UBDAFTAR HARGA SATUAN BAHAN DAN UPAHTAHUN 2011

NO.URAIANSATUANHARGAKETERANGAN12345UPAH1PekerjaOhRp32,500.002Tenaga gali tanah/pondasiOhRp32,500.003Tukang batuOhRp40,000.004Tukang kayuOhRp42,500.005Tukang catOhRp40,000.006Tukang besiOhRp40,000.007Tukang politurOhRp40,000.008Tukang ListrikOhRp40,000.009Tukang Pipa ledengOhRp40,000.0010Kepala tukang batuOhRp45,000.0011Kepala tukang kayuOhRp45,000.0012Kepala tukang catOhRp45,000.0013Kepala tukang besiOhRp45,000.0014Kepala tukang politurOhRp45,000.0015MandorOhRp45,000.00

BAHAN1Airm3Rp40,000.00Belum termasuk pajak dan2Alumnium foilrollRp75,000.00retribusi bahan galian C3Aspal curahkgRp7,500.00Aspal drum AC 60/70kgRp8,000.004Asbes gelombang kecil3000x1050x4 mmlbrRp63,900.002400x1050x4 mmlbrRp53,600.002100x1050x4 mmlbrRp46,300.001800x1050x4 mmlbrRp43,200.005Asbes gelombang besar3000x920x5 mmlbrRp100,000.002250x920x5 mmlbrRp82,400.001500x920x5 mmlbrRp51,500.003000x920x6 mmlbrRp118,700.002250x920x6 mmlbrRp96,900.001500x920x6 mmlbrRp72,100.006Asbes plat1000x1000x3 mmlbrRp11,300.001000x2000x3 mmlbrRp23,700.00500x2000x3 mmlbrRp12,300.00250x2000x4 mmlbrRp10,300.001200x2400x4 mmlbrRp41,200.001000x1000x4 mmlbrRp37,100.001200x2400x5 mmlbrRp51,500.001200x2400x6 mmlbrRp56,700.007Asbes nokGelombang kecilbjRp28,300.00Gelombang besarbjRp48,400.008Batu bata apple 4bjRp500.009Batu bata apple 5bjRp550.0010Batu belah hitambatu belah 15/20m3Rp114,200.00batu belah 10/15m3Rp135,000.00batu belah 5/7m3Rp209,484.33batu belah 4/6m3Rp217,734.76batu kricak 3/4 (MS)m3Rp240,423.45batu kricak 2/3 (MS)m3Rp247,986.3511Batu belah putihm3Rp84,600.0012Baja dan BesiBaja WFkgRp22,500.00Besi corkgRp9,250.00Besi betonkgRp9,250.0013Batako pejalbjRp2,100.0014Bambubtg Bambu apusbtgRp8,000.00Bambu wulungbtgRp11,500.00Bambu petungbtgRp60,000.00

NO.URAIANSATUANHARGAKETERANGAN1234515Buis betondiameter 15 mm x 1 mbjRp25,000.00diameter 20 mm x 1 mbjRp30,000.00diameter 25 mm x 1 mbjRp35,000.00diameter 30 mm x 1 mbjRp42,000.00diameter 40 mm x 1 mbjRp55,000.00diameter 60 mm x 0,5 mbjRp45,000.00diameter 80 mm x 0,5 mbjRp55,000.00diameter 100 mm x 0,5 mbjRp75,000.0016Catcat kayukgRp51,000.00Emcocat menikgRp17,500.00cat besikgRp51,000.00cat tembokkgRp15,000.00DecolithDempul tembok/ plamirkgRp12,000.00Dempul kayukgRp17,500.00Engsel pintubhRp17,500.00Engsel jendelabhRp15,000.00eternit 100 x 100 (polos)lbrRp14,000.0017FiberglaslbrRp50,000.0018FillerkgRp3,500.0019Formika 120 x 240 cmlbrRp65,000.0020Gebalan rumputm2Rp8,500.0029GrendelGrendel pintubhRp10,000.00Grendel jendelabhRp7,500.0030Gentenggenteng beton besarbjRp8,000.00genteng beton kecilbjRp4,000.00genteng tanah parisbjRp900.00genteng tanah kodokbjRp1,700.00genteng kaca 3 mmbjRp14,000.00genteng kaca kodokbjRp15,000.0031Geotekstilm2Rp23,000.0032HandelbhRp10,000.0033Hak anginbhRp15,000.0034IjukkgRp17,000.0029Kacakaca bening 3 mmm2Rp40,000.00kaca bening 5 mmm2Rp60,000.00Kaca buram 3 mmm2Rp60,000.00kaca buram 5 mmm2Rp75,000.00kaca reyband 5 mmm2Rp65,000.0030Karpet lebar 90 cmm'Rp12,000.0031kayu bakarm3Rp1,800,000.0032kayu begestengm3Rp2,200,000.00dpt untuk begesteng33Kayu dolkenm3Rp2,150,000.0034Kayu jatiKelas Ipapanm3Rp20,000,000.00balokm3Rp18,000,000.00rengm'Rp4,000.00Rp6,666,666.6735Kayu kamperpapanm3Rp8,300,000.00balokm3Rp7,500,000.00rengm'Rp2,750.005,000,00036Kayu Bangkirei833.3333333333papanm3Rp8,650,000.00balokm3Rp7,800,000.001666.6666666667rengm'Rp3,000.00Rp5,000,000.0037Kayu kruingpapanm3Rp6,750,000.00balokm3Rp5,800,000.00rengm'Rp2,000.0038Kayu merantipapanm3Rp5,500,000.00balokm3Rp5,100,000.00rengm'Rp1,800.0039Kayu glugum3Rp3,500,000.00Klas I40Kayu lapis tripleks 3 mmlbrRp45,000.00

NO.URAIANSATUANHARGAKETERANGAN1234541Kayu lapis tripleks 4 mmlbrRp55,000.0042Kayu lapis tripleks 6 mmlbrRp65,000.0043Kayu lapis tripleks 12 mmlbrRp125,000.0044Kayu lapis teakwood 4 mmlbrRp77,500.0045Kapur pasangm3Rp170,000.0046Kapur sirihm3Rp200,000.0047Kawat ayakanm2Rp13,500.0048Kawat beton / bendratkgRp14,000.0049Kawat bronjongkgRp15,000.0050Krilkil betonm3Rp180,000.0051Krokos/ kroco 2-4 cmm3Rp125,000.0052Kunci tanam besarbhRp225,000.00SES53Kunci tanam kecilbhRp100,000.00PIONEER54Kloset duduk lengkapbhRp1,000,000.0055Kloset jongkokbhRp120,000.0056Lem aica aibonkgRp45,000.0057MelaminkgRp45,000.0058Minyak cat/ ThinnerltrRp17,500.0059Minyak tanahltrRp9,200.0060Oli gardanltrRp40,000.0061Oli mesinltrRp32,200.0062Pasir pasang pasir pasangm3Rp107,800.00pasir betonm3Rp116,000.0063Pasir urugm3Rp80,500.0064Paku besar, sedangkgRp15,000.0065Paku kecilkgRp22,000.0066Paku payungkgRp22,000.0067Pipagalvanis diameter 0,5 "btgRp76,000.00galvanis diameter 0,75 "btgRp100,000.00galvanis diameter 1"btgRp125,000.00galvanis diameter 1,5 "btgRp300,000.00galvanis diameter 3"btgRp660,000.00galvanis diameter 4"btgRp1,000,000.00PVC 4 m diameter 0,5"btgRp14,000.00PVC 4 m diameter 0,75"btgRp18,500.00PVC 4 m diameter 1"btgRp25,000.00PVC 4 m diameter 1,25"btgRp35,000.00PVC 4 m diameter 3"btgRp95,000.00PVC 4 m diameter 4"btgRp155,000.0068Paving (abu - abu)m2Rp34,500.0069Paving ( warna )m2Rp45,000.002.695Paving beton pressm2Rp55,000.0070Plastik gelombangbhRp60,000.003M71Plamuur kayukgRp20,000.0072Plywood 9000x2100x4 mmlbrRp65,000.0073Plywood 1200x2400x4 mmlbrRp95,000.0074PoliturltrRp35,000.0075Semen (PC)Semen nusantara, Tiga rodazakRp42,000.00Semen putihzakRp81,000.00Semen warnakgRp81,000.0076Semen merahm3Rp105,000.0077Seng platseng BJLS 20 lebar 45 cmlbrRp15,000.00seng BJLS 20 lebar 55 cmlbrRp16,000.00seng BJLS 20 lebar 60 cmlbrRp18,200.00seng BJLS 20 lebar 70 cmlbrRp20,300.00seng BJLS 20 lebar 80 cmlbrRp21,400.00seng BJLS 20 lebar 90 cmlbrRp23,500.00seng BJLS 25 lebar 90 cmlbrRp39,600.0078Seng gelombangBJLS 30 90x180 cmlbrRp70,700.00BJLS 25 90x180 cmlbrRp82,500.00BJLS 20 90x240 cmlbrRp94,200.00BJLS 20 90x300 cmlbrRp117,800.0079SolarltrRp4,500.0080SirlakkgRp110,000.00

NO.URAIANSATUANHARGAKETERANGAN1234581Sirtum3Rp108,000.0082SpritusltrRp10,000.0083Tanah uruganm3Rp55,000.0084Teak oilltrRp18,000.0085TeerltrRp12,500.0086TerpentinltrRp14,000.0087Tegelmarmer 40x40 cmm2Rp100,000.00keramik 20x20 cmm2Rp38,000.00keramik 20x25 cmm2Rp40,000.00keramik 30x30 cmm2Rp35,000.00keramik 40x40 cmm2Rp47,500.00porselin 11x11 cmm20.0teraso 30x30 cmm20.0kembang 20x20 cmm20.0kembang 30x30 cmm20.0warna 20x20 cmm20.0warna 30x30 cmm20.0abu - abu 20x20 cmm20.0abu - abu 30x30 cmm20.088Thinner melaminltrRp27,000.0089UrioirbhRp225,000.0090VetkgRp23,000.0091WashtafelbhRp225,000.0092Bak mandi lps porselin/ keramikbhRp250,000.00uk. 50x50x50 cm93NakodaunRp15,000.00

ANALISA

ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSIBANGUNAN GEDUNG DAN PERUMAHANSNI ( STANDART NASIONAL INDONESIA )

A.PEKERJAAN PERSIAPAN

1 m' Pengukuran dan Pasang bouwplank SNI 03-2835-2002BAHAN0.012m3Kayu 5/7 (glugu)Rp3,500,000.00Rp42,000.000.020KgPaku biasa 2" - 5"Rp15,000.00Rp300.000.007m3Kayu sengon papan 3/20Rp2,200,000.00Rp15,400.00TENAGA0.100OHPekerjaRp32,500.00Rp3,250.000.100OHTukang KayuRp42,500.00Rp4,250.000.010OHKepala TukangRp45,000.00Rp450.000.005OHMandorRp45,000.00Rp225.00JUMLAHRp65,875.00HARGA SATUANRp65,875.00

1 m2 Membersihkan lapangan dan perataan SNI 03-2835-2002TENAGA0.100OHPekerjaRp32,500.00Rp3,250.000.050OHMandorRp45,000.00Rp2,250.00JUMLAHRp5,500.00HARGA SATUANRp5,500.00

1 m2 Membuat jalan sementara SNI 03-2835-2002BAHAN0.150m3Batu belah 15/20Rp114,200.00Rp17,130.000.090m3Batu pecah 5/7Rp209,484.33Rp18,853.590.010m3Pasir pasangRp107,800.00Rp1,078.00TENAGA1.000OHPekerjaRp32,500.00Rp32,500.000.050OHMandor Rp45,000.00Rp2,250.00JUMLAHRp71,811.59HARGA SATUANRp71,811.59

B.PEKERJAAN TANAH

1 m3 Galian tanah biasa sedalam 1 meter SNI : 2835:2008TENAGA0.750OHPekerjaRp32,500.00Rp24,375.000.025OHMandorRp45,000.00Rp1,125.00JUMLAHRp25,500.00HARGA SATUANRp25,500.00

1 m3 Galian tanah biasa sedalam 2 meter SNI : 2835:2008TENAGA0.900OHPekerjaRp32,500.00Rp29,250.000.045OHMandorRp45,000.00Rp2,025.00JUMLAHRp31,275.00HARGA SATUANRp31,275.00

1 m3 Galian tanah biasa sedalam 3 meter SNI : 2835:2008TENAGA1.050OHPekerjaRp32,500.00Rp34,125.000.067OHMandorRp45,000.00Rp3,015.00JUMLAHRp37,140.00HARGA SATUANRp37,140.00

1 m3 Galian tanah keras sedalam 1 meter SNI : 2835:2008TENAGA1.000OHPekerjaRp32,500.00Rp32,500.000.032OHMandorRp45,000.00Rp1,440.00JUMLAHRp33,940.00HARGA SATUANRp33,940.00

1 m3 Galian tanah cadas sedalam 1 meter SNI : 2835:2008TENAGA1.500OHPekerjaRp32,500.00Rp48,750.000.060OHMandorRp45,000.00Rp2,700.00JUMLAHRp51,450.00HARGA SATUANRp51,450.00

1 m3 Galian tanah lumpur sedalam 1 meter SNI : 2835:2008TENAGA1.200OHPekerjaRp32,500.00Rp39,000.000.045OHMandorRp45,000.00Rp2,025.00JUMLAHRp41,025.00HARGA SATUANRp41,025.00

1 m2 Stripping tebing setinggi 1 meter SNI : 2835:2008TENAGA0.050OHPekerjaRp32,500.00Rp1,625.000.005OHMandorRp45,000.00Rp225.00JUMLAHRp1,850.00HARGA SATUANRp1,850.00

Membuang 1 m3 tanah sejauh 15 meter SNI : 2835:2008TENAGA0.330OHPekerjaRp32,500.00Rp10,725.000.010OHMandorRp45,000.00Rp450.00JUMLAHRp11,175.00HARGA SATUANRp11,175.00

1 m3 Urugan kembali SNI : 2835:2008Mengurug kembali dihitung dari 1/3 kali dari indeks pekerjaan galian1 m3 Urugan kembali tanah biasa galian sedalam 1 meterRp25,500.00Rp8,500.001 m3 Urugan kembali tanah biasa galian sedalam 2 meterRp31,275.00Rp10,425.001 m3 Urugan kembali tanah biasa galian sedalam 3 meterRp37,140.00Rp12,380.00

Memadatkan 1 m3 tanah (per 20 cm) SNI : 2835:2008TENAGA0.500OHPekerjaRp32,500.00Rp16,250.000.050OHMandorRp45,000.00Rp2,250.00JUMLAHRp18,500.00HARGA SATUANRp18,500.00

1 m3 Urugan pasir SNI : 2835:2008BAHAN1.200m3Pasir urugRp80,500.00Rp96,600.00TENAGA0.300OHPekerjaRp32,500.00Rp9,750.000.010OHMandorRp45,000.00Rp450.00JUMLAHRp106,800.00HARGA SATUANRp106,800.00

1 m3 Urugan Tanah SNI : 2835:2008BAHAN1.100m3Tanah urugRp55,000.00Rp60,500.00TENAGA0.250OHPekerjaRp32,500.00Rp8,125.000.025OHMandorRp45,000.00Rp1,125.00JUMLAHRp69,750.00HARGA SATUANRp69,750.00

1 m3 Sirtu padat untuk peninggian lantai bangunan SNI : 2835:2008BAHAN1.200m3SirtuRp108,000.00Rp129,600.00TENAGA0.250OHPekerjaRp32,500.00Rp8,125.000.025OHMandorRp45,000.00Rp1,125.00JUMLAHRp138,850.00HARGA SATUANRp138,850.00

C.PEKERJAAN PONDASI

1 m3 Pondasi batu putih 1PC : 4 PP SNI : 2836:2008BAHAN1.200m3Batu putihRp84,600.00Rp101,520.00163.000KgPCRp1,050.00Rp171,150.000.520m3Pasir pasangRp107,800.00Rp56,056.00TENAGA1.500OHPekerjaRp32,500.00Rp48,750.000.750OHTukang batuRp40,000.00Rp30,000.000.075OHKepala TukangRp45,000.00Rp3,375.000.075OHMandorRp45,000.00Rp3,375.00JUMLAHRp414,226.00HARGA SATUANRp414,226.00

1 m3 Pondasi batu belah 1PC : 6 PP SNI : 2836:2008BAHAN1.200m3Batu putihRp84,600.00Rp101,520.00117.000KgPCRp1,050.00Rp122,850.000.561m3Pasir pasangRp107,800.00Rp60,475.80TENAGA1.500OHPekerjaRp32,500.00Rp48,750.000.750OHTukang batuRp40,000.00Rp30,000.000.075OHKepala TukangRp45,000.00Rp3,375.000.075OHMandorRp45,000.00Rp3,375.00JUMLAHRp370,345.80HARGA SATUANRp370,345.80

1 m3 Pondasi batu belah 1PC : 3 KP : 10 PP SNI : 2836:2008BAHAN1.200m3Batu putihRp84,600.00Rp101,520.0061.000KgPCRp1,050.00Rp64,050.000.147m3Kapur pasangRp170,000.00Rp24,990.000.492m3Pasir pasangRp107,800.00Rp53,037.60TENAGA1.500OHPekerjaRp32,500.00Rp48,750.000.750OHTukang batuRp40,000.00Rp30,000.000.075OHKepala TukangRp45,000.00Rp3,375.000.075OHMandorRp45,000.00Rp3,375.00JUMLAHRp329,097.60HARGA SATUANRp329,097.60

1 m3 Pondasi batu kosong (aanstamping) SNI : 2836:2008BAHAN1.200m3Batu putihRp84,600.00Rp101,520.000.432m3Pasir urugRp80,500.00Rp34,776.00TENAGA0.780OHPekerjaRp32,500.00Rp25,350.000.390OHTukang batuRp40,000.00Rp15,600.000.039OHKepala TukangRp45,000.00Rp1,755.000.039OHMandorRp45,000.00Rp1,755.00JUMLAHRp180,756.00HARGA SATUANRp180,756.00

1 m3 Pondasi siklop, 60% beton camp. 1 PC : 2 PB : 3 KR & 40% batu belah SNI : 2836:2008BAHAN0.480m3Batu putihRp84,600.00Rp40,608.00194.000KgPCRp1,050.00Rp203,700.000.312m3Pasir BetonRp116,000.00Rp36,192.000.468m3Kerikil BetonRp180,000.00Rp84,240.00126.000kgBesi BetonRp9,250.00Rp1,165,500.001.800KgKawat BetonRp14,000.00Rp25,200.00TENAGA3.400OHPekerjaRp32,500.00Rp110,500.000.850OHTukang batuRp40,000.00Rp34,000.000.085OHKepala TukangRp45,000.00Rp3,825.000.170OHMandorRp45,000.00Rp7,650.00JUMLAHRp1,711,415.00HARGA SATUANRp1,711,415.00

1 m3 Pondasi Sumuran, diameter 100 cm SNI : 2836:2008BAHAN0.450m3Batu putihRp84,600.00Rp38,070.00194.000KgPCRp1,050.00Rp203,700.000.312m3Pasir BetonRp116,000.00Rp36,192.000.468m3Kerikil BetonRp180,000.00Rp84,240.00

TENAGA2.400OHPekerjaRp32,500.00Rp78,000.000.800OHTukang batuRp40,000.00Rp32,000.000.080OHKepala TukangRp45,000.00Rp3,600.000.119OHMandorRp45,000.00Rp5,355.00JUMLAHRp481,157.00HARGA SATUANRp481,157.00

D.PEKERJAAN DINDING

1 m2 Dinding Bata merah tebal 1 bata 1PC : 4PP SNI : 6897:2008BAHAN140.000bhBatu bataRp500.00Rp70,000.0026.550kgPCRp1,050.00Rp27,877.500.093m3Pasir pasangRp107,800.00Rp10,025.40TENAGA0.600OHPekerjaRp32,500.00Rp19,500.000.200OHTukang batuRp40,000.00Rp8,000.000.020OHKepala TukangRp45,000.00Rp900.000.030OHMandorRp45,000.00Rp1,350.00JUMLAHRp137,652.90HARGA SATUANRp137,652.90

1 m2 Dinding Bata merah tebal 1/2 bata 1PC : 3PP SNI : 6897:2008BAHAN70.000bhBatu bataRp500.00Rp35,000.0014.370kgPCRp1,050.00Rp15,088.500.040m3Pasir pasangRp107,800.00Rp4,312.00TENAGA0.300OHPekerjaRp32,500.00Rp9,750.000.100OHTukang batuRp40,000.00Rp4,000.000.010OHKepala TukangRp45,000.00Rp450.000.015OHMandorRp45,000.00Rp675.00JUMLAHRp69,275.50HARGA SATUANRp69,275.50

1 m2 Dinding Bata merah tebal 1/2 bata 1PC : 4PP SNI : 6897:2008BAHAN70.000bhBatu bataRp500.00Rp35,000.0011.500kgPCRp1,050.00Rp12,075.000.043m3Pasir pasangRp107,800.00Rp4,635.40TENAGA0.300OHPekerjaRp32,500.00Rp9,750.000.100OHTukang batuRp40,000.00Rp4,000.000.010OHKepala TukangRp45,000.00Rp450.000.015OHMandorRp45,000.00Rp675.00JUMLAHRp66,585.40HARGA SATUANRp66,585.40

1 m2 Dinding Bata merah tebal 1/2 bata 1PC : 6PP SNI : 6897:2008BAHAN70.000bhBatu bataRp500.00Rp35,000.008.320kgPCRp1,050.00Rp8,736.000.049m3Pasir pasangRp107,800.00Rp5,282.20TENAGA0.300OHPekerjaRp32,500.00Rp9,750.000.100OHTukang batuRp40,000.00Rp4,000.000.010OHKepala TukangRp45,000.00Rp450.000.015OHMandorRp45,000.00Rp675.00JUMLAHRp63,893.20HARGA SATUANRp63,893.20

1 m2 Dinding Bata merah tebal 1/2 bata 1PC : 3 KP : 10PP SNI : 6897:2008BAHAN70.000bhBatu bataRp500.00Rp35,000.004.500kgPCRp1,050.00Rp4,725.000.015m3Kapur pasangRp170,000.00Rp2,550.000.050m3Pasir pasangRp107,800.00Rp5,390.00TENAGA0.300OHPekerjaRp32,500.00Rp9,750.000.100OHTukang batuRp40,000.00Rp4,000.000.010OHKepala TukangRp45,000.00Rp450.000.015OHMandorRp45,000.00Rp675.00JUMLAHRp62,540.00HARGA SATUANRp62,540.00

1 m2 Dinding terawang (roster) uk. (12x11x24) cm, 1PC : 4PP SNI : 6897:2008BAHAN30.000bhTerawang (roster)Rp2,500.00Rp75,000.0011.000kgPCRp1,050.00Rp11,550.000.035m3Pasir pasangRp107,800.00Rp3,773.00TENAGA0.300OHPekerjaRp32,500.00Rp9,750.000.150OHTukang batuRp40,000.00Rp6,000.000.015OHKepala TukangRp45,000.00Rp675.000.015OHMandorRp45,000.00Rp675.00JUMLAHRp107,423.00HARGA SATUANRp107,423.00

E.PEKERJAAN PLESTERAN

1 m2 Plesteran , 1PC : 3PP tebal 15 mm SNI : 2837:2008BAHAN7.776kgPCRp1,050.00Rp8,164.800.023m3Pasir pasangRp107,800.00Rp2,479.40TENAGA0.300OHPekerjaRp32,500.00Rp9,750.000.150OHTukang batuRp40,000.00Rp6,000.000.015OHKepala TukangRp45,000.00Rp675.000.015OHMandorRp45,000.00Rp675.00JUMLAHRp27,744.20HARGA SATUANRp27,744.20

1 m2 Plesteran , 1PC : 4PP tebal 15 mm SNI : 2837:2008BAHAN6.240kgPCRp1,050.00Rp6,552.000.024m3Pasir pasangRp107,800.00Rp2,587.20TENAGA0.300OHPekerjaRp32,500.00Rp9,750.000.150OHTukang batuRp40,000.00Rp6,000.000.015OHKepala TukangRp45,000.00Rp675.000.015OHMandorRp45,000.00Rp675.00JUMLAHRp26,239.20HARGA SATUANRp26,239.20

1 m2 Plesteran , 1PC : 6PP tebal 15 mm SNI : 2837:2008BAHAN4.416kgPCRp1,050.00Rp4,636.800.027m3Pasir pasangRp107,800.00Rp2,910.60TENAGA0.300OHPekerjaRp32,500.00Rp9,750.000.150OHTukang batuRp40,000.00Rp6,000.000.015OHKepala TukangRp45,000.00Rp675.000.015OHMandorRp45,000.00Rp675.00JUMLAHRp24,647.40HARGA SATUANRp24,647.40

1 m2 Plesteran , 1PC : 2Kp : 8Ps tebal 15 mm SNI : 2837:2008BAHAN3.000kgPCRp1,050.00Rp3,150.000.005m3Kapur pasangRp170,000.00Rp850.000.020m3Pasir pasangRp107,800.00Rp2,156.00TENAGA0.360OHPekerjaRp32,500.00Rp11,700.000.120OHTukang batuRp40,000.00Rp4,800.000.012OHKepala TukangRp45,000.00Rp540.000.018OHMandorRp45,000.00Rp810.00JUMLAHRp24,006.00HARGA SATUANRp24,006.00

1 m2 Plesteran , 1PC : 4PP tebal 20 mm SNI : 2837:2008BAHAN8.320kgPCRp1,050.00Rp8,736.000.032m3Pasir pasangRp107,800.00Rp3,449.60TENAGA0.400OHPekerjaRp32,500.00Rp13,000.000.200OHTukang batuRp40,000.00Rp8,000.000.020OHKepala TukangRp45,000.00Rp900.000.022OHMandorRp45,000.00Rp990.00JUMLAHRp35,075.60HARGA SATUANRp35,075.60

1 m' Plesteran Skoning, 1PC : 2PP lebar 10 mmERROR:#REF!BAHAN0.500kgPCRp1,050.00Rp525.000.013m3Pasir pasangRp107,800.00Rp1,401.40TENAGA0.080OHPekerjaRp32,500.00Rp2,600.000.400OHTukang batuRp40,000.00Rp16,000.000.040OHKepala TukangRp45,000.00Rp1,800.000.004OHMandorRp45,000.00Rp180.00JUMLAHRp22,506.40HARGA SATUANRp22,506.40

1 m2 Plesteran ciprat (kamprot), 1PC : 2PP SNI : 2837:2008BAHAN4.320kgPCRp1,050.00Rp4,536.000.006m3Pasir pasangRp107,800.00Rp646.80TENAGA0.300OHPekerjaRp32,500.00Rp9,750.000.100OHTukang batuRp40,000.00Rp4,000.000.010OHKepala TukangRp45,000.00Rp450.000.015OHMandorRp45,000.00Rp675.00JUMLAHRp20,057.80HARGA SATUANRp20,057.80

1 m2 Finishing siar pas. Batu kali adukan 1 PC : 2 PP SNI : 2837:2008BAHAN6.340kgPCRp1,050.00Rp6,657.000.012m3Pasir pasangRp107,800.00Rp1,293.60TENAGA0.300OHPekerjaRp32,500.00Rp9,750.000.150OHTukang batuRp40,000.00Rp6,000.000.015OHKepala TukangRp45,000.00Rp675.000.015OHMandorRp45,000.00Rp675.00JUMLAHRp25,050.60HARGA SATUANRp25,050.60

1 m2 Acian SNI : 2837:2008BAHAN3.250kgPCRp1,050.00Rp3,412.50TENAGA0.200OHPekerjaRp32,500.00Rp6,500.000.100OHTukang batuRp40,000.00Rp4,000.000.010OHKepala TukangRp45,000.00Rp450.000.010OHMandorRp45,000.00Rp450.00JUMLAHRp14,812.50HARGA SATUANRp14,812.50

F.PEKERJAAN BETON

1 m3 Beton lantai kerja mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm SNI : 7394:2008BAHAN230.000kgPCRp1,050.00Rp241,500.000.638m3Pasir betonRp116,000.00Rp73,991.430.761m3Kerikil betonRp180,000.00Rp136,933.33200.000literAirRp40.00Rp8,000.00TENAGA1.200OHPekerjaRp32,500.00Rp39,000.000.200OHTukang batuRp40,000.00Rp8,000.000.020OHKepala TukangRp45,000.00Rp900.000.060OHMandorRp45,000.00Rp2,700.00JUMLAHRp511,024.76HARGA SATUANRp511,024.76

1 m3 Beton mutu f'c = 19,3 Mpa (K 225), slump (12 2) cm, w/c = 0,58 SNI : 7394:2008BAHAN371.000kgPCRp1,050.00Rp389,550.000.499m3Pasir betonRp116,000.00Rp57,834.290.776m3Kerikil betonRp180,000.00Rp139,600.00215.000literAirRp40.00Rp8,600.00TENAGA1.650OHPekerjaRp32,500.00Rp53,625.000.275OHTukang batuRp40,000.00Rp11,000.000.028OHKepala TukangRp45,000.00Rp1,260.000.083OHMandorRp45,000.00Rp3,735.00JUMLAHRp665,204.29HARGA SATUANRp665,204.29

Pembesian 10 kg dengan besi polos atau ulir SNI : 7394:2008BAHAN10.500kgBesi beton (polos/ulir)Rp9,250.00Rp97,125.000.150kgKawat betonRp14,000.00Rp2,100.00TENAGA0.070OHPekerjaRp32,500.00Rp2,275.000.070OHTukang besiRp40,000.00Rp2,800.000.007OHKepala TukangRp45,000.00Rp315.000.004OHMandorRp45,000.00Rp180.00JUMLAHRp104,795.00HARGA SATUANRp104,795.001 kg ------------------->Rp10,479.50

1 m2 bekisting untuk pondasi SNI : 7394:2008BAHAN0.040m3Kayu kelas IIIRp2,200,000.00Rp88,000.000.300kgPaku 5 cm - 10 cmRp15,000.00Rp4,500.000.100literMinyak bekistingRp19,000.00Rp1,900.00TENAGA0.520OHPekerjaRp32,500.00Rp16,900.000.260OHTukang kayuRp42,500.00Rp11,050.000.026OHKepala TukangRp45,000.00Rp1,170.000.026OHMandorRp45,000.00Rp1,170.00JUMLAHRp124,690.00HARGA SATUANRp124,690.00

1 m2 bekisting untuk sloof SNI : 7394:2008BAHAN0.045m3Kayu kelas IIIRp2,200,000.00Rp99,000.000.300kgPaku 5 cm - 10 cmRp15,000.00Rp4,500.000.100literMinyak bekistingRp19,000.00Rp1,900.00TENAGA0.520OHPekerjaRp32,500.00Rp16,900.000.260OHTukang kayuRp42,500.00Rp11,050.000.026OHKepala TukangRp45,000.00Rp1,170.000.026OHMandorRp45,000.00Rp1,170.00JUMLAHRp135,690.00HARGA SATUANRp135,690.00

1 m2 bekisting untuk kolom SNI : 7394:2008BAHAN0.040m3Kayu kelas IIIRp2,200,000.00Rp88,000.000.400kgPaku 5 cm - 12 cmRp15,000.00Rp6,000.000.200literMinyak bekistingRp19,000.00Rp3,800.000.015m3Balok kayu kelas IIRp5,100,000.00Rp76,500.000.350lbrPlywoodRp65,000.00Rp22,750.002.000btgDolkenRp9,000.00Rp18,000.00TENAGA0.660OHPekerjaRp32,500.00Rp21,450.000.330OHTukang kayuRp42,500.00Rp14,025.000.033OHKepala TukangRp45,000.00Rp1,485.000.033OHMandorRp45,000.00Rp1,485.00JUMLAHRp253,495.00HARGA SATUANRp253,495.00

1 m2 bekisting untuk balok SNI : 7394:2008BAHAN0.040m3Kayu kelas IIIRp2,200,000.00Rp88,000.000.400kgPaku 5 cm - 12 cmRp15,000.00Rp6,000.000.200literMinyak bekistingRp19,000.00Rp3,800.000.018m3Balok kayu kelas IIRp5,100,000.00Rp91,800.000.350lbrPlywoodRp65,000.00Rp22,750.002.000btgDolkenRp9,000.00Rp18,000.00TENAGA0.660OHPekerjaRp32,500.00Rp21,450.000.330OHTukang kayuRp42,500.00Rp14,025.000.033OHKepala TukangRp45,000.00Rp1,485.000.033OHMandorRp45,000.00Rp1,485.00JUMLAHRp268,795.00HARGA SATUANRp268,795.00

1 m2 bekisting untuk plat lantai SNI : 7394:2008BAHAN0.040m3Kayu kelas IIIRp2,200,000.00Rp88,000.000.400kgPaku 5 cm - 12 cmRp15,000.00Rp6,000.000.200literMinyak bekistingRp19,000.00Rp3,800.000.015m3Balok kayu kelas IIRp5,100,000.00Rp76,500.000.350lbrPlywoodRp65,000.00Rp22,750.006.000btgDolkenRp9,000.00Rp54,000.00TENAGA0.660OHPekerjaRp32,500.00Rp21,450.000.330OHTukang kayuRp42,500.00Rp14,025.000.033OHKepala TukangRp45,000.00Rp1,485.000.033OHMandorRp45,000.00Rp1,485.00JUMLAHRp289,495.00HARGA SATUANRp289,495.00

1 m2 bekisting untuk tangga SNI : 7394:2008BAHAN0.030m3Kayu kelas IIIRp2,200,000.00Rp66,000.000.400kgPaku 5 cm - 12 cmRp15,000.00Rp6,000.000.150literMinyak bekistingRp19,000.00Rp2,850.000.015m3Balok kayu kelas IIRp5,100,000.00Rp76,500.000.350lbrPlywoodRp65,000.00Rp22,750.002.000btgDolkenRp9,000.00Rp18,000.00TENAGA0.660OHPekerjaRp32,500.00Rp21,450.000.330OHTukang kayuRp42,500.00Rp14,025.000.033OHKepala TukangRp45,000.00Rp1,485.000.033OHMandorRp45,000.00Rp1,485.00JUMLAHRp230,545.00HARGA SATUANRp230,545.00

1 m2 bekisting jembatan untuk pengecoran beton SNI : 7394:2008BAHAN0.0264m3Kayu kelas IIIRp2,200,000.00Rp58,080.000.600kgPaku 5 cm - 12 cmRp15,000.00Rp9,000.000.500btgDolkenRp9,000.00Rp4,500.00TENAGA0.150OHPekerjaRp32,500.00Rp4,875.000.050OHTukang kayuRp42,500.00Rp2,125.000.005OHKepala TukangRp45,000.00Rp225.000.008OHMandorRp45,000.00Rp360.00JUMLAHRp79,165.00HARGA SATUANRp79,165.00

1 m1 Kolom praktis beton bertulang (12 x 12) cm SNI : 7394:2008BAHAN0.002m3Kayu bekistingRp2,200,000.00Rp4,400.000.010kgPaku biasa 5 - 12 cmRp15,000.00Rp150.003.000kgBesi betonRp9,250.00Rp27,750.000.045kgKawat betonRp14,000.00Rp630.004.000kgPCRp1,050.00Rp4,200.000.006m3Pasir betonRp116,000.00Rp696.000.009m3Kerikil betonRp180,000.00Rp1,620.00TENAGA0.180OHPekerjaRp32,500.00Rp5,850.000.020OHTukang batuRp40,000.00Rp800.000.020OHTukang kayuRp42,500.00Rp850.000.020OHTukang besiRp40,000.00Rp800.000.006OHKepala TukangRp45,000.00Rp270.000.009OHMandorRp45,000.00Rp405.00JUMLAHRp48,421.00HARGA SATUANRp48,421.001 m3Rp4,001,735.54

1 m' Balok latei beton bertulang, (10 x 15) cm SNI : 7394:2008BAHAN0.003m3Kayu bekistingRp2,200,000.00Rp6,600.000.020kgPaku biasa 5 - 12 cmRp15,000.00Rp300.003.600kgBesi betonRp9,250.00Rp33,300.000.050kgKawat betonRp14,000.00Rp700.005.500kgPCRp1,050.00Rp5,775.000.009m3Pasir betonRp116,000.00Rp1,044.000.015m3Kerikil betonRp180,000.00Rp2,700.00TENAGA0.297OHPekerjaRp32,500.00Rp9,652.500.033OHTukang batuRp40,000.00Rp1,320.000.033OHTukang kayuRp42,500.00Rp1,402.500.033OHTukang besiRp40,000.00Rp1,320.000.010OHKepala TukangRp45,000.00Rp450.000.015OHMandorRp45,000.00Rp675.00JUMLAHRp65,239.00HARGA SATUANRp65,239.001 m3Rp2,718,291.67

1 m' Ring gunung beton bertulang, (12 x 15) cm SNI : 7394:2008BAHAN0.003m3Kayu bekistingRp2,200,000.00Rp6,600.000.020kgPaku biasa 5 - 12 cmRp15,000.00Rp300.003.600kgBesi betonRp9,250.00Rp33,300.000.050kgKawat betonRp14,000.00Rp700.005.500kgPCRp1,050.00Rp5,775.000.009m3Pasir betonRp116,000.00Rp1,044.000.015m3Kerikil betonRp180,000.00Rp2,700.00TENAGA0.297OHPekerjaRp32,500.00Rp9,652.500.033OHTukang batuRp40,000.00Rp1,320.000.033OHTukang kayuRp42,500.00Rp1,402.500.033OHTukang besiRp40,000.00Rp1,320.000.010OHKepala TukangRp45,000.00Rp450.000.015OHMandorRp45,000.00Rp675.00JUMLAHRp65,239.00HARGA SATUANRp65,239.001 m3Rp2,718,291.67

1 m3 Membongkar bekistingRp45,000TENAGA4.000OHPekerjaRp32,500.00Rp130,000.00JUMLAHRp130,000.00HARGA SATUANRp130,000.00

1 m3 Pondasi Footplat Beton mutu f'c = 19,3 Mpa, uk. 100x100 cm, tul. 12 mm - 20 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.290.888kgBesi beton9,303.28=menghitung berat besi tulangan polos4.0000m2Bekisting untuk pondasi498,760.00=0,006165 x d x d x L0.2500m3Membongkar bekisting32,500.00JUMLAH1,205,767.57DIBULATKAN1,205,767.00

1 m3 Sloof Beton mutu f'c = 19,3 Mpa, uk. 12x20 cm, tul. 4 12 mm, begel 6 - 20 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.291.110kgBesi beton11,629.105.8333m2Bekisting untuk sloof791,525.000.5000m3Membongkar bekisting65,000.00JUMLAH1,533,358.39DIBULATKAN1,533,358.00

1 m3 Sloof Beton mutu f'c = 19,3 Mpa, uk. 20x30 cm, tul. 6 16 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.291.973kgBesi beton20,673.965.0000m2Bekisting untuk sloof678,450.000.5000m3Membongkar bekisting65,000.00JUMLAH1,429,328.24DIBULATKAN1,429,328.00

1 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 30x40 cm, tul. 12 16 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.291.973kgBesi beton20,673.960.0620m2Bekisting untuk kolom15,712.210.5000m3Membongkar bekisting65,000.00JUMLAH766,590.45DIBULATKAN766,590.00

1 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 30x30 cm, tul. 8 16 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.291.973kgBesi beton20,673.960.0621m2Bekisting untuk kolom15,753.560.5000m3Membongkar bekisting65,000.00JUMLAH766,631.80DIBULATKAN766,631.00

1 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 12x20 cm, tul. 4 12 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.291.282kgBesi beton13,438.070.0404m2Bekisting untuk kolom10,239.810.6250m3Membongkar bekisting81,250.00JUMLAH770,132.17DIBULATKAN770,132.00

1 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 15x20 cm, tul. 4 12 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.291.282kgBesi beton13,438.070.0404m2Bekisting untuk kolom10,239.810.6571m3Membongkar bekisting85,428.57JUMLAH774,310.74DIBULATKAN774,310.00

1 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 15x25 cm, tul. 4 12 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.291.282kgBesi beton13,438.070.0404m2Bekisting untuk kolom10,239.810.7000m3Membongkar bekisting91,000.00JUMLAH779,882.17DIBULATKAN779,882.00

1 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 15x15 cm, tul. 4 12 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.291.282kgBesi beton13,438.076.6667m2Bekisting untuk kolom1,689,966.670.5000m3Membongkar bekisting65,000.00JUMLAH2,433,609.02DIBULATKAN2,433,609.00

1 m3 RingBalok Beton mutu f'c = 19,3 Mpa, uk. 12x20 cm, tul. 4 12 mm, begel 6 - 20 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.291.110kgBesi beton11,629.100.0108m2Bekisting untuk balok2,907.280.6250m3Membongkar bekisting81,250.00JUMLAH760,990.66DIBULATKAN760,990.00

1 m3 Balok Beton mutu f'c = 19,3 Mpa, uk. 15x25 cm, tul. 6 12 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.291.282kgBesi beton13,438.076.6667m2Bekisting untuk balok1,791,966.670.6250m3Membongkar bekisting81,250.00JUMLAH2,551,859.02DIBULATKAN2,551,859.00

1 m3 Balok Beton mutu f'c = 19,3 Mpa, uk. 20x35 cm, tul. 8 16 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.291.973kgBesi beton20,673.966.6667m2Bekisting untuk balok1,791,966.670.8000m3Membongkar bekisting104,000.00JUMLAH2,581,844.91DIBULATKAN2,581,844.00

1 m3 Balok Beton mutu f'c = 19,3 Mpa, uk. 25x45 cm, tul. 10 16 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.291.973kgBesi beton20,673.965.1111m2Bekisting untuk balok1,373,841.110.8214m3Membongkar bekisting106,785.71JUMLAH2,166,505.07DIBULATKAN2,166,505.00

1 m3 Plat Beton mutu f'c = 19,3 Mpa, tebal 12 cm, tul. 8 mm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.290.395kgBesi beton4,134.790.0186m2Bekisting untuk plat5,375.231.0000m3Membongkar bekisting130,000.00JUMLAH804,714.31DIBULATKAN804,714.00

G.PEKERJAAN KAYU

1 m3 Membuat dan memasang kusen pintu/jendela kayu jati SNI : 3434:2008BAHAN1.100m3Kayu jati, balokRp18,000,000.00Rp19,800,000.001.250KgPaku biasa 2" - 5"Rp15,000.00Rp18,750.001.000KgLem kayuRp12,000.00Rp12,000.00TENAGA7.000OHPekerjaRp32,500.00Rp227,500.0021.000OHTukang KayuRp42,500.00Rp892,500.002.100OHKepala TukangRp45,000.00Rp94,500.000.350OHMandorRp45,000.00Rp15,750.00JUMLAHRp21,061,000.00HARGA SATUANRp21,061,000.00

1 m3 Membuat dan memasang kusen pintu/jendela kayu kamper SNI : 3434:2008BAHAN1.200m3Kayu kamper, balokRp7,500,000.00Rp9,000,000.001.250KgPaku biasa 2" - 5"Rp15,000.00Rp18,750.001.000KgLem kayuRp12,000.00Rp12,000.00TENAGA6.000OHPekerjaRp32,500.00Rp195,000.0018.000OHTukang KayuRp42,500.00Rp765,000.001.800OHKepala TukangRp45,000.00Rp81,000.000.300OHMandorRp45,000.00Rp13,500.00JUMLAHRp10,085,250.00HARGA SATUANRp10,085,250.00

1 m3 Membuat dan memasang kusen pintu/jendela kayu bangkirei SNI : 3434:2008BAHAN1.200m3Kayu bangkirei, balokRp7,800,000.00Rp9,360,000.001.250KgPaku biasa 2" - 5"Rp15,000.00Rp18,750.001.000KgLem kayuRp12,000.00Rp12,000.00TENAGA6.000OHPekerjaRp32,500.00Rp195,000.0018.000OHTukang KayuRp42,500.00Rp765,000.001.800OHKepala TukangRp45,000.00Rp81,000.000.300OHMandorRp45,000.00Rp13,500.00JUMLAHRp10,445,250.00HARGA SATUANRp10,445,250.00

1 m3 Memasang kusen pintu/jendela lama SNI : 3434:2008Dipakai koefisien 1/3 dari biaya pembuatan dan pemasangan kusen pintu/jendela baru BAHAN0.417KgPaku biasa 2" - 5"Rp15,000.00Rp6,250.000.333KgLem kayuRp12,000.00Rp4,000.00TENAGA2.000OHPekerjaRp32,500.00Rp65,000.006.000OHTukang KayuRp42,500.00Rp255,000.000.600OHKepala TukangRp45,000.00Rp27,000.000.100OHMandorRp45,000.00Rp4,500.00JUMLAHRp361,750.00HARGA SATUANRp361,750.00

1 m2 Membuat dan memasang daun pintu panel kayu jati SNI : 3434:2008BAHAN0.040m3Kayu jati, papanRp20,000,000.00Rp800,000.000.500KgLem kayuRp12,000.00Rp6,000.00TENAGA1.000OHPekerjaRp32,500.00Rp32,500.003.000OHTukang KayuRp42,500.00Rp127,500.000.300OHKepala TukangRp45,000.00Rp13,500.000.050OHMandorRp45,000.00Rp2,250.00JUMLAHRp981,750.00HARGA SATUANRp981,750.00

1 m2 Membuat dan memasang daun pintu panel kayu kamper SNI : 3434:2008BAHAN0.040m3Kayu kamper, papanRp8,300,000.00Rp332,000.000.500KgLem kayuRp12,000.00Rp6,000.00TENAGA1.000OHPekerjaRp32,500.00Rp32,500.003.000OHTukang KayuRp42,500.00Rp127,500.000.300OHKepala TukangRp45,000.00Rp13,500.000.050OHMandorRp45,000.00Rp2,250.00JUMLAHRp513,750.00HARGA SATUANRp513,750.00

1 m2 Membuat dan memasang daun pintu panel kayu bangkirei SNI : 3434:2008BAHAN0.040m3Kayu bangkirei, papanRp8,650,000.00Rp346,000.000.500KgLem kayuRp12,000.00Rp6,000.00TENAGA1.000OHPekerjaRp32,500.00Rp32,500.003.000OHTukang KayuRp42,500.00Rp127,500.000.300OHKepala TukangRp45,000.00Rp13,500.000.050OHMandorRp45,000.00Rp2,250.00JUMLAHRp527,750.00HARGA SATUANRp527,750.00

1 m2 Memasang daun pintu panel lama SNI : 3434:2008Dipakai koefisien 1/3 dari biaya pembuatan dan pemasangan kusen pintu/jendela baru BAHAN0.167KgLem kayuRp12,000.00Rp2,000.00TENAGA0.333OHPekerjaRp32,500.00Rp10,833.331.000OHTukang KayuRp42,500.00Rp42,500.000.100OHKepala TukangRp45,000.00Rp4,500.000.017OHMandorRp45,000.00Rp750.00JUMLAHRp60,583.33HARGA SATUANRp60,583.33

1 m2 Membuat dan memasang daun pintu/jendela kaca kayu jati SNI : 3434:2008BAHAN0.024m3Kayu jati, papanRp20,000,000.00Rp480,000.000.300KgLem kayuRp12,000.00Rp3,600.00TENAGA0.800OHPekerjaRp32,500.00Rp26,000.002.400OHTukang KayuRp42,500.00Rp102,000.000.240OHKepala TukangRp45,000.00Rp10,800.000.040OHMandorRp45,000.00Rp1,800.00JUMLAHRp624,200.00HARGA SATUANRp624,200.00

1 m2 Membuat dan memasang daun pintu/jendela kaca kayu kamper SNI : 3434:2008BAHAN0.024m3Kayu kamper, papanRp8,300,000.00Rp199,200.000.300KgLem kayuRp12,000.00Rp3,600.00TENAGA0.800OHPekerjaRp32,500.00Rp26,000.002.400OHTukang KayuRp42,500.00Rp102,000.000.240OHKepala TukangRp45,000.00Rp10,800.000.040OHMandorRp45,000.00Rp1,800.00JUMLAHRp343,400.00HARGA SATUANRp343,400.00

1 m2 Membuat dan memasang daun pintu/jendela kaca kayu bangkirei SNI : 3434:2008BAHAN0.024m3Kayu bangkirei, papanRp8,650,000.00Rp207,600.000.300KgLem kayuRp32,500.00Rp9,750.00TENAGA0.800OHPekerjaRp32,500.00Rp26,000.002.400OHTukang KayuRp42,500.00Rp102,000.000.240OHKepala TukangRp45,000.00Rp10,800.000.040OHMandorRp45,000.00Rp1,800.00JUMLAHRp357,950.00HARGA SATUANRp357,950.00

1 m2 Memasang daun pintu/jendela kaca lama SNI : 3434:2008Dipakai koefisien 1/3 dari biaya pembuatan dan pemasangan kusen pintu/jendela baru BAHAN0.100KgLem kayuRp45,000.00Rp4,500.00TENAGA0.267OHPekerjaRp32,500.00Rp8,666.670.800OHTukang KayuRp42,500.00Rp34,000.000.080OHKepala TukangRp45,000.00Rp3,600.000.013OHMandorRp45,000.00Rp600.00JUMLAHRp51,366.67HARGA SATUANRp51,366.67

1 m2 Membuat dan memasang daun pintu dan jendela jalusi kayu jati SNI : 3434:2008BAHAN0.064m3Kayu jati, papanRp20,000,000.00Rp1,280,000.000.500KgLem kayuRp12,000.00Rp6,000.00TENAGA1.000OHPekerjaRp32,500.00Rp32,500.003.000OHTukang KayuRp42,500.00Rp127,500.000.300OHKepala TukangRp45,000.00Rp13,500.000.050OHMandorRp45,000.00Rp2,250.00JUMLAHRp1,461,750.00HARGA SATUANRp1,461,750.00

1 m2 Membuat dan memasang daun pintu dan jendela jalusi kayu kamper SNI : 3434:2008BAHAN0.040m3Kayu kamper, papanRp8,300,000.00Rp332,000.000.500KgLem kayuRp12,000.00Rp6,000.00TENAGA1.000OHPekerjaRp32,500.00Rp32,500.003.000OHTukang KayuRp42,500.00Rp127,500.000.300OHKepala TukangRp45,000.00Rp13,500.000.050OHMandorRp45,000.00Rp2,250.00JUMLAHRp513,750.00HARGA SATUANRp513,750.00

1 m2 Membuat dan memasang pintu dan jendela jalusi kayu bangkirei SNI : 3434:2008BAHAN0.040m3Kayu bangkirei, papanRp8,650,000.00Rp346,000.000.500KgLem kayuRp12,000.00Rp6,000.00TENAGA1.000OHPekerjaRp32,500.00Rp32,500.003.000OHTukang KayuRp42,500.00Rp127,500.000.300OHKepala TukangRp45,000.00Rp13,500.000.050OHMandorRp45,000.00Rp2,250.00JUMLAHRp527,750.00HARGA SATUANRp527,750.00

1 m2 Membuat dan memasang daun pintu lapis (plywood) rangkap, rangka tertutup, kayu kamper (lebar s/d 90 cm) SNI : 3434:2008BAHAN0.025m3Kayu kamper, papanRp8,300,000.00Rp207,500.000.030kgPaku 1 cm - 2,5 cmRp15,000.00Rp450.000.500kgLem kayuRp12,000.00Rp6,000.001.000lbrPlywoodRp65,000.00Rp65,000.00TENAGA0.700OHPekerjaRp32,500.00Rp22,750.002.100OHTukang KayuRp42,500.00Rp89,250.000.210OHKepala TukangRp45,000.00Rp9,450.000.035OHMandorRp45,000.00Rp1,575.00JUMLAHRp401,975.00HARGA SATUANRp401,975.00

1 m2 Membuat dan memasang daun pintu plywood rangkap, rangka ekspose, kayu kamper SNI : 3434:2008BAHAN0.0256m3Kayu kamper, papanRp8,300,000.00Rp212,480.000.030kgPaku 1 cm - 2,5 cmRp15,000.00Rp450.000.500kgLem kayuRp12,000.00Rp6,000.001.000lbrPlywoodRp65,000.00Rp65,000.00TENAGA0.800OHPekerjaRp32,500.00Rp26,000.002.400OHTukang KayuRp42,500.00Rp102,000.000.240OHKepala TukangRp45,000.00Rp10,800.000.040OHMandorRp45,000.00Rp1,800.00JUMLAHRp424,530.00HARGA SATUANRp424,530.00

1 m2 Memasang jalusi kusen kayu jati SNI : 3434:2008BAHAN0.060m3Kayu jati, papanRp20,000,000.00Rp1,200,000.000.150KgPaku kecilRp22,000.00Rp3,300.00TENAGA0.670OHPekerjaRp32,500.00Rp21,775.002.400OHTukang KayuRp42,500.00Rp102,000.000.200OHKepala TukangRp45,000.00Rp9,000.000.335OHMandorRp45,000.00Rp15,075.00JUMLAHRp1,351,150.00HARGA SATUANRp1,351,150.00

1 m2 Memasang jalusi kusen kayu kamper SNI : 3434:2008BAHAN0.060m3Kayu kamper, papanRp8,300,000.00Rp498,000.000.150KgPaku kecilRp22,000.00Rp3,300.00TENAGA0.670OHPekerjaRp32,500.00Rp21,775.002.400OHTukang KayuRp42,500.00Rp102,000.000.200OHKepala TukangRp45,000.00Rp9,000.000.335OHMandorRp45,000.00Rp15,075.00JUMLAHRp649,150.00HARGA SATUANRp649,150.00

1 m2 Memasang jalusi kusen kayu bangkirei SNI : 3434:2008BAHAN0.060m3Kayu bangkirei, papanRp8,650,000.00Rp519,000.000.150KgPaku kecilRp22,000.00Rp3,300.00TENAGA0.670OHPekerjaRp32,500.00Rp21,775.002.400OHTukang KayuRp42,500.00Rp102,000.000.200OHKepala TukangRp45,000.00Rp9,000.000.335OHMandorRp45,000.00Rp15,075.00JUMLAHRp670,150.00HARGA SATUANRp670,150.00

1 m3 Memasang kuda-kuda kayu bangkirei SNI : 3434:2008BAHAN1.100m3Kayu bangkirei, balokRp7,800,000.00Rp8,580,000.005.600KgPaku biasa 2" - 5"Rp15,000.00Rp84,000.0015.000KgBesi stripRp9,250.00Rp138,750.00TENAGA4.000OHPekerjaRp32,500.00Rp130,000.0012.000OHTukang KayuRp42,500.00Rp510,000.001.200OHKepala TukangRp45,000.00Rp54,000.000.200OHMandorRp45,000.00Rp9,000.00JUMLAHRp9,505,750.00HARGA SATUANRp9,505,750.00

1 m3 Memasang kuda-kuda lama SNI : 3434:2008Pemasangan kuda-kuda lama dipakai koefisien 50% tenaga kerjaTENAGA2.000OHPekerjaRp32,500.00Rp65,000.006.000OHTukang KayuRp42,500.00Rp255,000.000.600OHKepala TukangRp45,000.00Rp27,000.000.100OHMandorRp45,000.00Rp4,500.00JUMLAHRp351,500.00HARGA SATUANRp351,500.00

1 m3 Konstruksi Gording kayu bangkirei SNI : 3434:2008BAHAN1.100m3Kayu bangkirei, balokRp7,800,000.00Rp8,580,000.003.000KgPaku biasa 2" - 5"Rp15,000.00Rp45,000.0015.000KgBesi stripRp9,250.00Rp138,750.00TENAGA2.400OHPekerjaRp32,500.00Rp78,000.007.200OHTukang KayuRp42,500.00Rp306,000.000.720OHKepala TukangRp45,000.00Rp32,400.000.120OHMandorRp45,000.00Rp5,400.00JUMLAHRp9,185,550.00HARGA SATUANRp9,185,550.00

1 m3 Konstruksi Gording lama SNI : 3434:2008BAHAN3.000KgPaku biasa 2" - 5"Rp15,000.00Rp45,000.0015.000KgBesi stripRp9,250.00Rp138,750.00TENAGA2.400OHPekerjaRp32,500.00Rp78,000.007.200OHTukang KayuRp42,500.00Rp306,000.000.720OHKepala TukangRp45,000.00Rp32,400.000.120OHMandorRp45,000.00Rp5,400.00JUMLAHRp605,550.00HARGA SATUANRp605,550.00

1 m2 Rangka atap genteng keramik, kayu bangkirei SNI : 3434:2008BAHAN0.014m3Kaso-kaso (5/7), kayu bangkireiRp7,800,000.00Rp109,200.000.0036m3Reng (2/3), kayu bangkireiRp5,000,000.00Rp18,000.000.250KgPaku biasa 2" - 5"Rp15,000.00Rp3,750.00TENAGA0.100OHPekerjaRp32,500.00Rp3,250.000.100OHTukang KayuRp42,500.00Rp4,250.000.010OHKepala TukangRp45,000.00Rp450.000.050OHMandorRp45,000.00Rp2,250.00JUMLAHRp141,150.00HARGA SATUANRp141,150.00

1 m2 Rangka atap genteng keramik, kaso kruing reng jati SNI : 3434:2008BAHAN0.014m3Kaso-kaso (5/7), kayu kruingRp5,800,000.00Rp81,200.000.0036m3Reng (2/3), kayu jatiRp6,650,000.00Rp23,940.000.250KgPaku biasa 2" - 5"Rp15,000.00Rp3,750.00TENAGA0.100OHPekerjaRp32,500.00Rp3,250.000.100OHTukang KayuRp42,500.00Rp4,250.000.010OHKepala TukangRp45,000.00Rp450.000.050OHMandorRp45,000.00Rp2,250.00JUMLAHRp119,090.00HARGA SATUANRp119,090.00

1 m2 Rangka atap genteng beton, kayu bangkirei SNI : 3434:2008BAHAN0.014m3Kaso-kaso (5/7), kayu bangkireiRp7,800,000.00Rp109,200.000.0072m3Reng (3/4), kayu bangkireiRp5,000,000.00Rp36,000.000.250KgPaku biasa 2" - 5"Rp15,000.00Rp3,750.00TENAGA0.100OHPekerjaRp32,500.00Rp3,250.000.100OHTukang KayuRp42,500.00Rp4,250.000.010OHKepala TukangRp45,000.00Rp450.000.050OHMandorRp45,000.00Rp2,250.00JUMLAHRp159,150.00HARGA SATUANRp159,150.00

1 m2 Rangka atap genteng keramik, kayu lama SNI : 3434:2008BAHAN0.250KgPaku biasa 2" - 5"Rp15,000.00Rp3,750.00TENAGA0.100OHPekerjaRp32,500.00Rp3,250.000.100OHTukang KayuRp42,500.00Rp4,250.000.010OHKepala TukangRp45,000.00Rp450.000.050OHMandorRp45,000.00Rp2,250.00JUMLAHRp13,950.00HARGA SATUANRp13,950.00

1 m2 Rangka langit-langit, kayu kruing uk. (50x100) cm SNI : 3434:2008BAHAN0.0154m3Kayu kruing, balokRp5,800,000.00Rp89,320.000.200KgPaku biasa 2" - 5"Rp15,000.00Rp3,000.00TENAGA0.150OHPekerjaRp32,500.00Rp4,875.000.300OHTukang KayuRp42,500.00Rp12,750.000.030OHKepala TukangRp45,000.00Rp1,350.000.075OHMandorRp45,000.00Rp3,375.00JUMLAHRp114,670.00HARGA SATUANRp114,670.00

1 m2 Rangka langit-langit, kayu meranti uk. (50x100) cm SNI : 3434:2008BAHAN0.0154m3Kayu meranti, balokRp5,100,000.00Rp78,540.000.200KgPaku biasa 2" - 5"Rp15,000.00Rp3,000.00TENAGA0.150OHPekerjaRp32,500.00Rp4,875.000.300OHTukang KayuRp42,500.00Rp12,750.000.030OHKepala TukangRp45,000.00Rp1,350.000.075OHMandorRp45,000.00Rp3,375.00JUMLAHRp103,890.00HARGA SATUANRp103,890.00

1 m2 Rangka langit-langit, kayu kruing uk. (60x60) cm SNI : 3434:2008BAHAN0.0163m3Kayu kruing, balokRp5,800,000.00Rp94,540.000.250KgPaku biasa 2" - 5"Rp15,000.00Rp3,750.00TENAGA0.200OHPekerjaRp32,500.00Rp6,500.000.300OHTukang KayuRp42,500.00Rp12,750.000.030OHKepala TukangRp45,000.00Rp1,350.000.075OHMandorRp45,000.00Rp3,375.00JUMLAHRp122,265.00HARGA SATUANRp122,265.00

1 m2 Rangka langit-langit, kayu meranti uk. (60x60) cm SNI : 3434:2008BAHAN0.0163m3Kayu meranti, balokRp5,100,000.00Rp83,130.000.250KgPaku biasa 2" - 5"Rp15,000.00Rp3,750.00TENAGA0.200OHPekerjaRp32,500.00Rp6,500.000.300OHTukang KayuRp42,500.00Rp12,750.000.030OHKepala TukangRp45,000.00Rp1,350.000.075OHMandorRp45,000.00Rp3,375.00JUMLAHRp110,855.00HARGA SATUANRp110,855.00

1 m2 Rangka langit-langit, kayu kruing uk. (100x100) cm SNI : 2002BAHAN0.0120m3Kayu kruing, balokRp5,800,000.00Rp69,600.000.100KgPaku biasa 2" - 5"Rp15,000.00Rp1,500.00TENAGA0.150OHPekerjaRp32,500.00Rp4,875.000.250OHTukang KayuRp42,500.00Rp10,625.000.025OHKepala TukangRp45,000.00Rp1,125.000.075OHMandorRp45,000.00Rp3,375.00JUMLAHRp91,100.00HARGA SATUANRp91,100.00

1 m2 Rangka langit-langit miring, kayu meranti uk. (100x100) cm SNI : 2002BAHAN0.0060m3Kayu meranti, balokRp5,100,000.00Rp30,600.000.060KgPaku biasa 2" - 5"Rp15,000.00Rp900.00TENAGA0.150OHPekerjaRp32,500.00Rp4,875.000.250OHTukang KayuRp42,500.00Rp10,625.000.025OHKepala TukangRp45,000.00Rp1,125.000.075OHMandorRp45,000.00Rp3,375.00JUMLAHRp51,500.00HARGA SATUANRp51,500.00

1 m2 Rangka langit-langit, kayu lama uk. (100x100) cm SNI : 2002BAHAN0.0120m3Kayu kruing balokRp5,800,000.00Rp69,600.000.100KgPaku biasa 2" - 5"Rp15,000.00Rp1,500.00TENAGA0.150OHPekerjaRp32,500.00Rp4,875.000.250OHTukang KayuRp42,500.00Rp10,625.000.025OHKepala TukangRp45,000.00Rp1,125.000.075OHMandorRp45,000.00Rp3,375.00JUMLAHRp91,100.00HARGA SATUANRp91,100.00

1 m1 Memasang Lisplank uk. (3x20) cm kayu bangkirei SNI : 3434:2008BAHAN0.0108m3Kayu bangkirei, papanRp8,650,000.00Rp93,420.000.100KgPaku biasa 2" - 5"Rp15,000.00Rp1,500.00TENAGA0.100OHPekerjaRp32,500.00Rp3,250.000.200OHTukang KayuRp42,500.00Rp8,500.000.020OHKepala TukangRp45,000.00Rp900.000.005OHMandorRp45,000.00Rp225.00JUMLAHRp107,795.00HARGA SATUANRp107,795.00

1 m1 Memasang riuter uk. (2x15) cm kayu kruing SNI : 3434:2008BAHAN0.0030m3Kayu Kruing papanRp5,800,000.00Rp17,400.000.050KgPaku biasa 2" - 5 "Rp15,000.00Rp750.00TENAGA0.100OHPekerjaRp32,500.00Rp3,250.000.200OHTukang KayuRp42,500.00Rp8,500.000.020OHKepala TukangRp45,000.00Rp900.000.005OHMandorRp45,000.00Rp225.00JUMLAHRp31,025.00HARGA SATUANRp31,025.00

1 m1 Memasang winvier uk. (2x10) cm kayu bengkirei SNI : 3434:2008BAHAN0.0020m3Kayu bangkirai papanRp8,650,000.00Rp17,300.000.050Kgpaku biasa 2"- 5"Rp15,000.00Rp750.00TENAGA0.100OHPekerjaRp32,500.00Rp3,250.000.200OHTukang KayuRp42,500.00Rp8,500.000.020OHKepala TukangRp45,000.00Rp900.000.005OHMandorRp45,000.00Rp225.00JUMLAHRp30,925.00HARGA SATUANRp30,925.00

H.PEKERJAAN PENUTUP ATAP

1 m2 Memasang atap genteng kodok/glazzur SNI : 03-3436-2002BAHAN25.0000bhGenteng kodokRp1,700.00Rp42,500.00TENAGA0.150OHPekerjaRp32,500.00Rp4,875.000.075OHTukang KayuRp42,500.00Rp3,187.500.008OHKepala TukangRp45,000.00Rp360.000.008OHMandorRp45,000.00Rp360.00JUMLAHRp51,282.50HARGA SATUANRp51,282.50

1 m2 Memasang atap genteng palentong/paris, kecil SNI : 03-3436-2002BAHAN25.0000bhGenteng palentong/parisRp900.00Rp22,500.00TENAGA0.150OHPekerjaRp32,500.00Rp4,875.000.075OHTukang KayuRp42,500.00Rp3,187.500.008OHKepala TukangRp45,000.00Rp360.000.008OHMandorRp45,000.00Rp360.00JUMLAHRp31,282.50HARGA SATUANRp31,282.50

1 m2 Memasang atap genteng beton SNI : 03-3436-2002BAHAN9.0000bhGenteng betonRp8,000.00Rp72,000.000.0300kgPaku biasa 2"-5"Rp15,000.00Rp450.00TENAGA0.200OHPekerjaRp32,500.00Rp6,500.000.100OHTukang KayuRp42,500.00Rp4,250.000.010OHKepala TukangRp45,000.00Rp450.000.010OHMandorRp45,000.00Rp450.00JUMLAHRp84,100.00HARGA SATUANRp84,100.00

1 m2 Memasang atap genteng metal SNI : 03-3436-2002BAHAN1.0200lbrGenteng metalRp70,000.00Rp71,400.000.2000kgPaku biasa 2"-5"Rp15,000.00Rp3,000.00TENAGA0.200OHPekerjaRp32,500.00Rp6,500.000.100OHTukang KayuRp42,500.00Rp4,250.000.010OHKepala TukangRp45,000.00Rp450.000.010OHMandorRp45,000.00Rp450.00JUMLAHRp86,050.00HARGA SATUANRp86,050.00

1 m1 Memasang bubung genteng kodok/ glazzur SNI : 03-3436-2002BAHAN5.0000bhBubung genteng kodokRp3,000.00Rp15,000.008.0000kgPCRp1,050.00Rp8,400.000.0320m3Pasir pasangRp107,800.00Rp3,449.60TENAGA0.400OHPekerjaRp32,500.00Rp13,000.000.200OHTukang KayuRp42,500.00Rp8,500.000.020OHKepala TukangRp45,000.00Rp900.000.002OHMandorRp45,000.00Rp90.00JUMLAHRp49,339.60HARGA SATUANRp49,339.60

1 m1 Memasang bubung genteng palentong/paris SNI : 03-3436-2002BAHAN5.0000bhBubung genteng palentong/parisRp3,000.00Rp15,000.008.0000kgPCRp1,050.00Rp8,400.000.0320m3Pasir pasangRp107,800.00Rp3,449.60TENAGA0.400OHPekerjaRp32,500.00Rp13,000.000.200OHTukang KayuRp42,500.00Rp8,500.000.020OHKepala TukangRp45,000.00Rp900.000.002OHMandorRp45,000.00Rp90.00JUMLAHRp49,339.60HARGA SATUANRp49,339.60

1 m1 Memasang nok genteng beton SNI : 03-3436-2002BAHAN3.5000bhNok genteng betonRp13,000.00Rp45,500.000.0500kgPaku biasa 2"-5"Rp15,000.00Rp750.0010.8000kgPCRp1,050.00Rp11,340.000.0320kgPasir pasangRp107,800.00Rp3,449.601.0000m3Semen warnaRp2,025.00Rp2,025.00TENAGA0.400OHPekerjaRp32,500.00Rp13,000.000.200OHTukang KayuRp42,500.00Rp8,500.000.020OHKepala TukangRp45,000.00Rp900.000.002OHMandorRp45,000.00Rp90.00JUMLAHRp85,554.60HARGA SATUANRp85,554.60

1 m1 Memasang nok genteng metal SNI : 03-3436-2002BAHAN1.1000bhNok genteng metalRp5,000.00Rp5,500.000.0500kgPaku biasa 1/2"-1"Rp15,000.00Rp750.00TENAGA0.250OHPekerjaRp32,500.00Rp8,125.000.150OHTukang KayuRp42,500.00Rp6,375.000.015OHKepala TukangRp45,000.00Rp675.000.013OHMandorRp45,000.00Rp585.00JUMLAHRp22,010.00HARGA SATUANRp22,010.00

1 m2 Pasang atap asbes gelombang (2,25 x 0,92 m) x 5 mm SNI : 03-3436-2002BAHAN0.6000lbrAsbes gelombangRp82,400.00Rp49,440.000.1200bhPaku pancing Rp22,000.00Rp2,640.00TENAGA0.140OHPekerjaRp32,500.00Rp4,550.000.075OHTukang KayuRp42,500.00Rp3,187.500.008OHKepala TukangRp45,000.00Rp360.000.008OHMandorRp45,000.00Rp360.00JUMLAHRp60,537.50HARGA SATUANRp60,537.50

1 m2 Pasang atap asbes gelombang (1,5 x 0,92 m) x 5 mm SNI : 03-3436-2002BAHAN0.7250lbrAsbes gelombangRp51,500.00Rp37,337.500.1200bhPaku pancing Rp22,000.00Rp2,640.00TENAGA0.140OHPekerjaRp32,500.00Rp4,550.000.070OHTukang KayuRp42,500.00Rp2,975.000.007OHKepala TukangRp45,000.00Rp315.000.007OHMandorRp45,000.00Rp315.00JUMLAHRp48,132.50HARGA SATUANRp48,132.50

1 m2 Pasang atap asbes gelombang (3,0 x 1,05 m) x 4 mm SNI : 03-3436-2002BAHAN0.3500lbrAsbes gelombangRp63,900.00Rp22,365.000.1200bhPaku pancing Rp22,000.00Rp2,640.00TENAGA0.140OHPekerjaRp32,500.00Rp4,550.000.070OHTukang KayuRp42,500.00Rp2,975.000.007OHKepala TukangRp45,000.00Rp315.000.007OHMandorRp45,000.00Rp315.00JUMLAHRp33,160.00HARGA SATUANRp33,160.00

1 m2 Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm SNI : 03-3436-2002BAHAN0.4400lbrAsbes gelombangRp53,600.00Rp23,584.000.1200bhPaku pancing Rp22,000.00Rp2,640.00TENAGA0.140OHPekerjaRp32,500.00Rp4,550.000.070OHTukang KayuRp42,500.00Rp2,975.000.007OHKepala TukangRp45,000.00Rp315.000.007OHMandorRp45,000.00Rp315.00JUMLAHRp34,379.00HARGA SATUANRp34,379.00

1 m2 Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm SNI : 03-3436-2002BAHAN0.5100lbrAsbes gelombangRp46,300.00Rp23,613.000.1200bhPaku pancing Rp22,000.00Rp2,640.00TENAGA0.140OHPekerjaRp32,500.00Rp4,550.000.067OHTukang KayuRp42,500.00Rp2,847.500.007OHKepala TukangRp45,000.00Rp315.000.007OHMandorRp45,000.00Rp315.00JUMLAHRp34,280.50HARGA SATUANRp34,280.50

1 m' Pasang bubung stel gelombang 0,92 m SNI : 03-3436-2002BAHAN2.4000lbrBubung stel gelombangRp48,400.00Rp116,160.006.0000bhPaku sekrup 3,5"Rp500.00Rp3,000.00TENAGA0.084OHPekerjaRp32,500.00Rp2,730.000.125OHTukang KayuRp42,500.00Rp5,312.500.013OHKepala TukangRp45,000.00Rp585.000.004OHMandorRp45,000.00Rp180.00JUMLAHRp127,967.50HARGA SATUANRp127,967.50

1 m' Pasang bubung stel gelombang 1,05 m SNI : 03-3436-2002BAHAN2.1000lbrBubung stel gelombangRp28,300.00Rp59,430.006.0000bhPaku sekrup 3,5"Rp500.00Rp3,000.00TENAGA0.084OHPekerjaRp32,500.00Rp2,730.000.125OHTukang KayuRp42,500.00Rp5,312.500.013OHKepala TukangRp45,000.00Rp585.000.004OHMandorRp45,000.00Rp180.00JUMLAHRp71,237.50HARGA SATUANRp71,237.50

1 m2 Pasang atap seng gelombang SNI : 03-3436-2002BAHAN0.7000lbrSeng gelombang Rp65,000.00Rp45,500.000.0200bhPaku payungRp22,000.00Rp440.00TENAGA0.120OHPekerjaRp32,500.00Rp3,900.000.060OHTukang KayuRp42,500.00Rp2,550.000.006OHKepala TukangRp45,000.00Rp270.000.006OHMandorRp45,000.00Rp270.00JUMLAHRp52,930.00HARGA SATUANRp52,930.00

1 m' Pasang atap nok seng SNI : 03-3436-2002BAHAN0.3000lbrSeng plat 3" x 6" bjls 25Rp39,600.00Rp11,880.000.0400bhPaku payungRp22,000.00Rp880.00TENAGA0.150OHPekerjaRp32,500.00Rp4,875.000.070OHTukang KayuRp42,500.00Rp2,975.000.008OHKepala TukangRp45,000.00Rp360.000.008OHMandorRp45,000.00Rp360.00JUMLAHRp21,330.00HARGA SATUANRp21,330.00

1 m2 Pasang aluminium foil/ Sisalation SNI : 03-3436-2002BAHAN1.0500m2Sisalation/ aluminium foilRp7,500.00Rp7,875.00TENAGA0.150OHPekerjaRp32,500.00Rp4,875.000.050OHTukang KayuRp42,500.00Rp2,125.000.005OHKepala TukangRp45,000.00Rp225.000.008OHMandorRp45,000.00Rp360.00JUMLAHRp15,460.00HARGA SATUANRp15,460.00I.PEKERJAAN LANGIT-LANGIT

1 m2 Memasang langit-langit asbes semen, tebal 4 mm, 5mm, 6 mm SNI : 2839:2008BAHAN1.1000lbrAsbes semenRp11,300.00Rp12,430.000.0100kgPaku kecilRp22,000.00Rp220.00TENAGA0.030OHPekerjaRp32,500.00Rp975.000.070OHTukang KayuRp42,500.00Rp2,975.000.007OHKepala TukangRp45,000.00Rp315.000.004OHMandorRp45,000.00Rp180.00JUMLAHRp17,095.00HARGA SATUANRp17,095.00

1 m2 Memasang langit-langit akustik uk. (30 x 60) cm SNI : 2839:2008BAHAN5.8000lbrAkustikRp25,000.00Rp145,000.000.0500kgPaku kecilRp22,000.00Rp1,100.00TENAGA0.100OHPekerjaRp32,500.00Rp3,250.000.100OHTukang KayuRp42,500.00Rp4,250.000.010OHKepala TukangRp45,000.00Rp450.000.005OHMandorRp45,000.00Rp225.00JUMLAHRp154,275.00HARGA SATUANRp154,275.00

1 m2 Memasang langit-langit tripleks uk. (120 x 240) cm, tebal 3 mm SNI : 2839:2008BAHAN0.3750lbrTripleksRp45,000.00Rp16,875.000.0300kgPaku kecilRp22,000.00Rp660.00TENAGA0.100OHPekerjaRp32,500.00Rp3,250.000.100OHTukang KayuRp42,500.00Rp4,250.000.010OHKepala TukangRp45,000.00Rp450.000.005OHMandorRp45,000.00Rp225.00JUMLAHRp25,710.00HARGA SATUANRp25,710.00

1 m2 Memasang langit-langit gypsum board, uk. (1200 x 2400 x 9) mm SNI : 2839:2008BAHAN0.3640lbrGypsum boardRp60,000.00Rp21,840.000.1100kgPaku sekrupRp22,000.00Rp2,420.00TENAGA0.100OHPekerjaRp32,500.00Rp3,250.000.050OHTukang KayuRp42,500.00Rp2,125.000.005OHKepala TukangRp45,000.00Rp225.000.005OHMandorRp45,000.00Rp225.00JUMLAHRp30,085.00HARGA SATUANRp30,085.00

1 m1 Memasang list gypsum profil SNI : 2839:2008BAHAN1.0500m'List gypsum profilRp12,000.00Rp12,600.000.1500kgTepung gypsumRp3,500.00Rp525.00TENAGA0.060OHPekerjaRp32,500.00Rp1,950.000.060OHTukang KayuRp42,500.00Rp2,550.000.006OHKepala TukangRp45,000.00Rp270.000.003OHMandorRp45,000.00Rp135.00JUMLAHRp18,030.00HARGA SATUANRp18,030.00

1 m1 Memasang list langit-langit kayu profil SNI : 2839:2008BAHAN1.0500m'List kayu profilRp3,000.00Rp3,150.000.1000kgPakuRp15,000.00Rp1,500.00TENAGA0.050OHPekerjaRp32,500.00Rp1,625.000.050OHTukang KayuRp42,500.00Rp2,125.000.005OHKepala TukangRp45,000.00Rp225.000.003OHMandorRp45,000.00Rp135.00JUMLAHRp8,760.00HARGA SATUANRp8,760.00

J.PEKERJAAN PENUTUP LANTAI & DINDING

1 m2 Memasang lantai keramik uk.(30x30) cm SNI : 7395:2008BAHAN11.8700bhUbin keramik 30x30Rp3,181.82Rp37,768.1810.0000kgPCRp1,050.00Rp10,500.000.0450m3Pasir pasangRp107,800.00Rp4,851.001.5000kgSemen warnaRp2,025.00Rp3,037.50TENAGA0.700OHPekerjaRp32,500.00Rp22,750.000.350OHTukang batuRp40,000.00Rp14,000.000.035OHKepala TukangRp45,000.00Rp1,575.000.035OHMandorRp45,000.00Rp1,575.00JUMLAHRp96,056.68HARGA SATUANRp96,056.68

1 m2 Memasang lantai keramik uk.(30x30) cm anti slip SNI : 7395:2008BAHAN11.8700bhUbin keramik 30x30 anti slipRp3,545.45Rp42,084.5510.0000kgPCRp1,050.00Rp10,500.000.0450m3Pasir pasangRp107,800.00Rp4,851.001.5000kgSemen warnaRp2,025.00Rp3,037.50TENAGA0.700OHPekerjaRp32,500.00Rp22,750.000.350OHTukang batuRp40,000.00Rp14,000.000.035OHKepala TukangRp45,000.00Rp1,575.000.035OHMandorRp45,000.00Rp1,575.00JUMLAHRp100,373.05HARGA SATUANRp100,373.05

1 m2 Memasang lantai keramik uk.(30x30) cm SNI : 7395:2008BAHAN11.8700bhUbin keramik 30x30 anti slipRp3,545.45Rp42,084.5510.0000kgPCRp1,050.00Rp10,500.000.0450m3Pasir pasangRp107,800.00Rp4,851.001.5000kgSemen warnaRp2,025.00Rp3,037.50TENAGA0.700OHPekerjaRp32,500.00Rp22,750.000.350OHTukang batuRp40,000.00Rp14,000.000.035OHKepala TukangRp45,000.00Rp1,575.000.035OHMandorRp45,000.00Rp1,575.00JUMLAHRp100,373.05HARGA SATUANRp100,373.05

1 m2 Memasang lantai keramik uk.(20x20) cm SNI : 7395:2008BAHAN26.5000bhUbin keramik 20x20Rp1,520.00Rp40,280.0010.4000kgPCRp1,050.00Rp10,920.000.0450m3Pasir pasangRp107,800.00Rp4,851.001.6200kgSemen warnaRp2,025.00Rp3,280.50TENAGA0.700OHPekerjaRp32,500.00Rp22,750.000.350OHTukang batuRp40,000.00Rp14,000.000.035OHKepala TukangRp45,000.00Rp1,575.000.035OHMandorRp45,000.00Rp1,575.00JUMLAHRp99,231.50HARGA SATUANRp99,231.50

1 m1 Memasang plint keramik uk.(10x30) cm SNI : 7395:2008BAHAN3.5300bhPlint keramikRp1,060.61Rp3,743.941.1400kgPCRp1,050.00Rp1,197.000.0030m3Pasir pasangRp107,800.00Rp323.400.1000kgSemen warnaRp2,025.00Rp202.50TENAGA0.090OHPekerjaRp32,500.00Rp2,925.000.090OHTukang batuRp40,000.00Rp3,600.000.009OHKepala TukangRp45,000.00Rp405.000.005OHMandorRp45,000.00Rp225.00JUMLAHRp12,621.84HARGA SATUANRp12,621.84

1 m2 Memasang dinding keramik uk.(20x20) cm SNI : 7395:2008BAHAN26.5000bhKeramik dinding 20x20Rp1,520.00Rp40,280.009.3000kgPCRp1,050.00Rp9,765.000.0180m3Pasir pasangRp107,800.00Rp1,940.401.9400kgSemen warnaRp2,025.00Rp3,928.50TENAGA0.090OHPekerjaRp32,500.00Rp2,925.000.450OHTukang batuRp40,000.00Rp18,000.000.045OHKepala TukangRp45,000.00Rp2,025.000.045OHMandorRp45,000.00Rp2,025.00JUMLAHRp80,888.90HARGA SATUANRp80,888.90

1 m2 Memasang dinding keramik uk.(20x25) cm SNI : 7395:2008BAHAN21.2000bhKeramik dinding 20x25Rp2,000.00Rp42,400.009.3000kgPCRp1,050.00Rp9,765.000.0180m3Pasir pasangRp107,800.00Rp1,940.401.5520kgSemen warnaRp2,025.00Rp3,142.80TENAGA0.090OHPekerjaRp32,500.00Rp2,925.000.450OHTukang batuRp40,000.00Rp18,000.000.045OHKepala TukangRp45,000.00Rp2,025.000.045OHMandorRp45,000.00Rp2,025.00JUMLAHRp82,223.20HARGA SATUANRp82,223.20

1 m2 Memasang dinding batu tempel hitam SNI : 7395:2008BAHAN1.1000m2Batu tempel hitamRp60,000.00Rp66,000.0011.7500kgPCRp1,050.00Rp12,337.500.0350m3Pasir pasangRp107,800.00Rp3,773.00TENAGA0.700OHPekerjaRp32,500.00Rp22,750.000.350OHTukang batuRp40,000.00Rp14,000.000.035OHKepala TukangRp45,000.00Rp1,575.000.035OHMandorRp45,000.00Rp1,575.00JUMLAHRp122,010.50HARGA SATUANRp122,010.50K.PEKERJAAN BESI

1 kg Pasang besi profil SNI : 7393:2008BAHAN1.1500bhBesi profilRp12,500.00Rp14,375.00TENAGA0.060OHPekerjaRp32,500.00Rp1,950.000.060OHTukang las konstruksiRp40,000.00Rp2,400.000.006OHKepala TukangRp45,000.00Rp270.000.003OHMandorRp45,000.00Rp135.00JUMLAHRp19,130.00HARGA SATUANRp19,130.00

1 kg Pasang rangka kuda-kuda baja IWF SNI : 7393:2008BAHAN1.1500bhBesi baja IWFRp15,000.00Rp17,250.00TENAGA0.060OHPekerjaRp32,500.00Rp1,950.000.060OHTukang las konstruksiRp40,000.00Rp2,400.000.006OHKepala TukangRp45,000.00Rp270.000.003OHMandorRp45,000.00Rp135.00JUMLAHRp22,005.00HARGA SATUANRp22,005.00

100 kg Pekerjaan perakitan SNI : 7393:2008BAHAN1.0000ltrSolarRp4,500.00Rp4,500.000.1000ltrMinyak pelumasRp32,200.00Rp3,220.00TENAGA0.100OHPekerjaRp32,500.00Rp3,250.000.100OHTukang besi konstruksiRp40,000.00Rp4,000.000.001OHKepala TukangRp45,000.00Rp45.000.005OHMandorRp45,000.00Rp225.00ALAT0.800JamSewa alatRp10,000.00Rp8,000.00JUMLAHRp23,240.00HARGA SATUANRp23,240.00

1 m2 Pintu besi plat baja tebal 2 mm rangkap, rangkap baja siku SNI : 7393:2008BAHAN15.0000kgBesi siku L 30.30.3Rp12,500.00Rp187,500.0032.8000kgBesi plat bajaRp15,000.00Rp492,000.000.0500kgKawat lasRp22,000.00Rp1,100.00TENAGA1.050OHPekerjaRp32,500.00Rp34,125.001.050OHTukang las biasaRp40,000.00Rp42,000.000.105OHKepala TukangRp45,000.00Rp4,725.000.0520OHMandorRp45,000.00Rp2,340.00JUMLAHRp763,790.00HARGA SATUANRp763,790.00

10 cm Pengelasan dengan las listrik SNI : 7393:2008BAHAN0.4000kgKawat las listrikRp22,000.00Rp8,800.000.3000literSolarRp4,500.00Rp1,350.000.0400literMinyak pelumasRp32,200.00Rp1,288.00TENAGA0.040OHPekerjaRp32,500.00Rp1,300.000.020OHTukang besi konstruksiRp40,000.00Rp800.000.002OHKepala TukangRp45,000.00Rp90.000.002OHMandorRp45,000.00Rp90.00ALAT0.170JamSewa alatRp50,000.00Rp8,500.00JUMLAHRp22,218.00HARGA SATUANRp22,218.00

1 m2 Pasang pintu rolling door besi SNI : 7393:2008BAHAN1.0000m2Pintu gulung besiRp150,000.00Rp150,000.00TENAGA1.200OHPekerjaRp32,500.00Rp39,000.001.200OHTukang kayuRp42,500.00Rp51,000.000.120OHTukang las biasaRp40,000.00Rp4,800.000.006OHMandorRp45,000.00Rp270.00JUMLAHRp245,070.00HARGA SATUANRp245,070.00

1 m2 Pasang pintu lipat (folding gate) SNI : 7393:2008BAHAN1.0000m2Pintu lipatRp400,000.00Rp400,000.00TENAGA0.440OHPekerjaRp32,500.00Rp14,300.000.440OHTukangRp42,500.00Rp18,700.000.044OHKepala TukangRp40,000.00Rp1,760.000.022OHMandorRp45,000.00Rp990.00JUMLAHRp435,750.00HARGA SATUANRp435,750.00

1 m2 Pasang sunscreen alluminium SNI : 7393:2008BAHAN1.0000m2Sunscreen aluminium Rp35,000.00Rp35,000.00TENAGA0.080OHPekerjaRp32,500.00Rp2,600.000.800OHTukang Rp42,500.00Rp34,000.000.080OHKepala TukangRp40,000.00Rp3,200.000.00400OHMandorRp45,000.00Rp180.00JUMLAHRp74,980.00HARGA SATUANRp74,980.00

1 m2 Pasang rolling door aluminium SNI : 7393:2008BAHAN1.0000m2Rolling door aluminiumRp250,000.00Rp250,000.00TENAGA1.000OHPekerjaRp32,500.00Rp32,500.001.000OHTukang khusus aluminiumRp42,500.00Rp42,500.000.100OHKepala TukangRp40,000.00Rp4,000.000.050OHMandorRp45,000.00Rp2,250.00JUMLAHRp331,250.00HARGA SATUANRp331,250.00

1 m' Pasang kusen pintu aluminium SNI : 7393:2008BAHAN1.1000m'Profil aluminiumRp60,000.00Rp66,000.002.0000buahSkrup fixerRp1,000.00Rp2,000.000.0600tubeSealantRp8,000.00Rp480.00TENAGA0.043OHPekerjaRp32,500.00Rp1,397.500.043OHTukang khusus aluminiumRp42,500.00Rp1,827.500.0043OHKepala TukangRp40,000.00Rp172.000.0021OHMandorRp45,000.00Rp94.50JUMLAHRp71,971.50HARGA SATUANRp71,971.50

1 m2 Pasang pintu aluminium strip lebar 8 cm SNI : 7393:2008BAHAN4.4000m'Profil aluminiumRp60,000.00Rp264,000.0014.6000m'Alluminium stripRp2,000.00Rp29,200.00TENAGA0.085OHPekerjaRp32,500.00Rp2,762.500.085OHTukang khusus aluminiumRp42,500.00Rp3,612.500.0085OHKepala TukangRp40,000.00Rp340.000.0042OHMandorRp45,000.00Rp189.00JUMLAHRp300,104.00HARGA SATUANRp300,104.00

1 m2 Pasang pintu kaca rangka aluminium SNI : 7393:2008BAHAN4.4000mProfil aluminiumRp60,000.00Rp264,000.004.5000mProfil kacaRp7,000.00Rp31,500.000.2700tubeSealantRp8,000.00Rp2,160.00TENAGA0.085OHPekerjaRp32,500.00Rp2,762.500.085OHTukang aluminium/ kacaRp42,500.00Rp3,612.500.009OHKepala TukangRp40,000.00Rp360.000.005OHMandorRp45,000.00Rp225.00JUMLAHRp304,620.00HARGA SATUANRp304,620.00

1 m2 Pasang terali besi strip (20 x 3) mm SNI : 7393:2008BAHAN6.1770kgBesi stripRp9,250.00Rp57,137.2527.0800cmPengelasanRp2,000.00Rp54,160.00TENAGA1.670OHPekerjaRp32,500.00Rp54,275.001.670OHTukang kayuRp42,500.00Rp70,975.000.167OHKepala TukangRp40,000.00Rp6,680.000.083OHMandorRp45,000.00Rp3,735.00JUMLAHRp246,962.25HARGA SATUANRp246,962.25

1 m2 Pasang kawat nyamuk SNI : 7393:2008BAHAN1.1000m2Kawat nyamukRp15,000.00Rp16,500.0011.1100cmPengelasanRp2,000.00Rp22,220.001.7160kgBaja strip (0,2 x 2) cmRp9,250.00Rp15,873.00TENAGA0.100OHPekerjaRp32,500.00Rp3,250.000.100OHTukangRp42,500.00Rp4,250.000.010OHKepala TukangRp40,000.00Rp400.000.005OHMandorRp45,000.00Rp225.00JUMLAHRp62,718.00HARGA SATUANRp62,718.00

1 m2 Pasang jendela nako dan tralis SNI : 7393:2008BAHAN1.1000m2Jendela nako (rangka + kaca 5 mm)Rp15,000.00Rp16,500.0010.0000bhPaku skrupRp150.00Rp1,500.007.0000m'Besi stripRp9,250.00Rp64,750.00TENAGA0.200OHPekerjaRp32,500.00Rp6,500.000.200OHTukangRp42,500.00Rp8,500.000.020OHKepala TukangRp40,000.00Rp800.000.010OHMandorRp45,000.00Rp450.00JUMLAHRp99,000.00HARGA SATUANRp99,000.00

1 m' Pasang talang datar/ jurai seng BJLS 28 lebar 90 cm SNI : 7393:2008BAHAN1.0500m'Seng platRp39,600.00Rp41,580.000.0150kgPaku 1 cm - 2,5 cmRp22,000.00Rp330.000.0190m3Papan kayu Klas II/ IIIRp2,200,000.00Rp41,800.00TENAGA0.200OHPekerjaRp32,500.00Rp6,500.000.400OHTukangRp42,500.00Rp17,000.000.025OHKepala TukangRp40,000.00Rp1,000.000.010OHMandorRp45,000.00Rp450.00JUMLAHRp108,660.00HARGA SATUANRp108,660.00

1 m' Pasang talang 1/2 lingkaran D-15 cm, seng plat BJLS 30 lebar 45 cm SNI : 7393:2008BAHAN1.0500m'Seng platRp15,000.00Rp15,750.000.0100kgPaku 1 cm - 2,5 cmRp22,000.00Rp220.000.5000kgBesi stripRp9,250.00Rp4,625.00TENAGA0.150OHPekerjaRp32,500.00Rp4,875.000.300OHTukangRp42,500.00Rp12,750.000.030OHKepala TukangRp40,000.00Rp1,200.000.008OHMandorRp45,000.00Rp360.00JUMLAHRp39,780.00JASA 10%Rp3,978.00HARGA SATUANRp43,758.00L.PEKERJAAN SANITAIR

1 buah Pasang kloset duduk/monoblok SNI : 2002BAHAN1.0000bhkloset duduk/monoblokRp1,000,000.00Rp1,000,000.006% Harga klosetPerlengkapanRp60,000.00TENAGA3.300OHPekerjaRp32,500.00Rp107,250.001.100OHTukang batuRp40,000.00Rp44,000.000.001OHKepala TukangRp45,000.00Rp45.000.1600OHMandorRp45,000.00Rp7,200.00JUMLAHRp1,218,495.00HARGA SATUANRp1,218,495.00

1 buah Pasang kloset jongkok SNI : 2002BAHAN1.0000bhkloset jongkokRp120,000.00Rp120,000.006.0000kgPCRp1,050.00Rp6,300.000.0100m3Pasir pasangRp107,800.00Rp1,078.00TENAGA1.000OHPekerjaRp32,500.00Rp32,500.001.500OHTukang batuRp40,000.00Rp60,000.001.500OHKepala TukangRp45,000.00Rp67,500.000.1600OHMandorRp45,000.00Rp7,200.00JUMLAHRp294,578.00HARGA SATUANRp294,578.00

1 buah urinoir SNI : 2002BAHAN1.0000bhUrinoirRp225,000.00Rp225,000.0030% harga urinoirPerlengkapanRp67,500.006.0000kgPCRp1,050.00Rp6,300.000.0100m3Pasir pasangRp107,800.00Rp1,078.00TENAGA1.000OHPekerjaRp32,500.00Rp32,500.001.000OHTukang batuRp40,000.00Rp40,000.000.100OHKepala TukangRp45,000.00Rp4,500.000.1000OHMandorRp45,000.00Rp4,500.00JUMLAHRp381,378.00HARGA SATUANRp381,378.00

1 buah washtafel SNI : 2002BAHAN1.0000bhWashtafelRp225,000.00Rp225,000.0012% hrg WashtafelPerlengkapanRp27,000.006.0000kgPCRp1,050.00Rp6,300.000.0100m3Pasir pasangRp107,800.00Rp1,078.00TENAGA1.200OHPekerjaRp32,500.00Rp39,000.000.750OHTukang batuRp40,000.00Rp30,000.000.070OHKepala TukangRp45,000.00Rp3,150.000.1100OHMandorRp45,000.00Rp4,950.00JUMLAHRp336,478.00HARGA SATUANRp336,478.00

1 buah bak mandi batu bata vol. 0,3 m3 SNI : 2002BAHAN252.000bhBatu bataRp500.00Rp126,000.00120.000kgPCRp1,050.00Rp126,000.000.3000m3Pasir pasangRp107,800.00Rp32,340.00108.900bhKeramik 20x20Rp1,520.00Rp165,528.006.0000kgSemen natRp2,025.00Rp12,150.00TENAGA6.000OHPekerjaRp32,500.00Rp195,000.003.000OHTukang batuRp40,000.00Rp120,000.000.300OHKepala TukangRp45,000.00Rp13,500.000.3000OHMandorRp45,000.00Rp13,500.00JUMLAHRp804,018.00HARGA SATUANRp804,018.00

1 buah bak kontrol batu bata uk. (60x60) cm, tinggi 65 cm SNI : 2002BAHAN234.000bhBatu bataRp500.00Rp117,000.00114.000kgPCRp1,050.00Rp119,700.000.1840m3Pasir pasangRp107,800.00Rp19,835.200.0330m3Batu koralRp125,000.00Rp4,125.004.8500kgBesi betonRp9,250.00Rp44,862.500.1200m3Pasir betonRp116,000.00Rp13,920.00TENAGA2.160OHPekerjaRp32,500.00Rp70,200.000.720OHTukang batuRp40,000.00Rp28,800.000.072OHKepala TukangRp45,000.00Rp3,240.000.108OHMandorRp45,000.00Rp4,860.000.1000OHTukang galiRp32,500.00Rp3,250.00JUMLAHRp429,792.70HARGA SATUANRp429,792.70

1 m1 Pasang pipa galvanis dia 1/2" SNI : 2002BAHAN1.2000m'Pipa galvanisRp12,666.67Rp15,200.0035% Harga pipaPerlengkapanRp4,433.33TENAGA0.054OHPekerjaRp32,500.00Rp1,755.000.090OHTukang batuRp40,000.00Rp3,600.000.009OHKepala TukangRp45,000.00Rp405.000.0270OHMandorRp45,000.00Rp1,215.00JUMLAHRp26,608.33HARGA SATUANRp26,608.33

1 m1 Pasang pipa PVC tipe AW dia 1/2" SNI : 2002BAHAN1.2000m'Pipa PVCRp3,500.00Rp4,200.0035% Harga pipaPerlengkapanRp1,225.00TENAGA0.036OHPekerjaRp32,500.00Rp1,170.000.060OHTukang batuRp40,000.00Rp2,400.000.006OHKepala TukangRp45,000.00Rp270.000.0018OHMandorRp45,000.00Rp81.00JUMLAHRp9,346.00HARGA SATUANRp9,346.00

1 m1 Pasang pipa PVC tipe AW dia 3/4" SNI : 2002BAHAN1.2000m'Pipa PVCRp4,625.00Rp5,550.0035% Harga pipaPerlengkapanRp1,618.75TENAGA0.036OHPekerjaRp32,500.00Rp1,170.000.060OHTukang batuRp40,000.00Rp2,400.000.006OHKepala TukangRp45,000.00Rp270.000.0018OHMandorRp45,000.00Rp81.00JUMLAHRp11,089.75HARGA SATUANRp11,089.75

1 m1 Pasang pipa PVC tipe AW dia 1" SNI : 2002BAHAN1.2000m'Pipa PVCRp6,250.00Rp7,500.0035% Harga pipaPerlengkapanRp2,187.50TENAGA0.036OHPekerjaRp32,500.00Rp1,170.000.060OHTukang batuRp40,000.00Rp2,400.000.006OHKepala TukangRp45,000.00Rp270.000.0018OHMandorRp45,000.00Rp81.00JUMLAHRp13,608.50HARGA SATUANRp13,608.50

1 m1 Pasang pipa PVC tipe AW dia 1,25" SNI : 2002BAHAN1.2000m'Pipa PVCRp8,750.00Rp10,500.0035% Harga pipaPerlengkapanRp3,062.50TENAGA0.036OHPekerjaRp32,500.00Rp1,170.000.060OHTukang batuRp40,000.00Rp2,400.000.006OHKepala TukangRp45,000.00Rp270.000.0018OHMandorRp45,000.00Rp81.00JUMLAHRp17,483.50HARGA SATUANRp17,483.50

1 m1 Pasang pipa PVC tipe AW dia 3" SNI : 2002BAHAN1.2000m'Pipa PVCRp23,750.00Rp28,500.0035% Harga pipaPerlengkapanRp8,312.50TENAGA0.036OHPekerjaRp32,500.00Rp1,170.000.060OHTukang batuRp40,000.00Rp2,400.000.006OHKepala TukangRp45,000.00Rp270.000.0018OHMandorRp45,000.00Rp81.00JUMLAHRp40,733.50HARGA SATUANRp40,733.50

1 m1 Pasang pipa PVC tipe AW dia 4" SNI : 2002BAHAN1.2000m'Pipa PVCRp38,750.00Rp46,500.0035% Harga pipaPerlengkapanRp13,562.50TENAGA0.036OHPekerjaRp32,500.00Rp1,170.000.060OHTukang batuRp40,000.00Rp2,400.000.006OHKepala TukangRp45,000.00Rp270.000.0018OHMandorRp45,000.00Rp81.00JUMLAHRp63,983.50HARGA SATUANRp63,983.50

1 m1 Pasang kran dia 1/2" dan 3/4" SNI : 2002BAHAN1.0000m'KranRp25,000.00Rp25,000.000.0250bhSeal tapeRp2,000.00Rp50.00TENAGA0.010OHPekerjaRp32,500.00Rp325.000.100OHTukang batuRp40,000.00Rp4,000.000.010OHKepala TukangRp45,000.00Rp450.000.0050OHMandorRp45,000.00Rp225.00JUMLAHRp30,050.00HARGA SATUANRp30,050.00

1 m1 Pasang floordrain SNI : 2002BAHAN1.0000m'FloordrainRp15,000.00Rp15,000.00TENAGA0.010OHPekerjaRp32,500.00Rp325.000.100OHTukang batuRp40,000.00Rp4,000.000.010OHKepala TukangRp45,000.00Rp450.000.0050OHMandorRp45,000.00Rp225.00JUMLAHRp20,000.00HARGA SATUANRp20,000.00M.PEKERJAAN PENGGANTUNG & PENGUNCI

1 buah Pasang kunci tanam biasa (besar) SNI : 2002BAHAN1.0000bhKunci tanam besarRp225,000.00Rp225,000.00TENAGA0.010OHPekerjaRp32,500.00Rp325.000.500OHTukang kayuRp42,500.00Rp21,250.000.010OHKepala TukangRp45,000.00Rp450.000.005OHMandorRp45,000.00Rp225.00JUMLAHRp247,250.00HARGA SATUANRp247,250.00

1 buah Pasang kunci tanam biasa (kecil) SNI : 2002BAHAN1.0000bhKunci tanam kecilRp100,000.00Rp100,000.00TENAGA0.010OHPekerjaRp32,500.00Rp325.000.500OHTukang kayuRp42,500.00Rp21,250.000.010OHKepala TukangRp45,000.00Rp450.000.005OHMandorRp45,000.00Rp225.00JUMLAHRp122,250.00HARGA SATUANRp122,250.00

1 buah Pasang kunci silinder SNI : 2002BAHAN1.0000bhKunci silinderRp65,000.00Rp65,000.00TENAGA0.005OHPekerjaRp32,500.00Rp162.500.500OHTukang kayuRp42,500.00Rp21,250.000.005OHKepala TukangRp45,000.00Rp225.000.0025OHMandorRp45,000.00Rp112.50JUMLAHRp86,750.00HARGA SATUANRp86,750.00

1 buah Pasang engsel pintu SNI : 2002BAHAN1.0000bhEngsel pintuRp17,500.00Rp17,500.00TENAGA0.015OHPekerjaRp32,500.00Rp487.500.150OHTukang kayuRp42,500.00Rp6,375.000.015OHKepala TukangRp45,000.00Rp675.000.00075OHMandorRp45,000.00Rp33.75JUMLAHRp25,071.25HARGA SATUANRp25,071.25

1 buah Pasang engsel jendela SNI : 2002BAHAN1.0000bhEngsel jendelaRp15,000.00Rp15,000.00TENAGA0.010OHPekerjaRp32,500.00Rp325.000.100OHTukang kayuRp42,500.00Rp4,250.000.010OHKepala TukangRp45,000.00Rp450.000.00050OHMandorRp45,000.00Rp22.50JUMLAHRp20,047.50HARGA SATUANRp20,047.50

1 buah Pasang engsel jendela kupu-kupu SNI : 2002BAHAN1.0000bhEngsel jendela kupu-kupuRp7,500.00Rp7,500.00TENAGA0.010OHPekerjaRp32,500.00Rp325.000.100OHTukang kayuRp42,500.00Rp4,250.000.010OHKepala TukangRp45,000.00Rp450.000.00050OHMandorRp45,000.00Rp22.50JUMLAHRp12,547.50HARGA SATUANRp12,547.50

1 buah Pasang grendel pintu SNI : 2002BAHAN1.0000bhGrendel pintuRp10,000.00Rp10,000.00TENAGA0.020OHPekerjaRp32,500.00Rp650.000.200OHTukang kayuRp42,500.00Rp8,500.000.020OHKepala TukangRp45,000.00Rp900.000.00100OHMandorRp45,000.00Rp45.00JUMLAHRp20,095.00HARGA SATUANRp20,095.00

1 buah Pasang grendel jendela SNI : 2002BAHAN1.0000bhGrendel jendelaRp7,500.00Rp7,500.00TENAGA0.015OHPekerjaRp32,500.00Rp487.500.150OHTukang kayuRp42,500.00Rp6,375.000.015OHKepala TukangRp45,000.00Rp675.000.00050OHMandorRp45,000.00Rp22.50JUMLAHRp15,060.00HARGA SATUANRp15,060.00

1 buah Pasang hak angin SNI : 2002BAHAN1.0000bhHak anginRp15,000.00Rp15,000.00TENAGA0.015OHPekerjaRp32,500.00Rp487.500.150OHTukang kayuRp42,500.00Rp6,375.000.015OHKepala TukangRp45,000.00Rp675.000.00075OHMandorRp45,000.00Rp33.75JUMLAHRp22,571.25HARGA SATUANRp22,571.25

1 buah Pasang pegangan pintu/ door holder SNI : 2002BAHAN1.0000bhPegangan pintuRp95,000.00Rp95,000.00TENAGA0.050OHPekerjaRp32,500.00Rp1,625.000.500OHTukang kayuRp42,500.00Rp21,250.000.050OHKepala TukangRp45,000.00Rp2,250.000.00250OHMandorRp45,000.00Rp112.50JUMLAHRp120,237.50HARGA SATUANRp120,237.50

1 buah Pasang pegangan jendela/handel SNI : 2002BAHAN1.0000bhPegangan jendela/ handelRp10,000.00Rp10,000.00TENAGA0.015OHPekerjaRp32,500.00Rp487.500.150OHTukang kayuRp42,500.00Rp6,375.000.015OHKepala TukangRp45,000.00Rp675.000.00015OHMandorRp45,000.00Rp6.75JUMLAHRp17,544.25HARGA SATUANRp17,544.25

1 buah Pasang door closer SNI : 2002BAHAN1.0000bhDoor closerRp250,000.00Rp250,000.00TENAGA0.050OHPekerjaRp32,500.00Rp1,625.000.500OHTukang kayuRp42,500.00Rp21,250.000.050OHKepala TukangRp45,000.00Rp2,250.000.00250OHMandorRp45,000.00Rp112.50JUMLAHRp275,237.50HARGA SATUANRp275,237.50

1 m2 Pasang kaca bening 3 mm SNI : 2002BAHAN1.1000bhKaca bening 3 mmRp40,000.00Rp44,000.00TENAGA0.015OHPekerjaRp32,500.00Rp487.500.150OHTukang kayuRp42,500.00Rp6,375.000.015OHKepala TukangRp45,000.00Rp675.000.00075OHMandorRp45,000.00Rp33.75JUMLAHRp51,571.25HARGA SATUANRp51,571.25

1 m2 Pasang kaca bening 5 mm SNI : 2002BAHAN1.1000bhKaca bening 5 mmRp60,000.00Rp66,000.00TENAGA0.015OHPekerjaRp32,500.00Rp487.500.150OHTukang kayuRp42,500.00Rp6,375.000.015OHKepala TukangRp45,000.00Rp675.000.00075OHMandorRp45,000.00Rp33.75JUMLAHRp73,571.25HARGA SATUANRp73,571.25

1 m2 Pasang kaca reyben 5 mm SNI : 2002BAHAN1.1000bhKaca reyben 5 mmRp65,000.00Rp71,500.00TENAGA0.015OHPekerjaRp32,500.00Rp487.500.150OHTukang kayuRp42,500.00Rp6,375.000.015OHKepala TukangRp45,000.00Rp675.000.00075OHMandorRp45,000.00Rp33.75JUMLAHRp79,071.25HARGA SATUANRp79,071.25N.PEKERJAAN CAT

1 m2 Mengecat bidang kayu lama SNI : 2002BAHAN0.1500kgPlamirRp17,500.00Rp2,625.000.1700kgCat dasarRp51,000.00Rp8,670.000.1700kgCat penutupRp51,000.00Rp8,670.00TENAGA0.070OHPekerjaRp32,500.00Rp2,275.000.075OHTukang catRp40,000.00Rp3,000.000.008OHKepala TukangRp45,000.00Rp337.500.0025OHMandorRp45,000.00Rp112.50JUMLAHRp25,690.00HARGA SATUANRp25,690.00

1 m2 Mengecat bidang kayu baru SNI : 2002BAHAN0.2000kgCat meniRp17,500.00Rp3,500.000.1500kgPlamirRp17,500.00Rp2,625.000.1700kgCat dasarRp51,000.00Rp8,670.000.2600kgCat penutupRp51,000.00Rp13,260.00TENAGA0.070OHPekerjaRp32,500.00Rp2,275.000.009OHTukang catRp40,000.00Rp360.000.006OHKepala TukangRp45,000.00Rp270.000.0025OHMandorRp45,000.00Rp112.50JUMLAHRp31,072.50HARGA SATUANRp31,072.50

1 m2 Mengecat bidang tembok lama SNI : 2002BAHAN0.1200kgCat dasarRp15,000.00Rp1,800.000.1800kgCat penutupRp15,000.00Rp2,700.00TENAGA0.028OHPekerjaRp32,500.00Rp910.000.042OHTukang catRp40,000.00Rp1,680.000.004OHKepala TukangRp45,000.00Rp189.000.0025OHMandorRp45,000.00Rp112.50JUMLAHRp7,391.50HARGA SATUANRp7,391.50

1 m2 Mengecat bidang tembok baru SNI : 2002BAHAN0.1000kgPlamirRp12,000.00Rp1,200.000.1000kgCat dasarRp15,000.00Rp1,500.000.2600kgCat penutupRp15,000.00Rp3,900.00TENAGA0.020OHPekerjaRp32,500.00Rp650.000.063OHTukang catRp40,000.00Rp2,520.000.006OHKepala TukangRp45,000.00Rp283.500.0025OHMandorRp45,000.00Rp112.50JUMLAHRp10,166.00HARGA SATUANRp10,166.00

1 m2 Mengecat plafon eternit/ gypsum SNI : 2002BAHAN0.1200kgCat dasarRp15,000.00Rp1,800.000.1800kgCat penutupRp15,000.00Rp2,700.00TENAGA0.028OHPekerjaRp32,500.00Rp910.000.042OHTukang catRp40,000.00Rp1,680.000.004OHKepala TukangRp45,000.00Rp189.000.0025OHMandorRp45,000.00Rp112.50JUMLAHRp7,391.50HARGA SATUANRp7,391.50

1 m2 Mengecat genteng SNI : 2002BAHAN0.2600kgCat gentengRp21,250.00Rp5,525.00TENAGA0.020OHPekerjaRp15,000.00Rp300.000.063OHTukang catRp32,500.00Rp2,047.500.006OHKepala TukangRp40,000.00Rp252.000.0025OHMandorRp45,000.00Rp112.50JUMLAHRp8,237.00HARGA SATUANRp8,237.00O.PEKERJAAN LINGKUNGAN

1 m1 Memasang got U - 20 cm SNI : .BAHAN0.0060m3Pas. Bata merah 1PC : 4 PsRp66,585.40Rp399.511.0000m3Got -U 20Rp35,000.00Rp35,000.00TENAGA0.700OHPekerjaRp32,500.00Rp22,750.00JUMLAHRp58,149.51HARGA SATUANRp58,149.51

1 m2 Memasang konblok, tebal 6 cm SNI :BAHAN1.0500m2ConblockRp34,500.00Rp36,225.000.1200m3Pasir PasangRp107,800.00Rp12,936.00TENAGA0.240OHPekerjaRp32,500.00Rp7,800.000.080OHTukang batuRp40,000.00Rp3,200.000.008OHKepala TukangRp45,000.00Rp360.000.012OHMandorRp45,000.00Rp540.00JUMLAHRp61,061.00HARGA SATUANRp61,061.00

1 m2 Memasang konblok, tebal 8 cm SNI :BAHAN1.0500m2ConblockRp55,000.00Rp57,750.000.1200m3Pasir PasangRp107,800.00Rp12,936.00TENAGA0.240OHPekerjaRp32,500.00Rp7,800.000.080OHTukang batuRp40,000.00Rp3,200.000.008OHKepala TukangRp45,000.00Rp360.000.012OHMandorRp45,000.00Rp540.00JUMLAHRp82,586.00HARGA SATUANRp82,586.00P.PEKERJAAN ME

1 titik Pasang Stop kontak SNI : ..BAHAN15.000m'Kabel NYA 1 x 2,5 mmRp2,000.00Rp30,000.001.200btgPipa pralon 5/8"Rp10,000.00Rp12,000.001.000bhStop kontak + indoosRp17,500.00Rp17,500.00TENAGA0.050OHPekerjaRp32,500.00Rp1,625.000.500OHTukang listrikRp40,000.00Rp20,000.000.050OHKepala TukangRp45,000.00Rp2,250.00JUMLAHRp83,375.00HARGA SATUANRp83,375.00

1 titik Pasang Saklar tunggal SNI : ..BAHAN12.000m'Kabel NYA 1 x 2,5 mmRp2,000.00Rp24,000.002.000btgPipa pralon 5/8"Rp10,000.00Rp20,000.001.000bhSaklar tunggal + indoosRp15,000.00Rp15,000.00TENAGA0.050OHTukang listrikRp40,000.00Rp2,000.00JUMLAHRp61,000.00HARGA SATUANRp61,000.00

1 titik Pasang Saklar ganda SNI : ..BAHAN18.000m'Kabel NYA 1 x 2,5 mmRp2,000.00Rp36,000.002.000btgPipa pralon 5/8"Rp10,000.00Rp20,000.001.000bhSaklar gandaRp17,500.00Rp17,500.00TENAGA0.050OHTukang listrikRp40,000.00Rp2,000.00JUMLAHRp75,500.00HARGA SATUANRp75,500.00

1 buah Pasang Lampu TL 20 watt SNI : ..BAHAN1.000bhLampu TL 20 wattRp45,000.00Rp45,000.00TENAGA0.010OHPekerjaRp32,500.00Rp325.000.020OHTukang listrikRp40,000.00Rp800.000.005OHKepala TukangRp45,000.00Rp225.00JUMLAHRp46,350.00HARGA SATUANRp46,350.00

1 buah Pasang Lampu SL 18 watt SNI : ..BAHAN1.000bhLampu SL 18 wattRp30,000.00Rp30,000.001.000bhFiting keramikRp12,000.00Rp12,000.00TENAGA0.010OHPekerjaRp32,500.00Rp325.000.020OHTukang listrikRp40,000.00Rp800.000.005OHKepala TukangRp45,000.00Rp225.00JUMLAHRp43,350.00HARGA SATUANRp43,350.00

1 buah Pasang Lampu Pijar 25 watt SNI : ..BAHAN1.000bhLampu pijar 25 wattRp10,000.00Rp10,000.001.000bhFiting keramikRp12,000.00Rp12,000.00TENAGA0.010OHPekerjaRp32,500.00Rp325.000.020OHTukang listrikRp40,000.00Rp800.000.005OHKepala TukangRp45,000.00Rp225.00JUMLAHRp23,350.00HARGA SATUANRp23,350.00

1 buah Pasang Panel box + MCB SNI : ..BAHAN1.000bhPanel Box + MCBRp125,000.00Rp125,000.0012.000m'Kabel NYA 1 x 2,5 mmRp2,000.00Rp24,000.001.000bhIsolasiRp12,000.00Rp12,000.00TENAGA1.000OHPekerjaRp32,500.00Rp32,500.001.000OHTukang listrikRp40,000.00Rp40,000.000.005OHKepala TukangRp45,000.00Rp225.00JUMLAHRp233,725.00HARGA SATUANRp233,725.00Q.PEKERJAAN BONGKARAN

1 m3 Membongkar beton bertulang SNI : 2002TENAGA6.667OHPekerjaRp32,500.00Rp216,677.500.333OHMandorRp45,000.00Rp14,985.00JUMLAHRp231,662.50HARGA SATUANRp231,662.50

1 m3 Membongkar dinding tembok bata merah SNI Rev. : 2005TENAGA2.000OHPekerjaRp32,500.00Rp65,000.000.090OHMandorRp45,000.00Rp4,050.00JUMLAHRp69,050.00HARGA SATUANRp69,050.00

1 m3 Membongkar plesteran dinding SNI Rev. : 2005TENAGA0.050OHPekerjaRp32,500.00Rp1,625.000.025OHMandorRp45,000.00Rp1,125.00JUMLAHRp2,750.00HARGA SATUANRp2,750.00

1 m3 Membongkar genteng dipakai lagi SNI Rev. : 2005TENAGA0.040OHPekerjaRp32,500.00Rp1,300.000.020OHMandorRp45,000.00Rp900.00JUMLAHRp2,200.00HARGA SATUANRp2,200.00

1 m3 Membongkar reng/kaso-kaso dipakai lagi SNI Rev. : 2005TENAGA0.050OhPekerjaRp32,500.00Rp1,625.000.200OhTukang kayuRp42,500.00Rp8,500.000.005OhKepala TukangRp45,000.00Rp225.000.010OhMandorRp45,000.00Rp450.00JUMLAHRp10,800.00HARGA SATUANRp10,800.00

1 m3 Membongkar kuda-kuda/gording dipakai lagi SNI Rev. : 2005TENAGA6.000OhPekerjaRp32,500.00Rp195,000.004.000OhTukang kayuRp42,500.00Rp170,000.000.600OhKepala TukangRp45,000.00Rp27,000.000.200OhMandorRp45,000.00Rp9,000.00JUMLAHRp401,000.00HARGA SATUANRp401,000.00

1 m2 Membongkar rangka plafon dipakai lagi SNI Rev. : 2005TENAGA0.100OhPekerjaRp32,500.00Rp3,250.000.250OhTukang kayuRp42,500.00Rp10,625.000.015OhKepala TukangRp45,000.00Rp675.000.005OhMandorRp45,000.00Rp225.00JUMLAHRp14,775.00HARGA SATUANRp14,775.00

ANALISA BETON

1 m3 Pondasi Footplat Beton mutu f'c = 19,3 Mpa, uk. 100x100 cm, tul. 12 mm - 20 cmPanjang Pondasi ( x )=1.0000meterPanjang tulangan ( x )=13.3333meter1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.29Lebar Pondasi ( y )=1.0000meterPanjang tulangan ( y )=13.3333meter16.440kgBesi beton172,282.98Diameter tulangan=0.0100meterBerat tulangan ( x )=8.2200kg5.0000m2Bekisting untuk pondasi623,450.00Jarak tulangan ( x )=0.1500meterBerat tulangan ( y )=8.2200kg1.0000m3Membongkar bekisting130,000.00Jarak tulangan ( y )=0.1500meterTotal berat=16.4400kgJUMLAH1,590,937.27Jumlah rangkap=2.0000rangkapBekisting=5.0000m2DIBULATKAN1,590,937.00Tinggi plat ( x )=1.0000meter

1 m3 Sloof Beton mutu f'c = 19,3 Mpa, uk. 12x20 cm, tul. 4 12 mm, begel 6 - 20 cmDiameter tulangan=0.0120meterPanjang tulangan utama=177.7778meterBerat tulangan utama=39.4560kg1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.29Lebar sloof=0.1500meterPanjang / sengkang=0.5700meterBerat sengkang=65.9162kg105.372kgBesi beton1,104,247.76Tinggi sloof=0.1500meterJumlah sengkang=297.0000buahtotal berat=105.3722kg13.3333m2Bekisting untuk sloof1,809,200.00Jumlah tulangan utama=4.0000buahPanjang sengkang=169.2900meterBekisting=13.3333m21.0000m3Membongkar bekisting130,000.00Diameter sengkang=0.0060meterPanjang sloof=44.4444meterJUMLAH3,708,652.05Jarak sengkang=0.1500meterDIBULATKAN3,708,652.00

1 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 30x40 cm, tul. 12 16 mm, begel 8 - 15 cmDiameter tulangan=0.0120meterPanjang tulangan utama=150.0000meterBerat tulangan utama=22.1940kg1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.29Lebar kolom=0.2000meterPanjang / sengkang=0.7700meterBerat sengkang=37.0640kg59.258kgBesi beton620,994.00Tinggi kolom=0.2000meterJumlah sengkang=167.0000buahtotal berat=59.2580kg10.4000m2Bekisting untuk kolom2,636,348.00Jumlah tulangan utama=6.0000buahPanjang sengkang=128.5900meterBekisting=10.4000m21.0000m3Membongkar bekisting130,000.00Diameter sengkang=0.0060meterPanjang kolom=25.0000meterJUMLAH4,052,546.29Jarak sengkang=0.1500meterDIBULATKAN4,052,546.00

1 m3 RingBalok Beton mutu f'c = 19,3 Mpa, uk. 12x20 cm, tul. 4 12 mm, begel 6 - 20 cmDiameter tulangan=0.0100meterPanjang tulangan utama=277.7778meterBerat tulangan utama=42.8125kg1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.29Lebar ringbalk=0.1200meterPanjang / sengkang=0.4500meterBerat sengkang=102.7582kg145.571kgBesi beton1,525,508.36Tinggi ringbalk=0.1200meterJumlah sengkang=463.0000buahtotal berat=145.5707kg16.6667m2Bekisting untuk balok4,479,916.67Diameter sengkang=0.0060meterPanjang sengkang=208.3500meterBekisting=16.6667m21.0000m3Membongkar bekisting130,000.00Jumlah tulangan utama=4.0000buahPanjang ringbalk=69.4444meterJUMLAH6,800,629.31Jarak sengkang=0.1500meterDIBULATKAN6,800,629.00

1 m3 Balok Beton mutu f'c = 19,3 Mpa, uk. 15x25 cm, tul. 6 12 mm, begel 8 - 15 cmDiameter tulangan=0.0120meterPanjang tulangan utama=80.0000meterBerat tulangan utama=17.7552kg1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.29Lebar ringbalk=0.2000meterPanjang / sengkang=0.8700meterBerat sengkang=29.7400kg47.495kgBesi beton497,725.53Tinggi ringbalk=0.2500meterJumlah sengkang=134.0000buahtotal berat=47.4952kg14.0000m2Bekisting untuk balok3,763,130.00Jumlah tulangan utama=4.0000buahPanjang sengkang=116.5800meterBekisting=14.0000m21.0000m3Membongkar bekisting130,000.00Diameter sengkang=0.0060meterPanjang ringbalk=20.0000meterJUMLAH5,056,059.81Jarak sengkang=0.1500meterDIBULATKAN5,056,059.00

1 m3 Plat Beton mutu f'c = 19,3 Mpa, tebal 12 cm, tul. 8 mmLebar Plat ( y )=0.5000meterPanjang tulangan ( x )=120.0000meter1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58665,204.29Tebal plat=0.2000meterPanjang tulangan ( y )=69.3333meter168.083kgBesi beton1,761,421.19Diameter tulangan=0.0120meterBerat tulangan ( x )=106.5312kg9.0000m2Bekisting untuk plat2,605,455.00Jarak tulangan ( x )=0.1500meterBerat tulangan ( y )=61.5514kg1.0000m3Membongkar bekisting130,000.00Jarak tulangan ( y )=0.1500meterTotal berat=168.0826kgJUMLAH5,162,080.47Jumlah rangkap=2.0000rangkapBekisting=9.0000m2DIBULATKAN5,162,080.00Panjang plat=10.0000meter

TABELPANJANG=menghitung berat besi tulangan polosDIAMETER=0,006165 x d x d x L

DIAMETER