EXPERT SYSTEM FOR COMPETITIVE BIDDING OF AN ELECTRICAL INSTALLATION PROJECT
Presented By : T. M. WeerakkodyReg. ID : 108894F
Supervised By : Dr. KTMU Hemapala, Dr. AGBP Jayasekara
4TH PROGRESSING REVIEW
Introduction (Problem and Motivation) Competitive bidding used for Electrical contractor selection To win a bid, requires reliable & good decision making process Mostly heuristic knowledge involves in the process Human expertise is very scarce Even find, they have limited working memory, get tired & slow in recalling information The solution is to find more accurate knowledge base system
What are the benefits of knowledge base system
Help distribute human expertise Increase probability, frequency & consistency of making good decisions Free up mind & time of human expert Facilitate real time, low cost expert level decision by non expert
Introduction • Bid preparation process
Project details Bid
Experience and norms
Preparation of bid
Problems with competiveness of
the bid
Due to- Lack of experience- Incorrect material take off- Unclear scope of work- Fluctuation in material costs- Uncertainty in taxes & duties
Solution: Hire expertise teamUse of an expert system
Expert Systems approach for electrical estimation
Expert System Requirements,a) Implementation of Static Knowledge (facts)b) Flow chart interpretationc) Implementation of Dynamic Knowledge (rules)d) Implementation of Inference engine e) User interface
An expert system is a computer program that simulates the thought process of a human expert to solve complex decision problems in a specific domain
Competitive Bid Value
Material Cost Calculations
Labour Cost Calculations
1) Bidding docs
2) BOQ
3) Construction Dwgs
4) Electrical specs
5) Pre-bid meeting & visit
6) Material take off
7) Material cost input
8) Labour cost input
9) OHP input
Proposed system for the competitive bid estimationof an electrical installation project
Overhead & Profit Calculations
Expert System
Infe
ren
ce
En
gin
e
What are behind experts’ mind
1. Setup procedure for estimation2. Identify relevant material & labour depending on the scope of work3. Knowledge of Market prices of Materials & Labour and its fluctuations4. Value added areas that make the proposal more competitive5. Preparing of the Final Bid Value6. Judgment on competitiveness of the
final bid value
Satisfy Prequalification
Estimation Procedure
Search & verify followings
Type of contract
Pricing for BOQ Items
List out electrical items
Identify Material Involvement per
each item
Identify Labour involvement per
each item
Selected material for pricing = technical
specification
Material take off from the drawings
Overhead and profit input
Select pricing method
Identify scope of work per each
item
Labour input
Get Market price for selected &
quantified materials
Verify overhead requirement for
the project
Basic Labour cost per item
Add overhead & profit to basic
valueFinal BOQ Value
Collect Tender Documents
Basic Material & Labour for Total
BOQ
Costing Material input
Basic Material cost per item
Estimation Procedure Most Critical Tasks that Expertise Involvement is required
Static Knowledge Base for Bid estimation ( Electrical)
1. Bidding documents related information2. BOQ, specifications, drawings information3. Indirect cost dependant factors 4. Material pricing and quantifying5. Labour rates input6. Overhead and profit calculation
1. Bidding Documents related information– Main follow ups
a) General Informationb) Availability of relevant documentsc) Missing information, insufficient details, unclear informationd) Prequalification and supportive documents submissione) Selection of the type of the contractf) findings on building status or installation status
2. BOQ, specifications, drawings – Main follow ups
a) Categorizing of main electrical installation types b) Selection of no of types relevant to each categoryc) Insertion of material details in each typed) identify measuring unit for each materiale) Quantifying per unit measurements
Main Categories
3. Indirect cost dependant factors
a) Contractor efficiency on completion of projectsb) Contractor strength on maintaining cash flow of the projectc) Labour management strategies depending on the projectd) Prediction on future cost fluctuations in any categorye) Relationship build up with suppliers and other contractorsf) any indirect expenditure which leads for extra overhead costing
4. Material pricing and quantifying / 5. Labour rate input
a) Rough material take off for getting supplier quotation for the projectb) Summering total quantities for the projectc) Call quotation from suppliers with which the contract specification is complied d) Include material prices on relevant BOQ itemse) Insert exact quantities each type of item which is categorizedf) Get labour rates for each job from labour contractor or by using historical datag) Add labour rates for each type in BOQ items
6. Overhead and Profit Calculation
a) Select site staff, equipments, tools etc, overhead cost for the total project periodb) Distribute total overhead to each BOQ items so that basic material & labour cost plus overhead equals to final bid value
Flow chat approach for the Expert SystemBidding Docs 1
Bidding docs details are
clear
Submit & finalize unclear items from relevant
parties
Submission of bid security with correct
validity period
Remind the pending docs to
project mgt team & get it done
Bid docs are duly signed by
authorized persons
Remind the pending docs to
project mgt team & get it done
Attachment of neccessary
supportive docs
Remind the pending docs to
project mgt team & get it done
Insert in the docs submission
file
No
Yes
No
No
No`
No
Yes
Yes
YesYes
Yes
Yes
Yes
Continue from ''clarify all
disputes in pre-bid meeting''
Continue from ''Make assumption for items with lack
of details & submit in the offer
Bidding Docs
1
Expert System Flow chart approach
BOQ Docs 2
Details of the BOQ is clear
Desctiption of the BOQ is
having deficiencies
Summerize the dispute items
Soft copy of the BOQ is recieved
Type BOQ in excel format
BOQ details are matched with
construction dwgs
Summerize disput items
BOQ details are matched with specifications
Summerize disput items
Continue from ''clarify all
disputes in pre-bid meeting''
Continue from ''select BOQ item to be estimated
No
No
No
No
Yes
Yes
Yes
Yes
BOQ Docs
2
Flow chat approach for the Expert System
Findings from Site
Visit
Site Visit is carried out
Any deviation from the
original scope
Continue from ''select BOQ item to be
estima
Continue from ''clarify all disputes in
pre-bid meeting''
Details of the site condition are identified
Building status
Newly proposed Building
Refurbished old building
removable items are available
Reusable items are available
Measurements to be added in labour cost
Measurements to be added in Material cost
Continue from ''identify material
brand, type & standard from the
specification
Risk of uncertainty
factors should be taken into account
Allowance for extra cost of travelling is necessary
Allowance for extra cost of healthcare is
necessary
Allowance for extra cost of
accommodation is necessary
Working condition of
the site
a
g
b
Measurement to be added in the overhead
calculation
Working time duration of the
day is identified
Any existing site operations that effects to the working time
Any hindrance for working over time
Measurement to be added in
the Labour cost
calculation
Yes
Yes
Yes
Yes
Yes
No
No
No
NoSite Info
3
Flow chat approach for the Expert SystemContinue from
''select BOQ item to be estimated
Material Cost Calculation
Project is based on Duty
free BOI approved
Supply of material by
client
Go to Labour cost
calculation
Rates are only for
labour work
Supply of materials by
client
Clearance, bank charges & others paid
by client
Measurement to be added in the
overhead calculation
Rates are included for
complete job
Add duty component for
final cost calculation
Identify material brand, type & standard from
the specification
Continue from ''Newly
proposed building''
Inquiry from the material supplier for quotations
Check quotations are
compatible with specs
Evaluate supplier
quotations for best prices
Add prices to discount schedule for material cost
calculations
Continue from ''Get supplier
commitment & futher discounts for bulk supply''
Material take off relavent to the BOQ
item
Soft copy of the drawing is
available
Scale of the hardcopy is
correct
Prepare the drawing for
take off
Scale factor to be taken & multiply
with it for measurements
Select & group locations of
identical point arrangements &
distribution
Continue from ''Sort list BOQ
items same rate according to
dwgs''
MaterialCost
4
Continue from ''Sort list BOQ
items same rate according to
dwgs''
Circuit wirings are shown in
shown
Sketch most possible circuit arrangement in
the dwgs
Measure average
conduit length per point
Measure average length of neutral
& phase wires per point
Measure average length of earth wire
per point
Measure percentage
switch involvement
per point
Continue from ''Get supplier
commitment & futher discounts for bulk supply''
Measurements to be added in Material cost
calculation
Prepare Material cost
calculation
Get total materials quantity for requesting
discount from the supplier
Get basic material cost
Calculate wastage & acc per point as %
qty of material
Add tools & Machinery cost basd on basic material cost
Final Material cost in the rate analysis related
to selected BOQ item
Flow chat Diagram of the Expert System – Section 5
MaterialCost
4
Continue from ''select BOQ item to be estimated
Labour cost calculation for point wiring
Labour cost calculation for point wiring
Calculate the labour cost for the complete
project
Main job is covered by
direct labour
Get sub contractor rates
for the job
Get labour cost by calculating
labour requirement
Compare the measured cost with hystorical data analysis
Adjust labour cost depending on the
material usage accoding tho the
location
Get the basic material cost
Get the basic material cost
Basic labour cost & predicted labour
schedule cost are matched
Multiply basic labour cost by a factor to
compensate OT work during the project
Final labour cost in the rate analysis
related to the BOQ item
Adjust the basic labour cost so that predicted labour schedule cost are
matched
Flow chat Diagram of the Expert System – Section 6
LabourCost
5
Implementation of Dynamic Knowledge (know how, rules) by using a general resolution procedure
Bidding Docs
1
Implementation of Dynamic Knowledge (know how, rules) by using a general resolution procedure
BOQ Docs
2
Implementation of Dynamic Knowledge (know how, rules) by using a general resolution procedure
Site Visit
3
Implementation of Dynamic Knowledge (know how, rules) by using a general resolution procedure
Others4,5,6
Software Development1. Interface Development (Data acquisition and Output result)2. Implementation of expert system procedure
SummerySoftware Development (System Information)1. Developing software – Visual Studio 20102. Language – C #
Achieved so far,1. Problem Identification2. Corrective action with proper solution3. Data acquisition incorporated with the expert system concept4. Implementation of the system 5. Software Development6. Fine tuning the system based on expertise comments
Conclusion,This research will inspire the construction industry to be more active and vigilant about having an ultimate solution for electrical bid estimation.
Future direction1. Development of the software in commercial Level 2. Expand the system which would cover M&E installation
Thank You !