Upload
laila-ammar
View
242
Download
1
Tags:
Embed Size (px)
DESCRIPTION
Selected work from my Graduate and Undergraduate studies in Architecture.
Citation preview
LAILA AMMARARCHITECT.+.DESIGNER
SELECTED WORK SAMPLES
Index 02-03
Depth Conception (Thesis)
JetBlue Terminal
Lovell Guest House
Cultural Center
Global Art Academy
OTR Art Center
04-09
10-19
20-23
24-27
28-37
38-43
(# of ppl) ACADEMIC
Michael McInturf Architects
FRCH Design Worldwide
Gensler Hospitality
FME Design + Arch
SHP Leading Design
44-51
52-55
56-57
58-59
60-61
PROFESSIONAL (pg #)
(pg #)
03
Professors - Jeff Kipnis, Rob Livesey
SITE : Cincinnati, Ohio
PROMPT : Choose a competition to use as a platform to express your personal design agenda. (Used as part of Thesis Argument)
RESPONSE: I chose the Evolo Skyscraper competition which has few parameters but calls for an innovative solution to the vertical design problem. The loose restrictions enabled me to pursue my interests that range from fantastical, graphic, form making which plays with the transition between 2D and 3D to the realities that I feel ground Architecture such as structure, environment, context, and program. This competition entry was a springboard for my Exit Review talk “Depth Conception” which was given at Knowlton Hall April 8th 2014
SPRING STUDIO 2014EVOLO SKYSCRAPER#FigureField #DepthConception #Competition #2d3d
STRUCTURAL DIAGRAM>>
STEEL FRAMEIntegrated Water Collection & Drainage
SOUTH FACING CURTAINWALL
SUPERSTRUCTURE
RIGID SPACE TRUSS FLOORS SPANNING CORES
INTERMEDIATE FLOORSVariations of Tension Hung & Interior Column Support
RIGID SPACE TRUSS FLOORS SPANNING CORES
INTERMEDIATE FLOORSVariations of Tension Hung & Interior Column Support
STEEL STRUCTURAL PODSInfill :: Glass & Composite Panels
05
<<SOUTH PERSPECTIVEThe style of rendering speaks to its fantastical, futuristic ideals (a sort of homage to Mies van der Rohes Friedrichstrasse)
INTERIOR PERSPECTIVE>>
<<SOUTH AERIALIcons of the city
0607
RIVER PURIFICATION & ON-SITE AGRICULTURE::Living Machines//Aquaponics
Tidal Pools 1-3
Wetland A1&2
Wetland B1&2
FishTank
FishTank
Growing Beds
Growing Beds
Polluted River Intake
Clean Water to River
Greyw
ater for Tower
Fish & P
roduce for Restaurant &
Market
SphereInherently Voluminous
3D Op.Mold
3D FormAggregate (landscape)
3D FormRE-Aggregate (tower)
CONCEPT DIAGRAM>>
RIVER PURIFICATION & ON-SITE AGRICULTURE :: Living Machines/ /Aquaponics >>
3D Op.Compress
2d FormRetain Section
2d Op.Outline
2D=3DGraphic Projection
2D Op.Slice
3D Op.Displace
<<SECTION PERSPECTIVE
09
Partner - Natalie SnyderProfessor - Justin Diles
SITE : New York, New York at JFK airport directly connected to Eero Saarinen’s TWA Terminal.
PROMPT: Design a terminal for Jet Blue Airlines that relates to (touches, covers, shares space with, etc...) the existing TWA terminal as it stands today. The design should stem from a process of field object studies that will create an aggregated, volumetric, architectural shell. Incorporate way-finding strategies to create a clear sequence of arrivals.
RESPONSE: By aggregating many cellular boulders into one larger object we found a way to achieve a hierarchy of spaces that ultimately became a cohesive composition. The “riverstones” are situated so that where they cross the ground plane, enclosed volumes can be experienced. Inversely, where they don’t meet the ground, users experience them as an undulating ceilingscape. The concept of “riverstones” also helps organize the circulation creating a flow that directs travelers seamlessly to their destination while creating
SPRING STUDIO 2013JETBLUE TERMINAL#FieldObject #TWA #Wayfinding #Ceilingscape
11
LONGITUDINAL SECTION >>
<<EARLY FORM STUDIES
//LARGE PHYSICAL SECTION MODEL
13
\\SITE PLAN
//PHYSICAL MASSING MODEL
//LARGE PHYSICAL SECTION MODEL
\\TRANSVERSE SECTION
15
<<TEXTURE & LIGHTING PHOTOGRAPHS
//INTERIOR OF PHYSICAL SECTION MODEL
17
Op/Admin SpaceIn Bound
Out BoundSpatial Arrival (entrance)
Concessionsdirect to check-inmain entrance
kiosks
check-
in desk
s
check-
in desk
s
check-in desks
check-in desks
SECURITY CHECK-POINT
entrance
seating
shopping/dining/info
entrance
BAGGAGE CLAIM
car-rentals
exit
dining
outdoordining
seating/waiting
seating/waiting
seating/waiting
lost baggage
exit
a1
a2a3
a4
a5
a6
b1 b2
b3
b4 b5
b6b7 b8
b9
b12b13
b14
b10
b11
food c
ourt
food
food
to garage/air tran
pick-up
Operations/Administration
Operations/Administration
//WAYFINDING DIAGRAM
UPUP UPUP
\\FLOOR PLANS
19
Professor - Doug Graf
SITE : Newport Beach, California situated next to Rudolf Schindler’s Lovell Beach House. It is an oceanfront property that overtime has found itself in a tightly packed neighborhood. However, when the Lovell House was first designed it sat alone with the sand of the beach flowing right up underneath it.
PROMPT: Design a guest house that includes a living area, kitchenette, a place to eat, a restroom, and two bedrooms.
RESPONSE: The plot to the east of the house was once owned by the Lovell’s. Assuming their retention of that land, the new guest house is situated on that plot aligned to the alley to create a courtyard facing the beach front. As the frames of Schindler’s design march along, they transform from creating a frame for space to enabling a cellular arrangement. Sharing the edge with the most cellular facade, the guest house becomes a series of floating elements attached to a new type of framework. Rather than a very porous frame, the guest house has a solid wall that turns the corner and organizes main circulation paths along and around it.
FALL STUDIO 2013 (pt.1)LOVELL GUEST HOUSE#2wks #ModernAesthetic #LinkageToAutonomy
>>EXISTING PICTURES OF LOVELL HOUSE (library of congress historic buildings survey)
\\REAR PERSPECTIVE
21
THE LOVELL GUEST HOUSE
North Elevation
Ground Floor
Laila Ammar
South Elevation
First Floor
East Elevation
Second Floor
West Elevation
Roof
THE
OR
IGIN
AL
HO
US
E
Section BSection A
A
A
BB
0’ 5’
10’ 20’
N
THE LOVELL GUEST HOUSE
North Elevation
Ground Floor
Laila Ammar
South Elevation
First Floor
East Elevation
Second Floor
West Elevation
Roof
THE
OR
IGIN
AL
HO
US
E
Section BSection A
A
A
BB
0’ 5’
10’ 20’
N
THE LOVELL GUEST HOUSE
North Elevation
Ground Floor
Laila Ammar
South Elevation
First Floor
East Elevation
Second Floor
West Elevation
Roof
THE
OR
IGIN
AL
HO
US
E
Section BSection A
A
A
BB
0’ 5’
10’ 20’
N
\\ELEVATIONS
//FLOOR PLANS
West South
North East
\\PHYSICAL MODEL PHOTOS
//SECTIONS
East/West North/South
23
Professor - Doug Graf
SITE : Columbus, Ohio
RESPONSE: With such a large program, this design breaks up its components to create a renaissance village with its organization (albeit contemporary in its style). The arrangement creates a circulation narrative that lends itself to continuous discovery in an extroverted loop.
A large street brings the user up through the site, presenting different facades for entry points or views into the building. The street terminates into the keystone of the program, the Library. However, through a small reveal one can skirt past the library and find themselves in a hidden garden. With the sectional variation of the street running through the site, one could also enter on the south side into a lobby which compresses underneath the street and creates new entry points to the program related above. This is also where you will find the beginning of the gallery sequence that takes you further down, down, down - until you reach a sunken garden back on the west street front. This then presents you with the beginning of the street that you must have missed by entering on the south.
FALL STUDIO 2013 (pt.2)CULTURAL CENTER
DN
T H E A T R E
CA
FE
GALLER IES
V I E W
LIB
RA
RY
T H E A T R E
CA
FE
GALLER IES
LIB
RA
RY
S C H O O L
T E R R A C E
APARTMENTS
\\PHYSICAL MODEL
>>CIRCULATION DIAGRAMS
#OneMonth #Cultural #NarrativeCirculation
DN
T H E A T R E
CA
FE
GALLER IES
V I E W
LIB
RA
RY
T H E A T R E
CA
FE
GALLER IES
LIB
RA
RY
S C H O O L
T E R R A C E
APARTMENTS
25
<<VIGNETTES
\\SOUTH-EAST AERIAL
\\PHYSICAL MODEL VIEWS
DN
D
DN
D
DN
D
DN
D29 resident’s terrace28 apartments27 library26 studios25 classrooms
DN
D
08 racquetball courts07pool06 gym05 back of house04 theatre03 galleries02 event lobby (a)01 school lobby
15 event lobby (b)14 gallery shop13 cafe12 director’s offices11 conference10 language labs09 faculty offices
24 theatre mezzanine23 outdoor seating / sculpture garden22 resident’s event room21 event room terrace20 apartment entry19 library18 faculty offices17 studios16 classrooms
08
07
02
01
06
05
09
10
1112
13
1415
1617
18
19
20
21
2223
24
2526
27
2829
05
0403
0303
SECOND FLOOR
FIRST FLOOR
THIRD FLOOR
FOURTH FLOOR
4TH/6TH FL.TYP.
27
Partners - Yana Grinblat & Michael TomasoProfessors - Rob Livesey & Bart Overley
SITE : Yellow Springs, Ohio
PROMPT: Just as the last century’s tycoons sought to play out their wealth and power through the formation of The American Academy in Rome, the new generation of mega-patrons seek to make a mark with a collection of Art Academies placed internationally. With the given city, choose a site and design an academy for artists to live and work.
RESPONSE: With existing paths and a stream leading right to it, our selected site extends the experience of any user hiking, biking, rowing, or even horseback riding through Glen Helen. In this natural atmosphere we wanted to explore the powerful effect of providing a stark contrast - THE CUBE. The cube is dissected into two parts. The larger outer form has crashed into the site and shattered from its rigidity, creating an abstract interpretation of a geometrical tree canopy. The smaller cube that was carved away retains its pure geometric form and though it does not take on the form of the woods, it looms out over the stream and reflects its
FALL STUDIO 2012GLOBAL ART ACADEMY#ComprehensiveStudio #CubePotential #Objectness
29
LIBRARY : 4400 sf -reading room, offices, cataloging, & storage
ART GALLERIES : 1400 sf -wall, floor, and hanging space
RESIDENCE -1&2 bedroom apartments to accommodate 50 people
STUDIOS -sculpture, vis.art, arch., landscape, design, music performance and composition, writing, history, art history, & film
COMMON SPACES : 10,000 -dining, kitchen, gaming, lounging, cafe
ADMINISTRATION -director and asst. director offices, conference, reception, waiting, restrooms
SERVICE -laundry, IT, server room, building services, storage
//PROGRAM AXON
\\FORMAL ARRANGEMENT
MASSING
20MASSING 31
//SOUTH ELEVATION
//EAST WEST SECTION
[ [
BU
IL
DI
NG
.SK
IN
S [ [ [[ [ [OUTER SHELL: Random Cut Faces CANTED PORTICO: Vertical STUDIO CUBE: Pure Grid
//PHYSICAL MODEL
33
circulation core
post-tensioned concrete slabs
one way reinforced concrete slabs
reinforced concrete walls
inset slanted columns
circulation cores
site cast concrete frame
cantilevered truss
columns along curtainwall
one way reinforced concrete slabs
//STRUCTURAL AXON
//GALLERY PERSPECTIVE
//CAFETERIA PERSPECTIVE//LOUNGE PERSPECTIVE
35
\\SOUTH EAST PERSPECTIVE
//FLOOR PLANS
37
Professor - Ming Tang
SITE : Pendleton, Cincinnati, Ohio is the eastern edge of Over the Rhine (OTR), the largest, most intact urban historic district in the United States. Pendleton is considered OTR’s art district and houses the existing art center. This area is majority low income, non-home owners. However, OTR has seen major revitalization and a surge in small businesses in the past four years.
PROMPT: On an urban site in Cincinnati, use the potential of parametric thinking and tools as a resource for achieving diversity and complexity in urban form generation to design a new Pendleton Art Center. Total of 32,000 Sq. Ft.
RESPONSE: The design strives to align itself with the organization’s mission of ”encouraging and nurturing artistic creativity, by providing a supportive and inspiring environment for artists.” The programmatic adjacencies focus on a studio based environment with flexible gallery space. To interact with the iconic corner of Pendleton, the form gestures toward the “OTR Bell Tower.” To emphasize the relationship to its site, the interior grand stair bleeds into the landscape and a fragmented, ribbon like, tensile structure slinks through the landscape and up onto the building. The ribbons placement was based on solar studies from Vasari. The building skin was derived from the combination of a manual division of the faces and a parametric grasshopper definition. With color mapping, views and privacy were considered and
SPRING STUDIO 2012O.T.R. ART CENTER#ComputationalDesign #CommunityAccess #Gestural
39
\\SITE PLAN
Second Floor
retailgrand stairstoragekitchenmultipurpose roomrestroomspatioworkspacemech.classrooms/lecture hallslobby/gallery
galleryofficescomputer lablibrarybalconyrestroomsclassroomsconference roomsmech.
010203040506070809
0102030405060708091011
01 010202
03
04
05
06
06
07
07
08
08
09
01
01
01
01
02
0304
05
0606
07
0809
09
10
10
11
First Floor
//FLOOR PLANS
41
\\COLOR MAPPING PRIVACY & VIEWS
//ELEVATIONS
//INTERIOR GALLERY PERSPECTIVE
\\STREET SIDE PERSPECTIVE
43
Office Location: Cincinnati, Ohio
In this small office of roughly 8 people (+/-) I quickly took on various responsibilities stretching across all aspects of a design practice, challenging my creative and practical boundaries. I have also had the fortune of working on variable project types: Educational Facilities, Hospitality(F&B), Residential, Commercial (Mixed-Use) as well as speculative work. The four projects sampled here are as follows:
Business Club (Anonymous): Design Lead40,000 SF Co-Working+Wellness+Restaurant
CCDS Athletic Center: Project Manager/ArchitectNatatorium/Facilities Renovation + 5,000 SF Entry
CCDS Early Childhood Center: Design/Production8,000 SF 18mo-5 yr old Multi-Purpose Education Facility
ACADIA Pavilion: Logistics, Physical ModelsExhibit Entry & Anticipated Design Build
ARCHITECT (Aug.‘15-Current)Michael McInturf Architects#IterativeDesign #DigitalFabrication #LocalAgitator
//MASSING STUDIES
Business Club (Anonymous)
45
//MASSING STUDIES
<<EXTERIOR CONCEPT RENDERING
<<CONSTRUCTION PHOTOS
//EAST ELEVATION
//SOUTH ELEVATION
//NORTH ELEVATION
CCDS Early Childhood Center
<<CONSTRUCTION PHOTOS
//EAST ELEVATION
//SOUTH ELEVATION
//NORTH ELEVATION
47
//EXTERIOR PERSPECTIVE//ENTRY ADDITION INTERIOR PERSPECTIVE
//MASSING PARTI
//NATATORIUM INTERIOR PERSPECTIVE
CCDS Athletic Center Renovation & Addition
//EXTERIOR PERSPECTIVE
49
//EXHIBIT TEXT EXCERPT //PAVILION RENDERING
//PHYSICAL MASSING MODEL
05
‘WOODPRINTS’MARGEN-LAB + MICHAEL MCINTURF ARCHITECTS
DESIGN DRAWINGS
01 - ACCESS RAMP 02 - BASE FRAME 03 - WALLS AND OPENNINGS
04 - POLYPS 05 - SUPERIOR RINGS 06 - SHUTTERS
Section
Plan
5.2ft
11.2ft 6.49ft
18ft
38ft
14.8ft
10.7
sqf
1.4 ft
4.59 ft
7.87 ft
19 ft
21.3 ft
27.9 ft
Laye
rs /
Phas
es 0
1-03
La
yers
/ Ph
ases
04-
06
ACADIA Pavilion
//PAVILION SECTION
//PHYSICAL SECTION MODEL51
#RetailDesign #ConsumerFocused #NeutralArchitecture
//ENTRY PERSPECTIVE//STOREFRONT ELEVATIONS
Office Location: Cincinnati, Ohio
As a member of the Retail Mixed Use studio, I was assigned to our client, Premium Outlets. While working for the client I helped with a handful of ongoing projects they had (ground up and renovations). Most notably I spent a majority of my time on their new Denver Premium Outlet.
Denver Premium Outlet is a two phase project culminating in 400,000 sq ft of retail space supplemented with a (roughly) 17,000 sq ft Market Lodge for dining, resting, and capturing views of the neighboring Rocky Mountains. Letting nature speak for itself through the landscaping, the Architecture retains its fashionable integrity with minimal, asymmetrical forms.
Working with our Creative Director, I aided in the design and material selections and followed the project through to Construction Documents as design changes continued to be made by the client.
DESIGNER (Jun.‘14 to Aug.’15)FRCH Design Worldwide
//ENTRY PERSPECTIVE
53
Applied “Wood” SidingCondition 3
Denver Premium Outlets, Thorton, CO | Component Study | February 9, 2015 | page 1127851.000
PAINTCondition 2 : Different Color Over Storefronts
Denver Premium Outlets, Thorton, CO | Component Study | February 9, 2015 | page 1527851.000
WRAPPING HEADERCondition 1
Denver Premium Outlets, Thorton, CO | Component Study | February 9, 2015 | page 1727851.000
^^INTERIOR PERSPECTIVE
^^STOREFRONT VARIATION STUDY
^^COLUMN DETAIL STUDIES
^^ENTRY PERSPECTIVE
WOOD & STEEL CONNECTION STUDIES
BASE CONDITIONS
Denver Premium Outlets, Thornton, CO | Component Study | February 13, 2015 | page 527851.000
PAINTCondition 2 : Different Color Over Storefronts
Denver Premium Outlets, Thorton, CO | Component Study | February 9, 2015 | page 1527851.000
^^COLUMN DETAIL STUDIES
WOOD & STEEL CONNECTION STUDIES
BASE CONDITIONS
Denver Premium Outlets, Thornton, CO | Component Study | February 13, 2015 | page 527851.000 Applied “Wood” Siding
Conditions 1
Denver Premium Outlets, Thorton, CO | Component Study | February 9, 2015 | page 927851.000
StoneCondition 1 : On brick Base
Denver Premium Outlets, Thorton, CO | Component Study | February 9, 2015 | page 1227851.000
55
Office Location: Los Angeles, California
While at Gensler I split my time between two hotel projects. The first is shown here : Heritage Hotel in Albuquerque. The client was looking to infuse traditional architecture of the region (pueblo style) into a more contemporary, luxurious design. I took on the design responsibilities for the landscape and hardscape and also contributed to the facade designs. Additionally, I was responsible for creating presentations for the client.
The second project I was on (not pictured here for contractual reasons) was a feasibility study for an airport hotel attached to the Atlanta Airport. We engaged in site, market, and program research and came up with six possible designs for the client.
Summer Intern 2013GENSLER HOSPITALITY#InternationalMindset #ContextualArchitecture
//REAR PERSPECTIVE
\\POOL-SIDE VIGNETTES
//REAR PERSPECTIVE
57
Office Location: San Francisco, California
While at FME, I was mainly on the 717 Battery project team.
“The five-level, 58,000-square-foot club at 717 Battery St. contains a high-end restaurant, four bars, a wine cellar, a library, meeting rooms, a gym and spa, an outdoor garden and 14 hotel rooms, including a penthouse suite with views of the Transamerica Pyramid and the Bay Bridge. A dramatic glass elevator and glass railing on an imposing steel and glass staircase to the lower level are among the design highlights.”
-SF Gate
I mostly handled custom interior detailing for the Construction Documents. The photographs below show the finished building, and the image to the right is a rendering done during the design process.
I also worked on a handful of other tasks for various projects such as corporate interiors and office buildings for developers.
Winter Co-Op 2012FME DESIGN+ARCH#TechBoom #HistoricReUse #WorkplaceAndLeisure
//RESTAURANT PERSPECTIVE
\\FINISHED PHOTOGRAPHS
//RESTAURANT PERSPECTIVE
59
Office Location: Cincinnati & Columbus, Ohio
SHP Leading Design has been in the K-12 Market for over 100 years. I spent much of my time there on the Northwestern High School project team, designing my alma mater. The project was two separate buildings (a PK-6 & 7-12) totaling 247,000 square feet. The designs are 2-story buildings with abundant natural lighting. Each building will target a minimum of LEED Silver certification. The project will includes a geothermal HVAC system and many other new technologies.
It was an interesting experience learning about public clients sitting on both sides of the fence - as designer and a member of that school’s community. When I worked part time (16+ Hours a week), I became a more fluid employee working on several projects as needed. I took on tasks that ranged from SDs to CDs and even CA. I was also in direct contact with consultants to help produce the most innovative solutions for our design problems.
3Co-Ops & 2yrs Part Time SHP LEADING DESIGN#EducationDesign #LeadersInBIM #PublicProjects
//REAR PERSPECTIVE
\\PROGRAM SKETCH LAYOUT
2-1/2" SPRAY FOAMINSULATION AND AIRBARRIER
TERMINATION BAR
MEMBRANE FLASHING
SEALANT
CMU
MASONRY JOINTREINFORCEMENT
BRICK
THRU-WALL RECEIVER W/COUNTER FLASHING
TERMINATION BAR
WEEP
CAVITY DRAINAGEMATERIAL2-1/2" SPRAY
FOAM INSULATIONAND AIR BARRIER
6" CMU, GROUTSOLID
MEMBRANE FLASHING8" CMU
2-1/2" CAVITYWALL INSULATION
MEMBRANE ROOFING
GROUND FACE CMU IN LIEU OFBRICK AT SIMILAR CONDITION
BRICK
WEEP
MEMBRANE FLASHING
MASONRY JOINTREINFORCEMENT
CAST STONE SILL - SEEDETAILS ON SHEET A009
SEALANT ANDBACKER ROD
TRANSLUCENT WALL PANELS
12 x 8 BOND BEAM
5x3-1/2"X5/16" CONT. STEELANGLE (GALV), BOLT TO CMUW/ 1/2"Ø EXPANSION ANCHOR32"OC.
2-1/2" SPRAY FOAMINSULATION AND AIRBARRIER
12" CMU
BRAKE-FORMED ALUMNIUMSILL - TYPE 1
1"
SEALANT
4 5/8" 1 7/8"
5/8"
15°
5/8" 1 5/8"
5°
50°
4 1/4" 2 7/8"
2 1/8"
1'-1 1/2" 2"
15° 5°
1 5/8"5/8"
2 7/8"10 1/2"
2 1/8"
50°
8 X 8 BOND BEAM
8" CMU
4" H CMU, GROUT SOLID2-1/2" SPRAY FOAMINSULATION AND AIRBARRIER
STEEL JOIST
TAPERED ROOF INSULATIONON ROOF INSULATION
MEMBRANE ROOFING
ROOF DECK
VAPOR RETARDER
WOOD BLOCKING CUT FROM2x12, ANCHOR TO CMU W/1/2"Ø EXPANSION ANCHORS(MIN. 3-1/2" EMBEDMENT)COUNTERSUNK 24" OC. ,STAGGER SIDES, 2" MIN.FROM FACE OF CMU
1'-4"
2-1/2" CFMF Z-FURRING16" OC. VERTICAL
4 X 8 M
ASON
RY OP
ENING
CONDUCTOR HEAD13"W X 9"H X 8"DW/ BUILT-INOVERFLOW AS PERLATEST SMACNASTANDARDS
COVER BOARD
9"
3"6"
8"
DOWNSPOUT
1/2"
5x5x5/16 CONT. STEEL ANGLE(GALV), BOLT TO CMU W/1/2"Ø EXPANSION ANCHOR32"OC.
6" 3 1/2"
METAL COPING
2x12 WOOD BLOCKING, BOLTTO STEEL ANGLE W/ 1/2"ØBOLT 32" OC.
SLOPE
8 X 8 BOND BEAM
8" CMU
4" H CMU, GROUT SOLID2-1/2" SPRAY FOAMINSULATION AND AIRBARRIER
MASONRY JOINTREINFORCEMENT STEEL JOIST
TAPERED ROOF INSULATIONON ROOF INSULATION
MEMBRANE ROOFING
ROOF DECK
VAPOR RETARDER
METAL COPING WOOD BLOCKING CUT FROM2x12, ANCHOR TO CMU W/1/2"Ø EXPANSION ANCHORS(MIN. 3-1/2" EMBEDMENT)COUNTERSUNK 24" OC. ,STAGGER SIDES, 2" MIN.FROM FACE OF CMU
3"3/4
"
2-1/2" CFMF RUNNER
METAL WALLPANEL
1 1/2" 1'-0 5/8"ROOF STRUCTURE
VARIES @ SIMILAR CONDITIONS
2-1/2" CFMF Z-FURRING16" OC. VERTICAL
4 X 8 M
ASON
RY OP
ENING
CONDUCTOR HEAD13"W X 9"H X 8"DW/ BUILT-INOVERFLOW AS PERLATEST SMACNASTANDARDS
COVER BOARD
9"
3"6"
8"
DOWNSPOUT
METAL WALL PANEL 3"1/2
"
B/ SOFFIT110'-8"
AIR BARRIER
1/2" GYPSUMSHEATHING
MEMBRANE ROOFING
STEEL BEAM
STEEL JOIST
7/8" CFMF HAT SHAPEDFURRING CHANNELS 16" OC.ON 1-1/2" CFMF CARRYINGCHANNELS 32" OC.
1/2" GYPSUM SHEATHING
8"
METAL WALLPANEL
METAL COPING PANEL
WOOD BLOCKING CUTFROM 2x8, BOLT TO CFMFRUNNER 32" OC.
COVER BOARD
TAPERED ROOFINSULATION ONROOF INSULATION
1/2" CEMENT BOARD
DEFS ON 1/2" CEMENT BOARD
SOFFIT VENTEDGE TRIM AND SEALANT
3-5/8" CFMFSTUDS, 16" OC.
T/ PANEL115'-0"
B/ PANEL110'-5 1/2"
VAPOR RETARDER
CFMF SUPPORTCLIP ANCHOR TOSTEEL BEAM
METAL SCUPPERLINER 4"X8" - ALLSIDES
DRIP FLASHING
HEMMED METALFLANGE TRIMDRIP FLASHING
METAL COPING
THROUGH-WALL FLASHING
COUNTER FLASHINGRECEIVER
END DAM
COUNTERFLASHING
ROOF MEMBRANETERMINATION BAR
WEEP
ROOF MEMBRANE SEE S
ECTIO
NS8" M
IN.
4"
4"
2"
ROOF INSULATIONROOF DECK
NOTE:COUNTER FLASHING IS NOTSHOWN AT ALL LOCATIONS FORCLARITY
THROUGH WALL FLASHINGTERMINATION BAR
BRICK
COUNTER FLASHING RECEIVER
THROUGH-WALL FLASHING END DAM
ROOF MEMBRANE END DAM
SILL FLASHING END DAM
WEEP
ROOF MEMBRANETERMINATION BAR
ROOF DECK
ROOF INSULATION
1/2" CEMENT BOARD
ROOF MEMBRANE
CMU BACK UP
SILL FLASHING/RECEIVER POSITIVE SLOPE TOWARDS ROOF SURFACE
ROOF MEMBRANE TERMINATION BAR
NOTES:1. THIS DETAIL IS FOR ILLUSTRATIVE PURPOSES TO
SHOW HOW THE FLASHINGS TIE TOGETHER AT THEEND DAM. NOT ALL CLADDING COMPONENTS ARESHOWN. REFER TO ADDITIONAL DETAILS FORCOMPLETE ASSEMBLY
2. COUNTER FLASHING IS NOT SHOWN FOR CLARITY.3. METAL WALL PANELS ARE NOT SHOWN FOR CLARITY4. PROVIDE SEALANT BETWEEN END DAMS.
2 1/2" SPRAY FOAMINSULATION ANDAIR BARRIER
2 1/2" SPRAY FOAMINSULATION ANDAIR BARRIER
ROOF MEMBRANE
WEEP
ROOF MEMBRANE TERMINATION BAR
COUNTER FLASHING RECEIVER
THROUGH WALL FLASHING
END DAM
COUNTER FLASHING
4"
SEE S
ECTIO
NS8" M
IN.
4"
4"
NOTE:COUNTER FLASHING IS NOTSHOWN AT ALL LOCATIONS FORCLARITY
ROOF INSULATION
ROOF DECK
RI
D ARI
T
CH
TEC
EG
REE
ST
OI
HOFOETATS
KEVIN E. KREUZ8636
DATE
COMM NO.
COPYRIGHTSTEED HAMMOND PAUL, INCALL RIGHTS RESERVED
4805
Mon
tgom
ery
Roa
dC
inci
nnat
i, O
hio
4521
2
236
Hig
h S
treet
Ham
ilton
, Ohi
o 45
011
250
Civ
ic C
ente
r Driv
eC
olum
bus,
Ohi
o 43
215
Sui
te 4
0051
3-38
1-21
12
513-
863-
5441
Sui
te 2
0061
4-22
3-21
24
0'-1" REFERENCE LINE5/11
/201
1 4:
06:4
8 PM
5610
TR
OY
RO
AD, S
PRIN
GFI
ELD
, OH
455
02
A540
MISCELLANEOUSDETAILS
NO
RTH
WES
TER
N P
K-6
SC
HO
OL
5-11-11
2008071.01
NO
RTH
WES
TER
N L
OC
AL
SCH
OO
L D
ISTR
ICT
5610
TR
OY
RO
AD, S
PRIN
GFI
ELD
, OH
455
02
ISSUANCES
3" = 1'-0"A5401 DETAIL
3" = 1'-0"A5402 DETAIL
3" = 1'-0"A5403 DETAIL
TYPE 1 TYPE 2
3" = 1'-0"A5404 BRAKE-FORMED ALUMINUM SILL TYPES
TYPE 4TYPE 3
1 1/2" = 1'-0"A5405 SCUPPER DETAIL @ BRICK
1 1/2" = 1'-0"A5406 SCUPPER DETAIL @ METAL PANEL
1 1/2" = 1'-0"A5407 DETAIL
1 1/2" = 1'-0"A5408 PARAPET WALL FLASHING
1 1/2" = 1'-0"A5409 THROUGH WALL FLASHING TYPICAL DETAIL
1 1/2" = 1'-0"A54010 WALL FLASHING AT ROOF TRANSITION
\\3D CONSTRUCTION DETAIL
61
THANK YOUammarlm 1@gmai l .com5 1 . 3 . 5 6 2 . 0 2 9 7