Activity List Constraint Assumption Resource Req’d Resource Capability Historical Info. Expert Judgement Analoques Estimating Simulation Activity Duration Estimate Materials Site Condition Tools & Equipment Basic References & Personal Intuition Experience from the Last Project Try & Error to Match Requirement Standard Manhours & Work Unit Productivity Constraint Status & Update INPUT TOOLS & TECHNIQUES OUTPUT Faktor yang mempengaruhi perkiraan durasi Perkiraan (Estimasi) Durasi aktivitas

Activity List Constraint Assumption Resource Req’d Resource Capability Historical Info

  • Upload
    lowell

  • View
    30

  • Download
    0

Embed Size (px)

DESCRIPTION

TOOLS & TECHNIQUES. INPUT. OUTPUT. Activity List Constraint Assumption Resource Req’d Resource Capability Historical Info. Expert Judgement Analoques Estimating Simulation. Activity Duration Estimate. Materials. Basic References & Personal Intuition. Standard Manhours & - PowerPoint PPT Presentation

Citation preview

Page 1: Activity List Constraint Assumption Resource Req’d Resource Capability Historical Info

Activity List

Constraint

Assumption

Resource Req’d

Resource Capability

Historical Info.

Expert Judgement

Analoques Estimating

Simulation

Activity Duration Estimate

Materials

Site Condition

Tools & Equipment

Basic References & Personal Intuition

Experience from theLast Project

Try & Error to MatchRequirement

Standard Manhours &Work Unit

ProductivityConstraint

Status & Update

INPUTTOOLS &

TECHNIQUESOUTPUT

Faktor yang mempengaruhi perkiraan durasi

Perkiraan (Estimasi) Durasi aktivitas

Page 2: Activity List Constraint Assumption Resource Req’d Resource Capability Historical Info

Contoh perkiraan durasi

Worker Equip.

1 Beton K-225 300 m3 20 m3/jam - 1 15 Jam

2 Beton K-225 300 m3 5 m3/group/hari 5 - 12 hari

3 Pembesian 3500 Kg 50 kg/org/hari 5 - 14 hari

DurationResources Usage

No. Activity Volume Units Productivity

typroductivi

Volume

Output

InputDuration

Page 3: Activity List Constraint Assumption Resource Req’d Resource Capability Historical Info

Aplikasi MS Project untuk input Durasi

You can manualy enter task duration , or Double Clik the cell to display Task Information

If you're a visually oriented person, dragging task bars to change durations might be the best method for you.

Hold down and select date from Calender, if you want to start or finish on spesific date

by default, Project uses estimated durations for tasks when you type the duration into the Gantt table. You should have seen a question mark next to each duration.

1. Prosedur memasukkan durasi (deterministik)

2

1

3

Page 4: Activity List Constraint Assumption Resource Req’d Resource Capability Historical Info

2. Mengatur Time Scale

After entering several tasks and task durations, you'll probably want to manipulate the timescale in the Gantt chart to view information.

Go to : Format > Timescale.

In the "Timescale" dialog box, adjust the units you wish to display and how many to include.

Major Scale Label

Minor Scale Label1

2

3 4

Page 5: Activity List Constraint Assumption Resource Req’d Resource Capability Historical Info

3. Mengatur Constraints dan Deadline

Setting a deadline in Project provides you with a visual reminder if you don't complete a task by the deadline you established.

Constraints affect the timing of a task in relation to the start or end of your project or to a specific date.

Page 6: Activity List Constraint Assumption Resource Req’d Resource Capability Historical Info

4. Jenis-jenis constraint dalam MS Project

Classification Status

As Soon As Possible Mark a task as not constrained

As Late As PossibleDelays the task as long as possible, without holding up the finish of the project and without creating a conflict for any successor task that is constrained.

Start No Later Than This task must start on or before the designated date

Must Start On This task must start exactly on the designated date

Start No Earlier Than This task cannot start until the designated date or later

Finish No Later Than This task must complete on or before the designated date

Must Finish On This task must finish exactly on the designated date

Some task might be subject to deadlines from outside project : deadlines imposed by Customer, contractors, the Government or even international company policies.

Page 7: Activity List Constraint Assumption Resource Req’d Resource Capability Historical Info