TOOLS & TECHNIQUES. INPUT. OUTPUT. Activity List Constraint Assumption Resource Req’d Resource Capability Historical Info. Expert Judgement Analoques Estimating Simulation. Activity Duration Estimate. Materials. Basic References & Personal Intuition. Standard Manhours & - PowerPoint PPT Presentation
Citation preview
Activity List
Constraint
Assumption
Resource Req’d
Resource Capability
Historical Info.
Expert Judgement
Analoques Estimating
Simulation
Activity Duration Estimate
Materials
Site Condition
Tools & Equipment
Basic References & Personal Intuition
Experience from theLast Project
Try & Error to MatchRequirement
Standard Manhours &Work Unit
ProductivityConstraint
Status & Update
INPUTTOOLS &
TECHNIQUESOUTPUT
Faktor yang mempengaruhi perkiraan durasi
Perkiraan (Estimasi) Durasi aktivitas
Contoh perkiraan durasi
Worker Equip.
1 Beton K-225 300 m3 20 m3/jam - 1 15 Jam
2 Beton K-225 300 m3 5 m3/group/hari 5 - 12 hari
3 Pembesian 3500 Kg 50 kg/org/hari 5 - 14 hari
DurationResources Usage
No. Activity Volume Units Productivity
typroductivi
Volume
Output
InputDuration
Aplikasi MS Project untuk input Durasi
You can manualy enter task duration , or Double Clik the cell to display Task Information
If you're a visually oriented person, dragging task bars to change durations might be the best method for you.
Hold down and select date from Calender, if you want to start or finish on spesific date
by default, Project uses estimated durations for tasks when you type the duration into the Gantt table. You should have seen a question mark next to each duration.
1. Prosedur memasukkan durasi (deterministik)
2
1
3
2. Mengatur Time Scale
After entering several tasks and task durations, you'll probably want to manipulate the timescale in the Gantt chart to view information.
Go to : Format > Timescale.
In the "Timescale" dialog box, adjust the units you wish to display and how many to include.
Major Scale Label
Minor Scale Label1
2
3 4
3. Mengatur Constraints dan Deadline
Setting a deadline in Project provides you with a visual reminder if you don't complete a task by the deadline you established.
Constraints affect the timing of a task in relation to the start or end of your project or to a specific date.
4. Jenis-jenis constraint dalam MS Project
Classification Status
As Soon As Possible Mark a task as not constrained
As Late As PossibleDelays the task as long as possible, without holding up the finish of the project and without creating a conflict for any successor task that is constrained.
Start No Later Than This task must start on or before the designated date
Must Start On This task must start exactly on the designated date
Start No Earlier Than This task cannot start until the designated date or later
Finish No Later Than This task must complete on or before the designated date
Must Finish On This task must finish exactly on the designated date
Some task might be subject to deadlines from outside project : deadlines imposed by Customer, contractors, the Government or even international company policies.