  • 8/15/2019 Agenda 10.2 Traffic Impact Study Hwy 10 & McNabb

    1/3

    tÔ.e

    Minilry

    of Transportation

    Engineerirg

    Ofüce

    Conidor Management

    Section

    West Region

    659

    Exeter Road

    London,

    Ontario

    N6E

    1L3

    Telephone:

    (519)

    8734598

    Facsimile:

    (519)

    8Tl428

    June

    3, 2016

    -l-

    Ministère des Transports

    Bureau du

    génie

    Section de

    gestion

    des couloirs routiers

    Région de I'Ouest

    659,

    chemin Exeter

    Lor¡don

    (Ontado)

    N6E

    1L3

    Téléphone:

    (519)8734598

    Télécopieur:

    (519)

    8734?2'8

    Þontario

    By

    email:

    dwo@cantamoroup.

    com

    Jordan Chow

    Cantam

    Group

    Ltd.

    850

    Tapscott Rd.,

    Unit

    51

    Toronto,

    ON

    M1X 1N4

    RE:

    96 McNab

    Street

    Applicant 239196

    Ontario lnc.

    Mr.

    Wally

    Gupta

    92

    Toronto

    Street,

    106

    Toronto

    Street &

    84

    McNabb

    Street

    -

    Village of

    Chatsworth

    Township

    of

    Chatsworth, County

    of

    Grey

    -

    Highway

    10

    Reviewed

    Documents:

    o

    Traffic lmpact

    Study

    (TIS) prepared

    by

    Mark

    Engineering

    -

    File:201401 with a revision

    date of April 11,2016.

    Stamped

    and signed by N. Alímam

    on

    April 11,2016.

    .

    Siúe

    Plan

    SP1

    and

    SP

    prepared

    by

    Cantam Group

    Ltd.

    With a revision

    date

    of

    October

    30, 2015

    -

    No stamp/signature.

    .

    Landscape Plan L1 and L2

    prepared

    by

    Cantam Group

    Ltd. Wíth

    a

    revision

    date

    of

    October

    30, 2015 and is stampd and signed by

    John

    A. Russo

    on May 19, 2015.

    o

    Surue

    prepared

    by

    Dínsmore

    &

    England

    Ltd.

    File

    126-013.

    -

    lVo stamp/signature.

    c

    Drainage and

    Stormwater

    Management

    Study

    (SWM)

    prepared

    by WSP

    dated

    Septe

    mber 20

    1 5

    -No

    stamp/sig

    nature

    The Ministry

    of

    Transportation

    (MTO)

    has

    completed

    its review

    of the latest submission

    of the

    above

    noted documents for

    the subject

    development

    site.

    The

    proposed

    development has

    been

    considered

    and rev¡ewed

    in accordance with

    the

    requirements

    of our highway

    access

    policies

    and the

    Public Trcnspoñation

    and Highway

    lmprcvement

    Act

    (PTHIA).

    The

    PTHTA

    establishes

    that

    MTO

    may

    issue

    permits

    for

    the

    purpose

    of

    controlling and

    regulating

    buildings, land use,

    business establishments,

    encroachments,

    entrances,

    plantings,

    signs

    and miscellaneous

    structures

    and installations

    on orwithin

    MTO's

    Permit

    Control

    Area

    (PCA)

    adjacent

    to

    a

    provincial

    highway, and that

    MTO may

    attach such

    conditions

    to these

    permits

    as

    deemed necessary

    to

    protect

    our highways.

    The

    subject

    property

    lies within MTO's

    PCA, and

    as such,

    Building and

    Land Use

    Permits

    and

    Sign

    Permits are

    required

    from

    MTO

    before any

    grading/construction

    commences,

    the

    following

    outlines

    our comments

    and

    conditions

    of

    permit:

    ...t2

  • 8/15/2019 Agenda 10.2 Traffic Impact Study Hwy 10 & McNabb

    2/3

    -2-

    T¡S

    .

    MTO has

    reviewed

    the

    subject

    TIS and

    accept

    the

    conclusions

    made;

    o

    A

    northbound

    left turn

    lane

    with

    a 15-m storage

    and standard

    taper

    at

    the

    intersection

    of

    Highway 10

    and McNab

    Street.

    Designed

    to

    meet

    the

    Geometric

    Design

    Standards for

    Ontario

    Highways.

    .

    The TIS identifies a

    need

    for

    highway

    improvements

    as a result of this

    development

    and

    therefore

    the

    owner shall enter into a Legal

    Agreement

    with

    the

    MTO

    whereby the

    owner

    agrees

    to

    assume

    financial responsibility,

    supported by

    a Letter of Credit for

    the

    environmental

    assessment, design, construc{ion and

    contract administration

    of the new

    street

    entrance and all necessary associated

    highway improvements.

    SWM

    o

    MTO has reviewed the subject report

    and accepts

    the

    report

    in

    principle,

    however

    the

    report

    must

    be signed and sealed by

    a

    Professional

    Engineer Licenced

    in

    the

    Province

    of

    Ontario.

    Site

    Plan

    o

    The 0.3m reserve is shown on the

    highway

    side

    of the

    visibility

    triangle,

    please

    revise

    this detail

    to

    show this 0.3m reserye along

    the

    development

    property

    side

    of

    the

    triangles.

    This

    0.3m reserve

    is

    required

    as a separate block in

    the

    reference

    plan.

    .

    lf

    any

    part

    of

    the

    development

    (including

    parking)

    is integral

    to

    the operation of the

    business, or must comply with municipal by-laws, such

    as minimum

    parking

    requirements, fire lanes, drive'through

    lanes, delivery areas and loading docks,

    those

    parts

    of

    the

    development must be

    set back

    a minimum

    of

    14m

    from

    the Highway

    10

    (property)

    limits, as any future highway widening may result in the loss of these

    features.

    Please confirm that the

    parking

    within

    14m

    is surplus.

    .

    A

    portion

    of

    the

    parking

    facility is

    directly adjacent

    (no

    setback) from

    the daylighting

    triangle that will be deeded to MTO along with a 0.3m reserve along the

    property

    limit,

    forming the new highway

    (property)

    limit as

    part

    of the land requirements

    for

    the

    subject

    development.

    The minimum setback for all surplus

    parking

    on the lot is

    3m

    from

    the

    widened

    highway

    (property)

    limit.

    .

    The

    pylon

    sign

    needs

    to

    be setback a minimum of 3m from the widened

    highway

    (property

    limit.

    The cunent

    site

    plan

    shows

    the

    dimension to

    the

    highway

    (property)

    limit

    prior to

    the

    daylighting triangle or

    0.3m

    reserve.

    Landscape Plan

    .

    The minimum

    setback for

    trees,

    hedges

    plantings

    and berms

    is 0.3m

    from

    the

    highway

    (property)

    limit. Please

    review drawings

    and dimension

    all items

    shown

    to

    ensure

    the

    setback

    requirements

    are adhered

    to.

    ...t3

  • 8/15/2019 Agenda 10.2 Traffic Impact Study Hwy 10 & McNabb

    3/3

    -3-

    Draft

    Reference Plan

    .

    Per MTO

    Comments dated

    July

    9, 2015,

    please

    submit a draft reference

    plan

    for our

    review.

    All

    Lots Consolidated

    .

    Per MTO

    Comments

    dated

    July

    9,

    2015,

    all

    lots shall be consolidated and

    merged

    as

    one ownership

    parcel prior

    to the

    issuance of any MTO

    permits.

    Should

    you

    have any

    questions, please

    contact

    our office.

    ..../ ¡'7

    -..-,r.

    ,// /

    ¿//t

    ¿.'

    .

    /

    ,.//

    ..,

    /'

    /'''

    Zsolt

    Katziz

    Corridor

    Management

    Planner

    Corridor

    Management

    Section

    MTO

    -

    West Region,

    London

    c.

    Jessrba Pegelo-Conidor Managament

    Secr-o¿ Owen Sound

    Scott

    Taylor-

    Grey County

    Planner

    Ron Davidson-Township

    of Chatsworth Planner