Most of the work is slated to be completed by 2014, while a few by 2013.The rows marked in red are the lakes whose BBMP zones have not been identified
Action plan for lakes to be restored
Lakes under BBMP
Name of lake
Abbigere kere
Agrahara lake
Bellahalli
Chikka Banawara
Chokkanahalli lakeHandrahalliKammagondanahalli
Kattiganahalli kereKattiganahalli kere
Kogilu lake
Lakshmipura lakeLingadiranahalli Mallasandra Gudde lakeMedi Agrahara
Nagarabhavi
Shivanahalli
Singapura kere
Srigandadakaval
Srinivasapura kere
Action plan for the lakes under BBMP, BDA, Lake Development Authority and Karanataka Forest Department
Thirumenahalli
Vaderahalli
Veerasagara lake
Vishwa nidam lake
Ramagondanahalli
Gunjur mouji kere
Panathur kere
Parappara Agrahara
Gangasetty kere
Kudlu doddakere
Nalluralli tank
Kudlu chikere
Siddapura kere
Panathur kere
Bhoganalli kere
Devara bisenalli kere
Gunjur palya kere
Gunjur kere (Carmelarm)
KR Puram (BEML)
Vibhuthipura kere
Horamavu kere
Vijanapura kere
Junnsandra kere
Konnappana agrahara
Chikka Bellandur kere
Doddakanenahalli kere
Haraluru kere
Munnekolalu kere
Horamavu Agara
Sadaramangala kere
Garudachar palya kere (Gosala)
Hoodi kere
Hoodi kere (Giddana kere)
Garudachar palya (Achanakere)
Devsandra kere
Chikkabasavanapura kere
Sowl kere
Bhattralli kere
Sigehalli
Jimkenalli kere
Sitaram palya
Pattandur AgraharaKasavanalli
Shilavantana kereNagareshwara-Nagenahalli lake
Kalkere Rampura kere
Chennasandra
Pattandur AgraharaMahadevpura
Dubasipalya lake
H Gollahalli lake
Gattigere palya lake
Byappana palya kunte
Chikkegowdana palya lake
Halagevaderahalli lake
Byrasandra kere
Gowdana Palya lake
Haralakunte lake (Somasandrakere)
Mangammana Palya lake
Anjanapura lake/Alahalli
Basapura lake -1
Basapura lake -2
Basavanapura lake
Begur lake
Chikkammanahalli lake
Chik Begur lake
Devarakere lake
Nyanappanahalli lake
Gottigere lake
Kalena Agrahara lake
Subbarayanakere
Subedeharanakere
Subramanyapura lake
Swarnakunte gudda kere
Yellenhalli lake
Chowdeshwari layout lake
Kammanahalli lake (Meenakshi lake)Annappahalli/Yelachenahalli lake
Singasandra lake
Kalyani/kunte next to Sai Baba temple
Total funds required
Lakes under BDA
Name
Nalagadaranahalli
Amruthalli
Chikkabasthi
Manganahalli
Kenchanapura
Garvebhavi Palya
Chunchanaghatta
Kaggadasanapura
Singasandra
B Narayanapura
Doddanakundi
Narasappanahalli
Bheemanakuppe
Hosakere
Chikkabettahalli
Sulekere
Kannenahalli
B Channasara lake
Bellandur
Varthur
Lingadheeranahalli
Gubbalala
Konankunte
Hosakerehalli
Doddakallasandra
Avalahalli
Byrasandra
Arekere
Hulimavu
Kembathalli
Vasanthapura
Lakes under LDA
Name
Jaraganahalli
Agaram lake
Lakes under KFD
Name of lake
Puttenahalli
JB Kaval tank
Mylsandra
BBMP zone Extent Status
Dasarahalli 47-13
Byatarayanapura 15-33
Byatarayanapura 18-32 Survey completed
104.4 To be surveyed
Byatarayanapura 8-2Dasarahalli 16-6 Fencing in progressDasarahalli 22.29 Certified, fencing yet to start
Byatarayanapura 25 Sketch certified by Tahsildar, fencing to be startedByatarayanapura 20-10 Sketch certified by Tahsildar, fencing is nearing completion
Byatarayanapura 73-28
East 10-20Dasarahalli 11-32 Fencing in progressDasarahalli 17-11 Fencing in progress
13-15 Survey in progress
17-39 Survey in progress
Byatarayanapura 18-12
66-18
6-33 Fencing in progress
Byatarayanapura 3-4 To be surveyed
Sketch certified by Tahsildar; fencing is almost complete except in encroached areas and letter has been sent to DC (Urban) to take action to evict encroachmentsSketch certified by Tahsildar; fencing is almost complete except in encroached areas and letter has been sent to DC (Urban) to take action to evict encroachments
Sketch certified by Tahsildar; fencing is almost complete except in encroached areas and letter has been sent to DC (Urban) to take action to evict encroachments
Sketch submitted to Tahsildar for certification, fencing in progressSketch certified by Tahsildar; fencing is almost complete except in encroached areas and letter has been sent to DC (Urban) to take action to evict encroachments
Rajarajeshwari Nagar
Lake land is acquired for NH-7, other roads and railway embankment. To be handed over to BDASketch certified by Tahsildar; fencing is almost complete except in encroached areas and letter has been sent to DC (Urban) to take action to evict encroachments
Byatarayanapura 23-8
Byatarayanapura 9-34 Sketch certified by Tahsildar, fencing in progress
Byatarayanapura 21-14
Dasarahalli 4-30 Certified. In progress
Mahadevpura 36-26 To be surveyed
Mahadevpura 63-39
Mahadevpura 27-17
16-11 Fenced by KFD, afforestation works are in progress
Mahadevpura 21-27
43-39
Mahadevpura 47-39
13-15
South 27-35
Mahadevpura 6-31
Bommanahalli 12-24
Bommanahalli 13-31
Mahadevpura 36-27
Mahadevpura 9-17
East 45-39
Mahadevpura 45-18
Byatarayanapura 37-14
Fencing not started as acquisition data on the lake area is not available
Sketch certified by Tahsildar. Fencing is almost complete except for an encroachment, letter has been sent to DC (Urban) to evict encroachment
Sketch made by BBMP surveyors. Fencing is complete except for a temple area, about which case is pending in SC. DC had given 2.20 acres to an individual through an order in 1953. Afforestation works are in progressSketch certified by tahsildar. Fencing is complete, encroachments have been evicted and afforestation is in progress
Sketch signed by BBMP surveyors. Encroachments by slum dwellers wil be shifted from the tank. Afforestation work is in progressSketch certified by Tahsildar. Some encroachments are evicted and tank is partly fenced. Afforestation works are progressingSketch submitted to Tahsildar, yet to be certified. Some land was granted to individuals, DC has to verify that. Partly fenced and afforestation works are in progressSketch certified by Tahsildar. Tank is completed, all encroachments evicted and afforestation works are in progress
Sketch submitted to tahsildar. Encroachment of 2.18 acres already evicted; rest encroachment by BEML Housing Society, case pending in HC. Tank is partly fenced and afforestation works are in progress
Sketch certified by Tahsildar. Encroachments evicted, fencing complete and afforestation works in progressSketch certified by Tahsildar. Some encroachments are to be removed. Tank is fully fenced and afforestation work is in progressSketch certified by Tahsildar. All encroachments except that of road are evicted. Fencing is complete and afforestation is progressingSketch certified by Tahsildar. Encroachments evicted, fencing complete and afforestation works in progressSketch certified by Tahsildar. Encroachments evicted except Christian missionary area, fencing complete and afforestation works in progress
Sketch certified by Tahsildar. Partly fenced, Encroachment of 30 guntas should be evicted; afforestation progressingSketch certified by Tahsildar. Fencing work progressing. DC has been asked to remove the permanent structures that have encroached the lakeSketch submitted to Tahsildar. Fencing work progressing. Encroached by permanent constructions/houses, some cases pending in HC
Mahadevpura 11-28
Bommanahalli 24-33
Bommanahalli 5-17
Mahadevpura 67-14
Bommanahalli 18-14
Bommanahalli 34-7
Mahadevpura 15-38
Byatarayanapura 51-34
Mahadevpura 62-11
Mahadevpura 5-36
Mahadevpura 15-10 Fencing done by KFD and BBMP. Afforestation progressing
Mahadevpura 28-31
Mahadevpura 5-14
Mahadevpura 16-8
Mahadevpura 14-7 Sketch submitted to East Tahsildar; fencing under progress
Bommanahalli 61-37
18-10
Mahadevpura 31-13
Mahadevpura 8-24
23-37
16-35Bommanahalli 55-8 Fenced by KFD
Sketch submitted to Tahsildar. A govt school building and other constructions have encroached the lake and sewage is entering the lake
Sketch certified by Tahsildar. Entire lake is encroached, used for eucalyptus plantation. Case is pending in court
Sketch certified by Tahsildar, fencing and afforestation in progressSketch submitted to Tahsildar; fencing and afforestation in progress. Encroachment by way of agriculture/gardenSketch certified by Tahsildar. Afforestation progressing and fencing work will be completed after removing encroachments on north east sideSketch submitted to Tahsildar. Fencing and afforestation progressing; encroachment near waist weir by way of compound wall to be evicted.
Sketch certified and afforestation in progress. Fencing is complete except on south side where apartments have extended compound wall into the lake area; this will be evicted
Sketch submitted to tahsildar; fencing and afforestation progressing
Afforestation in progress. Part of the lake in Sadaramangala village has been certified by Tahsildar, there are protests about ownership. Sketch of the other part of the lake, which comes in Kodagehalli village, is yet to be certified.Sketch submitted for counter signature to Tahsildar, Bangalore East. Afforestation progressing
Survey map submitted to East Tahsildar. Fencing partly completed, afforestation progressing
Sketch submitted to East Tahsildar; fencing and afforestation progressing
Sketch certified by East Tahasildar. Encroaching building to be evicted; fencing and afforestation progressing
Sketch certified by East Tahsildar except the lake area in Doddakanahalli sy no.68; fencing and afforestation progressing
Sketch submitted to East Tahsildar. Encroachment is by way of slum. Fencing and afforestation progressingSketch certified by East Tahsildar; fencing and afforestation in progress. Letter addressed to DC to evict buildings that encroachSketch certified by East Tahsildar; fencing and afforestation in progress. Letter addressed to DC to evict buildings that encroach
Rajarajeshwari Nagar
Sketch submitted to East Tahsildar; encroachment exists; fencing and afforestation progressing
Sketch submitted to East Tahsildar; Encroachment is partly removed and fencing and afforestation work is going on
Mahadevpura 19-32 Sketch countersigned by East Tahsildar; Fencing done by ZPByatarayanapura 11-8 Yet to be surveyed and fenced
Byatarayanapura 187-31
East 47-38
12-37 Major part of lake is encroachedMahadevpura 13-11 Major part of lake is encroached
23-35 Survey sketch certified; encroachment being evicted
21-18 Fencing and afforestation completed
1 ac 30 g Checked
2 ac 31 g Certified, encroachment to be removed
1 ac 10 g Checked
17-10 Fencing existing
15-11 Survey in progress
South 9-30 Checked, encroachment to be removed
16-29 Certified
Bommanahalli 7-29 Sketch submitted for certification
Bommanahalli 21-25 Certified
9-34 Fencing and afforestation progressing
10-29 Fencing and afforestation progressing
Mahadevpura 7-34 Fencing and afforestation progressing
Bommanahalli 137-24 Fencing and afforestation progressing
East 5-19 Fencing and afforestation progressing
Bommanahalli 41-16 Certified. Yet to start
Sketch submitted for certification. Part of the area was granted to private people, now sketch has to be corrected accordingly. Fencing and afforestation progressing
Fenced by KFD, part of lake is encroached by Fire station and buildings
Rajarajeshwari Nagar
Rajarajeshwari Nagar
Rajarajeshwari Nagar
Rajarajeshwari Nagar
Rajarajeshwari Nagar
South 7-15 Certified
Bommanahalli 6-07 Fencing and afforestation progressing
Bommanahalli 37-13 Fencing and afforestation progressing
7-30 Work in progress
Bommanahalli 5-10 Fencing and afforestation progressing
Bommanahalli 6-05 Fencing and afforestation progressing
18-6 Sketch submitted for certification
9-05 Fencing and afforestation progressing
4-39 Fencing and afforestation progressing
Byatarayanapura 11-18 Fencing and afforestation progressing
East 18-37 Fencing and afforestation progressingSouth 6-32 Fencing progressing
Bommanahalli 11-09 Fencing progressing
Bommanahalli 1-08 Development and afforestation progressing
BBMP zone Extent Status
20 lake is weed infested and sewage ridden
Byatarayanapura 25
6 Highly weed-infested. Is a source for fishing
Rajarajeshwari Nagar
lake is sewage-ridden and covered with weeds to the extent that water surface is not visible
6 Weed infested and sewage ridden
20
Bommanahalli
Bommanahalli 14-14
East 35-19 Needs to be de-weeded and free of sewage
Bommanahalli 7-20 Water is opaque. Boundary to be demarcated.
Mahadevpura 3-8 Needs to be de-weeded and free of sewage
Mahadevpura 111-37 Very little water impounded
11-24
Water is clean. Dredging needed to increase capacity
38-16
Byatarayanapura
15-7 Very small quantity of water impounded. Boundary to be fixed
117-16 Very small quantity of water impounded. Boundary to be fixed
3-8
Bommanahalli 797-21
Mahadevpura 411-21
Dasarahalli 5-22 Dry
8-10 Polluted
Bommanahalli 19-18 Polluted, weed growth, solid waste dumped and encroached
59-26 Dry, silted, weed growth, weir breached, encroached
Bommanahalli 21-16 polluted, encroached
South 21-25 polluted, weed growth
South 14-30 Dry, silted, weed growth, weir breached, encroached
Bommanahalli 37-21 Polluted, weed growth, solid waste dumped and encroached
Located close to NICE road, surrounded by villages and agricultural farms
Impounding capacity to be increased and water quality to be improved
Water is dark and opaque, and foaming is observed. Needs to be de-weeded
Should be de-weeded, and made free of industrial waste and sewage
Water quality should be improved. De-weeding required and sewage entry to be controlled
Boundary not defined. Impounding capacity should be increased and de-weeding should be done
Covered with weeds. Sewage entry should be stopped and storage capacity should be increased
Covered with weeds, there is heavy foaming. Sewage entry should be controlled
High levels of organic pollution. Desilting and controlling sewage entry is needed
Rajarajeshwari nagar
Rajarajeshwari nagar
Bommanahalli 130-17 Polluted, weed growth, solid waste dumped and encroached
5-16 Encroached
Bommanahalli 7-10 Polluted, weed growth, solid waste dumped and encroached
BBMP zone Extent Status
South
Bommanahalli 97-76
BBMP Zone Status
Byatarayanapura 100
Byatarayanapura 20 Lake situated in forest area
85 Plating indigenous species, fencing
Was developed under National Lake Conservation Programme (NCLP). There is sewage entry. De-weeding needed and STP has to be set up if inflow of rainwater is inadequate. Developer under NCLP on 15 years lease basis by M/s Biota Natural Systems (India) Pvt Ltd, Hyderabad from 10-4-2007 to 9-4-2022 at the cost of Rs 1363.16 lakh
Cost estimate in lakhs
Lake full of sewage, but rich in avian bio-diversity. Recently sewage diverted to Yelahanka tertiary treatment plant (STP), but treated water is not discharged back to the lake. Restoration should be in phased manner to protect existing
Rajarajeshwari nagar
Restoration plan Time in years Estimated Cost Remarks
Comprehensive Development 3 340
Comprehensive Development 3 110
Comprehensive Development 3 135
Comprehensive Development 3 820
Comprehensive Development 3 65Comprehensive Development 2 120Comprehensive Development 3 305
Comprehensive Development 3 180Comprehensive Development 3 145
Comprehensive Development 3 540
Comprehensive Development 3 75Comprehensive Development 2 70Improvements 2 240Comprehensive Development 3 300
215
Comprehensive Development 3 400
Comprehensive Development 3 470
Comprehensive Development 3 55
Comprehensive Development 3 25
After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started
After encroachment is removed, development work can be started
After encroachment is removed, development work can be started
After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started
Comprehensive Development 3 170
Comprehensive Development 3 70
Comprehensive Development 3 145
Improvements 2 60
Comprehensive Development 3 270
Comprehensive Development 3 435
Comprehensive Development 3 199
Comprehensive Development 3 232
Comprehensive Development 3 290
Comprehensive Development 3 612
Comprehensive Development 3 668
Comprehensive Development 2 187
Comprehensive Development 3 385
Comprehensive Development 3 54
Comprehensive Development 3 89
Comprehensive Development 3 189
Comprehensive Development 3 514
Comprehensive Development 2 68
Comprehensive Development 2 87
Comprehensive Development 3 395
Comprehensive Development 3 528
After encroachment is removed, development work can be started
After encroachment is removed, development work can be started
After encroachment is removed, development work can be started
After encroachment is removed, development work can be started
After encroachment is removed, development work can be started
After encroachment is removed, development work can be started
After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started
Comprehensive Development 2 91
Comprehensive Development 3 118
Comprehensive Development 2 73
Comprehensive Development 3 479
Comprehensive Development 3 257
Comprehensive Development 3 483
Comprehensive Development 3 234
Comprehensive Development 3 367
Comprehensive Development 3 374
Comprehensive Development 2 89
Comprehensive Development 2 110
Comprehensive Development 2 399
Comprehensive Development 3 75
Comprehensive Development 3 230
Comprehensive Development 3 103
Comprehensive Development 3 850
Comprehensive Development 3 258
Comprehensive Development 3 441
Comprehensive Development 3 61
Comprehensive Development 3 174
Comprehensive Development 3 117Comprehensive Development 3 766
After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started
After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started
After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started
After encroachment is removed, development work can be started
After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started
After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started
Comprehensive Development 2 290Fencing 1 87
Comprehensive Development 3 2624
Comprehensive Development 3 344
Comprehensive Development 2 104111
Comprehensive Development 2 500
Comprehensive Development 3 400
17
102
14
Comprehensive Development 2 200
200
Comprehensive Development 2 200
200
Comprehensive Development 3 200
350
Comprehensive Development 3 150
Comprehensive Development 3 170
Comprehensive Development 3 145
Comprehensive Development 3 600
Comprehensive Development 3 150
Comprehensive Development 3 350
After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started
After encroachment is removed, development work can be started
After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started
After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started
Comprehensive Development 3 80
Comprehensive Development 3 80
Comprehensive Development 3 520
Comprehensive Development 3 180
Comprehensive Development 3 130
Comprehensive Development 3 160
260
Comprehensive Development 3 160
Comprehensive Development 3 130
Comprehensive Development 3 185
Comprehensive Development 3 260150
Comprehensive Development 3 150
Comprehensive Development 3 60
262 cr
Restoration plan
3
3
3
After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started
After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started
After encroachment is removed, development work can be startedAfter encroachment is removed, development work can be started
Time required in years
Chain link fencing, de-weeding, desilting/dredging, network improvement, electrical works, landscaping, STP, Jogging track, Chain link fencing, de-weeding, desilting/dredging, network improvement, electrical works, landscaping, STP, Jogging track, Chain link fencing, de-weeding, desilting/dredging, network improvement, electrical works, landscaping, STP, Jogging track,
3
3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
Chain link fencing, de-weeding, desilting/dredging, network improvement, electrical works, landscaping, STP, Jogging track, Chain link fencing, de-weeding, desilting/dredging, network improvement, electrical works, landscaping, STP, Jogging track
DPR under preparation 3
DPR under preparation 3
DPR under preparation 3
Action plan
Action plan is not yet decided
Proposed Restoration
Lease is terminated and lessee got stay from High Court. After case is decided, LDA will maintain the lake. As inflow is reduced STP needs to
Bund strengthening, clearing inlet and outlet, diversion channel, desilting etcBund strengthning, pitching round the wasteweir, creation of island, desilting, catchment area treatment
bund strengthning, desilting, planting, fencing