEPTA Accelerated Bridge Replacement

Page 44: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SEPTA Accelerated Bridge Replacement

Page 45: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SEPTA Accelerated Bridge Replacement

Page 46: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SEPTA Accelerated Bridge Replacement

Page 47: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SEPTA Accelerated Bridge Replacement

Page 48: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SEPTA Accelerated Bridge Replacement

Page 49: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

SEPTA Accelerated Bridge Replacement

Page 50: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

• Construction transpired over Labor Day Weekend (August 29th –September 1st)

• CONSPAN chosen as a result of extensive rail experience, aesthetics and speed of installation

• Demolition commenced at 4AM Friday morning

• The precast installation was completed in 14 hours

• The trains were back in service for the first run at 5AM Tuesday morning

• The project required close coordination between 4 public agencies, a college, and the contractor

Summary & Conclusions

SEPTA Accelerated Bridge Replacement

Page 51: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

NYSDOT: Albany, NYI-90 Over Anderson Drive

Page 52: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Project Details

• Minimal impact to I-90 was the main selection criteria

• 40 – Precast 36’ span x 11’ rise CON/SPAN arch units

including 10 pie-shaped pieces and headwalls

• Unique construction process of building a bridge under

existing structure limited impact to both interstate and

local road

I-90 Over Anderson Drive

Page 53: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Plan view

I-90 Over Anderson Drive

Page 54: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

3-D Model

I-90 Over Anderson Drive

Page 55: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-90 Over Anderson Drive

Page 56: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-90 Over Anderson Drive

Page 57: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-90 Over Anderson Drive

Page 58: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-90 Over Anderson Drive

Page 59: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-90 Over Anderson Drive

Page 60: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-90 Over Anderson Drive

Page 61: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-90 Over Anderson Drive

Page 62: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-90 Over Anderson Drive

Page 63: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-90 Over Anderson Drive

Page 64: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

I-90 Over Anderson Drive

Page 65: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

• Staged Construction process took 5 weeks to complete

• Closure time and inconvenience to the public was greatly

reduced

• Prefabricated bridge greatly reduced overall construction

period – pieces were installed in 5 working days

Summary & Conclusions

I-90 Over Anderson Drive

Page 66: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Springfield Road

Page 67: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Project Details

• Reduce the amount of closure time and traffic

disturbance to hours per day

• 54 – Precast 28’ span x 11’ rise CON/SPAN arch units

including precast wingwalls and headwalls

• In a single day operation, the arch units were slid into

position leaving the existing bridge beams and

abutments in place.

• Structure was backfill with grouted through holes cored

in shoulder of existing roadway

Dayton-Springfield Road

Page 68: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Springfield Road

Page 69: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Springfield Road

Page 70: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Springfield Road

Page 71: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Springfield Road

Page 72: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Springfield Road

Page 73: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Springfield Road

Page 74: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Springfield Road

Page 75: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Springfield Road

Page 76: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

• Project specification stipulated 14 day road closure time

and inconvenience to the public was greatly reduced

• Actual closure time was 12 partial days, the road was

reopened for traffic through most of the day

• Successfully replaced existing structure in a cost-

effective manner while minimizing the closure time on

the road

Summary & Conclusions

Dayton-Springfield Road

Page 77: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

• All 6 projects demonstrated that the use prefabricated bridge elements decrease construction duration

• Pre-approved systems can cut months out of schedules

• Sense of urgency from DOT combined with road opening commitments to public plays a factor

• The use of on-site manufacturing facilities creates opportunities to save significant time on construction schedules

Conclusions

PREFABRICATED BRIDGES ALLOW DOT’S TO REPLACE BRIDGES AT RECORD SPEEDS

Page 78: ACCELERATED CONSTRUCTION AND EMERGENCY ......• 40 –Precast 36’ span x 11’ rise CON/SPAN arch units including 10 pie-shaped pieces and headwalls • Unique construction process

Knowledge. Solutions. Service.

Plate:

Precast:

Truss: