52
AMERICAN COATINGS Systems Guide www.americancoatings.com

Amer Coat Cat.qxd

  • Upload
    lecong

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Amer Coat Cat.qxd

AMERICANCOATINGSSystems Guide

www.americancoatings.com

Page 2: Amer Coat Cat.qxd

American Coatings is a “can do”company manufacturing and developingnew products to enhance youreffectiveness in meeting and exceedingthe competition. We take pride inproviding value added service, andgiving you a product that fits and lasts.

AMERICANCOATINGS

MISSION STATEMENT

Page 3: Amer Coat Cat.qxd

NOTES

CO

NTE

NTS

Top-Coat Finishing Options .................................... Page 2

Primer Options ........................................................ Page 3

Support Materials for Custom Applications ......... Page 4

Index to Coating Systems .................................. Page 5, 6

Tank and Vessel Restoration .................................. Page 7

Light Industrial Atmosphere .................................. Page 8

Mild Corrosive Areas and Inland to 150 Miles ..... Page 9

Heavy Corrosive Areas - Acid, Alkaline, and Sea Coasts to 50 Miles Inland ................ Page 10

Miscellaneous ........................................................ Page 11

Coating System Specifications ..................... Page 12 - 46

1

1. Rust-Lok products have extended recoatabilityand can be used for preconstruction priming aswell as inorganic zinc.

2. American Coatings polyurethanes are availablewith a variety of properties and VOC’s. Allpolyurethane products can be used in thesespecifications not just the SU Series.

3. American Coatings Inorganic and Epoxy Zincs areavailable in various VOC contents and zinc loads.See your representative.

4. American Coatings AK Alkyd Primers and Finishesare available in varying solvent systems, VOC’s,and with different drying properties.

5. American Coatings AE products can be catalyzedfor enhanced performance.

Page 4: Amer Coat Cat.qxd

PR

OD

UC

T O

FF

ER

IN

GS

Top-Coat Finishing OptionsAlkyd Air Dry/Quick DryAK 4000 Series For brush and roll application.AK 6000 Series Fast dry, high gloss topcoats and primers.AK 7000 Series Slow dry for maximum substrate penetration. Brush & spray.SAK Silicone Silicone modified adding durability and gloss.

Acrylic ModifiedAE Series Improved durability and gloss over alkyds.AC Series Maximum hardness in one component system.

Polyurethane OptionsPU Series Aliphatic Polyurethane offering quality at low cost.SU Series Aliphatic Polyurethane offering excellent gloss and DOI.AU Series Acrylic Polyurethane offering “Auto” gloss & DOI.2U Series Superior gloss, DOI, & Mar resistance w / 2.2 VOC.

High HeatSC Series Silicone Acrylic with protection to 500° F.SL Series Silicone with protection approaching 1200° F

Water OptionsAW Series Alkyd Water Reducible Primer, and High Gloss Finishes.WB Series Latex Water Acrylic Primer, and Finishes.HW Series Modified Alkyd Modified w/High Gloss & Quick Dry acrylic

Acrylic LatexWBR Series Roof Mastics designed for sheet metal, and built-up roofs.

BakingBW Series Custom Water Alkyd Baking Enamel.BE Series Custom baking formulations.

2

Page 5: Amer Coat Cat.qxd

PR

OD

UC

T O

FF

ER

IN

GS

Primer OptionsAlkydsAK Shop Coat Series Inexpensive, fast-dry protection. Primarily for spray application.AK Heavy Duty Series For improved durability areas where brushing and spraying is

necessary (Tanks, Piping).

Alkyd PhenolicAK 3550 Red Oxide Primer that accepts a variety of topcoats.AK 3561 Gray Primer Primer that accepts a variety of topcoats.

Epoxy EsterEE 566 Red Oxide Designed for specialty applications.

Epoxy PolyamidesEX Series “Resin Rich” Systems for high performance.EM Series High-Build primers for harsh environments.RL Series Designed for use over marginal surfaces or where sandblasting is not

permitted.AX Series “Automotive” quality primer / surfacer.

Coal Tar EpoxyEX 8330 Coal Tar Lining, tank bottoms, and sewage treatment applications.

Etching PrimersAC 12471 One component Acrylic surface prep primer.WP 9521 Two component Vinyl Etch Primer.

Zinc and Zinc Modified PrimersAZ 11 3.5 VOC Inorganic Zinc.AZ 76 Inorganic Zinc - lower Zinc load then AZ 86.AZ 82 Zinc Rich EpoxyAZ 83 Zinc Rich Epoxy - 2.8 VOC.AZ 84 Liquid Galvanize designed for repair.AZ 86 Maximum load Inorganic Zinc.

3

Page 6: Amer Coat Cat.qxd

PR

OD

UC

T O

FF

ER

IN

GS

Support Materials for Custom ApplicationsLinings / Caulks / AdhesivesEP Glass Flake Tank bottom and shell repair.EP Series Epoxy Phenolic Linings Chem protection for various tanks - frac.Epoxy Novalac Linings Improved chemical resistance. Not for frac tanks.Vinyl Ester Series Liner that handles specialty chemicalsCT 1120 One Comp. Coal Tar Gas resistant for buried pipe and tanksBL Series Urethane Bedliners Maximum durability liner, abrasion resistant surface.CL 3 Cable Lock System Self-leveling bolt set coating.CL 8 Black Flexible Epoxy Putty Expansion joints, oil and solvent resistant.CL 10 Gray Epoxy Putty Holes, joints and crack repair - concrete.TL 1 100% Solids Laminating Epoxy Chop fiberglass system for tank repair.TC 7 100% Solids Epoxy Caulk Spray applied for repair - plural.TC 12 Hand applied version of TC 7.

Cleaners / Degreasers / Rust ConvertersRL 101 Rust Converter Converts rust to a black primer.TH 100 Industrial Cleaner Water-based, multiple use cleaner.TH 150 Heavy Duty Degreaser Alkaline cleaner / degreaser.TH 200 Haps Free Degreaser Used where rinsing is impossibleTH 950 Chemical Cleaner Acid-based etching of concrete / steel.

Floor Coatings (Zero VOC) A two or three coat complete flooring system for concretefinishing.FP 8001 Concrete Primer / Sealer Designed to seal concrete prior to FC application.FC Series Colored Finish Coats Self Leveling Epoxy Coating.FC 8999 Clear Coat Utilized for extreme traffic and wear.

AdditivesEpoxy Accelerators RM 1147 0.5 - 2.0 ounces per gallon.Urethane Accelerators RM 1014 0.5 - 1.5 ounces per gallon.Roll Additives Urethane additive for roll application.Urethane Retarder Used to extend pot life.

Not all products are stock items. Some products require minimum orders.

4

Page 7: Amer Coat Cat.qxd

PR

OD

UC

T O

FF

ER

IN

GS

Index to Coating SystemsNo. Page1. Blue, Fiberglass and 100% Solids Epoxy System applied by the American Process ...............132. White, Fiberglass and 100% Solids Epoxy System applied by the American Process ............143. Vinyl Ester and Fiberglass applied with chopped or mat glass ................................................154. 100% Solids Rivet and Seam Caulking applied by the American Process. ..............................165. Epoxy Zinc and High Build Epoxy Finish ....................................................................................166. Epoxy Zinc, Mid Coat High Build Epoxy, and Polyurethane Finish. .........................................177. Inorganic Zinc, Mid Coat High Build Epoxy, and Polyurethane Finish.....................................178. Inorganic Zinc, and High Build Epoxy Finish. ............................................................................189. 100 % Solids Epoxy Hand Caulk for Rivets, etc. ........................................................................1810. Inorganic Zinc, Mid Coat High Build Epoxy, and Epoxy High Gloss Finish. .............................1911. Heavy Duty Alkyd Primer, and Alkyd Finish Coat......................................................................1912. Epoxy Mastic Primer and High Build Epoxy Finish. ...................................................................2013. Alkyd Heavy Duty Primer, Alkyd Mid Coat, and Alkyd Finish. .................................................2014. Modified Alkyd All-Purpose Primer, Alkyd Mid Coat, and Alkyd Finish. .................................2115. Modified Alkyd All-Purpose Primer, Acrylic Mid Coat, and Acrylic Finish. ..............................2116. Modified Alkyd All Purpose Primer, and SU Series Finish.........................................................2217. Modified Alkyd All Purpose Primer, and Epoxy High Build Epoxy Finish. ...............................2218. Modified Alkyd All Purpose Primer, and High Gloss Epoxy Finish. ..........................................2319. Zinc Primer for Galvanize Repair. ...............................................................................................2320. Epoxy Primer, High Gloss Epoxy Mid Coat, and High Gloss Epoxy Finish. ...............................2321. Epoxy Primer, Polyurethane Mid Coat, and Polyurethane Finish.............................................2422. Epoxy Primer, and Epoxy Acrylic Finish. .....................................................................................2423. High Build Epoxy Primer, High Gloss Epoxy Mid Coat, and High Gloss Epoxy Finish .............2524. High Build Epoxy DTM (Direct to Metal). ..................................................................................2525. High Build Epoxy, and Polyurethane Finish. ..............................................................................2526. Rust Lok Epoxy Mastic Primer, and Rust Lok Epoxy Mastic Finish............................................2627. Rust Lok Epoxy Mastic Primer, and High Build Epoxy Finish. ...................................................2628. Rust Lok Epoxy Mastic Primer, and High Gloss Epoxy. ..............................................................2629. Rust Lok Epoxy Mastic Primer, and Polyurethane Finish...........................................................2730. Rust Lok Epoxy Mastic Primer, and Alkyd Finish. ......................................................................2731. Rust Lok Epoxy Mastic Primer, and Acrylic Finish. .....................................................................2732. Rust Lok Epoxy Mastic Primer, and Epoxy Acrylic Finish...........................................................2833. Rust Lok Gloss Epoxy Mastic Primer, and Rust Lok Gloss Epoxy Mastic Finish. .......................2834. Rust Lok Gloss Epoxy Mastic Primer, and Epoxy Mastic Finish. ................................................2835. Rust Lok Gloss Epoxy Mastic Primer, and Gloss Epoxy Finish....................................................2936. High Heat Resistant Epoxy Primer, and High Heat Resistant Epoxy Finish..............................2937. 100% Solids Epoxy Rust Lok Primer, Polyurethane Finish.........................................................2938. Vinyl Wash Primer, and High Gloss Epoxy Finish.......................................................................3039. Vinyl Wash Primer, and Polyurethane Finish. ............................................................................3040. Vinyl Wash Primer, and Alkyd Finish. .........................................................................................3041. Vinyl Wash Primer, and Acrylic Finish.........................................................................................3142. Silicone Acrylic Primer, and Silicone Acrylic Finish. ...................................................................3143. Silicone Acrylic Zinc Primer, and Silicone Acrylic Finish.............................................................3144. Inorganic Zinc Primer, and Silicone Acrylic Finish......................................................................3245. Silicone Primer, and Silicone Finish.............................................................................................3246. Silicone Zinc Primer, and Silicone Finish.....................................................................................3247. Acrylic Latex Block Filler, and Acrylic Latex Finish.....................................................................3348. Water Based Alkyd Primer, and Water Based Alkyd Finish. .....................................................3349. Latex Roof Coating Primer, and Latex Roof Coating Finish. ....................................................3350. Latex Shop Coat Primer, and Latex Finish..................................................................................3451. Epoxy Floor System (Thin film). ..................................................................................................34

5

Page 8: Amer Coat Cat.qxd

PR

OD

UC

T O

FF

ER

IN

GS

Index to Coating SystemsNo. Page52. One Component Coal Tar (Oil & Gas Resistant). .......................................................................3553. Coal Tar Epoxy Primer, and Coal Tar Epoxy Finish.....................................................................3554. Epoxy Phenolic Primer, and Epoxy Phenolic Finish....................................................................3555. Epoxy Flake Filled Phenolic Primer, and Epoxy Flake Filled Phenolic Finish............................3656. Vinyl Ester Flake Filled Primer, and Vinyl Ester Flake Filled Finish. .........................................3657. Epoxy Repair Putty.......................................................................................................................3658. Pourable Epoxy Grout. ................................................................................................................3759. Reserved .......................................................................................................................................3760. Epoxy Novaloc Primer, and Epoxy Novaloc Finish. ....................................................................3761. Flexible Sprayable Epoxy Caulk. .................................................................................................3862. Quick Patch Epoxy Adhesive. ......................................................................................................3863. Degreaser/Cleaner (non-etching)................................................................................................3864. Chemical Cleaner (etching Type). ...............................................................................................3865. Rust Converter..............................................................................................................................3966. Reserved .......................................................................................................................................3967. DTM Polyurethane.......................................................................................................................3968. DTM Alkyd....................................................................................................................................4069. Automotive Epoxy Primer, and Polyurethane Finish.................................................................4070. Automotive Epoxy Primer, and Acrylic Finish. ...........................................................................4071. Inorganic Zinc...............................................................................................................................4172. FC Series 100% Solids Floor System............................................................................................4173. Latex Acrylic .................................................................................................................................4274. 100 % Solids Tank Linings (one coat).........................................................................................4275. CL 19 100% Solids Cargo Liner ...................................................................................................4276. Flexible Caulk ...............................................................................................................................4277. Epoxy Automotive Primer, Polyurethane Automotive Top Coat..............................................4378. Alkyd Spot Primer, Oil Alkyd Mid Coat, and Oil Alkyd Finish. .................................................4379. White Strippable Coating ...........................................................................................................4380. Potable Water Epoxy System ......................................................................................................4481. Degreaser, Epoxy Primer, and Polyurethane Finish. ..................................................................4482. Reserved .......................................................................................................................................4483. Jet Fuel System (4556D)...............................................................................................................4584. 100% Solids Epoxy Lining (non-laminating). .............................................................................4585. Epoxy with Glass Wrap................................................................................................................4586. Epoxy Primer ................................................................................................................................4687. High Build Epoxy Primer .............................................................................................................4688. Chemical Cleaner, Epoxy Primer, and Polyurethane Finish. ......................................................4689. Flake Filled Polyester. ..................................................................................................................4790. Alkyd Finish ..................................................................................................................................47

6

Page 9: Amer Coat Cat.qxd

PR

OD

UC

T O

FF

ER

IN

GS

TANK AND VESSEL RESTORATIONThe American Process is the spray-up application of 100% solids epoxy adhesive resins reinforced with chopped fiberglass applied to steel or masonry surfaces to 62 mils DFT.

1st Choice AlternateSystem No. System

RoofsUnderside Corrosion Protection (Floater) ....................................... 54 12, 33Underside Corrosion Protection (Fixed) .......................................... 54 12, 33Top Side - Leaking............................................................................. 2 37Painting ............................................................................................. 7 6, 20, 23, 25, 29 Patching ............................................................................................ 9 57

ShellsInterior - Metal Loss by Corrosion and Weather Seal Wear ......... 1 55, 53

Corrosion Protection ....................................................... 54 55, 53Exterior - Rivet and Seam Caulk ...................................................... 4 9

Painting............................................................................ 6, 20, 22, 23, 2527, 29, 31

Bottom Ring (on top of pad) .......................................................... 76

BottomsMetal Loss by Corrosion .................................................................. 1 4 or 9, then 54 or 55Pitted and Patching .......................................................................... 4 or 9 57Corrosion Protection - New Tanks, or Replacement Bottoms ....... 54 55, 53

7

Page 10: Amer Coat Cat.qxd

PR

OD

UC

T O

FF

ER

IN

GS

LIGHT INDUSTRIAL ATMOSPHERE

1st Choice AlternateSystem No. System

Structural Steel ................................................................................. 12-15, 68 11, 48, 50Piping to 180° F ................................................................................ 12-15, 68 11, 48, 50Piping 180° F to 300° F .................................................................... 43, 44 42Piping 300° F to 800° F .................................................................... 46 45Stacks and Furnaces to 1000° F ....................................................... 46 45Process Equipment to 180° F ........................................................... 12-15, 68 11, 48, 50Process Equipment 180° F to 300° F ............................................... 43, 44 42Process Equipment 300° F to 1000° F ............................................. 46 45Vessels, Exterior, to 180° F ............................................................... 12-15 11, 48, 50Storage Tanks, Exterior to 180° F .................................................... 12-14 48, 50Carbon Steel to be insulated .......................................................... 54, 53 12Carbon Steel Near Cooling Towers ................................................. 26, 27 53Carbon Steel 0° F to 50° F ............................................................... 54, 55 53Carbon Steel, Dock Facilities ........................................................... 26, 27 32, 28Poured Concrete .............................................................................. 26, 29, 31, 34 50Concrete Block ................................................................................. 31, 25, 29 50Masonry (Interior) ............................................................................ 31, 27 50Concrete Floors ................................................................................ 51 72Rivet and Sean Caulk, American Process ........................................ 4 9Rivet and Sean Caulk Mastic, Manual ............................................ 9 57Industrial and Equipment Enamels ................................................. 13-15 11, 50, 68Concrete Water Proof and Vapor Seal ........................................... 33, 31, 28, 29 47, 49Urethane Foam Water Proof and Vapor Seal ................................ 49Wood Water Proof and Vapor Seal ................................................ 49Steel Tank Lining, Chemical Service ................................................ 54 23Weathered Painted Metal Structures to be Painted ..................... 13, 14 11, 48, 50Overcoating Galvanized Metal ....................................................... 39-41 50, 48

8

Page 11: Amer Coat Cat.qxd

PR

OD

UC

T O

FF

ER

IN

GS

MILD CORROSIVE AREAS AND INLAND TO 150 MILES

1st Choice AlternateSystem No. System

Structural Steel.................................................................................. 12, 24, 26-35 13-18, 48, 50Piping to 180° F ................................................................................ 12, 24, 26, 27, 13-18, 48, 50Piping 180° F to 300° F .................................................................... 43, 44, 71 42Piping 300° F to 800° F .................................................................... 46, 71 45Stacks and Furnaces to 1000° F ....................................................... 46 45Process Equipment to 180° F ........................................................... 12, 24, 26-35 13-18, 48, 50Process Equipment 180° F to 300° F ............................................... 43, 71 44Process Equipment 300° F to 1000° F ............................................. 46 45Storage Tanks, Exterior to 180° F .................................................... 5, 8, 12, 26-36 13-18, 48, 50Vessels, Exterior to 180° F ............................................................... 5-8, 10, 11 20-23, 25-37 Carbon Steel to be Insulated .......................................................... 54, 53 71Cold Service 0° F to 50° F ................................................................. 8, 5 42Carbon Steel Near Cooling Towers ................................................. 26, 27 53Carbon Steel, Dock Facilities ........................................................... 26, 27 28, 32Poured Concrete .............................................................................. 26, 29, 31, 34 50Concrete Block ................................................................................. 31, 25, 29 50Masonry (Interior) ............................................................................ 31, 27 47Concrete Floors ................................................................................ 72 51Rivet and Seam Caulk, American Process ....................................... 4 9Rivet and Seam Caulk, Matstick, Manual ....................................... 9 57Industrial and Equipment Enamels ................................................. 13-18 48Concrete Water Proof and Vapor Seal ........................................... 33, 31, 28, 29 48Urethane Foam Water Proof and Vapor Seal ................................ 49Wood Water Proof and Vapor Seal ................................................ 49Steel Tank Lining - Chemical Service .............................................. 54Weathered Painted Metal Structures to be Painted ..................... 13, 14 11, 48, 50Over Coating Galvanized Metal ..................................................... 39, 40, 41 48, 50

9

Page 12: Amer Coat Cat.qxd

PR

OD

UC

T O

FF

ER

IN

GS

HEAVY CORROSIVE AREAS - ACID, ALKALINE, AND SEA COASTS TO 50MILES INLAND

1st Choice AlternateSystem No. System

Structural Steel ................................................................................. 5-8, 10 20-35, 37Piping up to180° F ........................................................................... 5-8, 10 20-35, 37Piping 180° F to 300° F .................................................................... 43, 44, 71 42Piping 300° F to 800° F .................................................................... 46 45Stacks and Furnaces to 1000° F ....................................................... 46 45Process Equipment to 180° F ........................................................... 5-8, 10 20-37Process Equipment 180° F to 300° F ............................................... 44, 43, 71 42Process Equipment 300° F to 1000° F ............................................. 46Storage Tank, Exterior, to 180° F .................................................... 6, 7 10, 20, 21Vessels, Exterior, to 180° F ............................................................... 5-8, 10 20-35, 37Carbon Steel to be Insulated .......................................................... 54, 71 53Cold Service 0° F to 50° F ................................................................. 8, 5 25, 27-29, 33,

37, 87Carbon Steel Near Cooling Towers ................................................. 20, 23 12Carbon Steel, Dock Facilities ........................................................... 5-8, 10 22, 27, 28Poured Concrete .............................................................................. 26, 29, 31, 34 50Concrete Block ................................................................................. 31, 25, 29 50Masonry (Interior) ............................................................................ 50 27Concrete Floors ................................................................................ 72 51Rivet and Seam Caulk, American Process ....................................... 4Rivet and Seam Caulk, Manual Application .................................. 9Industrial and Equipment Enamels ................................................. 13, 15, 16Concrete Water Proof and Vapor Seal ........................................... 49Urethane Foam Water Proof and Vapor Seal ................................ 49Wood Water Proof and Vapor Seal ................................................ 49Steel Tank Lining - Chemical Service .............................................. 54, 55, 56, 60 12Weathered Painted Metal Structures to be Painted ..................... 18, 26-41 50Over Coating Galvanized Metal ..................................................... 38-41 50

10

Page 13: Amer Coat Cat.qxd

PR

OD

UC

T O

FF

ER

IN

GS

MISCELLANEOUS

1st Choice AlternateSystem No. System

AUTOMOTIVEBed Liner .......................................................................................... 75Heavy Duty Haulers .......................................................................... 75Truck / Auto Painting / Trailers (exterior) ....................................... 69 70Undercoating ................................................................................... 53 52

BARRIERS / OBSTACLESRight of Ways ................................................................................... 90Fences ............................................................................................... 90Posts .................................................................................................. 90Markers ............................................................................................. 90

BUILDINGSGalvanized (slight rust) .................................................................... 39, 41, 22, 29, 49, 50

32Galvanized Roof................................................................................ 49 50Baked On .......................................................................................... 39 50Baked on Roof ................................................................................. 49 50Flat Roof ........................................................................................... 49Gutter Lining .................................................................................... 49

CONCRETEConcrete (Oil Soaked) ...................................................................... 88Concrete Patch ................................................................................. 58 57

CRANESCranes ............................................................................................... 68 67

FIRE TUBE COATINGFT Series ............................................................................................ 36 54

FLOOR COATINGSFC Series ............................................................................................ 72

FRAC TANKSExterior ............................................................................................. 21 29Interior .............................................................................................. 54, 56 84

ISOCYANATE FREE - TWO PARTGL Series ........................................................................................... 22, 32

JET FUEL LININGJet Fuel Lining (4556D) .................................................................... 83 54

MANUFACTURERS STANDARD PAINTManufactures Stand Paint (overcoating) ....................................... 14-18

MARINEFiberglass Boats ................................................................................ 69 67Aluminum Boats .............................................................................. 39 41Steel Boats ........................................................................................ 7 6Barges ............................................................................................... 6, 7 34-37

11

Page 14: Amer Coat Cat.qxd

PR

OD

UC

T O

FF

ER

IN

GS

MISCELLANEOUS

1st Choice AlternateSystem No. System

MISCELLANEOUSField Pipe Fence, Corrals................................................................... 29 88Ornamental Iron .............................................................................. 21 11, 13Galvanized Ornamental Iron ........................................................... 39, 38 40, 41

PILINGPiling New ........................................................................................ 53 89Piling Repairs .................................................................................... 57

PIPEInterior .............................................................................................. 86 87

PIPELINE JOINT REPAIRPipeline Joint Repair ........................................................................ 85 53, 76, 75

POTABLE WATER LININGPotable Water Lining ....................................................................... 80 54

SANDBLASTINGSandblasting not Permitted ............................................................ 26-37 13

SWIMMING POOLSSwimming Pool Paint ....................................................................... 22, 24

TANKS PRODUCTION (Interior)Old .................................................................................................... 1, 56 54New ................................................................................................... 1, 56 54Bottoms (Buried) .............................................................................. 52Pipe (Buried) ..................................................................................... 52

UNDERWATER EPOXYUnderwater Epoxy ........................................................................... 57

VARIOUS METALSAluminum, Galvanize ...................................................................... 39, 38 40, 41Stainless ............................................................................................ 21 29, 37Phosphotized .................................................................................... 81Galvaneal .......................................................................................... 88

12

Page 15: Amer Coat Cat.qxd

Specification System #1

Blue, Fiberglass and 100% Solids Epoxy System applied by the American Process SystemSolids by Volume: 100% Reactive and Non-Volatile.

Surface PreparationMinimum: SSPC-SP5 (Sa3) White Metal Sandblast or NACE No. 1Minimum: 3 - 4 mil anchor profile (75 to 100 microns).

PrimerAmerican Coatings EX 8300 Polyamide Catalyzed Epoxy. Applied to a 1/2 - 1 mil (12.5 - 25 microns) DFTTheoretical Coverage: 800 sq. ft. per gallon (19.72 m2 per liter @ 25 microns) Volume Solids: 50 %Primer is required in large tanks requiring several days’ sandblasting; EX 8300 must be applied atthe end of each day’s cleaning operation to prevent overnight rusting. Apply the followingcaulking and laminating resins direct to the cleaned steel whenever possible.

Caulk Rivets and SeamsAmerican Coatings TC 7 Epoxy Caulking Resin.Applied to a 62 mils (1550 microns) DFT. Theoretical Coverage: 26 linear feet per gallon (m2 per liter)Volume Solids: 100 %

Resin and Fiberglass: TL 1 Epoxy Laminating Resin.Apply with chopped fiberglass a 45 - 50 mils (1125 - 1250 microns) DFT.Theoretical Coverage: 32 sq. ft. per gallon @ 60 mils (.79 m2 per liter @ 1,250 microns)Volume Solids: 100 %

Gel Coat: TL 1 Epoxy Resin.Applied to a 12 mils (300 microns) DFT.Theoretical Coverage: 135 sq. ft. per gallon @ 12 mils (3.33 m2 per liter @ 300 microns)Volume Solids: 100 %

Total System Thickness: 57 - 62 mils (1425 - 1550 microns) minimum DFT.

Note: For practical coverage of this resin system, contact our office for quantity ofmaterials. For complete specification, patch, and leg detail, see catalog.

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

13

1

Page 16: Amer Coat Cat.qxd

Specification System #2 2

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

White, Fiberglass and 100% Solids Epoxy System applied by the AmericanProcess SystemSolids by Volume 100 % Reactive and Non-Volatile.

Surface PreparationMinimum: SSPC-SP5 (Sa3) White Metal Sandblast or NACE No. 1Minimum: 3 - 4 mil anchor profile (75 - 100 microns)

Primer American Coatings EX 8300 Polyamide Catalyzed Epoxy.Applied to a 1/2 - 1 mil (12.5 - 25 microns) DFTTheoretical Coverage: 1 mil 800 sq. ft./gallon @ 1 mil. (19.72 m2 per liter)Volume Solids: 50 % Primer is required in large tanks requiring several days’ sandblasting; EX 8300 must be applied atthe end of each day’s cleaning operation to prevent overnight rusting. Apply the followingcaulking and laminating resins direct to the cleaned steel whenever possible.

Caulk Rivets and Seams: American Coatings TC 7 Epoxy Caulking Resin Applied to a 62 mils (1550 microns) DFT.Theoretical Coverage: 26 lineal feet/gallon @ 62 mils.Volume Solids: 100 %

Resin and Fiberglass: TL 47 Laminating Resin Applied with chopped fiberglass to a 45 - 50 mils (11250-01250 microns) DFT.Theoretical Coverage: 32 sq. ft./gallon @ 60 mils (.78 m2 per liter @ 1250 microns)Volume Solids: 100 %

Gel Coat: TL 47 Laminating Resin Applied to a 12 mils (300 microns) DFT.Theoretical Coverage: 135 sq. ft./gallon @ 12 mils (3.33 m2 per liter @ 300 microns)Volume Solids: 100 %

Total System Thickness: 57 - 62 mils (1425 - 1550 microns) DFT.

Note: For practical coverage of this resin system, contact our office for quantity ofmaterials. For complete specification see catalog.

14

Page 17: Amer Coat Cat.qxd

Specification System #3 3

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Vinyl Ester and Fiberglass applied 100% solids with chopped or mat glassSolids by Volume: 100% Reactive and Non-Volatile.

Surface Preparation: Minimum: SSPC-SP5 (Sa3) White Metal Sandblast or NACE No. 1Minimum: 3 - 4 mil anchor profile (75 - 100 microns)

PrimerAmerican Coatings EX 8300 Polyamide Catalyzed Epoxy Iron Oxide Zinc Chromate Applied to a 1/2 - 1 mil (12.5 - 25 microns) DFTTheoretical Coverage: 800 sq. ft./gallon @ 1 mil (19.72 m2 per liter @ 25 microns).Volume Solids: 50 % Primer is required in large tanks requiring several days’ sandblasting; 1-830 must be applied at theend of each day’s cleaning operation to prevent overnight rusting. Apply the following caulkingand laminating resins direct to the cleaned steel whenever possible.

Caulk Rivets and SeamsAmerican Coatings TC 48 Vinyl Ester Caulking Resin Applied t o a 62 mils (1550 microns) DFT - sweep blast before glass application.Theoretical Coverage: 26 lineal feet/gallon @ 62 milsVolume Solids: 100 %

Resin and FiberglassAmerican Coatings TL 20 Laminating Resin Apply with chopped fiberglass or 1 1/2 oz fiberglass mat to a 45 - 50 mils (1125-1250 microns) DFT.Theoretical Coverage: 32 sq. ft./gallon @ 50 mils (0.79 m2 per liter @ 1250 microns).Volume Solids: 100 %

Gel Coat: TL 20 Laminating Resin Applied to a 12 mils (300 microns) DFT.Theoretical Coverage: 135 sq. ft./gallon @ 12 mils (3.33 m2 per liter @ 300 microns).Volume Solids: 100 %

Total System Thickness: 57 - 62 mils DFT (1425 - 1550 microns).

Note: Allow 20% to 25% shrinkage factor for each coat of CL 20 Vinyl Ester For practicalcoverage of this resin system, contact our office for quantity of materials.

15

Page 18: Amer Coat Cat.qxd

Specification System #5 5

Specification System #4 4

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

100% Rivet and Seam Caulking applied by the American ProcessSolids by Volume: 100% Reactive and Non-Volatile.

Surface Preparation: Minimum: SSPC-SP5 (Sa3) White Metal Sandblast or NACE No. 1Minimum: 3 - 4 mil anchor profile (75 - 100 microns)

Primer No primer required.

Caulk Rivets and SeamsAmerican Coatings TC 7 Epoxy Caulking Resin Applied to a 62 mils (1550 microns) DFTTheoretical Coverage: 26 sq. ft. per gallon @ 62 mils.Volume Solids: 100 %

Total System Thickness: 62 mils minimum. (1550 microns)

Warranty for Rivet and Seam Caulking SpecificationsThe spray-up method for applying American Coatings TC 7, Catalyzed Epoxy Adhesive, is coveredby the American Process Rivet and Seam Caulking Specifications.American Coatings, Tomball, Texas, guarantees only the American TC 7 Epoxy Adhesive to beformulated, manufactured and supplied in accordance with said specifications.The application of American TC 7 to rivets and seams by the American Process Method is the totalresponsibility of qualified and approved contractors. Guarantees for workmanship and applicationwill be given by the contractor.American Coatings LP does not recommend the following conditions without council and writtenagreements with a company representative:

1. Tank interior application of American Coatings TC 7 to interior rivets and seams exceptwhere top coated with TL 1 system or equal.

2. Application of American Coatings TC 7 to bolted tanks.

3. Overcoating American Coatings TC 7 with inorganic zinc rich primers.

4. Exterior or interior application of American Coatings TC 7 to rivet and seams of riveted tankswith added welded sheets. Also included are converted cone roof riveted tanks to floatingroof tanks.

Epoxy Zinc and Epoxy Mastic Finish.Surface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings AZ 83 Epoxy Zinc. Apply to a 3 - 6 mils (75 - 150 microns) DFT.Theoretical Coverage: 374 - 187 sq. ft. per gallon (9.20 - 4.6 m2 per liter @ 25 microns).Volume Solids: 70 %

Second CoatAmerican Coatings EM Series Finish. Apply to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 173 sq. ft. per gallon (6.4 - 4.27 m2 per liter @ 25 microns).Volume Solids: 65 %

Total System Thickness: 7 - 12 dry mils (175 - 300 microns).

16

Page 19: Amer Coat Cat.qxd

Specification System #7 7

Specification System #6 6

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Epoxy Zinc, Mid Coat Epoxy Mastic, and Polyurethane Finish.Surface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings AZ 83 Epoxy Zinc. Applied to a 3 - 6 mils (75 - 150 microns) DFT.Theoretical Coverage: 374 - 187 sq. ft. per gallon (9.2 - 4.6 m2 per liter @ 25 microns).Volume Solids: 70 %

Second CoatAmerican Coatings EM Series Intermediate. Applied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 173 sq. ft. per gallon (6.4 - 4.27 m2 per liter).Volume Solids: 65 %

Third CoatAmerican Coatings SU Series Finishes Applied to a 3 - 5 mils (75 - 125 microns) DFT.Theoretical Coverage: 331 - 198 sq. ft. per gallon (8.2 - 4.9 m2 per liter).Volume Solids: 59 - 62 %.

Total System Thickness: 10 - 17 dry mils (250 - 425 microns) DFT.

Inorganic Zinc, Mid Coat Epoxy Mastic, and Polyurethane Finish.Surface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings AZ 76 Epoxy Zinc. Applied to a 2.5 - 6 mils (62.5 - 150 microns) DFT.Theoretical Coverage: 436 - 182 sq. ft. per gallon (10.7 - 4.5 m2 per liter).Volume Solids: 68 %

Second CoatAmerican Coatings EM Series Intermediate. Applied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 173 sq. ft. per gallon (6.4 - 4.3 m2 per liter).Volume Solids: 65 %

Third CoatAmerican Coatings SU Series Finishes Applied to a 3 - 5 mils (75 - 125 microns) DFT.Theoretical Coverage: 331 - 198 sq. ft. per gallon (8.2 - 4.9 m2 per liter).Volume Solids: 62 %

Total System Thickness: 9.5 - 17 dry mils (237.5 - 425 microns).

17

Page 20: Amer Coat Cat.qxd

Specification System #8 8

Specification System #9 9

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Inorganic Zinc and High Build Epoxy Finish.Surface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings AZ 76 Epoxy Zinc. Apply to a 2.5 - 6 mils (62.5 - 150 microns) DFT.Theoretical Coverage: 436 - 182 sq. ft. per gallon (10.7 - 4.5 m2 per liter).Volume Solids: 68 %

Second CoatAmerican Coatings EM Series Finish. Apply to a 4 - 6 mils (100-150 microns) DFT.Theoretical Coverage: 260 - 173 sq. ft. per gallon (6.4 - 4.3 m2 per liter).Volume Solids: 65 %

Total System Thickness: 6.5 - 12 dry mils (162.5 - 300 microns) DFT.

100% Solids Hand Caulk for Rivets, Etc.Surface PreparationMinimum: SSPC-SP5 (Sa3) White Metal Sandblast or NACE 1

Caulk ApplicationAmerican Coatings TC 12 100 % Solids Epoxy CaulkMixing ratio: 2:1Applied to a 62 mils (1,550 microns) DFT.Theoretical Coverage: 1604 sq. ft. per gallon @ 1 mil

26 linear ft. per gallon @ 62 mils (1/4” bead)Volume Solids: 100 %

Finish CoatAny American Coatings product with the exception of inorganic zinc. It is necessary to brush blastfor enhanced adhesion when topcoating with alkyds.

18

Page 21: Amer Coat Cat.qxd

Specification System #10 10

Specification System #11 11

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Inorganic Zinc, Mid Coat High Build Epoxy, and Epoxy High Gloss Finish.Surface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings AZ 76 Inorganic Zinc. Applied to a 2.5 - 6 mils (62.5 - 150 microns) DFT.Theoretical Coverage: 436 - 182 sq. ft. per gallon (10.7 - 4.5 m2 per liter).Volume Solids: 68 %

Second CoatAmerican Coatings EM Series Intermediate. Applied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 173 sq. ft. per gallon (9.2 - 4.6 m2 per liter).Volume Solids: 65 %

Third CoatAmerican Coatings EX Series Finishes Applied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %

Total System Thickness: 8.5 - 15 dry mils (212.5 - 375 microns) DFT

Shop Coat Alkyd Primer, and Alkyd FinishSurface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings AK Series Heavy Duty Primer (AK3190 Red or AK3545 Gray)Applied to a 1.5 - 2.0 mils (37.5 - 50 microns) DFT.Theoretical Coverage: Varies 1

Volume Solids: Varies 1

Second CoatAmerican Coatings AK 7000 Series Finish. Applied to a 1.5 - 2.0 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 556 - 417 sq. ft. per gallon (13.7 - 10.3 m2 per liter).Volume Solids: 52 %

Total System Thickness: 4.5 - 6 dry mils (100 - 150 microns) DFT.

1 Varies per product, see data sheet (Tab 2 in catalog)

19

Page 22: Amer Coat Cat.qxd

Specification System #12 12

Specification System #13 13

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

High Build Epoxy Primer and High Build Epoxy FinishSurface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning PreferredSurfaces should be free of dust, dirt, oils, moisture and contaminates.

First CoatAmerican Coatings EM Series Epoxy Primer (EM 8301 Red, EM 8442 Gray)Applied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 178 sq. ft. per gallon (6.4 - 4.3 m2 per liter).Volume Solids: 65 %

Second CoatAmerican Coatings EM Series Epoxy Applied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 178 sq. ft. per gallon (6.4 - 4.3 m2 per liter).Volume Solids: 65 %

Total System Thickness: 8 - 12 dry mils (200 - 300 microns) DFT.

Alkyd Heavy Duty Primer, Alkyd Mid Coat, and Alkyd Finish.Surface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings AK Series Heavy Duty Primer (AK3190 Red or AK3545 Gray)Applied to a 1.5 - 2 mils (37.5 - 50 microns) DFT.Theoretical Coverage: Varies 1

Volume Solids: Varies 1

Second CoatAmerican Coatings AK 7000 Series Long Oil Finishes Applied to a 1.5 - 2 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 556 - 417 sq. ft. per gallon (13.7 - 10.3 m2 per liter).Volume Solids: 52 %

Third CoatAmerican Coatings AK 7000 Series Long Oil Finishes Applied to a 1.5 - 2 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 556 - 417 sq. ft. per gallon (13.7 - 10.3 m2 per liter).Volume Solids: 52 %

Total System Thickness: 4.5 - 6 dry mils (100 - 150 microns) DFT.

1 Varies per product, see data sheet (Tab 2 in catalog)

20

Page 23: Amer Coat Cat.qxd

Specification System #14 14

Specification System #15 15

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Modified Alkyd All Purpose Primer, Alkyd Mid Coat, and Alkyd Finish.Surface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings AK Series All Purpose Primer (AK 3550 Red or AK 3561 Gray)Applied to a 1 - 1.5 mils (25 - 37.5 microns) DFT.Theoretical Coverage: 609 - 406 sq. ft. per gallon (15 - 10 m2 per liter).Volume Solids: 38 %

Second CoatAmerican Coatings AK 7000 Series Finishes Applied to a 1.5 - 2 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 556 - 417 sq. ft. per gallon (13.7 - 10.3 m2 per liter).Volume Solids: 52 %

Third Coat OptionalAmerican Coatings AK 7000 Series Finishes Applied to a 1.5 - 2 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 556 - 417 sq. ft. per gallon (13.7 - 10.3 m2 per liter).Volume Solids: 52 %

Total System Thickness: 4.5 - 6 dry mils (100 - 150 microns) DFT.

Modified Alkyd All Purpose Primer, Acrylic Mid Coat, and Acrylic Finish.Surface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings AK Series All Purpose PrimerApplied to a 1 - 1.5 mils (25 - 37.5 microns) DFT.Theoretical Coverage: 609 - 406 sq. ft. per gallon (15 - 10 m2 per liter).Volume Solids: 38 %

Second CoatAmerican Coatings AE Series FinishesApplied to a 1.5 - 2 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 427 - 320 sq. ft. per gallon (10.5 - 7.9 m2 per liter).Volume Solids: 40 %

Third Coat OptionalAmerican Coatings AE Series Finishes Applied to a 1.5 - 2 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 427 - 320 sq. ft. per gallon (10.5 - 7.9 m2 per liter).Volume Solids: 40 %

Total System Thickness: 4 - 5.5 dry mils (100 - 137.5 microns) DFT.

AE Finishes can be catalyzed for better performance (see your American CoatingsRepresentative).

21

Page 24: Amer Coat Cat.qxd

Specification System #16 16

Specification System #17 17

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Modified Alkyd All Purpose Primer and SU Series Finish.Surface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings AK Series All Purpose PrimerApplied to a 1 - 1.5 mils (25 - 37.5 microns) DFT.Theoretical Coverage: 609 - 406 sq. ft. per gallon (15 - 10 m2 per liter).Volume Solids: 38 %

Second CoatAmerican Coatings SU Series Finishes 1 Applied to a 3 - 5 mils (75 - 100 microns) DFT.Theoretical Coverage: 338 - 198 sq. ft. per gallon (8.2 - 4.9 m2 per liter).Volume Solids: 62 %

Total System Thickness: 4 - 6.5 dry mils (100 - 137.5 microns) DFT.

1 Low VOC version (2.8 #/gal)PU Series also available

Modified Alkyd All Purpose Primer and High Build Epoxy Finish.Surface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings AK Series All Purpose PrimerApplied to a 1 - 1.5 mils (25 - 37.5 microns) DFT.Theoretical Coverage: 609 - 406 sq. ft. per gallon (15 - 10 m2 per liter).Volume Solids: 38 %

Second CoatAmerican Coatings EM Series Finishes Applied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 173 sq. ft. per gallon (6.4 - 4.3 m2 per liter).Volume Solids: 65 %

Total System Thickness: 5 - 7.5 dry mils (125 - 187.5 microns) DFT.

22

Page 25: Amer Coat Cat.qxd

Specification System #20 20

Specification System #18 18

Specification System #19 19

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Modified Alkyd All Purpose Primer, High Gloss Epoxy Mid Coat, and HighGloss Epoxy Finish.Surface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings AK Series All Purpose PrimerApplied to a 1 - 1.5 mils (25 - 37.5 microns) DFT.Theoretical Coverage: 609 - 406 sq. ft. per gallon (15 - 10 m2 per liter).Volume Solids: 38 %

Second CoatAmerican Coatings EX Series Finishes Applied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %

Third Coat OptionalAmerican Coatings EX Series Finishes Applied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %

Total System Thickness: 5 - 7.5 dry mils (125 - 187.5 microns) DFT.

Zinc Primer for Galvanize RepairSurface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings AZ 84 Liquid GalvanizeApplied to a 1 - 2 mils (25 - 50 microns) DFT.Theoretical Coverage: 592 - 296 sq. ft. per gallon (14.5 - 7.3 m2 per liter).Volume Solids: 37 %

Total System Thickness: 1 - 2 dry mils (25 - 50 microns) DFT.When topcoating use American Coatings WB Finishes.

Epoxy Primer, High Gloss Epoxy Mid Coat, and High Gloss Epoxy Finish.Surface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings EX Series PrimerApplied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %

Second CoatAmerican Coatings EX Series Finishes Applied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %

Third Coat OptionalAmerican Coatings EX Series Finishes Applied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %

Total System Thickness: 6 - 9 dry mils (150 - 225 microns) DFT. 23

Page 26: Amer Coat Cat.qxd

Specification System #21 21

Specification System #22 22

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Epoxy Primer, Polyurethane Mid Coat, and Polyurethane Finish.Surface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings EX Series PrimerApplied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %

Second CoatAmerican Coatings SU Series Finishes Applied to a 3 - 5 mils (75 - 125 microns) DFT.Theoretical Coverage: 322 - 193 sq. ft. per gallon (7.9 - 4.7 m2 per liter).Volume Solids: 59 - 62 %

Third Coat OptionalAmerican Coatings SU Series Finishes Applied to a 3 - 5 mils (75 - 125 microns) DFT.Theoretical Coverage: 338 - 198 sq. ft. per gallon (8.2 - 4.9 m2 per liter).Volume Solids: 62 %

Total System Thickness: 8 - 13 dry mils (200 - 325 microns) DFT.

Epoxy Primer, and Epoxy Acrylic Finish.Surface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings EX Series PrimerApplied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %

Second CoatAmerican Coatings GL Series Finishes Applied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: Varies 1

Volume Solids: Varies 1

Total System Thickness: 6 - 9 dry mils (150 - 225 microns) DFT.

1 Varies per product, see data sheet (Tab 6 in catalog)

24

Page 27: Amer Coat Cat.qxd

Specification System #23 23

Specification System #24 24

Specification System #25 25

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

High Build Epoxy Primer, High Gloss Epoxy Mid Coat, and High GlossEpoxy Finish.Surface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings EM 8301 Red Epoxy PrimerApplied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 173 sq. ft. per gallon (6.4 - 4.3 m2 per liter).Volume Solids: 65 %

Second CoatAmerican Coatings EX Series Finishes Applied to a 2 - 3 mils (50 -75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61%

Third Coat OptionalAmerican Coatings EX Series Finishes Applied to a 2 - 3 mils (50 -75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %

Total System Thickness: 8 - 12 dry mils (200 - 300 microns) DFT.

High Build Epoxy DTMSurface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings EM 8301 Red Epoxy PrimerApplied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 173 sq. ft. per gallon (6.4 - 4.3 m2 per liter).Volume Solids: 65 %

Total System Thickness: 4 - 6 dry mils (100 - 150 microns) DFT.

High Build Epoxy, and Polyurethane Finish.Surface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings EM 8301 Red Epoxy PrimerApplied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 173 sq. ft. per gallon (6.4 - 4.3 m2 per liter).Volume Solids: 65 %

Second CoatAmerican Coatings SU Series Finishes Applied to a 3 - 5 mils (75 - 125 microns) DFT.Theoretical Coverage: 360 - 198 sq. ft. per gallon (8.2 - 4.9 m2 per liter).Volume Solids: 59 - 62 %.

Total System Thickness: 7 - 11 dry mils (175 - 275 microns) DFT.

25

Page 28: Amer Coat Cat.qxd

Specification System #26 26

Specification System #28 28

Specification System #27 27

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Rust Lok Epoxy Mastic Primer, and Rust Lok Epoxy Mastic Finish.Surface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings RL 1464 Marginal Surface Primer/FinishesApplied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 187 - 140 sq. ft. per gallon (4.6 - 3.5 m2 per liter).Volume Solids: 70 %

Second CoatAmerican Coatings RL 1464 Marginal Surface Primer/FinishesApplied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 187 - 140 sq. ft. per gallon (4.6 - 3.5 m2 per liter).Volume Solids: 70 %

Total System Thickness: 12 - 16 dry mils (300 - 400 microns) DFT.

Rust Lok Epoxy Mastic Primer, and High Build Epoxy Finish.Surface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings RL 1464 Marginal Surface Primer/FinishesApplied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 187 - 140 sq. ft. per gallon (4.6 - 3.5 m2 per liter).Volume Solids: 70 %

Second CoatAmerican Coatings EM Series FinishesApplied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 173 sq. ft. per gallon (6.4 - 4.3 m2 per liter).Volume Solids: 65 %

Total System Thickness: 10 - 14 dry mils (250 - 350 microns) DFT.

Rust Lok Epoxy Primer, and High Gloss EpoxySurface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings RL 1464 Marginal Surface Primer/FinishesApplied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 187 - 140 sq. ft. per gallon (4.6 - 3.5 m2 per liter).Volume Solids: 70 %

Second CoatAmerican Coatings EX Series FinishesApplied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %

Total System Thickness: 8 - 11 dry mils (200 - 275 microns).

26

Page 29: Amer Coat Cat.qxd

Specification System #29 29

Specification System #30 30

Specification System #31 31

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Rust Lok Epoxy Mastic Primer, and Polyurethane FinishSurface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings RL 1464 Marginal Surface Primer/FinishesApplied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 187 - 140 sq. ft. per gallon (4.6 - 3.5 m2 per liter).Volume Solids: 70 %

Second CoatAmerican Coatings SU Series Finishes Applied to a 3 - 5 mils (75 - 125 microns) DFT.Theoretical Coverage: 338 - 198 sq. ft. per gallon (8.2 - 4.9 m2 per liter).Volume Solids: 59 - 62 %

Total System Thickness: 9 - 13 dry mils (225 - 325 microns) DFT.

Rust Lok Epoxy Mastic Primer, and Alkyd FinishSurface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings RL 1464 Marginal Surface Primer/Finishes Applied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 187 - 140 sq. ft. per gallon (4.6 - 3.5 m2 per liter).Volume Solids: 70 %

Second CoatAmerican Coatings AK 4000 Series Finishes or AK 6000 Series Finishes Only.Applied to a 2 - 3 mils (150 - 200 microns) DFT.Theoretical Coverage: Varies 1Volume Solids: 32 - 35 %

Total System Thickness: 8 - 10 dry mils (200 - 250 microns) DFT.

Rust Lok Epoxy Mastic Primer, and Acrylic FinishSurface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings RL 1464 Marginal Surface Primer/FinishesApplied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 187 - 140 sq. ft. per gallon (4.6 - 3.5 m2 per liter).Volume Solids: 70 %

Second CoatAmerican Coatings AE Series FinishesApplied to a 1.5 - 2 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 427 - 320 sq. ft. per gallon (10.5 - 7.9 m2 per liter).Volume Solids: 40 %

Total System Thickness: 7.5 - 10 dry mils (187.5 - 250 microns) DFT.

27

Page 30: Amer Coat Cat.qxd

Specification System #32 32

Specification System #34 34

Specification System #33 33

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Rust Lok Epoxy Mastic Primer, and Epoxy Acrylic FinishSurface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings RL 1464 Marginal Surface Primer/FinishesApplied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 187 - 140 sq. ft. per gallon (4.6 - 3.5 m2 per liter).Volume Solids: 70 %

Second Coat American Coatings GL Series Finishes Applied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: Varies 1Volume Solids: Varies 1

Total System Thickness: 10 - 14 dry mils (250 - 350 microns) DFT.

1 Varies per product, see data sheet (Tab 6 in catalog)

Rust Lok Gloss Epoxy Mastic Primer, and Rust Lok Gloss Epoxy MasticFinishSurface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings RL 8000 Marginal Surface Primer/FinishesApplied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 213 - 160 sq. ft. per gallon (5.2 - 3.9 m2 per liter).Volume Solids: 80 %

Second CoatAmerican Coatings RL 8000 Marginal Surface Primer/FinishesApplied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 213 - 160 sq. ft. per gallon (5.2 - 3.9 m2 per liter).Volume Solids: 80 %

Total System Thickness: 12 - 16 dry mils (300 - 400 microns) DFT.

Rust Lok Gloss Epoxy Mastic Primer, and High Build Epoxy FinishSurface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings RL 8000 Marginal Surface Primer/FinishesApplied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 213 - 160 sq. ft. per gallon (5.2 - 3.9 m2 per liter).Volume Solids: 80 %

Second CoatAmerican Coatings EM Series FinishesApplied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 173 sq. ft. per gallon (6.4 - 4.3 m2 per liter).Volume Solids: 65 %

Total System Thickness: 10 - 14 dry mils (250 - 350 microns) DFT.

28

Page 31: Amer Coat Cat.qxd

Specification System #35 35

Specification System #37 37

Specification System #36 36

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Rust Lok Gloss Epoxy Mastic Primer, and Gloss Epoxy FinishSurface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings RL 8000 Marginal Surface Primer/FinishesApplied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 213 - 160 sq. ft. per gallon (5.2 - 3.9 m2 per liter).Volume Solids: 80 %

Second CoatAmerican Coatings EX Series FinishesApplied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %

Total System Thickness: 8 - 11 dry mils (200 - 275 microns) DFT.

High Heat Resistant Epoxy Primer, and High Heat Resistant Epoxy FinishSurface PreparationMinimum: SSPC-SP5 (Sa3) White Metal Sandblast or NACE No. 1

First CoatAmerican Coatings FT 13838 Fire Tube CoatingApplied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 168 - 112 sq. ft. per gallon (5.2 - 3.9 m2 per liter).Volume Solids: 42 %

Second CoatAmerican Coatings FT 13838 Fire Tube CoatingApplied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 168 - 112 sq. ft. per gallon (5.2 - 3.9 m2 per liter).Volume Solids: 42 %

Total System Thickness: 8 - 12 dry mils (200 - 300 microns) DFT.

100 % Solids Epoxy Mastic Primer, and Polyurethane FinishSurface PreparationMinimum: SSPC-SP6 (Sa2) Commerical Blast Cleaning

First CoatAmerican Coatings RL 9000 Marginal Surface Primer/FinishesApplied to a 10 - 15 mils (150 - 200 microns) DFT.Theoretical Coverage: 160 - 106 sq. ft. per gallon (3.9 - 2.6 m2 per liter).Volume Solids: 100 %

Second CoatAmerican Coatings SU Series Finishes Applied to a 3 - 5 mils (75 - 125 microns) DFT.Theoretical Coverage: 331 - 198 sq. ft. per gallon (8.2 - 4.9 m2 per liter).Volume Solids: 62 %

Total System Thickness: 13 - 20 dry mils (325 - 500 microns) DFT.

29

Page 32: Amer Coat Cat.qxd

Specification System #38 38

Specification System #40 40

Specification System #39 39

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Vinyl Wash Primer, and High Gloss Epoxy FinishSurface PreparationMinimum: Properly Cleaned Galvanized Metal or Aluminum

First CoatAmerican Coatings WP 9521 Vinyl Wash PrimerApplied to a 0.2 - 0.5 mils (5 - 12.5 microns) DFT.Theoretical Coverage: 401 - 160 sq. ft. per gallon (9.9 - 3.9 m2 per liter).Volume Solids: 5 %

Second CoatAmerican Coatings EX Series FinishesApplied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %

Total System Thickness: 2.2 - 3.5 dry mils (55 - 87.5 microns) DFT.

Vinyl Wash Primer, and Polyurethane FinishSurface PreparationMinimum: Properly Cleaned Galvanized Metal or Aluminum

First CoatAmerican Coatings WP 9521 Vinyl Wash PrimerApplied to a 0.2 - 0.5 mils (5 - 12.5 microns) DFT.Theoretical Coverage: 401 - 160 sq. ft. per gallon (9.9 m2 per liter).Volume Solids: 5 %

Second CoatAmerican Coatings SU Series Finishes Applied to a 3 - 5 mils (75 - 125 microns) DFT.Theoretical Coverage: 331 - 198 sq. ft. per gallon (8.2 - 4.9 m2 per liter).Volume Solids: 62 %

Total System Thickness: 3.2 - 5.2 dry mils (80 - 130 microns) DFT.

Vinyl Wash Primer, and Alkyd FinishSurface PreparationMinimum: Properly cleaned Galvanized Metal or Aluminum

First CoatAmerican Coatings WP 9521 Vinyl Wash PrimerApplied to a 0.2 - 0.5 mils (5 - 12.5 microns) DFT.Theoretical Coverage: 401 - 160 sq. ft. per gallon (9.9 - 3.9 m2 per liter).Volume Solids: 5 %

Second CoatAmerican Coatings AK Series Finishes Applied to a various 1.5 - 2.0 mils (37.5 - 50 microns) DFT.Theoretical Coverage: Varies 1

Volume Solids: Varies 1

Total System Thickness: 1.7 - 2.5 dry mils (42.5 - 62.5 microns) DFT.

1 Varies per product, see data sheet (Tab 2 in catalog)

30

Page 33: Amer Coat Cat.qxd

Specification System #41 41

Specification System #43 43

Specification System #42 42

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Vinyl Wash Primer, and Acrylic FinishSurface PreparationMinimum: Properly cleaned Galvanized Metal or Aluminum

First CoatAmerican Coatings WP 9521 Vinyl Wash PrimerApplied to a 0.2 - 0.5 mils (5 - 12.5 microns) DFT.Theoretical Coverage: 401 - 160 sq. ft. per gallon (9.9 - 3.9 m2 per liter).Volume Solids: 5 %

Second CoatAmerican Coatings AE Series Finishes Applied to a 1.5 - 2.0 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 427 - 320 sq. ft. per gallon (10.5 - 7.9 m2 per liter).Volume Solids: 40 %

Total System Thickness: 1.7 - 2.5 dry mils (42.5 - 62.5 microns) DFT.

Silicone Acrylic Primer, and Silicone Acrylic FinishSurface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings SAC Series Primer/FinishesApplied to a 1 mils (25 microns) DFT.Theoretical Coverage: 513 sq. ft. per gallon (12.61 m2 per liter).Volume Solids: 32 %

Second CoatAmerican Coatings SAC Series Primer/FinishesApplied to a 1 mils (25 microns) DFT.Theoretical Coverage: 513 sq. ft. per gallon (12.61 m2 per liter).Volume Solids: 32 %

Total System Thickness: 2 dry mils (50 microns) DFT.

Silicone Acrylic Zinc Primer, and Silicone Acrylic FinishSurface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings SAC 237 Zinc PrimerApplied to a 1 mils (25 microns) DFT.Theoretical Coverage: 513 sq. ft. per gallon (12.61 m2 per liter).Volume Solids: 32 %

Second CoatAmerican Coatings SAC Series Primer/FinishesApplied to a 1.0 mils (25 microns) DFT.Theoretical Coverage: 513 sq. ft. per gallon (12.61 m2 per liter).Volume Solids: 32 %

Total System Thickness: 2 dry mils (50 microns) DFT.

31

Page 34: Amer Coat Cat.qxd

Specification System #44 44

Specification System #45 45

Specification System #46 46

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Inorganic Zinc Primer, and Silicone Acrylic FinishSurface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings AZ 76 Inorganic ZincApplied to a 2.5 mils (62.5 microns) DFT.Theoretical Coverage: 436 - 182 sq. ft. per gallon (10.67 - 4.5 m2 per liter).Volume Solids: 68 %

Second CoatAmerican Coatings SAC Series Primer/FinishesApplied to a 1.0 mils (25 microns) DFT.Theoretical Coverage: 513 sq. ft. per gallon (12.61 m2 per liter).Volume Solids: 32 %

Total System Thickness: 3.5 dry mils (87.5 microns) DFT.

Silicone Primer, and Silicone FinishSurface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings SL Series Primer FinishesApplied to a 1 mils (25 microns) DFT.Theoretical Coverage: 513 sq. ft. per gallon (12.61 m2 per liter).Volume Solids: 32 %

Second CoatAmerican Coatings SL Series Primer FinishesApplied to a 1.0 mils (25 microns) DFT.Theoretical Coverage: 513 sq. ft. per gallon (12.61 m2 per liter).Volume Solids: 32 %

Total System Thickness: 2 dry mils (50 microns) DFT.

Silicone Zinc Primer, and Silicone FinishSurface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings SL 231 Zinc Primer Applied to a 1.5 - 2.0 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 513 - 385 sq. ft. per gallon (12.6 - 9.5 m2 per liter).Volume Solids: 48 %

Second CoatAmerican Coatings SL Series Primer/Finishes Applied to a 1.0 mils (25 microns) DFT.Theoretical Coverage: 513 sq. ft. per gallon (12.6 m2 per liter).Volume Solids: 32 %

Total System Thickness: 2.5 - 3 dry mils (62.5 - 75 microns) DFT.

32

Page 35: Amer Coat Cat.qxd

Specification System #47 47

Specification System #49 49

Specification System #48 48

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Acrylic Latex Block Filler, and Acrylic Latex FinishSurface PreparationMinimum: Water Blast to remove all dirt & dust.

First CoatAmerican Coatings WB Series Block FillerApplied to a 10 - 12 mils (250 - 300 microns) DFT.Theoretical Coverage: 80 - 67 sq. ft. per gallon (2.0 - 1.6 m2 per liter).Volume Solids: 50 %

Second CoatAmerican Coatings WB FinishesApplied to a 1.5 - 2.0 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 513 - 385 sq. ft. per gallon (12.6 - 9.5 m2 per liter).Volume Solids: 48 %

Total System Thickness: 11.5 - 14 dry mils (287.5 - 350 microns) DFT.

Water Based Alkyd Primer, and Water Based Alkyd FinishSurface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings HW 3001 Red Oxide Waterbased Latex PrimerApplied to a 1.5 - 2.0 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 342 - 257 sq. ft. per gallon (8.4 - 6.3 m2 per liter).Volume Solids: 32 %

Second CoatAmerican Coatings HW, AW, or WB Series Waterbase FinishApplied to a 1 - 1.5 mils (25 - 37.5 microns) DFT.Theoretical Coverage: 561 - 374 sq. ft. per gallon (13.8 - 9.2 m2 per liter).Volume Solids: 35 %

Total System Thickness: 2.5 - 3.5 dry mils (62.5 - 87.5 microns) DFT.

Latex Roof Coating Primer, and Latex Roof Coating FinishSurface PreparationMinimum: Spot primed surface (AK 3190), water blasting is recommended to

remove dust, dirt, or old coatings prior to application.

First CoatAmerican Coatings WB 11528Applied to a 10 - 12 mils (250 - 300 microns) DFT.Theoretical Coverage: 83 - 69 sq. ft. per gallon (2.1 - 1.7 m2 per liter).Volume Solids: 52 %

Second CoatAmerican Coatings WB 11528Applied to a 10 - 12 mils (250 - 300 microns) DFT.Theoretical Coverage: 83 - 69 sq. ft. per gallon (2.1 - 1.7 m2 per liter).Volume Solids: 52 %

Total System Thickness: 20 - 24 dry mils (500 - 600 microns) DFT.

33

Page 36: Amer Coat Cat.qxd

Specification System #50 50

Specification System #51 51

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Latex Shop Coat Primer, and Water Based Latex FinishSurface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings HW Series PrimerApplied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 300 - 225 sq. ft. per gallon (5.5 - 2.7 m2 per liter) Volume Solids: 28%

Second CoatAmerican Coatings WB Latex FinishApplied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: Varies 1Volume Solids: Varies 1

Total System Thickness: 4 - 6 mils (100 - 150 microns) DFT.

1 Varies per product, see data sheet

Epoxy Floor System (Thin Film)Surface PreparationMinimum: Allow new concrete surfaces to age approx. 30 days in order to bedry enough to promote good adhesion. Blast to a 1 - 2 mil anchor profile or chemical clean andetch with American Coatings TH 950 Chemical Cleaner. When using American Coatings TH 950Chemical Cleaner apply with roller or mop to all surfaces to be coated and allow to be in contactwith the concrete for 30 - 45 minutes. After the cleaner has done it’s work, wash thoroughly withfresh water to remove. After concrete is dry, it may be necessary to sweep or buff and remove anydust left after this etching/cleaning step.

First CoatAmerican Coatings EX Series Epoxy that has been thinned 50% with TH 760 Epoxy Reducer.Applied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %Allow 8 - 10 hours for penetration and curing before application of final coat. This step shouldseal the pores of the concrete to assure an even glossy finish. Application can be rolled on orsprayed.

Second CoatAmerican Coatings EX Series Epoxy that has been thinned 5 - 10% with TH 760 Epoxy Reducer orjust enough to allow product to flow evenly. Applied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %Avoid excess build-up in sharp corners and allow 8 - 10 hours before putting into service.

Third Coat (Optional)American Coatings EX Series Epoxy that has been thinned 5 - 10% with TH 760 Epoxy Reducer orjust enough to allow product to flow evenly. Applied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %Avoid excess build-up in sharp corners and allow 8 - 10 hours before putting into service.

Total System Thickness: 4 - 9 dry mils (150 - 225 microns) DFT.

Note: Aggregate for non-slip surfaces is available from American Coatings.

34

Page 37: Amer Coat Cat.qxd

Specification System #52 52

Specification System #54 54

Specification System #53 53

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

One Component Coal Tar (Oil & Gas Resistant)Surface PreparationMinimum: SSPC-SP3 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings CT 1120 Coal Tar MasticApplied to a 12 - 15 mils (30 - 375 microns) DFT.Theoretical Coverage: 50 - 40 sq. ft. per gallon (1.2 - 1.0 m2 per liter).Volume Solids: 38 %

Total System Thickness: 12 - 15 dry mils (300 - 375 microns) DFT.

Coal Tar Epoxy Primer and Coal Tar Epoxy Finish.Surface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings EX 8330 Coal Tar EpoxyApplied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 189 - 142 sq. ft. per gallon (4.6 - 3.5 m2 per liter).Volume Solids: 71 %

Second CoatAmerican Coatings EX 8330 Coal Tar EpoxyApplied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 189 - 142 sq. ft. per gallon (4.6 - 3.5 m2 per liter).Volume Solids: 71 %

Total System Thickness: 12 - 16 dry mils (300 - 400 microns) DFT.

Epoxy Phenolic Primer, and Epoxy Phenolic FinishSurface PreparationMinimum: SSPC-SP5 (Sa3) White Metal Sandblast or NACE No. 1

First CoatAmerican Coatings EP 8500 Green Epoxy PhenolicApplied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 174 sq. ft. per gallon (6.4 - 4.3 m2 per liter).Volume Solids: 65 %

Second CoatAmerican Coatings EP 8520 Gray Epoxy PhenolicApplied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 174 sq. ft. per gallon (6.4 - 4.3 m2 per liter).Volume Solids: 65 %

Total System Thickness: 8 - 12 dry mils (200 - 300 microns) DFT.

* NOT FOR EXTERIOR USE (Yellowing)

35

Page 38: Amer Coat Cat.qxd

Specification System #55 55

Specification System #57 57

Specification System #56 56

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Epoxy Flake Filled Phenolic Primer, and Epoxy Flake Filled Phenolic FinishSurface PreparationMinimum: SSPC-SP5 (Sa3) White Blast or NACE No. 1Minimum: 2 mil anchor profile

First CoatAmerican Coatings EP 8505 Gray Flake Epoxy PhenolicApplied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 174 - 130 sq. ft. per gallon (4.3 - 3.2 m2 per liter).Volume Solids: 65 %

Second CoatAmerican Coatings EP 8525 Green Flake Epoxy PhenolicApplied to a 6 - 8 mils (150 - 200 microns) DFT.Theoretical Coverage: 174 - 130 sq. ft. per gallon (4.3 - 3.2 m2 per liter).Volume Solids: 65 %

Total System Thickness: 12 - 16 dry mils (300 - 400 microns) DFT.

Vinyl Ester Flake Filled Primer, and Vinyl Ester Flake Filled FinishSurface PreparationMinimum: SSPC-SP5 (Sa3) White Metal Blast CleaningMinimum: 3 - 4 mil anchor profile

First CoatAmerican Coatings TL 41 Flake Vinyl Ester Applied to a 12 - 15 mils (300 - 375 microns) DFT.Theoretical Coverage: 134 - 107 sq. ft. per gallon (3.3 - 2.6 m2 per liter).Volume Solids: 100 %

Second CoatAmerican Coatings TL 41 Flake Vinyl Ester Applied to a 12 - 15 mils (300 - 375 microns) DFT.Theoretical Coverage: 134 - 107 sq. ft. per gallon (3.3 - 2.6 m2 per liter).Volume Solids: 100 %

Total System Thickness: 24 - 30 dry mils (600 - 750 microns) DFT.

*ALLOW 20% FOR SHRINKAGE

Epoxy Repair PuttySurface PreparationMinimum: SSPC-SP2 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings CL - 10 AdhesiveApplied to a 1/4” DFT.Theoretical Coverage: 1 gallon = 231 cubic inchesVolume Solids: 100 %Claw Lok 10 is a two-part gray epoxy putty (1:1 ratio). It cures to a hard, solid plastic surface. Itcan be trimmed, shaped with tools, or smoothed after curing.

UsesIdeal for bonding dissimilar metals, patching tanks, patching and filling pitted valves, pumps, lowpressure steam lines, radiators, cast iron pipes, and water tanks. Use with steel patches forrepairing the interior or exterior of tanks. Excellent for patching cracks in concrete.

Total System Thickness: Unlimited

*CAN BE APPLIED UNDERWATER

36

Page 39: Amer Coat Cat.qxd

Specification System #58 58

Specification System #60 60

Specification System #59 59

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Pourable Epoxy GroutSurface PreparationMinimum: 1 1/2 - 3 mil anchor profile on concrete or steel surfaces

First CoatAmerican Coatings CL - 30 Epoxy GroutApplied up to 4 inches without reinforcementTheoretical Coverage: 0.5 cubic feet per unitVolume Solids: 100 %A specially developed gray grout offering enhanced bonding properties when used with existingoil free concrete. Has exceptional strength, negligible linear shrinkage, and low water absorption.Good resistance to organic acids, oils, and solvents.

Total System Thickness: Unlimited

• THIS PRODUCT CAN BE USED FOR LEVELING COMPRESSORS, PUMPS, AND ENGINES. ALWAYSPOUR USING CAULKED FORMS FOR BEST RESULTS.

Reserved

Epoxy Novalac Primer, and Epoxy Novalac FinishSurface PreparationMinimum: SSPC-SP5 (Sa3) White Metal Blast CleaningMinimum: 2 - 3 mil anchor profile

First CoatAmerican Coatings TL 1471 Tan Flake Novalac Applied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 289 - 192 sq. ft. per gallon (7.1 - 4.7 m2 per liter)Volume Solids: 72 %

Second CoatAmerican Coatings TL 10329 Gray Epoxy Novalac Applied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 289 - 192 sq. ft. per gallon (7.1 - 4.7 m2 per liter)Volume Solids: 72 %

Total System Thickness: 8 - 12 dry mils (200 - 300 microns) DFT.

37

Page 40: Amer Coat Cat.qxd

Specification System #61 61

Specification System #63 63

Specification System #62 62

Specification System #64 64

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Flexible Sprayable Epoxy and CaulkSurface PreparationMinimum: 1 1/2 to 3 mil anchor profile on concrete or steel surfaces

First CoatAmerican Coatings CL8C Applied to a 1/4 to 1-inch thickness.Theoretical Coverage: 6.4 - 1.6 sq. ft. per gallonVolume Solids: 100 %CL8C is a Tan Epoxy Putty. It cures to a tough rubber like substance with excellent flexibility andgood adhesive properties.Recommended for concrete expansion joints, where resistance to spillage of oils, solvents orchemicals is important. Extremely useful in patching floor cracks, bolted steel joints, areas wherevibration is a problem. Spray formula (CL8S) is excellent for sealing the exterior curb of storagetanks between the concrete pad and the steel bottom.

Quick Patch Epoxy AdhesiveSurface PreparationMinimum: Sand, or power tool to roughen surfaces

First CoatAmerican Coatings CL 31Applied to a 1/16 to 1/4-inch DFT.Theoretical Coverage: 12. - 6.4 sq. ft. per gallon (1 gallon = 231 cubic inches).Volume Solids: 100 %

Total System Thickness: 62 dry mils (1550 microns) DFT.

* FOR WEAK OR SLOW LEAKS ON TANKS AND VESSELS CL-31 MUST BE BRIDGED OVER BYANOTHER CLAW LOK PRODUCT FOR BEST RESULTS.

Degreaser/Cleaner (non-etching)First CoatAmerican Coatings TH 150 DegreaserMix 4 - 5 ounces of TH 150 per gallon of water.Theoretical Coverage: 300 sq. ft. per gallon.Volume Solids: N/A Apply by pressure washer, pump sprayer, mop, brush, or broom. Rinse off with clean fresh water.

Chemical Cleaner (Etching type)Surface PreparationMinimum: SSPC-SP2 (St3) Power Tool Cleaning

SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings TH 950 Chemical Cleaner and Acid EtchTheoretical Coverage: 300 sq. ft. per gallon (7.4 m2 per liter).Volume Solids: N/A Apply by pump sprayer, mop, brush, or broom. Rinse off with clean fresh water, and allow to drybefore coating. Allow to sit on concrete surfaces 30 to 45 minutes and remove with water.

38

Page 41: Amer Coat Cat.qxd

Specification System #65 65

Specification System #67 67

Specification System #66 66

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Rust ConverterSurface PreparationMinimum: For best results wire brush to remove dirt and loose rust.

First CoatAmerican Coatings RL 101 Rust Converter Applied to a 1 mil (25-microns) DFT.Theoretical Coverage: 465 sq. ft. per gallon (11.4 m2 per liter).Volume Solids: 29 %

Second CoatAmerican Coatings RL 101 Rust Converter Applied to a 1 mil (25-microns) DFT.Theoretical Coverage: 465 sq. ft. per gallon (11.4 m2 per liter).Volume Solids: 29 %

Total System Thickness: 2 dry mils (50 microns) DFT.*Serves as a primer and can receive a solvent based topcoat. *Waterbased products not recommended as a topcoat.

NOTE:Apply both coats simultaneously in order to completely wet out old rust.

Reserved

DTM PolyurethaneSurface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings SU DTM Series PolyurethaneApplied to a 3 - 5 mils (75 - 125 microns) DFT.Theoretical Coverage: 320 - 192 sq. ft. per gallon (7.8 - 4.7 m2 per liter).Volume Solids: 60 %Total System Thickness: 3 - 5 dry mils (75 - 125 microns) DFT.

* FOR BEST RESULTS BE SURE TO APPLY THE SU DTM COATING 2 - 3 MILS DRY IN ACCESS OFTHE ANCHOR PROFILE ACHIEVED.

39

Page 42: Amer Coat Cat.qxd

Specification System #68 68

Specification System #70 70

Specification System #69 69

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

DTM AlkydSurface PreparationMinimum: SSPC-SP2 (St2) Hand Tool Cleaning

SSPC-SP2 (St3) Power Tool Cleaning

First CoatAmerican Coatings AK Series FinishApplied to a 1.5 - 2.0 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 374 - 280 sq. ft. per gallon (9.2 - 6.9 m2 per liter).Volume Solids: 35 %

Total System Thickness: 1.5 - 2 dry mils (37.5 - 50 microns) DFT.

Automotive Epoxy Primer, and Polyurethane FinishSurface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings AX 8733 Gray or AX 8730 Red Automotive Epoxy Primer Applied to a 1.5 - 2.0 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 470 - 353 sq. ft. per gallon (11.6 - 8.7 m2 per liter).Volume Solids: 44 %Mixing Ratio: 4:1

Second CoatAmerican Coatings SU Series Polyurethane Applied to a 3 - 5 mils (75 - 125 microns) DFT.Theoretical Coverage: 331 - 198 sq. ft. per gallon (8.2 - 4.9 m2 per liter).Volume Solids: 62 %

Total System Thickness: 4.5 - 7 dry mils (112.5 - 175 microns) DFT.

Automotive Epoxy Primer, and Acrylic FinishSurface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings AX 8733 Gray Automotive Epoxy Primer Applied to a 1.5 - 2.0 mils ( 37.5 - 50 microns) DFT.Theoretical Coverage: 470 - 353 sq. ft. per gallon (11.6 - 8.7 m2 per liter).Volume Solids: 44 %

Second CoatAmerican Coatings AE Acrylic FinishApplied to a 1.5 - 2.0 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 428 - 321 sq. ft. per gallon (10.5 - 7.9 m2 per liter).Volume Solids: 40 %

Total System Thickness: 3 - 4 dry mils (75 - 100 microns) DFT.

*For best results catalyze the AE Finish. See your American Coatings representative.

40

Page 43: Amer Coat Cat.qxd

Specification System #72 72

Specification System #71 71

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Inorganic ZincSurface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings AZ 76 Inorganic Zinc PrimerApplied to a 2.5 - 6.0 mils (62 - 150 microns) DFT.Theoretical Coverage: 436 - 182 sq. ft. per gallon (10.7 - 4.5 m2 per liter).Volume Solids: 68 %

Total System Thickness: 2.5 - 6.0 dry mils (62 - 150 microns) DFT.

FC Series Floor SystemSurface PreparationMinimum: New Concrete surfaces should be allowed to dry for 28 days. ShotBlast or Blast Trac the floor for maximum coatings adhesion. Acceptable also is a chemicalcleaning. Use American Coatings TH 950 Chemical Cleaner to remove oil, grease, and etch theconcrete surfaces. Allow TH 950 Chemical Cleaner to react 30 to 45 minutes on the concretesurfaces. Remove by fresh water wash, taking care to remove acid completely. Allow to dry andbuff or sweep up any loose dust that remains on the concrete surface.

First CoatAmerican Coatings FC Series EpoxyApplied to a 10 - 20 mils (250 - 250 microns) DFT.Theoretical Coverage: 160 - 80 sq. ft. per gallon (3.9 - 2.0 m2 per liter) @ 10 - 15 mils percoat.Volume Solids: 100 %

Second CoatAmerican Coatings FC Series EpoxyApplied to desired thickness.Theoretical Coverage: 160 - 80 sq. ft. per gallon (3.9 - 2.0 m2 per liter) @ 10 - 15 mils percoat.Volume Solids: 100 %Avoid excess build-up in sharp corners and allow 8 - 10 hours before putting into service.

NOTE:Should you decide to roll the epoxies, make sure that you use a short haired napindustrial roller. FC Series Epoxies have a pot life of approx. 30 minutes.

Total System Thickness: Minimum 18 - 35 dry mils (450 - 875 microns) DFT.

• Non slip aggregate is available from American Coatings

41

Page 44: Amer Coat Cat.qxd

Specification System #73 73

Specification System #76 76

Specification System #75 75

Specification System #74 74

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

LatexSurface PreparationMinimum: Surfaces to be clean and dust free.

First CoatAmerican Coatings WB Acrylic Latex FinishApplied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: Varies 1

Volume Solids: Varies 1

Total System Thickness: 2 - 3 dry mils.

1 Varies per product, see data sheet

100 % Solids Tank Lining (One Coat)Surface PreparationMinimum: SSPC-SP5 (Sa3) White Metal Blast Cleaning

First CoatAmerican Coatings TL 13506 Gray 100% Solids Tank LiningApplied to a 15 - 20 mils (375 - 500 microns) DFT.Theoretical Coverage: 107 - 80 sq. ft. per gallon (2.6 - 2.0 m2 per liter).Volume Solids: 100 %Total System Thickness: 15 - 20 dry mils (375 - 500 microns) DFT.

• Holiday test recommended.

• This product should be applied pin hole free. Striping should first be done then a pin holefree coating should be applied.

CL-19 100% Solids Cargo LinerSurface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatAmerican Coatings CL-19 100% Solids Cargo LinerApplied to a 1/8 - 1/2 inch DFT (1 gal = 231 cubic inches).Volume Solids: 100 %

Total System Thickness: 1/8 - 1/2 inch

• Product sprayed with special plural component machinery heated to approx. 120 - 135° F

Flexible CaulkSurface PreparationMinimum: SSPC-SP6 (Sa2) Commercial Blast Cleaning

First CoatCLSC Flexible Epoxy CaulkApplied to a 1/8 - 1/2 inch DFT (1 gal = 231 cubic inches).Volume Solids: 100 %

Total System Thickness: 1/8 - 1/2 inch

• Product sprayed with special plural component equipment

42

Page 45: Amer Coat Cat.qxd

Specification System #77 77

Specification System #79 79

Specification System #78 78

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Epoxy Automotive Primer, and Polyurethane Automotive Top CoatSurface PreparationMinimum: Sand all surfaces to be coated to improve adhesion then solvent wipewith American Coatings TH 315 thinner to remove any gel coat release wax that may be present.

First CoatAmerican Coatings AX 8733 Gray Automotive Epoxy Primer Applied to a 1.5 - 2 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 408 - 321 sq. ft. per gallon (11.6 - 8.7 m2 per liter).Volume Solids: 44 %

Second CoatAmerican Coatings AU Series Acrylic PolyurethaneApplied to a 1.5 - 2 mils (523 - 314 microns) DFT.Theoretical Coverage: 200 - 134 sq. ft. per gallon (4.9 - 3.3 m2 per liter).Volume Solids: 50 %

Total System Thickness: 3 - 4 mils (75 - 100 microns) DFT.

Alkyd Spot Primer, Alkyd Oil Mid Coat, and Alkyd Oil FinishSurface PreparationMinimum: Pressure wash all areas to be coated

PrimerAmerican Coatings AK 3190Applied to a 2 mils (50 microns) DFT.Theoretical Coverage: 344 sq. ft. per gallon (8.5 m2 per liter).Volume Solids: 43 %

First CoatAmerican Coatings AK 3280 Galvanized Iron PrimerApplied to a 1.5 - 2 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 460 - 345 sq. ft. per gallon (11.3 - 8.5 m2 per liter).Volume Solids: 43 %

Second CoatAmerican Coatings AK 3280 Galvanized Iron PrimerApplied to a 1.5 - 2 mils (37.5 - 50 microns) DFT.Theoretical Coverage: 460 - 345 sq. ft. per gallon (11.3 - 8.5 m2 per liter).Volume Solids: 43 %

Total System Thickness: 5 - 6 mils (125 - 150 microns) DFT.

White Strippable CoatingSurface PreparationMinimum: Clean and degrease all surfaces to be coated.

First CoatAmerican Coatings WB 7777 White Strippable CoatingApplied to 5 mils (125 microns) DFT.Theoretical Coverage: 154 sq. ft. per gallon (3.8 m2 per liter).Volume Solids: 48 %

Total System Thickness: 5 mils (125 microns) DFT.

43

Page 46: Amer Coat Cat.qxd

Specification System #80 80

Specification System #82 82

Specification System #81 81

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

NSF 61 (Potable Water)Surface PreparationMinimum: SSPC-SP5 (Sa3) White Metal Sandblast or NACE No. 1

First CoatAmerican Coatings EM 4650 Tan High Build Epoxy Applied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 173 sq. ft. per gallon (6.4 - 4.3 m2 per liter).Volume Solids: 65 %

Second CoatAmerican Coatings EM 4651 White High Build EpoxyApplied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 260 - 173 sq. ft. per gallon (6.4 - 4.3 m2 per liter).Volume Solids: 65 %

Total System Thickness: 8 - 12 mils (200 - 300 microns) DFT.

Degreaser, Epoxy Primer, and Polyurethane FinishSurface PreparationMinimum: Clean thoroughly with American Coatings TH 150 or TH 200 Cleaner /Degreaser. Wash with water (not necessary with TH 200).

First CoatAmerican Coatings EM, EX, RL, or AX Series Epoxy Primer to recommended thickness.Applied to correct milage on Spec Sheet (Varies 1) Theoretical Coverage: Varies 1

Volume Solids: Varies 1

Second CoatAmerican Coatings PU, SU, AU, or VU Series.Applied to correct milage on Spec Sheet (Varies 1) Theoretical Coverage: Varies 1

Volume Solids: Varies 1

Total Thickness: 6 - 9 mils (150 - 225 microns) DFT.

1 Varies per product, see data sheet (Tab 6 in catalog)

Reserved

44

Page 47: Amer Coat Cat.qxd

Specification System #83 83

Specification System #85 85

Specification System #84 84

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Jet Fuel System (4556D)Surface PreparationMinimum: SSPC-SP5 (Sa3) White Metal Sandblast or NACE No. 1

First CoatAmerican Coatings EM 4654 Applied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 706 - 529 sq. ft. per gallon (17.6 - 11.8 m2 per liter).Volume Solids: 44 %

Second CoatAmerican Coatings EM 4654 Applied to a 4 - 6 mils (100 - 150 microns) DFT.Theoretical Coverage: 706 - 529 sq. ft. per gallon (17.6 - 11.8 m2 per liter).Volume Solids: 44 %

Total System Thickness: 8 - 12 mils (200 - 300 microns) DFT.

100% Solids Epoxy Lining (non laminating)Surface PreparationMinimum: SSPC-SP5 (Sa3) White Metal Sandblast or NACE No. 1

Stripe CoatAmerican Coatings TL 12721Applied to all welds and hard to coat areas first.Theoretical Coverage: 1604 sq. ft. per gallon (39.7 m2 per liter).Volume Solids: 100 %

Primer CoatAmerican Coatings TL 12721Applied to a 10 - 20 mils (250 - 500 microns) DFT.Theoretical Coverage: 160 - 80 sq. ft. per gallon (3.9 - 2.0 m2 per liter).Volume Solids: 100 %

Finish CoatAmerican Coatings TL 12721Applied to a 10 - 20 mils (250 - 500 microns) DFT.Theoretical Coverage: 160 - 80 sq. ft. per gallon (3.9 - 2.0 m2 per liter).Volume Solids: 100 %

Total System Thickness: 20 - 40 mils (500 - 1000 microns) DFT.

Epoxy with Glass WrapSurface PreparationMinimum: SSPC-SP3 (St2) Manual Cleaning

First CoatAmerican Coatings TL 1Applied to a 10 - 12 mils (250 - 300 microns) DFT.Theoretical Coverage: 160 - 134 sq. ft. per gallon (3.9 - 3.3 m2 per liter).Volume Solids: 100 %

Second CoatAmerican Coatings TL 1 with glass tapeApplied to a 55 mils (1375 microns) DFT.Theoretical Coverage: 160 - 134 sq. ft. per gallon (3.9 - 3.3 m2 per liter).Volume Solids: 100 %

Third CoatAmerican Coatings TL 1Applied to a 10 - 12 mils (250 - 300 microns) DFT.Theoretical Coverage: 160 - 134 sq. ft. per gallon (3.9 - 3.3 m2 per liter).Volume Solids: 100 %

Total System Thickness: Approx. 60 - 75 mils (1500 - 1875 microns) DFT.45

Page 48: Amer Coat Cat.qxd

Specification System #86 86

Specification System #88 88

Specification System #87 87

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Epoxy PrimerSurface PreparationMinimum: SSPC-SP2 (St2) Hand Tool Cleaning

First CoatAmerican Coatings EX 8300 Epoxy Primer Applied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %

Total System Thickness: 4 - 6 mils (50 - 75 microns) DFT

Reserved

Chemical Cleaner, Epoxy Primer, and Polyurethane FinishSurface PreparationMinimum: SSPC-SP2 (St2) Hand Tool Cleaning

PreparationApply American Coatings TH 950 Chemical Cleaner to all surfaces to be painted, allow to set 1hour, then wash off with fresh water. Will not work on painted surfaces.

First CoatAmerican Coatings EX 8300 Epoxy Primer Applied to a 2 - 3 mils (50 -75 microns) DFT.Theoretical Coverage: 489 - 326 sq. ft. per gallon (12 - 8 m2 per liter).Volume Solids: 61 %

Second CoatAmerican Coatings PU, SU, AU, or VU SeriesApplied to a 2 - 3 mils (50 - 75 microns) DFT.Theoretical Coverage: Varies 1

Volume Solids: Varies 1

Total Thickness: 4 - 6 mils (100 - 150 microns) DFT.

1 Varies per product, see data sheet (Tab 6 in catalog).

46

Page 49: Amer Coat Cat.qxd

Specification System #89 89

Specification System #90 90

SP

EC

IF

IC

ATIO

N S

YS

TE

MS

Flake Glass PolyesterSurface PreparationMinimum: SSPC-SP10 (Sa2 1/2) Near-White Blast Cleaning

First CoatAmerican Coatings TL 15 Flake Glass Filled Polyester (Isopthalic)Applied to a 12 - 15 mils (300 - 375 microns) DFT.Theoretical Coverage: 134 - 107 sq. ft. per gallon (3.3 - 2.6 m2 per liter).Volume Solids: 100 % *

Second CoatAmerican Coatings TL 15 Flake Glass Filled Polyester (Isopthalic)Applied to a 12 - 15 mils (300 - 375 microns) DFT.Theoretical Coverage: 134 - 107 sq. ft. per gallon (3.3 - 2.6 m2 per liter).Volume Solids: 100 % *

Total System Thickness: 24 - 30 mils (600 - 750 microns) DFT.

* Has 20% Shrinkage

Alkyd FinishSurface PreparationMinimum: Surface free of dirt, dust, and grease

First CoatAmerican Coatings AK 6000, AK 4000, AK 7000 SeriesApplied to a 1.5 - 2.0 mils (37.5 - 50 microns) DFT.Theoretical Coverage: Varies 1

Volume Solids: Varies 1

Second Coat (Optional)American Coatings AK 6000, AK 4000, AK 7000 SeriesApplied to a 1.5 - 2.0 mils (37.5 - 50 microns) DFT.Theoretical Coverage: Varies 1

Volume Solids: Varies 1

Total System Thickness: 1.5 - 4.0 mils (37.5 - 100 microns) DFT.

1 Varies per product, see data sheet (Tab 5 in catalog).

47

Page 50: Amer Coat Cat.qxd
Page 51: Amer Coat Cat.qxd
Page 52: Amer Coat Cat.qxd

AMERICANCOATINGSP.O. Box 1426Tomball, Texas 77377-1426800.749.7080281.351.1776281.351.6348 Fax