Agenda of 139th meeting of State Environment Impact Assessment Authority (SEIAA), Odisha, held on 14.08.2015 at 3.30 PM
1. Proceedings of SEAC, Odisha held on 10th August, 2015.
Sl. No.
Name of the proponent
Name of the proposal SEAC recommendation Decision of SEIAA, Odisha
1 M/s. Infrastructure development corporation (IDCO)
Environmental Clearance For Setting Up Of Electronics Manufacturing Park Over An Area Of 203.37 Acres Within Premises Of Infovalley Project Of IDCO At Harapur, Gudakasipur And Durgapur Village Of Khurda District (TOR).
The SEAC decided to take decision on the proposal after receipt of the following information from the proponent.
2 M/s. Infrastructure development corporation (IDCO)
Environmental Clearance For Aluminium Park Over An Area Of 454 Acres Of IDCO At Tulasipal And Languliabeda, Dist – Angul (TOR).
The SEAC prescribed the following tors for undertaking detailed EIA study
3 M/s. Infrastructure development corporation (IDCO)
Environmental Clearance for Plastic Park over an area of 120 acres of IDCO at Siju village, Kujanga, dist – Jagatsinghpur (TOR).
The SEAC prescribed the following tors for undertaking detailed EIA study
4 M/s. Tata steel ltd Environmental Clearance For Proposed 500 Bed Tata Hospital Project At Mouza Sitalapur, Tahasil Konisi In The District Of Ganjam Of M/S. Tata Steel Ltd With Total Built Up Area 73057.01 M2 (EC)
The SEAC recommended for grant of environmental clearance for a period of 07 years in favour of the project
5 M/s. Saikripa real estate Pvt. Ltd
Environmental Clearance For Construction Of Residential Township Project “Cesa Florenza” At Mouza Patapur And Fakirpada, Cuttack Odisha By M/S. Saikripa Real Estate Pvt. Ltd With Total Built Up Area 346910 M2 (EC)
The SEAC decided to take decision on the proposal after receipt of the following information from the proponent.
A M/s Rebana Pyrophyllite of Shri Kanan Bihari Pahi
Proposal For Environemntal Clearance Of M/S Rebana Pyrophyllite Deposit In Rebana Rf Of Shri Kanan Bihari Pahi For Production Of 9000 Tpa Of Pyrophyllite Ore And 7100 Tpa Of Quartzite Oreover An Mine Lease Area Of
The SEAC recommended for grant of environmental clearance for a period of 30 years in favour of the project
��
�
3.5936 Ha. Near Rampakot Village; Ghatgaon Tehsil, Dist – Keonjhar.
B M/s Menkamunda Graphite Mine of Sri Prabhas Chandra Agrawal
Proposal For Environmental Clerance Of M/S Menkamunda Graphite Mine For Enhancement In Production Of Graphite From 1047 Tpa To 15162 Tpa Over An Area Of 26.228 Ha At Menkamunda In District Bargarh By Sri Prabhas Chandra Agrawal. (EC)
The seac recommended that the seiaa, odisha shall deal with the violation matter in accordance with moef&cc, govt. Of india om no. J-11013/41/2006-ia.ii(i) dt.12.12.2012 and dtd. 27.6.2013
C M/S. Gangpur Udyog Pvt. Ltd .
Environmental Clearance For 2,40,000 Tpa Coal Beneficiation Plant At Deuli In The District Of Sundargarh By M/S. Gangpur Udyog Pvt. Ltd.
The seac decided to take decision on the proposal after receipt of the following information from the proponent.
D M/S. Bhawani Constructions Pvt. Ltd
Proposal For Construction Of Buildings For The Residential Complex At Balukhand, Puri By M/S Bhawani Constructions Pvt. Ltd. With Total Built Up Area 97443.05 M3 (Consultant – M/S. Global Experts, Bhubaneswar).
The seac decided to take decision on the proposal after receipt of the following information from the proponent. The committee decided to take up the matter with the dfo, puri wild life division and in this connection a letter to be issued by the secretary, seac to dfo, puri wild life division.
E M/S. Balasore Alloys Ltd
Environmental Clearance Of Ispat Sukinda Chromite Mines (Ml Area 35.6 Ha) Of M/S. Balasore Alloys Ltd At Village Kaliapani, Tahasil Sukinda, Dist – Jajpur For Production Of Chromite Ore Of Capacity 0.4 Mtpa Through Underground Mining Methods (EC).
The SEAC reiterate its earlier stand and without prejudice to the court case pending, recommended for grant of environmental clearance
F M/S Home Base Estates Pvt. Ltd.
Environmental Clearance for Construction Of Residential Apartment At Mouza Atala in Balianta Grampanchayat, Bhubaneswar By M/S Home Base Estates Pvt. Ltd.With Total Built Up Area 24,986 Sq.M And Plot Area 2.75 Acres (EC).
The SEAC Recommended That The SEIAA, Odisha Shall Deal With The Violation Matter In Accordance With MoEF & CC, Govt. Of India OM No. J-11013/41/2006-ia.ii(i) dt.12.12.2012 and dtd. 27.6.2013
��
�
2. Proceedings of SEAC of Minor Mineral projects less than 25 ha held on 13.08.2015.
Sl. No Name & Address of the proponent
Name of the project
Mining lease period
Details of other mines including lease area located within 500m of the mine lease area
Observation of SEAC Maximum production capacity
Whether bridge/ forest lands there
Recommendation of SEAC
1. Sri Manoranjan Martha, At/Po- Bharatpalli, Dist- Ganjam, Odisha
Environmental Clearance for Kharipalli Stone Quarry over an area 2.490 acre. at village Kharipalli Tahasil Dharakote in the District of Ganjam. (Lease Period-FY-2014-15 to 2018-2019)
Lease Period-FY-2014-15 to 2018-2019)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Dharakote. 3.Mining plan approved by the Geologist & Authorised officer Bhanjanagar Sub-Diviosion O/o the Joint Director Geology South Zone, Berhampur on 22.07.2015. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
3337.2 Cum No Recommended Environmental Clearance for 2014-15 to 2018-19
2. Sri Hemanta Kumar Mishra Club Para, Balangir Dist- Balangir
Environmental Clearance for Basupali Stone Quarry over an area 4.50 acre. at village Basupali Tahasil Balangir in the District of
Lease Period-FY-2015-16 to 2019-2020)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Balangir. 2. 3.Mining plan approved by the Mining officer, Balangir Circle, Balangir on 24.07.2015. 4.No forest land involved in lease area
4200 Cum ?Forest Land
SEAC has decided to return the proposal for the following As per the toposheet the location is within Jungle kisam land
��
�
Balangir. (Lease Period-FY-2015-16 to 2019-2020)
5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
/ forest land so the proponent has clarify from DFO /Tahasildar if the ML area is forest land or not. Forest clearance is required or not
3. Sri Kailash Chandra Singh Deo, At-Kutumdola, Po- Jhankarpali, Dist- Balangir
Environmental Clearance for Kutumdola Sand Quarry over an area 4.00 acre. at village Kutumdola Tahasil Balangir in the District of Balangir. (Lease Period-FY-2015-16 to 2019-2020)
Lease Period-FY-2015-16 to 2019-2020)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Balangir. 3.Mining plan approved by the Mining officer, Balangir Circle, Balangir on 15.07.2015. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
17500 Cum NO Recommended Environmental Clearance for 2015-16 to 2019-20
4. Sri Ram Bhagat Agrawal, At/Po-Saragad, Dist- Balangir
Environmental Clearance for Uchhabapali No-3 Stone Quarry over an area 7.80 acre. at village Uchhabapali Tahasil Loisingha in the District of Balangir. (Lease Period-FY-2015-16 to 2019-2020)
Lease Period-FY-2015-16 to 2019-2020)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Loisingha. 3.Mining plan approved by the Mining officer, Balangir Circle, Balangir on 24.07.2015. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area.
11250 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
��
�
6. There is no court case / litigation pending.
5. Sri Ram Bhagat Agrawal, At/Po-Saragad, Dist- Balangir
Environmental Clearance for Uchhabapali No-8 Stone Quarry over an area 6.72 acre. at village Uchhabapali Tahasil Loisingha in the District of Balangir (Lease Period-FY-2015-16 to 2019-2020)
Lease Period-FY-2015-16 to 2019-2020)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Loisingha. 2. 3.Mining plan approved by the Mining officer, Balangir Circle, Balangir on 24.07.2015. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
10000 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
6. Sri Ram Bhagat Agrawal, At/Po-Saragad, Dist- Balangir
Environmental Clearance for Uchhabapali No-4 Stone Quarry over an area 10.70 acre. at village Uchhabapali Tahasil Loisingha in the District of Balangir. (Lease Period-FY-2015-16 to 2019-2020)
Lease Period-FY-2015-16 to 2019-2020)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Loisingha. 2. 3.Mining plan approved by the Mining officer, Balangir Circle, Balangir on 24.07.2015. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
10500 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
7. Sri Rabinarayan Das, At/Po- Mahumuhan,
Environmental Clearance for Khanjamahal-
Lease Period-FY-2015-
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Soro.
9000 Cum /5years
No Recommended Environmental Clearance for
��
�
Dist- Balasore Mahumuhan Stone Quarry No-50 over an area 0.50 acre at village Khanjamahal, Tahasil Soro in the District of Balasore. (Lease Period-FY-2015-16 to 2019-2020)
16 to 2019-2020)
2. 3.Mining plan approved by the Geologist Directorate of Geology Odisha, Bhubaneswar on 29.06.2015. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
2015-16 to 2019-20
8. Sri Lambodhar Parida, At/Po- Mahumuhan, Dist- Balasore
Environmental Clearance for Khanjamahal-Mahumuhan Stone Quarry No-34 over an area 1.50 acre at village Khanjamahal, Tahasil Soro in the District of Balasore. (Lease Period-FY-2015-16 to 2019-2020)
Lease Period-FY-2015-16 to 2019-2020)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Soro. 2. 3.Mining plan approved by the Geologist Directorate of Geology Odisha, Bhubaneswar on 29.06.2015. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
9608 Cum ?Forest Land
SEAC has decided to return the proposal for the following As per the toposheet the location is within Jungle kisam land / forest land so the proponent has clarify from DFO /Tahasildar if the ML area is forest land or not. Forest clearance is required or not
9. Sri Pravakar Jena, At/Po- Mahumuhan, Dist- Balasore
Environmental Clearance for Khanjamahal-Mahumuhan Stone Quarry No-43 over an area 1.00 acre at village Khanjamahal,
Lease Period-FY-2015-16 to 2019-2020)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Soro. 2. 3.Mining plan approved by the Geologist Directorate of Geology Odisha, Bhubaneswar on 29.06.2015. 4.No forest land involved in lease area
7636 Cum ?Forest Land
SEAC has decided to return the proposal for the following As per the toposheet the location is within Jungle kisam land
��
�
Tahasil Soro in the District of Balasore. (Lease Period-FY-2015-16 to 2019-2020)
5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
/ forest land so the proponent has clarify from DFO /Tahasildar if the ML area is forest land or not. Forest clearance is required or not
10. Sri Pramod Kumar Panda, At/Po-Palaceline, Dist-Balangir
Environmental Clearance for Bhanpur Stone Quarry over an area 0.71 acre. at village Bhanpur Tahasil Balangir in the District of Balangir. (Lease Period-FY-2015-16 to 2019-2020)
Lease Period-FY-2015-16 to 2019-2020)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Balangir. 2. 3.Mining plan approved by the Mining Officer Balangir Circle, Balangir on 24.07.2015. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
3000 Cum ?Forest Land
SEAC has decided to return the proposal for the following As per the toposheet the location is within Jungle kisam land / forest land so the proponent has clarify from DFO /Tahasildar if the ML area is forest land or not. Forest clearance is required or not
11. Sri Chhatrapal Jain, At/Po/Ps- Titilagarh, Dist-Balangir
Environmental Clearance for Desil (D) Stone Quarry over an area 3 acre at village Desil, Tahasil Titilagarh, in the district of Balangir. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Titilagarh 2. 3.Mining plan approved by the Deputy Director Geology, Zonal Survey, Balangir on 18.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by
1596 m3 No Recommended Environmental Clearance for 2015-16 to 2019-20
�
�
CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending
12. Sri Parameswar Nag, At-Hatapada, Po-Titilagarh, Dist-Balangir
Environmental Clearance for Dhamandhanga Stone Quarry over an area 5 acre out of 11.04 acre at village Dhamandhanga, Tahasil Titilagarh in the district of Balangir. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Titilagarh. 2. 3. Mining plan approved by the Deputy Director Geology, Zonal Survey, Balangir on 29.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
1350 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
13. Sri Tapan Kumar Sahoo, At-Badagan, Po- Diapada, Dist-Kendrapada
Environmental Clearance for Artmul Sand Quarry (Luna River) over an area 12.75 ha. at village Artmul, Tahasil Derabis in the district of Kendrapada. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Derabis. 2. 3. Mining plan approved by the Geologist Directorate of Geology, Odisha Bhubaneswar on 21.07.15. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
70106 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
�
�
14. Sri Bibhuti Bhushan Mallick, At/Po-Kalabuda, Dist-Kendrapara
Environmental Clearance for Sathilo Sand Quarry (Luna River) over an area 5.261 ha. at village Sathilo, Tahasil Garadpur in the district of Kendrapara. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Garadpur. 2. 3. Mining plan approved by the Geologist Directorate of Geology, Odisha Bhubaneswar on 27.06.15. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
165420 Cum
No Recommended Environmental Clearance for 2015-16 to 2019-20
15. Sri Amarendra Narayan Das, Backbone Enterprises, Bhubaneswar
Environmental Clearance for Dhansuli Sand Quarry over an area 3.864 ha. at village Dhansuli, Tahasil Papadhandi in the district of Nabarangapur. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Papadhandi. 2. 3. Mining plan approved by the Geologist &Approving Authority O/o Deputy Director of Mines Koraput Circle on 27.07.15. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
8400 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
16. Sri Amarendra Narayan Das, Backbone Enterprises, Bhubaneswar
Environmental Clearance for Bhamuni Stone Quarryover an area 2.84 acre at village
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Papadhandi. 2. 3. Mining plan approved by the Deputy
31600 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
���
�
Bhamuni, Tahasil Papadhandi in the district of Nabarangpur. (Lease Period-FY-2015-16 to 2019-20)
Director of Mines Koraput Circle, Koraput on 27.07.15. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
17. Sri Subash Bisoi, At-Pipilibandha, Po-Siker, Dist-Balangir
Environmental Clearance for Dumudumi Stone Quarry over an area 2.50 acre at village Dumudumi, Tahasil Titilagarh in the district of Balangir. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Titilagarh. 2. 3. Mining plan approved by the Deputy Director Geology Zonal Survey, Balangir on 18.06.15. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
1300 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
18. Sri Amit Kumar Routray At- Jharpada, Ps-Govindpur, Dist-Cuttack
Environmental Clearance for Biluakhai River Sand Quarry over an area 25.00 acre at village Manguli-Sankharisahi, Tahasil Biridi in the district of Jagatsinghpur.
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Biridi. 2. 3. Mining plan approved by the Geologist Directorate of Geology Bhubaneswar on 27.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory
15000 Cum ? No toposheet
SEAC has decided to return the proposal for the following No toposheet with mining plan
���
�
(Lease Period-FY-2015-16 to 2019-20)
Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
19. Sri Surya Narayan Sahu, At/Po-Tarbha, PS- Tarbha, Dist-Subarnpur
Environmental Clearance for Luduriamunda Stone Quarry over an area 9.020 acre. at village Luduriamunda, Tahasil Tarbha in the district of Subarnpur. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Tarbha. 2. 3. Mining plan approved by the Joint Direcor Geology Zonal Survey, Balangir, on 22.07.2015. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
11600 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
20. Sri Sujit Kumar Bhuyan, Rajlaxmi Construction Ltd. At/Po- New Industrial Estate, Jagatpur, Dist-Cuttack
Environmental Clearance for Desil B Stone Quarry over an area 1.214 ha. at village Desil Tahasil Titlagarh in the District of Balangir. (Lease Period-FY-2015-16 to 2019-2020)
Lease Period-FY-2015-16 to 2019-2020)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Titlagarh. 2. 3. Mining plan approved by the Deputy Direcor Geology Zonal Survey, Balangir, on 18.06.2015. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area.
972 Cum Recommended Environmental Clearance for 2015-16 to 2019-20
���
�
6. There is no court case / litigation pending.
21. Sri Chiantamani Samal, At/Po-Ichhapur, Dist-Cuttack
Environmental Clearance for Mangarajpur Mahanadi Sand Quarry over an area 5.66 ha. at village Mangarajpur, Tahasil Baramba in the district of Cuttack. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Baramba. 2. 3. Mining plan approved by the Deputy Director, Geology, Directorate of Geology Odisha Bhubaneswar on 17.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
9148 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
22. Sri Trilochan Samal At/Po-Ichhapur, Dist-Cuttack
Environmental Clearance for Gopinathpur Mahanadi Sand Quarry over an area 5.76 ha. at village Gopinathpur, Tahasil Baramba in the district of Cuttack. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Baramba. 2. 3. Mining plan approved by the Deputy Director, Geology, Directorate of Geology Odisha Bhubaneswar on 18.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
7462 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
23. Sri Trilochan Samal At/Po-Ichhapur, Dist-
Environmental Clearance for Tunapur Mahanadi
(Lease Period-FY-2015-
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Baramba.
9578 Cum No Recommended Environmental Clearance for
���
�
Cuttack Sand Quarry over an area 5.26 ha. at village Tunapur, Tahasil Baramba in the district of Cuttack. (Lease Period-FY-2015-16 to 2019-20)
16 to 2019-20)
2. 3. Mining plan approved by the Deputy Director, Geology, Directorate of Geology Odisha Bhubaneswar on 18.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
2015-16 to 2019-20
24. Sri Trilochan Samal At/Po-Ichhapur, Dist-Cuttack
Environmental Clearance for Bangarsingha Mahanadi Sand Quarry over an area 6.88 ha. at village Bangarsingha, Tahasil Baramba in the district of Cuttack. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Baramba. 3. Mining plan approved by the Deputy Director, Geology, Directorate of Geology Odisha Bhubaneswar on 18.06.15. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
4420 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
25. Sri Chintamani Samal At/Po-Ichhapur, Dist-Cuttack
Environmental Clearance for Naranpur Mahanadi Sand Quarry over an area 5.40 ha. at village Naranpur, Tahasil Baramba in the district of
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Baramba. 2. 3. Mining plan approved by the Deputy Director, Geology, Directorate of Geology Odisha Bhubaneswar on 17.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National
4204 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
���
�
Cuttack. (Lease Period-FY-2015-16 to 2019-20)
Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
26. Sri Mukundalal Chowhan At/Po-Bonaigarh, Dist-Sundargarh
Environmental Clearance for Sana Mushaposh Stone Quarry over an area 17.30 acre at village Sana Mushaposh, Tahasil Gurundia in the district of Sundargarh. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Gurundia. 2. 3. Mining plan approved by the Mining Officer Koira, Sundargarh on 10.06.15 4 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
14000 Cum ? Reserved Forest Land
SEAC has decided to return the proposal for the following As per the toposheet the location is within reserved forest land so the proponent has to clarify from DFO /Tahasildar if the ML area is forest land or not. Forest clearance is required or not
27. Sri Trilochan Samal At/Po-Ichhapur, Dist-Cuttack
Environmental Clearance for Kantapada Mahanadi Sand Quarry over an area 6.47 ha. at village Kantapada, Tahasil Baramba in the district of Cuttack. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Baramba. 2. 3. Mining plan approved by the Deputy Director, Geology, Directorate of Geology Odisha Bhubaneswar on 18.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area.
3177 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
���
�
6. There is no court case / litigation pending.
28. Sri Durga Prasad Mishra, M.D. of Animesh Construction Pvt Ltd At- Raju Street, Po-Jeypore, Dist-Koraput
Environmental Clearance for Jayantigiri Stone Quarry-1 over an area 1.012 ha. at village Jayantigiri, Tahasil Jeypore in the district of Koraput. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Jeypore. 2. 3. Mining plan approved by the Deputy Director, Mines, Koraput Circle, Koraput on 17.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
2752 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
29. Sri Pramod kumar Sahoo At/Po-Palasapanga, Dist- Keonjhar
Environmental Clearance for Murusuan Stone Quarry-II over an area 4.75 ha. at village Murusuan, Tahasil Sadar,Keonjhar in the district of Keonjhar. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Sadar,Keonjhar. 2. 3. Mining plan approved by the Joint Director, Geology, Keonjhar on 20.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
734 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
30. M/s Acharya Earth Movers (P) Ltd., Jail Road, Santi
Environmental Clearance for Kanaktura Stone Quarry-II over an
(Lease Period-FY-2015-16 to
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Hemgir. 2.
127558.00 Cum
? Forest Land
SEAC has decided to return the proposal for the following
���
�
Nagar, Jharapada, Bhubaneswar
area 2.063 ha. at village Kanaktura, Tahasil Hemgir in the district of Sundargarh. (Lease Period-FY-2015-16 to 2019-20)
2019-20) 3. Mining plan approved by the Deputy Director of Geology, Zonal Survey, Sambalpur on 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
As per the toposheet the location is within jungle forest land so the proponent has clarify from DFO /Tahasildar if the ML area is forest land or not. Forest clearance is required or not
31. Smt. Indumati Khillar At- Kashipur, Po- Keonjhar, Dist- Keonjhar
Environmental Clearance for Raghunathpur Stone Quarry-I over an area 1.214 ha. at village Raghunathpur, Tahasil Sadar,Keonjhar in the district of Keonjhar. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Sadar,Keonjhar. 2. 3. Mining plan approved by the Joint Director, Geology, Keonjhar on 02.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
1584 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
32. Sri Prasanta Behera At- Bheunria, Po-Padampur, Dist- Bargarh
Environmental Clearance for Firupali Sand Quarry over an area 7.02 ha. at village Firupali, Tahasil Padampur in the district of Bargarh. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Padampur. 2. 3. Mining plan approved by the Deputy Director of Geology, Zonal Survey, Sambalpur on 20.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected
2000 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
���
�
Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
33. Sri Prasanta Behera At- Bheunria, Po-Padampur, Dist- Bargarh
Environmental Clearance for Deoli Sand Quarry over an area 11.01 ha. at village Deoli, Tahasil Padampur in the district of Bargarh. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Padampur. 2. 3. Mining plan approved by the Deputy Director of Geology, Zonal Survey, Sambalpur on 20.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
2500 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
34. Sri Kashiram Agrawal, At-Ward No.7, Po-Padampur, Dist- Bargarh
Environmental Clearance for Garbhanakhol Stone Quarry over an area 2.14 ha. at village Garbhanakhol, Tahasil Padampur in the district of Bargarh. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Padampur. 2. 3. Mining plan approved by the Deputy Director of Geology, Zonal Survey, Sambalpur on 20.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation
944 Cum No The SEAC has decided to return the proposal due to the following The prefeasibility report submitted on bishipali stone quarry instead of Garbhanakhol Stone Quarry.
��
�
pending. 35. Sri Pratap
Kumar Mishra, At-Block Colony, Po-Padampur, Dist- Bargarh
Environmental Clearance for Ghanamal Stone Quarry over an area 2.64 ha. at village Ghanamal, Tahasil Padampur in the district of Bargarh. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Padampur. 2. 3. Mining plan approved by the Deputy Director of Geology, Zonal Survey, Sambalpur on 17.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
5000 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
36. Sri Md. Jawed, At-Ward No-3, Po-Padampur, Dist- Bargarh
Environmental Clearance for Ghanamal Sand Quarry over an area 10.33 ha. at village Ghanamal, Tahasil Padampur in the district of Bargarh. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Padampur. 2. 3. Mining plan approved by the Deputy Director of Geology, Zonal Survey, Sambalpur on 17.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
5000 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
37. Sri Premananda Pradhan At- Santiparal, Po-
Environmental Clearance for Hirapur Sand Quarry over an
(Lease Period-FY-2015-16 to
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Loisingha. 2.
16500 Cum No The SEAC has decided to return the proposal due to
��
�
Rajendra College, Dist- Balangir
area 6.070 ha. at village Hirapur, Tahasil Loisingha in the district of Balangir. (Lease Period-FY-2015-16 to 2019-20)
2019-20) 3. Mining plan approved by the Miming Officer Balangir Circle, Balangir on 24.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
the following The proponent has to furnish clarification regarding the distance railway bridge from quarry site quarry.
38. Sri Hemant Kumar Samal Vill-Goutam Nagar, Dist- Koraput
Environmental Clearance for Mangara Stone Quarry over an area 1.00 acre. at village Mangara, Tahasil Koraput in the district of Koraput. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Koraput. 2. 3. Mining plan approved by the Joint Director, Geology, Zonal Survey, Koraput on 14.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
2000 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
39. Sri Hemant Kumar Samal Vill-Goutam Nagar, Dist- Koraput
Environmental Clearance for Bagaipadar Stone Quarry over an area 2.00 acre. at village Bagaipadar, Tahasil Koraput in the district of Koraput. (Lease
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Koraput. 3. Mining plan approved by the Joint Director, Geology, Zonal Survey, Koraput on 14.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National
2500 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
���
�
Period-FY-2015-16 to 2019-20)
Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
40. Sri Bhola Nath Meher At- Salegadi, Po-Padampur, Dist- Bargarh
Environmental Clearance for Dhuambhata Stone Quarry over an area 0.20 ha. at village Dhuambhata, Tahasil Padampur in the district of Bargarh. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Padampur. 2. 3. Mining plan approved by the Deputy Director Geology, Zonal Survey, Sambalpur on 04.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
2040 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
41. Sri Sunil Kumar Mahapatra VSS Nagar, Ward No.9, Dist- Bargarh
Environmental Clearance for Khaprel Nuapali Stone Quarry over an area 4.605 ha. at village Khaprel Nuapali, Tahasil Bijepur in the district of Bargarh. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Bijepur. 2. 3. Mining plan approved by the Deputy Director Geology, Zonal Survey, Sambalpur on 20.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of
1650.00 Cum
No Recommended Environmental Clearance for 2015-16 to 2019-20
���
�
the mine lease area. 6. There is no court case / litigation pending.
42. Smt. Bimala Devi Sharma Godbhanga, Attabira, Dist- Bargarh
Environmental Clearance for Kesharipali Stone Quarry over an area 2.16 ha. at village Kesharipali, Tahasil Bheden in the district of Bargarh. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Bheden. 2. 3. Mining plan approved by the Deputy Director Geology, Zonal Survey, Sambalpur on 20.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
1035.00 Cum
No Recommended Environmental Clearance for 2015-16 to 2019-20
43. Sri Pradipta Kumar Baral At- Nurtanga, Po-Mahanga, Dist- Cuttack
Environmental Clearance for Kathajodi River Sand Quarry, Rajahansa over an area 5.46 ha. at village Rajahansa, Tahasil Sadar Cuttack in the district of Cuttack. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Sadar Cuttack. 2. 3. Mining plan approved by the Deputy Director Geology, Directorate of Geology Bhubaneswar on 07.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
50000 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
44. Sri Dillip Kumar Parida At/Po-
Environmental Clearance for
(Lease Period-
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by
15000 Cum No Recommended Environmental
���
�
Mahakalapada, Dist- Jajpur
Birupa River Sand Quarry, Batitanki over an area 5.26 ha. at village Batitanki, Tahasil Bari in the district of Jajpur. (Lease Period-FY-2015-16 to 2019-20)
FY-2015-16 to 2019-20)
Tahasildar, Bari. 2. 3. Mining plan approved by the Deputy Director, Mines, Jajpur on 27.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
Clearance for 2015-16 to 2019-20
45. Sri Birendra Bir At- Rampur, Po-Rairakhol, Dist- Sambalpur
Environmental Clearance for Karandi Jhor Sand Quarry over an area 5.06 ha. at village Rampur, Tahasil Rairakhol in the district of Sambalpur. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Rairakhol. 2. 3. Mining plan approved by the Deputy Director, Mines, (I/C) Sambalpur Circle, Sambalpur on 23.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
2892 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
46. Sri Sekh Mohamad Wajid At/Po- Sunaripada, , Dist- Bargarh
Environmental Clearance for Luhakhan- A Stone Quarry over an area 6.39 ha. at village Luhakhan, Tahasil Padampur in the district of
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Padampur. 2. 3. Mining plan approved by the Deputy Director, Geology Zonal Survey, Sambalpur on 18.06.15 4.
2000 Cum ?Forest Land
SEAC has decided to return the proposal for the following As per the toposheet the location is within Jungle kisam land
���
�
Bargarh. (Lease Period-FY-2015-16 to 2019-20)
5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
/ forest land so the proponent has to clarify from DFO /Tahasildar if the ML area is forest land or not and Forest clearance required or not
47. Sri Prakash Sahu At/Po-Titilagarh, Dist- Balangir
Environmental Clearance for Burdipada ‘C’ Stone Quarry over an area 1.618 ha. at village Burdipada, Tahasil Titilagarh in the district of Balangir. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Titilagarh. 2. 3. Mining plan approved by the Deputy Director, Geology Zonal Survey, Balangir on 20.07.15 4. 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
2000 Cum ?Forest Land
SEAC has decided to return the proposal for the following As per the toposheet the location is within Jungle kisam land / forest land so the proponent has to clarify from DFO /Tahasildar if the ML area is forest land or not and Forest clearance required or not
48. Sri Samir Kumar Garnaik,Sr. Manager (Civil) Odisha Construction Corp.Ltd., Telengiri Spillway Project, Bariniput, Jeypore, Dist- Koraput
Environmental Clearance for Malikarchi Stone Quarry (B) over an area 0.405 ha. at village Malikarchi, Tahasil Jeypore in the district of Koraput. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Jeypore. 2. 3. Mining plan approved by the Deputy Director of Mines (I/C) Koraput Circle,Koraput on 06.07.15 4. 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by
26962 Cum ?Forest Land
SEAC has decided to return the proposal for the following As per the toposheet the location is within Jungle kisam land / forest land so the proponent has to clarify from DFO /Tahasildar if the
���
�
CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
ML area is forest land or not and Forest clearance required or not
49. Sri Mohammad Siraj At-Bhandisahi, Po-Padampur, Dist- Bargarh
Environmental Clearance for Singhanpur Sand Quarry over an area 6.23 ha. at village Singhanpur, Tahasil Padampur in the district of Bargarh. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Padampur. 2. 3. Mining plan approved by the Deputy Director of Geology Zonal Survey, Sambalpur on 04.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
3613 Cum Yes Recommended Environmental Clearance for 2015-16 to 2019-20
50. Sri Anand Kumar Kedia At- Khandadhip, Po-Rairakhol, Dist- Sambalpur
Environmental Clearance for Surubali Jore- A Sand Quarry over an area 5.06 ha. at village Sarapal, Tahasil Rairakhol in the district of Sambalpur. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Rairakhol. 2. 3. Mining plan approved by the Deputy Director Mines,(I/C) Sambalpur Circle, Sambalpur on 23.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
4718 Cum No SEAC has decided to return the proposal due to following As per checklist the distance of bridge is 200mt. The project proponent has to furnish clarification exact location of the bridge
51. Sri Mahamad Environmental (Lease Nil 1. Furnished filled in Form-I, pre-feasibility 2580 Cum No Recommended
���
�
Jawed At- Ward No.3, Po-Padampur, Dist- Bargarh
Clearance for Bishipali Stone Quarry (B) over an area 1.04 ha. at village Bishipali, Tahasil Padampur in the district of Bargarh. (Lease Period-FY-2015-16 to 2019-20)
Period-FY-2015-16 to 2019-20)
report and check list forwarded by Tahasildar, Padampur. 2. 3. Mining plan approved by the Deputy Director of Geology Zonal Survey, Sambalpur on 19.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
Environmental Clearance for 2015-16 to 2019-20.
52. Sri Sekh Mohammad Wajid At/Po-Sunaripada, Dist- Bargarh
Environmental Clearance for Luhakhan-B Stone Quarry over an area 0.41 ha. at village Luhakhan, Tahasil Padampur in the district of Bargarh. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Padampur. 2. 3. Mining plan approved by the Deputy Director of Geology Zonal Survey, Sambalpur on 18.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
2580 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
53. Sri Iswar Dutta Meher At- Kushunapalli, Po-Padampur, Dist- Bargarh
Environmental Clearance for Fulmatipur Stone Quarry-(C) over an area 11.31 ha. at village Fulmatipur,
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Padampur. 2. 3. Mining plan approved by the Deputy Director of Geology Zonal Survey,
5000 Cum ?Forest Land
SEAC has decided to return the proposal for the following As per the toposheet the
���
�
Tahasil Padampur in the district of Bargarh. (Lease Period-FY-2015-16 to 2019-20)
Sambalpur on 15.06.15 4. 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
location is within Jungle kisam land / forest land so the proponent has to clarify from DFO /Tahasildar if the ML area is forest land or not
54. Sri Amarendra Narayan Das Backbone Enterprises, Bhubaneswar
Environmental Clearance for Tumburla Sand Quarry over an area 2.581 ha. at village Tumburla, Tahasil Papadahandi in the district of Nabarangapur. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Papadahandi. 2. 3. Mining plan approved by the Deputy Director of Mines (I/C) Koraput Circle, Koraput on 27.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
8800 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
55. Sri Birendra Pradhan At/Po-Loisingha, Dist- Balangir
Environmental Clearance for Uchhabapali No-5 Stone Quarry over an area 7.65 acre. at village Uchhabapali, Tahasil Loisingha in the district of Balangir. (Lease Period-FY-2015-16
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Loisingha. 2. 3. Mining plan approved by the Mining Officer Balangir Circle, Balangir on 24.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected
1960 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
���
�
to 2019-20) Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
56. Sri Sunil Kumar Mishra, At- Gandhinagarpada, Po-Balangir, Dist- Balangir
Environmental Clearance for Pandarani Stone Quarry-I over an area 10.00 ac. at village Pandarani, Tahasil Loisingha in the district of Balangir. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Loisingha. 2. 3. Mining plan approved by the Mining Officer Balangir Circle, Balangir on 24.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
1920 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
57. Sri Hasmukh Patel At/Po-Kansaripada, Dist- Balangir
Environmental Clearance for Uparudar Stone Quarry over an area 2.832 ha. at village Uparudar, Tahasil Loisingha in the district of Balangir. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Loisingha. 2. 3. Mining plan approved by the Mining Officer Balangir Circle, Balangir on 24.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area.
11250 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
��
�
6. There is no court case / litigation pending.
58. Sri Ullas Kumar Das At- Hatabaspur, Po-Aripada, Dist- Kendrapara
Environmental Clearance for Mangalpur Sand Quarry (Birupa River) over an area 5.20 ha. at village Mangalpur, Tahasil Derabis in the district of Kendrapara. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Derabis. 2. 3. Mining plan approved by the Geologist Directorate of Geology, Odisha Bhubaneswar on 21.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
42180 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
59. Sri Sadhu Charan Barik At/Po-Govindpally, Dist- Malkangiri
Environmental Clearance for Tekguda Stone Quarry over an area 1.456 ha. at village Tekguda, Tahasil Kudumulugumma in the district of Malkangiri. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Kudumulugumma. 2. 3. Mining plan approved by the Deputy Director Geology Zonal Survey, Koraput on 21.07.15 4 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
58215 Cum ?Forest
SEAC has decided to return the proposal for the following As per the toposheet the location is within Jungle kisam land / forest land so the proponent has to clarify from DFO /Tahasildar if the ML area is forest land or not and Forest clearance required or not
��
�
60. Sri Anup Das At/Po-Titlagarh, Dist- Balangir
Environmental Clearance for Burdipada A Stone Quarry over an area 1.618 ha. at village Burdipada, Tahasil Titlagarh in the district of Balangir. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Titlagarh. 2. 3. Mining plan approved by the Deputy Director Geology Zonal Survey,Balangir on 20.07.15 45.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending
1625 Cum Forest
SEAC has decided to return the proposal for the following As per the toposheet the location is within Jungle kisam land / forest land so the proponent has to clarify from DFO /Tahasildar if the ML area is forest land or not and Forest clearance required or not
61. Sri Mukesh Jain At/Po-Kursud, Dist- Bolangir
Environmental Clearance for Nirmula Stone Quarry-III over an area 0.5 acre out of 8.60 acre at village Nirmula, Tahasil Titilagarh in the district of Bolangir. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Titilagarh 2. 3. Mining plan approved by the Deputy Director, Geology Zonal Survey, Bolangir on 18.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
900 Cum ? No toposheet
SEAC has decided to return the proposal for the following No toposheet with mining plan
62. Sri Ganesh Bisoyi At/Po-College Chhak, Kotinada, Aska, Dist- Ganjam
Environmental Clearance for Karnoli Stone Quarry-II over an area 6.3091 ha. at village Karnoli,
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Aska. 2. 3. Mining plan approved by the Geologist & Authorised Officer Bhanjanagar Sub-
6095.00 Cum
No Recommended Environmental Clearance for 2015-16 to 2019-20
���
�
Tahasil Aska in the district of Ganjam. (Lease Period-FY-2015-16 to 2019-20)
Division South Zone, Berhampur on 03.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
63. Sri Ganesh Bisoyi At/Po-College Chhak, Kotinada, Aska, Dist- Ganjam
Environmental Clearance for Baragam Stone Quarry over an area 02.032 ha. at village Baragam, Tahasil Aska in the district of Ganjam. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Aska. 2. 3. Mining plan approved by the Geologist & Authorised Officer Bhanjanagar Sub-Division South Zone, Berhampur on 03.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
4100.00 Cum
No Recommended Environmental Clearance for 2015-16 to 2019-20
���
�
64. Sri Babuli Sahu At- Maisanpur, Po-Kalabada, Dist- Ganjam
Environmental Clearance for Kalabada Sand Quarry over an area 5.062 ha. at village Kalabada, Tahasil Chikiti in the district of Ganjam. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Chikiti. 2. 3. Mining plan approved by the Mining Officer Ganjam Circle, Berhampur on 09.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
10200 Cum ? No toposheet
SEAC has decided to return the proposal for the following No toposheet with mining plan
65. Sri Amjad Khan At/Po-Kosagumuda, Dist- Nabarangpur
Environmental Clearance for Majhiguda Sand Quarry over an area 0.90 acre at village Majhiguda, Tahasil Kodinga in the district of Nabarangpur. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Kodinga. 2. 3. Mining plan approved by the Deputy Director Mines (I/C) Koraput Circle, Koraput on 24.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
2550 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
66. Sri Amjad Khan At/Po-Kosagumuda, Dist- Nabarangpur
Environmental Clearance for Gajagam Sand Quarry over an area 0.80 acre at
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Kodinga. 2. 3. Mining plan approved by the Geologist
2565 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
���
�
village Gajagam, Tahasil Kodinga in the district of Nabarangpur. (Lease Period-FY-2015-16 to 2019-20)
& Approving Authority O/o Deputy Director Mines Koraput Circle, on 24.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
67. Sri Narendra Pradhan Vill- Bijayramchandrapur, Ward No-21, Dist- Mayurbhanj
Environmental Clearance for Panijia Stone Quarry over an area 1.093 ha. at village Panijia, Tahasil Kuliana in the district of Mayurbhanj. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Kuliana. 2. 3. Mining plan approved by the Geologist O/o the Joint Director, Geology, Keonjhar on 29.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
6204 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
68. Sri Pradeep Pratap Singhdeo At/Po-Kuarmunda, Dist- Sundagarh
Environmental Clearance for Jamunanaki Sand Quarry-I over an area 6.879 ha. at village Jamunanaki, Tahasil Panposh in the district of Sundagarh. (Lease
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Panposh. 2. 3. Mining plan approved by the Mining Officer Rourkela on 10.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory
12280 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
���
�
Period-FY-2015-16 to 2019-20)
Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
69. Sri Antaryami Nayak At/Po-Sahapur, Dist- Ganjam
Environmental Clearance for Sahapur Stone Quarry over an area 2.83 ha. at village Sahapur, Tahasil Hinjilicut in the district of Ganjam. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Hinjilicut. 2. 3. Mining plan approved by the Mining Officer Ganjam Circle, Berhampur on 08.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
15957 Cum Form-Iis not properly folled
SEAC has decided to return the proposal for the following Form –I is not filled up
70. M/s Hitech Rock Products & Aggregates Limited. Mountmalee Road, Manapakkam, Po. Box No-979, Chennai-600089
Environmental Clearance for Murgapat-II Stone Quarry over an area 4.196 ha. at village Murgapat, Tahasil Karanjia in the district of Mayurbhanj. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Karanjia. 2. 3. Mining plan approved by the Deputy Director, Geology, Keonjhar on 06.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation
40400.00 Cum
No Recommended Environmental Clearance for 2015-16 to 2019-20
���
�
pending.
71. Sri Birendra Pradhan At/Po-Loisingha, Dist- Bolangir
Environmental Clearance for Gopalpur, Chhelibahal Sand Quarry over an area 20.80 acre at village Gopalpur, Chhelibahal, Tahasil Loisingha in the district of Bolangir. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Loisingha. 2. 3. Mining plan approved by the Mining Officer Bolangir Circle, Bolangir on 24.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
2000 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
72. Sri Pravakar Jena At/Po-Mahumuhan, Dist- Balasore
Environmental Clearance for Khanjamahal- Mahumuhan Stone Quarry No-51 over an area 1.012 ha. at village Khanjamahal, Tahasil Soro in the district of Balasore. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Soro. 2. 3. Mining plan approved by the Geologist Directorate of Geology Odisha, Bhubaneswar on 29.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
1890 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
73. Sri Ptitam Environmental (Lease Nil 1. Furnished filled in Form-I, pre-feasibility 22500 Cum ? Yes SEAC has
���
�
Kumar Panigrahi At/Po-Chandanbhati, Dist- Bolangir
Clearance for Chandanbhati Sand Quarry over an area 8.00 acre at village Chandanbhati, Tahasil Bolangir in the district of Bolangir. (Lease Period-FY-2015-16 to 2019-20)
Period-FY-2015-16 to 2019-20)
report and check list forwarded by Tahasildar, Bolangir. 2. 3. Mining plan approved by the Mining Officer Bolangir Circle, Bolangir on 24.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
decided to return the proposal for the following As the lease boundary is close to the nearest bridge and the distance is less than 300m
74. Smt. Manju Agrawal Udit Nagar, Rourkela, Dist- Sundargarh
Environmental Clearance for Kutunia Stone Quarry over an area 1.634 ha. at village Kutunia, Tahasil Rajgangpur in the district of Sundargarh. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Rajgangpur. 2. 3. Mining plan approved by the Deputy Director of Geology Zonal Survey, Sambalpur on 20.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
4545.00 Cum
No Recommended Environmental Clearance for 2015-16 to 2019-20
75. Sri Sanjeev Kumar Kapoor, Director of T.R. Ispat & Power Pvt. Ltd. Dist-
Environmental Clearance for Barangakhol Stone Quarry over an area 2.023 ha. at
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Rajgangapur. 2. 3. Mining plan approved by the Deputy
30952 Cum ?Forest Land
SEAC has decided to return the proposal for the following As per the
���
�
Sundargarh village Rajgangapur, Tahasil Rajgangapur in the district of Sundargarh. (Lease Period-FY-2015-16 to 2019-20)
Director of Geology Zonal Survey, Sambalpur on 25.07.15 4. 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
toposheet the location is within Jungle kisam land / forest land so the proponent has to clarify from DFO /Tahasildar if the ML area is forest land or not and forest clearance is required or not
76. Sri Anjani Prasad Dash At- Sargignok, Po-Titilagarh, Dist- Bolangir
Environmental Clearance for Kumuda Stone Quarry over an area 1.214 ha. at village Kumuda, Tahasil Titilagarh in the district of Bolangir. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Titilagarh. 2. 3. Mining plan approved by the Deputy Director of Geology Zonal Survey, Bolangir on 29.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
1176 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
77. Sri Amit Kumar Agrawal At/Po-Titilagarh, Dist- Bolangir
Environmental Clearance for Desil A Stone Quarry over an area 1.214 ha. at village Desil, Tahasil Titilagarh in the district of Bolangir. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Titilagarh. 2. 3. Mining plan approved by the Deputy Director of Geology Zonal Survey, Bolangir on 30.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory
1365 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
���
�
Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
78. Sri Sadananda Sahoo At- Adhanga, Po-Alipingal, Dist- Keonjhar Jagatsinghpur
Environmental Clearance for Hazipur- Kulakaijanga-Nuapari Biluakhai Nadi Quarry over an area 9.21 ha. at village Hazipur- Kulakaijanga-Nuapari, Tahasil Biridi in the district of Jagatsinghpur. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Biridi. 2. 3. Mining plan approved by the Geologist Directorate of Geology, Odisha Bhubaneswar on 02.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
5500 Cum No SEAC has decided to return the proposal for the following This is a vulenerable point from flood point of view. The lease area covers major portion within the flood Plain area ( Nadi patha) . This is also very close to embakment and Machhgan canal/ This should not be allowed . The pp has to apply for sand quarry from river bed only.
79. Sri Ramesh Sahu At- Mudhela, Po-Parakod, Dist- Nuapada
Environmental Clearance for Boirbhadi Road Metal Quarry over an area 0.931 ha. at village Boirbhadi, Tahasil Nuapada in the district of
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Nuapada. 2. 3. Mining plan approved by the Deputy Director Geology Zonal Survey, Balangir on 21.07.15 4.No forest land involved in lease area
2723 Cum No Recommended Environmental Clearance for 2015-16 to 2019-20
��
�
Nuapada. (Lease Period-FY-2015-16 to 2019-20)
5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
80. Sri Hemanta Kumar Sahoo At/Po-Jakhapura, Dist- Jajpur
Environmental Clearance for Pankapal-1 Sand Quarry (Brahmani River) over an area 7.284 ha. at village Pankapal, Tahasil Danagadi in the district of Jajpur. (Lease Period-FY-2015-16 to 2019-20)
(Lease Period-FY-2015-16 to 2019-20)
Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Danagadi. 2. 3. Mining plan approved by the Deputy Director, Mines, Jajpur Road on 22.07.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.
180000 Cum
No Recommended Environmental Clearance for 2015-16 to 2019-20
Any other item with the permission by Chairman.