ANNUAL REPORT 2007-08 Government of India Ministry of Power Central Electricity Authority

Annual Report 07 08

Embed Size (px)

Citation preview

Page 1: Annual Report 07 08

20007-08

ANNUAL REPORT2007-08

Government of IndiaMinistry of Power

Central Electricity Authority

De

sig

n &

Prin

ted

at: C

ha

nd

u P

ress

Ph

.: 2

25

26

93

6

Page 2: Annual Report 07 08

AnnuAl RepoRt

2007-08

GoveRnment of IndIA

mInIstRy of poweR

CentRAl eleCtRICIty AuthoRIty

July 2008

Page 3: Annual Report 07 08

Central electricity authority Annual Report 2007-08

Central eleCtriCity authoritySewa Bhawan, R.K. Puram

New Delhi – 110 066CEA website: www.cea.nic.in

Sub ordinate Offices :

Regional Power Committees: 1. Member Secretary, Northern Regional Power Committee, 18-A, Shaheed Jit Singh Marg,

Katwaria Sarai, New Delhi-110016.2. Member Secretary, Western Regional Power Committee, Plot No. F-3, Opposite SEEPZ Complex,

MIDC Area Marol, Andheri (East), Mumbai-400093.3. Member Secretary, Southern Regional Power Committee, 29 Race Course Cross Road, Near

Anand Rao Circle, Bangalore-560009.4. Member Secretary, Eastern Regional Power Committee, 14 Golf Club Road, Tollygunge,

Kolkata-700033.5. Member Secretary, North-Eastern Regional Power Committee, Nongrimbah Road, Laitumkhrah,

Shillong-793003.

Regional Power Survey Offices:1. Dy.Director,RegionalPowerSurveyOffice(North),3rd Floor, 18-A, Shaheed Jit Singh Marg,

Katwaria Sarai, New Delhi-110016.2. Dy.Director,RegionalPowerSurveyOffice(South),LetterBoxNo.38,6th Floor, ‘F’ Wing,

Kendriya Sadan, Koramangala, Bangalore – 560034.3. Dy.Director,RegionalPowerSurveyOffice(West),5th Floor, Plot No. F-3, Opposite SEEPZ

Complex, MIDC Area Marol, Andheri (East), Mumbai-400093.4. Dy.Director,RegionalPowerSurveyOffice(East),RoomNo.201,C.G.O.Complex, ‘DF’-

Block, Salt Lake City, Kolkata-700064.

Regional Inspectorial Organisations:1. Superintending Engineer, Regional Inspectorial Organisation (North), 18-A, Shaheed Jit Singh

Marg, Katwaria Sarai, New Delhi-110016.2. Superintending Engineer, Regional Inspectorial Organisation (West), Ground Floor, WRPC

Building, F-3, MIDC Area Marol, Andheri (East), Mumbai-400093.3. Superintending Engineer, Regional Inspectorial Organisation (South), Shastri Bhawan, Chennai-

600006.4. Superintending Engineer, Regional Inspectorial Organisation (East), 14 Golf Club Road,

Tollygunge, Kolkata-700033.5. Superintending Engineer, Regional Inspectorial Organisation (North-East), “Aprem” near Miza

Modern High School, Nongrim Hills, Shillong-793003.

Page 4: Annual Report 07 08

Central electricity authority Annual Report 2007-08

From the Chairperson

Intheyear2007-08,manysignificantmilestoneshavebeenachieved,thus marking a good beginning for the 11th Plan. A capacity addition target of 78,700 MW was set for the 11th Plan to meet the gap between demand and supply of electricity and the expected growth of economy, as well as the creation of a National Grid by 2012. The Implementation Strategy formulated for the 11th Plan to provide Key Inputs for accelerated development of Power Sector is noteworthy in terms of its multi-pronged approach to ensure timely availability of all clearances, fuel linkages for the projects, availability of equipment and material as well as trained manpower. With a stringent

monitoring mechanism in place, this Plan is expected to witness a mammoth capacity addition and the creation of an All India Grid

Major achievements during the year 2007-08 have been as follows:

(i) Notification of theNational Electricity Planwhich serves as the roadmap for the overalldevelopment of the Power Sector.

(2) Convening an International Conclave to sensitize the stakeholders about the requirement of Key Inputs for 11th Plan, as well as to address constraints in the development of the Power Sector. Followupactionwastakenregardingdevelopmentofnewvendors,reviewofprequalificationrequirements for suppliers of critical equipments to encourage entrepreneurs, timely placement of orders for main plant and balance of plant.

(3) Integration of the Northern, Western, Eastern and North- Eastern Grid.

(4) Government’s Initiative for development of UMPPs was taken forward. Technical inputs were provided by CEA in the bidding process and award of Sasan, Mundra and Krishnapatnam projects to the developers.

(5) Action was initiated on development of 78 schemes totaling to 34,020 MW as a follow up of 50,000 MW Hydro-electric Initiative of the Government.

(6) Under the IGEN Programme jointly being implemented by CEA and M/s GTZ, mapping of thermal power stations was initiated and mapping of 33 stations was completed.

(7) CEA published important documents such as “General Review 2008”, “Growth of Electricity Sector In India” and “CO2 baseline database for the Indian Power Sector in India”.

(8) Report on Optimization of land requirement for Thermal Power Stations was brought out.

Page 5: Annual Report 07 08

Central electricity authority Annual Report 2007-08

The Power Sector is at a crucial threshold of its development. The task before CEA is to adapt itselftofunctioninthechangedenvironmentandfulfillitscommitmentsaslaiddownintheAct.Ilook forward to working with you all towards steering the Power Sector to new heights.

Rakesh Nath Chairperson, CEA

Page 6: Annual Report 07 08

Central electricity authority Annual Report 2007-08

the Authority

Shri Rakesh NathChairperson, CEA

Shri V.S. VermaMember (Planning)

Shri Gurdial SinghMember (Hydro)

Shri V. RamakrishnaMember (Power System)

Shri R. DahiyaMember (Thermal)

Shri Sunil VermaMember (E&C)

Shri S.M. DhimanMember (G.O.&D)

Page 7: Annual Report 07 08

Central electricity authority Annual Report 2007-08

Page 8: Annual Report 07 08

Central electricity authority Annual Report 2007-08

INDExtitle Page No.

Chapter – 1 Organisation 1

Chapter – 2 Planning For Power Development 17

Chapter – 3 Power Systems Planning and Development 39

Chapter – 4 Grid Management 54

Chapter – 5 Hydro Power Development 65

Chapter – 6 Thermal Power Development 75

Chapter – 7 DistributionandRuralElectrification 86

Chapter – 8 Design & Engineering Services 91

Chapter – 9 Economic and Commercial Aspects of the Power Industry 93

Chapter – 10 Power Generation 104

Chapter – 11 Power Development in North-Eastern Region 110

Chapter – 12 Training and Human Resource Development 122

Annexure-2A Awardees for the Year 2006-07 127

Annexure-2B List of Captive Coal Mines allocated to Power Utilities 128

Annexure -3A Inter-Regional Transmission Capacity Existing and Planned upto 2011-12

129

Annexure-3B Statement Showing the Transmission Lines completed during the year 2007-08

131

Annexure-3C Statement showing the Sub Stations completed during 2007-08 138

Annexure-3D Issues pertaining to Transmission System Planning taken up during 2007-08

143

Annexure-4A Power Supply Position during 2007-2008 146

Annexure-4B Status of Capacitor Installation during 2007-08 148

Annexure-5A Hydro Capacity Addition during the Year 2007-08 (Programme : 2751 MW)

149

Annexure-5B Hydro Capacity Addition Programme for 2008-09 151

Annexure-5C HydroProjectsidentifiedforbenefitsduring12th Plan (Tentative) 153

Annexure-5D Cost Reduction achieved by CEA in Hard Cost & Soft Cost at the time of according concurrence to various Hydro Power Projects during 2007-2008

156

Annnexure -6A Salient Features of The Nine Ultra Mega Power Projects 157

Page 9: Annual Report 07 08

Central electricity authority Annual Report 2007-08

title Page No.

Annexure –6B Consolidated List of IPP Projects recommended by Standing Committee of CEA for grant of Coal Linkage/LoA

158

Annexure-6C Thermal Power Projects commissioned in 2007-08 162

Annexure-6D ThermalPowerProjectsidentifiedforcommissioning during 2008-09

163

Annexure-6E 10th Plan Schemes spilled over to 11th Plan in State Sector 165

Annexure-7A State-wise Transmission and Distribution Losses (%) 169

Annexure-7B Aggregate Technical and Commercial (AT&C) Losses (%) 170

Annexure-8A Hydro Power Stations in Operation for which consultancy services have been rendered by CEA

172

Annexure-8B List of Projects for which detail Design & Engineering Services were provided during the period 2007-08

174

Annexure-9A Outstanding dues payable to Central Public Sector Undertakings(CPSUs) Upto 31-03-2008

176

Annexure-9B State-Wise Estimated Average Rates of Electricity (Updated Upto 31.03.2008)

177

Annexure-9C Cost of Energy Generation during 2000-01 to 2005-06 180

Annexure-9D Cost of Generation of Power for the year 2006-07 187

Annexure-9E Status of Power Sector Reforms 197

Annexure-10A All India/Sector-wise/Organisation-wise Generation Target/Actual Generation for the year 2007-08

198

Annexure-10B All India Installed Generating Capacity in the regions of Mainland and Islands

203

Annexure-11A 50000 MW H.E. Initiative Low Tariff HE Schemes under Survey & Investigation

210

Annexure-11B Hydro-ElectricSchemes identified for benefits during 11th Plan in North-Eastern Region

212

Annexure-11C Details of New Thermal Power Projects in North-Eastern States 213

Annexure-12A Tours/Trainings abroad of CEAOfficersduringtheyear2007-08 214

Page 10: Annual Report 07 08

1

Central electricity authority Annual Report 2007-08

“Failing to plan is planning to fail.”

CHAPTER – 1ORGANISATION

1.1 Organisation of CEA

1.1.1 The Central Electricity Authority (CEA) is a statutory organisation originally constituted under section 3(1) of the repealed Electricity (Supply) Act, 1948 since substituted by section 70 of the Electricity Act, 2003. It was established as a part- time body in the year 1951 and made a full- time body in the year 1975.

1.1.2 As per section 70(3) of the Electricity Act, 2003, Authority shall consist of not more than 14 members (including its Chairperson) of whom not more than eight shall be full-time Members to be appointed by the Central Government.

1.1.3 CEA is headed by a Chairperson who as the Chief Executive of the Authority oversees largely the development of Power Sector in the country. A Secretary, appointed by the Authority with the approval of the Central Government under section 72 of Electricity Act 2003, assists the Chairperson in discharging of CEA’s statutory functions. The Secretary also assists the Chairperson in all matters pertaining to administration and technical matters including human resource development and concurrence of hydro power projects etc. There are six (6) Wings in CEA namely Planning, Hydro, Thermal, Grid Operation & Distribution, Economic & Commercial and Power System each headed by a Member of the Authority. Under each Member, there are technical Divisions each headed by an officer of the rank of Chief Engineer. At present, there are twenty-nine Divisions in CEA headquarter at New Delhi.

1.1.4Sub-ordinateofficesofCEA

There are 14 subordinate offices of CEA viz. five (5) Regional Inspectorial Organizations,

four (4) Regional Power Survey Organizations and five (5) Regional Power Committees located in various parts of the country.

a) Regional Inspectorial Organisation(RIO)

Under Chief Engineer (EI) in Power System Wing, five (5) Regional Inspectorial Organisation (RIO) offices, each headed by an officer of the rank of Superintending Engineer function at New Delhi, Mumbai, Chennai, Kolkata and Shillong to inspect the HV/MV installations of the Central Government.

b) Regional Power Survey Organisation (RPSO)

Four (4) Regional Power Survey Organisation (RPSO) offices, each headed by an officer of the rank of Deputy Director function at New Delhi, Mumbai, Bangalore and Kolkata under Chief Engineer (DMLF) in the Planning Wing to carry out surveys to forecast the demand of power in their respective regions.

c) RegionalPowerCommittees(RPCs)

Five (5) Regional Power Committees (RPCs) each headed by a Member Secretary, an officer of the rank of the Chief Engineer, are functioning at New Delhi, Mumbai, Bangalore, Kolkata and Shillong to facilitate the integrated operation of the Regional Electricity Grids.

1.2 FunctionsofCEA

The functions and duties of the Authority are delineated under section 73 of the Electricity Act, 2003. Besides, CEA has to discharge various other functions as well under sections 3, 7, 8, 53, 55 and 177 of the Act.

Page 11: Annual Report 07 08

Central electricity authority Annual Report 2007-08

2 “Let our advance worrying become advance thinking and planning.”

Section 73-Functions and Duties of theAuthority

a) advise the Central Government on the matters relating to the national electricity policy, formulate short-term and perspective plans for development of the electricity system and coordinate the activities of the planning agencies for the optimal utilization of resources to subserve the interests of the national economy and to provide reliable and affordable electricity to all consumers;

b) specify the technical standards for construction of electrical plants, electric lines and connectivity to the grid;

c) specify the safety requirements for construction, operation and maintenance of electrical plants and electric lines;

d) specify the Grid Standards for operation and maintenance of transmission lines;

e) specify the conditions for installation of meters for transmission and supply of electricity;

f) promote and assist in the timely completion of schemes and projects for improving and augmenting the electricity system;

g) promote measures for advancing the skills of persons engaged in electricity industry;

h) advise Central Government on any matter on which its advice is sought or make recommendation to that Government on any matter if, in the opinion of the Authority, the recommendation would help in improving the generation, transmission, trading, distribution and utilization of electricity;

i) collect and record the data concerning the generation, transmission, trading, distribution and utilization of electricity and carry out studies relating to cost, efficiency, competitiveness and such like matters;

j) make public from time to time the information secured under this Act, and provide for the publication of reports and investigations;

k) promote research in matters affecting the generation, transmission, distribution and trading of electricity;

l) carry out, or cause to be carried out, any investigation for the purpose of generating or transmitting or distributing electricity;

m) advise any State Government, licensees or the generating companies on such matters which shall enable them to operate and maintain the electricity system under their ownership or control in an improved manner and where necessary, in coordination with any other Government, licensee or the generating company owning or having the control of another electricity system;

n) advise the Appropriate Government and the Appropriate Commission on all technical matters relating to generation, transmission and distribution of electricity; and

o) discharge such other functions as may be provided under this Act.

In addition to above functions and duties, CEA has to perform the following functions in terms of the under mentioned sections of the Electricity Act, 2003:-

Section 3 -NationalElectricity Policy andPlan

(1) The Central Government shall, from time to time, prepare the National Electricity Policy and Tariff Policy, in consultation with the State Governments and the Authority for development of the power system based on optimal utilization of resources such as coal, natural gas, nuclear substances or materials, hydro and renewable sources of energy.

Page 12: Annual Report 07 08

3

Central electricity authority Annual Report 2007-08

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

(2) The Central Government shall publish the National Electricity Policy and Tariff Policy from time to time.

(3) The Central Government may, from, time to time, in consultation with the State Governments and the Authority, review or revise the National Electricity Policy referred to in sub-section (1).

(4) The Authority shall prepare a National Electricity Plan in accordance with the National Electricity Policy and notify such plan once in five years.

PROVIDED that the Authority while preparing the National Electricity Plan shall publish the draft National Electricity Plan and invite suggestions and objections thereon from licensees, generating companies and the public within such time as may be prescribed;

PROVIDED FURTHER that the Authority shall -

a) notify the plan after obtaining the approval of the Central Government;

b) revise the plan incorporating therein directions, if any, given by the Govt. while granting approval under clause (a).

(5) The Authority may review or revise the National Electricity Plan in accordance with the National Electricity Policy.

Section8-Hydro-ElectricGeneration

(1) Any generating company intending to set up a hydro-generating station shall prepare and submit to the Authority for its concurrence, a scheme estimated to involve a capital expenditure exceeding such sum, as may be fixed by the Central Government, from time- to time, by notification.

(2) The Authority shall, before concurring in any scheme submitted to it under sub-section (1) particular regard to, whether or not in its opinion:

a) The p roposed r ive r -works wi l l prejudice the prospects for the best ultimate development of the river or its tributaries for power generation, consistent with the requirements of drinking water, irrigation, navigation, flood-control, or other public purposes, and for this purpose the Authority shall satisfy itself, after consultation with the State Government, the Central Government, or such other agencies as it may deem appropriate, that an adequate study has been made of the optimum location of dams and other river-works;

b) the proposed scheme meets, the norms regarding dam design and safety.

(3) Where a multi-purpose scheme for the development of any river in any region is in operation, the State Government and the generating company shall co-ordinate their activities with the activities of the person responsible for such scheme in so far as they are inter-related.

Section53- ProvisionRelatingToSafetyAndElectricitySupply

The Authority may in consultation with the State Governments, specify suitable measures for-

a) protecting the public (including the person engaged in the generation, transmission or distribution or trading) from dangers arising from the generation, transmission or distribution or trading of electricity, or use of electricity supplied or installation,

Page 13: Annual Report 07 08

Central electricity authority Annual Report 2007-08

4 “A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

maintenance or use of any electric line of electrical plant ;

b) eliminating or reducing the risks of personal injury to any person, or damage to property of any person or interference with use of such property;

c) prohibiting the supply or transmission of electricity except by means of a system which conforms to the specification as may be specified;

d) giving a notice in the specified form to the Appropriate Commission and the Electrical Inspector, of accidents and failures of supplies or transmission of electricity;

e) keeping by a generating company or licensee the maps, plant and sections relating to supply or transmission of electricity;

f) inspection of maps, plans and sections by any person authorized by it or by Electrical Inspector or by any person on payment of specified fee;

g) specifying action to be taken in relation to any electric line or electrical plant, or any electrical appliance under the control of a consumer for the purpose of eliminating or reducing the risk of personal injury or damage to property or interference with its use.

Section55- Use,etc.ofMeters

(2) For proper accounting and audit in the generation, transmission and distribution or trading of electricity, the Authority may direct the installation of meters, by a generating company or licensee at such stages of generation, transmission or distribution or trading of electricity and at such locations of generation, transmission or distribution or trading, as it may deem necessary.

Section177-PowersofAuthoritytoMakeRegulations

1) The Authority may, by notification, make regulations consistent with this Act and the rules generally to carry out the provisions of this Act.

2) In particular and without prejudice to the generality of the power conferred in sub-sec. (1), such regulations may provide for all or any of the following matters, mainly :-

a) the Grid Standards under section 34;

b) suitable measures relating to safety and electricity supply under section 53;

c) the installation and operation of meters under section 55;

d) the rules of procedure for transaction of business under sub-section (9) of section 70;

e) the technical standards for construction of electrical plants and electric lines and connectivity to the grid under clause (b) of section 73;

f) the form and manner in which and the time at which the State Government and licensees shall furnish statistics, returns or other information under section 74;

g) any other matter which is to be, or may be, specified.

3) All regulations made by the Authority under this Act shall be subject to the conditions of previous publication.

1.3BroadFunctionalAreasofwork ofChairpersonandtheMembersoftheAuthority

Chairperson

Chairperson is the Chief Executive of the Authority.

Page 14: Annual Report 07 08

5

Central electricity authority Annual Report 2007-08

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

Member(Planning)

Formulation of National Electricity Plan; integrated resource planning; coordinating the activities of Planning agencies for optimization of resource utilization; formulation of short, medium and long term power plans; long and short term demand forecast and sensitivity studies; material and manpower planning; coal, oil and gas linkages to power projects; surveys for power demand growth; identification and testing of co-lateral parameters for economic model for demand forecasting; collection, compilation and publication of statistics of Power Sector; securitization of resources/ fuel availability and fuel efficiency with the support of emerging technologies; modernization of project management; concepts of skill development; pro-active technology forecasting approaches; research and development in Power Sector, co-ordination with multiple agencies involved in research and development activities, energy conservation; energy auditing; environmental aspects of thermal projects; coordination of fuel oil/ liquid fuel supplies; coal quantity and quality control; etc.

Member(Thermal)

Overall thermal power development in the country; updating, development and evaluation of thermal technologies; design and engineering of thermal projects; quality assurance standards and plans; preparation of model documents and standards; thermal projects investigation and ash utilization; monitoring of construction and stabilization of thermal projects and suggesting remedial measures to problems involved; renovation, modernisation and life extension programmes of thermal generating stations; making operating norms for thermal generating stations etc.

Member(Hydro)

Overall hydro power development in the country; technical appraisal of hydro-electric

projects; integrated planning for utilization of water resources; assessment of hydro potential; assistance to States on investigation and project report preparation; construction & investigation, monitoring of hydro projects and suggesting remedial measures to problems involved; updating, development and evaluation of hydro technologies; environmental aspects of hydro projects; quality assurance plans and standardization, design and engineering of hydro projects; renovation, modernization and up rating of hydro stations; co-operation with neighbouring countries of Nepal, Bhutan and Myanmar for development of water resources for mutual benefits; etc.

Member(PowerSystem)

Planning and development of Transmission system consistent with national power plans; studies for the purpose of appraisal of transmission projects; transmission technology development; design and engineering; standardization and preparation of model document; renovation and modernization of transmission schemes; construction monitoring of transmission projects; inspection of existing electrical installations in Union Territories and Central Government Departments; investigation of accidents on electrical installations and suggesting remedial measures for their minimization and prevention etc.

Member(GridOperation&Distribution)

Formulation of policies for safe, secure and economic operation of regional grids; integrated operation, co-ordination of five regional grids through Regional Power Committees (RPCs); monitoring of delivery of shares from Central Sector projects; intra and inter-regional exchange of power; regional energy accounting; load generation balance; investigation of grid disturbances; matters relating Accelerated Power Development and Reforms Programme (APDRP) in J&K; monitoring of rural electrification programme; all matters relating to power development in union

Page 15: Annual Report 07 08

Central electricity authority Annual Report 2007-08

6 “It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

Category SanctionedStrength FilledStrengthHead

QuartersSubOffice

Total HeadQuarters

SubOffice

Total

CPES Group-A 373 113 486 302 79 381CPES Group-B 92 17 109 58 13 71NonCPESGroupGroup A 47 - 47 33 - 33Group B 311 17 328 281 13 294

Group C 347 109 456 199 82 281Group D 153 66 219 131 59 190Total 1323 322 1645 1004 246 1250

Category TotalNo.ofEmployees No.ofwomenemployeesIn Position

% ageFieldSanctioned Filled

CPES Group-A 486 381 13 3.41CPES Group-B 109 71 10 14.08NonCPESGroupGroup A 47 33 4 12.12Group B 328 294 107 36.39Group C 456 281 91 32.38Group D 219 190 16 8.42Total 1645 1250 241 19.28

territories; telecommunication in Power Sector; telecommunication data acquisition and software support; operation monitoring and performance review of thermal power stations; updating of maintenance procedures; generation data collection; performance analysis; maintenance monitoring etc.

Member(Economic&Commercial)

Economic evaluation of power policies and projects; appraisal of tariff for Nuclear Power Stations; financial packages; financial parameters; interest during construction and completed cost; examination of bulk power tariff structure; performance of SEBs; scrutiny for import duty exemption; certification of deemed

export benefit; co-ordination for externally aided schemes; examination of Power Purchase Agreements, advice on legal matters, etc.

Secretary

The Secretary (CEA) appointed by the Authority with the approval of the Government of India, assists the Authority in discharge of CEA’s statutory functions. The Secretary also assists the Chairperson (CEA) in all matters pertaining to administration and technical matters including human resource development and techno-economic appraisal and concurrence of power projects, planning of budget and expenditure control etc.

1.4 PersonnelandAdministration

1.4.1RepresentationofwomeninCEACEA had a total of 241 women employees as on

31.03.2008. The group wise number of women employees is shown in the table:

Page 16: Annual Report 07 08

7

Central electricity authority Annual Report 2007-08

“The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

1.4.2Representa t ion o f ScheduledCaste (SC), ScheduledTribes (ST)

Category

TotalNo.of Employees

SC ST OBC PhysicallyHandi-capped

Sanctioned FilledCPES Group A 486 381 58 11 5 2CPES Group B 109 71 4 2 - 1Non-CPES GroupGroup A 47 33 2 - - -Group B 328 294 42 8 - 2Group C 456 281 47 9 8 1Group D 219 190 73 5 5 1Total 1645 1250 226 35 18 7

& Ph y s i c a l l y H a nd i c a p p e demployees

1.5 Representation ofCEAOfficers onBoardsofPSUs

The Chairperson, Members and other officers of CEA who have been nominated to

Board of Directors of various Public Sector Undertakings (PSUs) and other Government Organisations as technical experts, are shown in the table below:

Sl.No Name&DesignationofOfficer Organisation Nominatedas1. Sh. Rakesh Nath, Chairperson, CEA

(w.e.f. 6.10.05)Nuclear Power Corp. Ltd. Director

2. Sh. Gurdial Singh, Member (Hydro)(w.e.f. 02.12.04)

NEEPCO Director

3. Sh. Gurdial Singh, Member (Hydro)(w.e.f. 02.12.04)

THDC Director

4. Sh. Gurdial Singh, Member (Hydro)(w.e.f. 02.12.04)

SJVNL Director

5. Sh. Gurdial Singh, Member (Hydro)(w.e.f. 02.12.04)

NHPC Director

6. Sh. Gurdial Singh, Member (Hydro)(w.e.f. 24.01.2008)

J&K State Power Development Corp. Ltd.

Director

7. Sh. B.K.Mishra, Secretary, CEA(Upto. 30.11.2007)

Haryana Vidyut Prasaran Nigam Ltd. (HVPNL)

Director

8. Sh. A.K.Asthana, CE (SP&PA)(w.e.f. 26.12.2007)

Haryana Vidyut Prasaran Nigam Ltd. (HVPNL)

Director

9. Sh. A.K.Gupta, CE (TRM)(w.e.f. 17.12.2007)

Haryana Power Generation Corpn. Ltd. (HPGCL)

Director

10. Sh.A.K.Gupta, Director (TE&TD)(Up to 30.09.2007)

Puducherry Power Corpn. Ltd. Thermal Expert

11. Sh. S.K.Thakur, Director (TP&I)(w.e.f. 22.11.2007)

Puducherry Power Corpn. Ltd. Thermal Expert

12. Sh. T.K. Barai ,Director (F&CA) (w.e.f 16.04.07)

Punjab State Electricity Regulatory Commission

Member of State Advisory Committee

Page 17: Annual Report 07 08

Central electricity authority Annual Report 2007-08

8 “Honesty is the first chapter in the book of wisdom.”

1.6 AnnualBudget

During the year 2007-08, against an allocation of Rs.78.65 crores (reduced to Rs.10.11 crores in the RE 2007-08) under Plan head, an expenditure of Rs.7.03 crores has been booked upto 31-03-2008. An expenditure of Rs.10.03 crores was booked under Plan head during 2006-07.

On the Non-Plan side, during the year 2007-08 an expenditure of Rs.42.54 crores was incurred against an allocation of Rs.40.87 crores, whereas during the year 2006-07, an expenditure of Rs.39.35 crores was incurred.

1.6.1RevenueRecoveredforConsultancyServicesbyCEA

CEA renders Consultancy Services for design and engineering of thermal and hydro projects to various SEBs and power utilities. During 2007-08, CEA rendered consultancy services worth Rs.2.78 crores and an amount of Rs.4.05 crores was recovered during the year (upto 31-03-08).

1.7 Progressiveuse ofHindi inOfficialWorkofCEA

All out efforts are being made to enhance the usage of Hindi in official work in CEA. All incentive schemes sponsored by the Deptt.of Official Language are in operation in CEA. In addition a Roving Shield is awarded to the Division/Section/Unit who does maximum work in Hindi throughout the year. During the year, Rajbhasha Shields were awarded to 10 Divisions/Sections where maximum correspondence is made in Hindi with Regions “A” & “B”. Apart from above CEA has introduced a Cash Award Scheme namely Kendriya Vidyut Pustak Lekhan Puraskar Yojna on All India basis to promote original book writing in Hindi from the calander year 2003. Under this scheme winners are awarded with the following prizes: (A) First Prize - Rs. 50,000/-,

(B) Second Prize - Rs.30,000/- (C) Third Prize - Rs. 20,000/-. During this period prizes for the two years i.e.2005 & 2006 have been evaluated. For the Year 2005 only two entries were received and only one book was found eligible for the first prize and for the year, 2006, six entries were received from which two were found eligible for prizes i.e. Ist and IInd prize.

Sub-offices of CEA were inspected to assess the usage of Hindi in official work. During this year two Sub offices of CEA i.e. RPSO Mumbai and Delhi have been inspected by parliamentary committee. Official Language Implementation Committee’s quarterly meetings were held regularly.

Hindi Fortnight was celebrated from 14-9-2007 to 25-9-2007. During this period six Hindi Competitions namely Hindi Essay Writing, Hindi Noting & Drafting, Hindi Technical article writing, Hindi speech, Kavya Paath and Hindi quiz were organized. Winners of these competitions were awarded Cash Prizes alongwith letter of appreciation on 25.9.2007 in the Hindi Day celebrations.

To create interest in Hindi the Hindi Books were purchased for library of CEA as per the target prescribed by the Official Language department.

During the year 2 Hindi Computer Training Programme were organised by NPTI, Faridabad in CEA Head Quarter in which altogether 25 employees of CEA were trained.

Officers and employees were regularly nominated for Hindi Language, Hindi Typing and Hindi Stenography training conducted under Hindi Teaching Scheme. Out of 31 typists 22 were trained and 01 is under training and 08 are still to be trained. In stenography out of 143 employees, 101 trained and 05 are under training and 37 are still to be trained. In Hindi Language all officers/employees are trained. Newly recruited officers/

Page 18: Annual Report 07 08

9

Central electricity authority Annual Report 2007-08

“Ambition should be made of sterner stuff.”

employees are being asked about their educational qualification in which information about their Hindi qualification level is being collected. In order that they may be given training in case they do not possess the knowledge of Hindi.

1.8 WelfareActivitiesinCEA

1.8.1DepartmentalCouncil

Departmental Council of CEA was constituted in August, 1998, consisting of eight members from official side and eight members from staff side under the Chairmanship of Chairperson, CEA. The objective of the council is to promote harmonious relations and to secure the greatest measure of cooperation between the Government in its capacity as employer and the general body of its employees in matters relating to conditions of work, welfare of employees, improvement of efficiency and standard of work.

1.8.2BenevolentFund

The Central Electricity Authority Benevolent Fund is a society registered under Societies Registration Act of 1860. The main objective of the Society is to provide financial assistance to the members of the Society on the following eventualities:-

a. (i) When the member is prematurely retired due to sickness.

(ii) When the member is on prolonged sickness leave.

(iii) When the member suffers from any unforeseen misfortune.

b. Providing financial assistance to members of families in case of death in service.

The membership of the society is voluntary and open to all temporary and permanent employees of CEA located at New

Inauguration of CEA Resource Centre By Sh. Anil Razdan, Secretary (Power)

Page 19: Annual Report 07 08

Central electricity authority Annual Report 2007-08

10 “The one exclusive sign of thorough knowledge is the power of teaching.”

Delhi. The subscription is collected on monthly basis. The benefit of the fund is limited to those who are members of the society or their dependents namely widow, sons and daughters. Financial assistance to the extent of Rs. 2500/- (maximum) is given to the families of the deceased or to a member of the fund on medical grounds.

1.8.3Associations/UnionsinCEA

The following Associations/ Unions of employees in CEA were active during 2007-08:

Power Engineers Association- Under process for recognition under CCS (RSA) Rules 1993.

Drawing Staff Association- recognized for 2 years under CCS (RSA) Rules 1993.

1.8.4PensionCases

1.8.4.1 PensionCases (Superannuation/VRS including sanct ion ofCGEGISamount)

75 regular superannuation cases, 2 VRS cases and 4 death cases have been settled during the year 2007-08 and necessary payment of retirement benefits have been released. In addition 4 more revised pension cases were also settled subsequent to revision of Pay/ Pay Scale of PSs.

1.8.4.2Transfer ofCapitalized value ofPensionarybenefits

3 cases of transfer of capitalized value in respect of ex-employees of CEA who have been permanently absorbed in Government Undertakings/ Autonomous Bodies were processed and have been finalized where CEA has discharged its pensionary liabilities to the concerned Organisations. 1 case has been forwarded to PAO (CEA). 22 more such cases are under process.

1.8.4.3Restorationofone-thirdcommutedportionofpension/ grant ofFamilyPension

In terms of revised instructions/guidelines issued by the Department of Pension & Pensioner’s Welfare calculation of 1/3rd restored amount of commuted portion of pension vide O.M. No.4/79/2006-P&PW(D) dtd.6.9.2007, 7 such cases relating to revision of the restored amounts of 1/3rd portion of pension and their grant of family pension have been settled.

1.8.4.4 Pro-rata pension (CAT/ CourtCases)

14 cases of grant of pro-rata and other pensionary benefits to ex-employees of CEA permanently absorbed in PSUs who had approached the CAT/court for relief were processed. Out of these, 2 (two) cases, where judgements were passed, have been settled and requisite payment released as directed by the Hon’ble CAT/Court. In 2 (Two) cases where judgment were received, the Department/ Government has filed “Appeal” in the Hon’ble Supreme Court & Civil Court, Tis Hazari. In 8 (Eight) cases, the judgments of the Hon’ble CAT required the Department to consider the claims of the applicant to pro-rata pensionary benefits and issue suitable orders. In these cases, the Department considered the claims of the applicants and finding them ineligible for pro-rata pensionary benefits, issued requisite speaking orders to them. The judgment received from the Hon’ble CAT in one case is under consideration of the Government. 5 (five) cases are still sub-judice in the Hon’ble CAT/Court.

1.9 VigilanceActivities / DisciplinaryCases in CEA

The Vigilance Division, CEA deals with various facets of vigilance mechanism and functions as a resource to the top management for carrying out investigations into complaints,

Page 20: Annual Report 07 08

11

Central electricity authority Annual Report 2007-08

“Children are our most valuable natural resource.”

suggesting corrective measures for improving the control system, compliance of laid down procedures and also for carrying out preventive vigilance exercises.

At the beginning of the year i.e. on 1.4.2007, there were five cases of disciplinary action pending under CEA’s disciplinary jurisdiction. During the year two new cases have been added. Out of total seven cases, two cases have since been finalized and action in respect of remaining five cases is at various stages of finalization. Thus, at present, in all there are five cases pending finalization.

Complaints other than anonymous/pseudonymous were taken up for investigation promptly and after completion of investigation, reports submitted to the prescribed authority.

As part of preventive vigilance, the Vigilance Division played its part in ensuring job rotation in sensitive posts and also assisted in ensuring that persons under suspicion are not posted at sensitive posts. The vigilance Division has also taken steps to ensure that web-site of CEA plays an important role in increasing transparency in its regulatory functions.

Prescribed periodical returns were sent to the Central Vigilance Commission and the Ministry of Power in time. Vigilance Awareness Week was also observed from 12th to 16th November, 2007 in CEA Headquarters and its Subordinate Offices to spread the message of integrity and transparency. On this occasion, Chairperson, CEA administered the pledge to all the officers and staff of the Central Electricity Authority.

1.10ElectricPower InformationSociety(EPIS

The Electric Power Information Society (EPIS) was established in June 1996 under the aegis of Central Electricity Authority on no-loss-no-profit basis for bringing out various CEA publications. These publications including

a quarterly technical journal “Vidyut Bharati” are being distributed by CEA among various Government agencies on complimentary basis. These are also available on sale for general public.

During the year 2007-08, the following publications have been brought out:

1. Vidyut Bharati, Quarterly Journal Issues

i) April - 2007

ii) July - 2007

iii) Oct. - 2007

iv) Jan. - 2008

2. Co2 Baseline Data Base for The Indian Power Sector-user Guide/ Version 3.0- Dec,2007

3. Annual Report 2006-07 (English version) – July, 2007

4. All India Electricity Statistics (2005-06), General Review, 2007-June, 2007.

5. National Electricity Plan, Vol.-I & II – April, 2007

6. 17th Electricity Power Survey of India Report – March, 2007

7. Electricity Tariff & Duty and Average Rates of Electricity Supply in India, July-2006.

1.11GrievanceCell

To redress the grievances of CEA Head Quarter employees, in accordance with the instructions of Department of Administrative Reforms and Public Grievances, Shri S. K. Thakral, Chief Engineer (Electrical Inspectorate Division), functioned as Director (Grievances).

1.12RighttoInformationAct,2005

Under the Right to Information Act, Shri S. K. Thakral, Chief Engineer has been entrusted the

Page 21: Annual Report 07 08

Central electricity authority Annual Report 2007-08

12 “The farther backward you can look, the farther forward you are likely to see.”

work of Central Public Information Officer of CEA. During the financial year 2007-08, 71 requests/ applications have been received under the Act. Out of 71 cases, 64 had been decided and 7 requests are under process. Further, 4 applicants filed the first appeal to the Appellate Authority, CEA and one applicant went for the second appeal to the Central Information Commission.

1.13PublicRelationsGroup

The Public Relations Group (PR Group) was constituted in CEA in March, 1999 with a view to consolidate and project the achievements of CEA as also to interact with the media. The PR Group is headed by Secretary, CEA. Shri R.K. Verma, Director (DP&D) who has been appointed as Director (PR), assists the Secretary, CEA in coordinating and implementing public relation activities with the help of officers from various wings.

The Public Relation (PR) Group has been involved in the following activities:-

l Preparation and issue of Press Releases covering all major CEA events.

l Organising CEA stall in Exhibition at Pragati Maidan, New Delhi.

l Publication of brochure on CEA.

l Interaction with Media.

1.14ParliamentQuestions, ParliamentAssurances,VIPreferences

Work relating to answering of Parliament Questions, Parliamentary Assurances, VIP reference and compilation and updating material for Consultative Committee and Standing Committee on Energy, compilation and processing of material for presentations such as power sector reform and Pvt. Sector participation including action taken reports, notes for Estimates Committee and Ministers meeting on power scenario etc. were dealt with. This involved

data sourcing and collection, preparation and forwarding of replies to MoP and participation in briefings. Subsequent need based queries and updating was also accomplished promptly.

Material for ‘Calling Attention Motion’ and ‘ No day Yet named Motions’ on various matters under Rule 196, 377 etc. of Parliament Procedure were also dealt with.

Generation, compilation and updating of material in respect of various Consultative Committee meetings were accomplished. The action taken reports on these were prepared with the help of data / replies received from various units.

VIP / MoP references including references from PMO covering areas of Power Sector were processed and as a result of active communication with respective divisions/ authorities, data so generated was finalized and forwarded to MoP. Material was also compiled and processed for President’s Address to both the Houses of Parliament and Finance Minister’s Budget Speech.

1.15MonthlyReports

CEA receives regular data on almost all the areas of Power Sector, such as generation, transmission and distribution of power. The information received is incorporated in the following regular monthly reports:

1. Report on important developments during the month for Prime Minister’s Office

2. Summary report for Council of Ministers on important developments in Power Sector during the month.

3. Executive Summary

The first two reports are issued by 1st and 5th of every month briefly highlighting the major achievements/ milestones / critical issues in Power Sector.

Page 22: Annual Report 07 08

13

Central electricity authority Annual Report 2007-08

“Failing to plan is planning to fail.”

The Executive Summary is issued by 10th of every month and is an important reference document reflecting targets vis-à-vis achievements in almost all the important areas of Power Sector in the month of review. Executive Summary of the important activities in the Power Sector and the energy generation parameters for the review and information is sent to Hon’ble Minister of Power and other concerned officials. The report contains the details of the thermal and hydro generating units commissioned during the month and the progress of major transmission lines & sub-stations commissioned. The status of generation vis-à-vis the programme and also the performance with reference to the corresponding period of previous years and the status of the coal position of various thermal power stations is highlighted.

The up-to-date details of the generating capacity, energy demand and the demand met in various States and the Region are brought out for overall review of the power situation in the country. Also information regarding capacity addition, generation targets / achievements etc. are sent to MoP every month for Press Release by the end of 2nd week.

1.16ComputerizationinCEA

The use of computers for Power Sector Development was started in CEA in mid sixties. In the initial years, the usage was mainly for power system planning studies. However, over the years computerization has pervaded all activities of CEA. A number of software packages have been procured (Refer Software facilities) and in-house expertise developed. The hardware facilities have also been enhanced.

All the technical division and the administrative sections have been provided with computers to facilitate computerization of all the works in CEA. Provision of LAN for the whole building is underway.

The important statistics/ data/ information of CEA is uplinked on the website of Central Electricity Authority (www.cea.nic.in) for global access. The website is designed, developed and maintained in-house by CEA. The internet facility accessed through 34 MBps Fiber Optic link provided by NIC has been extended to various nodes of the LAN in CEA. Some of the officers are provided with internet facility through Broadband connections.

1.16.1HardwareFacilities

The hardware facilities presently available include:

l About 550 Nos. Pentium-II/Pentium-III/Pentium-IV based PC systems.

l Advanced peripheral like A0 size plotter/digitizer, colour laser printers, high speed digital printer-cum-copiers, A3 size inkjet printers, heavy duty line printers, CD writer, scanners etc.

1.16.2Softwarefacilities

The following general software packages are available:

l MS Office bilingual software.

l Data Base-(FOXPRO, VISUAL DBASE)

l Report Generation (ADOBE ACROBAT 6)

l Graphic Packages – (AUTOCAD)

l Fortran Compiler (LPI, LAHEY 90, MS FORTRAN etc)

l Bilingual Software (LEAP, AKSHAR, APS 2000++)

l Corel Draw-8

l SQL 2005 with 5 Clients

l Windows 2003 Server Edition

l Payroll package for CEA

Page 23: Annual Report 07 08

Central electricity authority Annual Report 2007-08

14 “Let our advance worrying become advance thinking and planning.”

l Office automation package for GPF/Consultancy/Billing/Newspaper billing.

Some of the important and scientific packages available include:

l Power System Analysis Package (PSAP), IREQ

l Electric Generation Expansion Analysis System Model (EGEAS)

l Integrated System Planning Model (ISPLAN), etc

l MULTISYM.

l River Basis Planning Module – SIMHYDE.

l River Basis Planning Module – MINERVA.

l Thermoflow software (GT Pro, GT Master and Peace, Steam Pro, Steam Master and Peace).

l Caeser II Ver.4.5 standalone PC version-Pipe stress Analysis Software.

l Cadworx-Plant design and Automation Software Version 2005 standalone PC Version autocad based specification driven Plant Design.

l Primavera for enterprise for construction (P3ec) version 4.1.

l Autocad 2005-standalone.

l STAAD Pro Structural Suite Software.

l Cyme software for power flow study.

l Software for Distribution Planning (SynerGEE).

l PLS-CADD software package for transmission line terrain modeling.

l I-tower software package for designing steel lattice structures.

l Current Distribution Electromagnetic Interference, Grounding and Soil Analysis (CDEGS) software package.

l PSCAD/EMTDC software package.

l ASPEN one line for relay co-ordination

l ASPEN line constant programme.

l C Y M C A P p a c k a g e f o r a m p a c i t y calculation.

l iSWITCHYARD software for design of switchyard and sub-station structures.

l SIMPOW and NEPLAN - load flow, short circuit, optional power flow and stability studies.

l PSS/E - for load flow, short circuit and stability studies.

1.16.3UsageofFacilities

All the formations of CEA continue to make use of the existing computer facilities for carrying out studies and day-to-day work. The computer systems are extensively utilized by technical wings of CEA for bringing out various reports through complex engineering studies and analysis. These facilities are also made used for Internet Communications, Data Transfer between CEA and Ministry of Power, Budgetary allocation and monitoring and sanction/grant of loans/advances to CEA personnel.

1.16.4Upgradation of I.T. facilities inCEA

Govt. of India, Min. of Power have approved a Scheme “Upgradation of I.T. facilities in CEA” at an estimated cost of Rs.9.52 crores. The Scheme under Phase-I envisages providing computers at each working desk inter-connected through LAN and having the facility of Internet. The network is proposed to be extended to all the Wings and Sections within CEA. The scheme envisages receiving data electronically from the utilities online through CEA website.

Page 24: Annual Report 07 08

15

Central electricity authority Annual Report 2007-08

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

To achieve the above, CEA is in the process of implementation of information management system. This covers building of data centre, installation of high end servers and associated system softwares including establishment of Local Area Network and development of application software for the different functionalities in CEA.

The work related to data centre and installation of servers and system softwares including establishment of LAN has been completed and development of application software is under progress. It is expected that the work will be completed in 2-3 months time. This facility will provide CEA to create a centralized and online data base for analyzing and monitoring the data of Indian power sector.

This would facilitate in (a) interlinking various database of each division on relational basis for sharing data among various divisions of CEA (b) automatic uplinks of various information to CEA website etc.

The work on further upgradation of IT facilities in CEA (under IMS Phase II) has also been initiated with the following broad objectives.

l To provide adequate redundancy in the existing data centre to enhance reliability of the system and to build a separate disaster recovery data centre.

l More intensive and comprehensive IT based monitoring of execution of power projects.

1.17ISO 9001:2000 Quality SystemcertificationforCEA

In order to improve the quality of output and competency of the personnel of CEA, the Quality Management System (QMS) as per ISO 9001:2000 was adopted by CEA. The

ISO certification for all the wings of CEA was obtained from BIS during February-March, 2004. Monthly, Quarterly & Half Yearly meetings as prescribed in the Management Representation (MR) Manual on QMS are held in time in various divisions/ wings and at the level of Chairperson. The BIS conducts Surveillance Audit of all wings for continuance of ISO certification.

1.18ResourceCentre

Resource Centre a joint venture of CEA-BEE was inaugurated by Secretary (Power) on 28/4/2008.

It is a state of art, the resource centre is equipped with modern equipments:

Two (2) LCD screens for displaying the latest news/event hosted

One touch screen for searching books/journals from the catalogue

One wifi for facilitating internet connection to thirteen (13) computers

Multi purpose printer-Xerox facility connected with the computers

Library management software ‘LIBCARE’ has been installed for tracking/ issuing/ returning books. The resource centre houses 10,000 books including 2000 in Hindi. Magazines/ Periodicals are displayed on the racks.

Sitting arrangement, ambience and environment has been designed keeping in mind the need and comfort of the readers.

1.19VariousCommitteesConstituted by CEA

The following committees/ working groups, comprising of CEA officer & others, were constituted by CEA:

Page 25: Annual Report 07 08

Central electricity authority Annual Report 2007-08

16 “A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

Sl.No.

DateofConstitution ofCommittee

NameoftheCommittee

1 02.04.2007 Committee to define criterion for commissioning of generating unit. 2 04.04.2007 Committee to work out the Optimal Land Requirements for TPSs.3 06.06.2007 Expert Committee on HRT of Parbati Hydro-electric Project Stage- II of NHPC.4 06.07.2007 Committee to give recommendations for long term coal linkage/ allotment of

Coal Blocks for Power Plants.5 24.10.2007 Standing Committee to examine Proposals/Applications for Grant of Coal

Linkage/Captive Coal Blocks for new Thermal Plants.6 06.11.2007 Committee for selection of a consultant for implementation of Upgradation of IT

facilities in CEA-Phase-II.7 13.12.2007 Joint Monitoring committee to Monitor the Progress of Sasan Ultra Mega Power

Project (6 x 660 MW).8 07.01.2008 Committee to review Design Features of Boilers being sourced from Chinese

Manufactures.9 08.02.2008 Committee to work out the specifications of Cold Rolled Grain Oriented (CRGO)

– short supply. 10 13.02.2008 Joint Monitoring committee to Monitor the progress of Krishnapatnam Ultra

Mega Power Project (5 x 800 MW).11 13.03.2008 Formation of Crisis Management Group.12 13.03.2008 Committee to enquire into partial grid disturbance that occurred in Northern

Region on 7th and 9th March, 2008.

CEA Stall in Trade Fair (IITF)

Page 26: Annual Report 07 08

17

Central electricity authority Annual Report 2007-08

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

CHAPTER – 2 PLANNING FOR POWER DEVELOPMENT

2. Power Planning

2.1 GenerationPlanningStudies

Power absorption studies for accord of concurrence to the following projects were carried out using ISPLAN model.

a) Ranjit State-IV HEP (120 MW) in Sikkim by Jal Power Corpn.Ltd.

b) Lower Jurala HEP (240 MW) in Andhra Pradesh by APGENCO Ltd.

c) Pare HEP (110 MW) in Arunachal Pradesh by NEEPCO

d) Dibang Multi purpose project (3000 MW) in Arunachal Pradesh by NHPC.

Following studies were also carried out using EGEAS model:

(i) Generation Planning Studies have been completed for absorbing power for the Pancheshwar Multipurpose Project, Govt. of Nepal, Nepal considering 5600 MW + 240 MW and 2800 MW + 240 MW as the two possible alternatives with commissioning target for the year 2016-17.

(ii) Power absoption studies for 3000 MW Dibang MPP in Arunanchal Pradesh, North Eastern Region have been completed and report finalized.

2.1.2 Reports on Power Planning

1. Section 3(4) of Electricity Act, 2003 mandates CEA to prepare National Electricity Plan once in five years in accordance with Policy. CEA in consultation with all stakeholders has prepared a National Electricity Plan for development of power sector based on optimal utilization of

resources. The Plan is in two volumes, with Volume-I covering the generation aspects and the Volume-II covering the transmission aspects. The plan has been evolved based on detailed Generation Capacity Expansion Studies carried out in the Planning Wing. The plan has been notified in the Gazette of India in August 2007.

2. Substantial technical inputs were provided for finalization of report of the Special Task Force on “Road Map for Development of Power Sector in Bihar” issued by STFB, Planning Commission. A visit was also undertaken by CEA officers alongwith MNRE officers to BSEB’s headquarter in Patna to discuss the report of the Special Task Force on Bihar. As per the advice of the Chairman, Special Task Force, CEA is also monitoring the progress of action taken by BSEB/ Govt.of Bihar on the recommendations made by Special Task Force on Bihar.

3. A committee under the Chairmanship of Member (Planning), CEA with representatives from NTPC, NHPC, NPCIL & BHEL finalized a report recommending criteria for commissioning of new hydro, coal/lignite based plants, gas based plants and nuclear plants after taking into consideration international practices. The report was submitted in September, 2007 to Ministry of Power for consideration.

4. A Draft Qualifying Requirement of bidders for balance of plants of thermal projects has been prepared in consultation with Thermal Division of CEA and after collecting information from various organizations. The Draft Qualifying Requirement has also been discussed with PSUs and private sector organizations and is being finalized.

5. Task Force Report on formulation of an action plan for development of Energy Sector in North-Eastern Region was prepared and submitted to Ministry of Power.

Page 27: Annual Report 07 08

Central electricity authority Annual Report 2007-08

18 “It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

6. Geothermal energy is one such source which can be tapped for generation of electrical energy. India has vast geothermal resources and 340 perennial hot springs have been identified throughout the country with surface temperatures ranging from 37° to 90°C. The potential for power generation at these sites is about 10,000 MW. Studies for exploitation of these geothermal energy resources have been undertaken by many institutions / organizations and valuable data has been generated in respect of structural geological, geochemical, hydrological and thermal parameters of these systems. The Ministry on New and Renewable Energy (MNRE) has been supporting a research, development and demonstration programme for utilization of geothermal energy for power generation and direct heat applications and has demonstrated its use at some locations in the country. In a meeting held under the Chairmanship of Secretary (MNRE) on 3rd

September, 2007 to discuss the various issues related to use of geothermal energy for power generation and direct heat applications at potential sites in the country.

7. An Expert Group was constituted under the Chairmanship of Member (Planning), CEA to examine and compile information available with various agencies for the Puga geothermal fields, assess the geothermal potential and prepare an Action Plan for development of this potential. During the course of its activities, the Expert Group had many meet ings/interactions with the experts and also visited the geothermal fields of Puga during 11-14 November, 2007. The data available with various agencies GSI, CEA, NGRI and NHPC who had been involved in exploratory studies over the last two decades was also collated and examined. The Report of the Expert Group is under finalization.

Vindhyachal Super Thermal Power Station-N.T.P.C. Ltd Installed Capacity : 2760 MW

Page 28: Annual Report 07 08

19

Central electricity authority Annual Report 2007-08

“The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

2.2 ParticipationasCommitteeMember/InteractionMeetsOrganized/KeyNoteAddressdelivered/PaperPresentedetc.

1. International Conclave on Key Inputs for Accelerated Development of Indian Power Sector for ‘11th Plan and Beyond’ was organized by MoP and CEA in partnership with CII on 4th and 5th July 2007 at New Delhi. A base paper indicating the details of proposed 11th Plan and likely size of 12th Plan and requirement of various equipments, materials and other inputs for implementation of the Power Plans was prepared by CEA for this conclave. About 85 industries including BHEL, Dong Fang, L&T, MHI, Ansaldo, Alstom, VA Tech & Toshiba , 125 Nos. research institutes, State Govts. CERC, SERCs, Ministry of Industry, PSUs & 25 other organizations participated. Major recommendations of the conclave was prepared & submitted to MoP. During the Conclave, major issues which are critical and which need to be addressed were identified for timely implementation of projects. A paper was also prepared by CEA & CII highlighting the crucial issues to be addressed, constraints being experienced by the manufacturers and the requirement of manufacturing capability of Main Plant and Balance of Plants (BoP) equipment for 11th plan projects. A Joint CEA-CII task force has been formed and seven subgroups of the task force have been constituted and several meetings of sub-groups were held. Regional Conferences are being held by MoP with industries. The first such Regional Conference was held on 25th August 2007 at Chennai and the second Regional Conference was held on 26th October 2007 in Chandigarh to sensitize the industries for meeting the 11th Plan target and requirements of future Plans. To look into the financial requirement of 11th Projects and related issues a high power “Sub-Committee on Financial Issues” has been set up and CEA is actively participating and providing all inputs to the committee.

2. Member (Planning) delivered a Key Note Address on the occasion of the post centenary golden jubilee of University of Calcutta on 3rd December, 08 at Kolkata.

3. Shri A.S.Bakshi, Chief Engineer (CEA) participated as Member Secretary & Convener of the Committee under the Chairmanship of Member (Planning) CEA with representatives from NTPC, NHPC, NPCIL & BHEL to define criteria for commissioning of new hydro, coal/lignite based plants, gas based plants and nuclear plants.

4. Officers of CEA participated in the interactive session with captive power producers and industries held in Ahmedabad, Jaipur, Bangalore, Bhubaneshwar, Hyderabad and Chennai during July-December,2007 in association with CII, PTC & PFC to know the progress on various fronts on the issues of captive generation. The interactive sessions were also attended by the representatives of State Govts., State Utilities & SERCs.

5. CEA in association with GTZ, Germany, organized an interactive workshop on optimization of land requirement of large power plants and institutional arrangements related to energy efficiency in power plants.

6. Shri K.K.Sethi, Director made a presentation in Ahmedabad in interactive session on issues & opportunities in Captive Power Plants. He also made a presentation in Guwahati for Thai delegation on Overview of power sector in North Eastern region.

2.3 ForeignTrainingandVisittoPowerStations

The following three officers of CEA participated in the IGEN (Indo – German Efficiency programme) for familiarization cum study tour from 6th to 17th August, 2007 in Germany:

Page 29: Annual Report 07 08

Central electricity authority Annual Report 2007-08

20 “Honesty is the first chapter in the book of wisdom.”

(i) Sh. A.S.Bakshi, Chief Engineer

(ii) Sh. Amarjeet Singh, Director

(iii) Smt. Nagma Furquan, Asstt. Director

Apart from above Shri Sandesh Sharma, Director along with five officers from different divisions of CEA attended the training programme on Power System Network Analysis Software PSAF of M/s CYME at Montreal, Canada under TIP in Grid Operation from 20.11.2007 to 29.11.2007.

Shri A.S. Bakshi, Chief Engineer & Smt Neerja Mathur, Director visited the Tarapur atomic power plant on 29-30th Jan, 2008 followed by the following officers of CEA to Narora Atomic Power Station of NPCIL on 1st & 2nd February, 2008 to get themselves acquainted with the working of nuclear power station:

(1) Sh. K.K.Sethi, Director

(2) Sh. P.K.Bhadra, Deputy Director

(3) Sh. Ishan Sharan, Deputy Director

(4) Smt. Rishika Sharan, Deputy Director

(5) Smt. Ammi R.Toppo, Deputy Director

(6) Sh. Harish Aggarwal, Deputy Director

(7) Smt. Anita Gahlot, Deputy Director

(8) Sh. Sanjay Jain, Asstt. Director

(9) Smt. P.E.Kamla, Asstt. Director

(10) Smt. Nagma Furquan, Asstt. Director

(11) Smt. Rehana Sayeed, Asstt. Director

2.4 ElectricityDemand

a) Under existing system, electricity demand of the country is projected periodically, normally once in five years, for short and long time frames.

The demand forecasting is done by a National level Committee of Experts constituted by CEA with consent of the Ministry of Power, by conducting an exhaustive Electric Power Survey of India. The demand forecast is basic input for formulation of National Electricity Policy, Developmental Plans and Programmes and Schemes concerning generation, transmission, trading, distribution and utilization of electricity. The demand forecast qualifies the need for development of various areas of electricity consumption to orient the growth of the specified sectors of development and leads to planned growth in various categories of electricity consumption. Electric load forecast also drives the development of transmission highways and optimum transmission network for carrying electricity from generation centre to load centre. Inter-regional transmission links for electricity transmission from surplus region to deficit region is an important input for planning and development of such links. The load projections also facilitate planning of electricity transfer MoU and trading of electricity for the mutual benefits of surplus/deficit regions/States

The latest forecast of electricity demand has been made by the 17th Electric Power Survey (EPS) Committee and published in March, 2007

(b) Analysis of Load Growth

The 17th EPS was prepared in consultation with utilities with various assumptions, in order to keep a watch on the load growth vis-à-vis demand forecast of various States regular analysis of energy demand and the peak demand is being carried out. The All India energy demand is very much in line with the 17th EPS forecast i.e. demand being 737 BU against the projected forecast of 744 BU. The energy demand of most of the Regions / States is deviated from projections in closed band of 0-5%. The peak demand of few of the States

Page 30: Annual Report 07 08

21

Central electricity authority Annual Report 2007-08

“Ambition should be made of sterner stuff.”

had exceed the 17th EPS projections during a particular month within a range of (0-5%) and for few other States, it was lower than the EPS projections by in the range of 0-10%. The peak demand projections on All India basis were about 4% more than the actual demand. During the analysis of the demand, it is noted that there are spurts in the peak demand by 15-30% where as the corresponding energy demand during the same month had grown by 8-10% only. The irregular increase in peak demand without corresponding energy growth needs to be addressed through load management, Demand Side Management and T&D loss reduction programme accordingly many States have been advised to develop the load growth and infrastructure to provide power for all.

2.4.1PublicationongrowthofElectricitySectorinIndiafrom1947-2007

In fulfillment of its duties and functions s ta ted under Sect ion 73 ( i ) & ( j ) and exercising powers vested under Section 74 of the Electricity Act, 2003, CEA publishes documents carrying annual electricity statistics of National and International importance and growth indicators of the Indian Electricity Sector. A Publication titled “Growth of Electricity Sector in India from 1947-2007” was brought out in July, 2007. The data for this publication has been sourced from various Utilities and Non-utilities and various National & International Journals.

This annual publication of CEA illustrates the growth of vital development indicators like generating capacity, electrical energy production, transmission and distribution network, captive power plants and pattern of consumption of electricity etc. The important statistics have been compared with the International data with respect to some of the developed and developing

nations. The booklet contains maps and charts presenting a panoramic view of the Indian Electricity Sector.

2.5 GeneralReview

The “General Review” containing annual electrical energy statistics of utilities, concerning growth of the Indian Electricity Sector, important information like organizational structure of Electricity Supply Industry in India and reforms carried out by Utilities are incorporated. The General Review also incorporates many important statistics/ data on installed capacity, energy generation and utilization of energy along with the transmission and distribution losses. This publication contains energy utilization by various categories of electricity consumers like domestic, commercial, irrigation, industries (LV/ MV, HV/ EHV), public lighting, public water works, etc. In addition, the information on captive generation by over 4500 HV/ EHV industries is also compiled along with the installed generating capacity by captive generators. The present publication has incorporated a new chapter on energy trading by various power trading companies. Important parameters of energy have been shown through pie charts and bar charts.

2.6 StandingCommittee onDerating,UpratingandRetirementofInstalledCapacityofStations

The Authority had constituted the Standing Committee on derating, uprating & retirement of electricity generating capacity of power stations. Following units were derated / retired during 2007-08. The Committee evaluates the performance of the unit through review of the economic performance vis-à-vis performance data and the overall generation through out the life of the plant.

Page 31: Annual Report 07 08

Central electricity authority Annual Report 2007-08

22 “The one exclusive sign of thorough knowledge is the power of teaching.”

2.7 UnitsRetired/Deratedduring2007-08

Sl. No. NameofStation/Plant UnitNo.

Installed Capcity(MW)

DeratedCapacity(MW)

NetDerationEffect(MW)

Retired(MW)

1 Dhuvaran TPS 5 140.00 110.00 30.00 0.00

2 Dhuvaran TPS 6 140.00 110.00 30.00 0.00

3 Nasik TPS 1 140.00 125.00 15.00 0.00

4 Nasik TPS 2 140.00 125.00 15.00 0.00

5 Koradi TPS 1 120.00 105.00 15.00 0.00

6 Koradi TPS 2 120.00 105.00 15.00 0.00

7 Koradi TPS 3 120.00 105.00 15.00 0.00

8 Koradi TPS 4 120.00 105.00 15.00 0.00

9 Bhusawal TPS 1 62.50 55.00 7.50 0.00

10 Paras TPS 1 62.50 55.00 7.50 0.00

11 Parli TPS 1 30.00 20.00 10.00 0.00

12 Parli TPS 2 30.00 20.00 10.00 0.00

13 Dhuvaran TPS 1 63.50 0.00 0.00 63.50

14 Dhuvaran TPS 2 63.50 0.00 0.00 63.50

15 Dhuvaran TPS 3 63.50 0.00 0.00 63.50

16 Dhuvaran TPS 4 63.50 0.00 0.00 63.50

17 Galeki Gas Power Station Mobile 1 3.00 0.00 0.00 3.00

18 Galeki Gas Power Station Mobile 2 3.00 0.00 0.00 3.00

19 Galeki Gas Power Station Mobile 3 3.00 0.00 0.00 3.00

20 Kothalguri Gas Power Stn.Mobile 4 3.00 0.00 0.00 3.00

21 Kothalguri Gas Power Stn. Mobile 5 3.00 0.00 0.00 3.00

22 Kothalguri Gas Power Stn.Mobile 6 3.00 0.00 0.00 3.00

23 Kothalguri Gas Power Stn. Mobile 7 3.00 0.00 0.00 3.00

24 Bongaigaon TPS 1 60.00 0.00 0.00 60.00

25 Bongaigaon TPS 2 60.00 0.00 0.00 60.00

26 Bongaigaon TPS 3 60.00 0.00 0.00 60.00

27 Bongaigaon TPS 4 60.00 0.00 0.00 60.00

28 Patna (Karbigha)TPS 1 1.50 0.00 0.00 1.50

29 Patna (Karbigha)TPS 2 1.50 0.00 0.00 1.50

30 Patna (Karbigha)TPS 3 3.00 0.00 0.00 3.00

Page 32: Annual Report 07 08

23

Central electricity authority Annual Report 2007-08

“Children are our most valuable natural resource.”

2.8 Crisis&DisasterManagement

Subsequent to the publication of the Crisis and Disaster Management Plan and Power Sector by Ministry of Power in July, 2004 and the Disaster Management Act, 2005 as notified in the Gazette of India by the Ministry of Home Affairs, the National Disaster Management Policy is under finalization and the necessary inputs and suggestions for the same were provided to the National Disaster Management Authority. Note was prepared on Vital Installation in Power Sector for identification of increased security. The meetings of Inter Ministerial Committee (IMC) on Planning Commission’s recommendations for the States of Andhra Pradesh, Kerala, Tamil Nadu and Pondicherry on long term rehabilitation and reconstruction of damaged infrastructure due to sever floods / natural calamities during 2005 were attended. The Meeting of the IMC to consider the report of Central Team which visited Mizoram in the wake of loss of crops due to Gregarious flowering of Bamboo was attended. The Meeting taken by Joint Secretary (Vigilance) for considering Private Sector installations as Vulnerable Area / Vital Points (VA / VP) was attended by Senior Officer for which due material were furnished to

Ministry of Power. The IMC Meeting considering restoration of damaged infrastructure in the State of Maharasthra and Gujarat was attended.

2.9 Research&Development inPowerSector

2.9.1PerspectivePlanforResearch&Development

A Standing Committee on R&D headed by Chairperson, CEA for preparation of a Perspective Research and Development Plan for next 15 years and to make recommendations from time to time for optimum utilization of infrastructure, raising of funds and to ensure that the outcome of research results in benefits to the customers and the operational efficiency of the sector, was constituted by the MoP in Feb. 2001 viz;

Five Standing Task Forces were constituted to assist the Standing Committee

l Task Force on Thermal Generation including Nuclear

l Task Force on Hydro Generation l Task Force on Transmissionl Task Force on Distribution

l Task Force on Energy Environment Interface

31 Patna (Karbigha)TPS 4 7.50 0.00 0.00 7.50

32 Namrup Gas Power Station 1 12.50 11.00 1.50 0.00

33 Namrup Gas Power Station 2 23.00 20.00 3.00 0.00

34 Namrup Gas Power Station 3 23.00 21.00 2.00 0.00

35 Namrup Gas Power Station 4 23.00 21.00 2.00 0.00

36Namrup Waste Heat Gas Power Stn. 1 30.00 24.00 6.00 0.00

Total(Retired&Derated) 199.50 528.50

Total(Derated)(MW) 199.50

Total(Retired)(MW) 528.50

Page 33: Annual Report 07 08

Central electricity authority Annual Report 2007-08

24 “The farther backward you can look, the farther forward you are likely to see.”

These Task Forces were entrusted with identification of Area of Research for R&D in their respective field, and to call for specific Research Projects and to scrutinize and prioritize these Research projects. The Research projects recommended by the Task Force were to be examined by the Standing Committee on R&D for Power Sector for approval.

A Standing Finance Committee (SFC) memo for 8 such R&D projects, approved by the Standing Committee, was forwarded to MoP for allocation of fund. The Standing Finance Committee of MoP approved 6 of these projects to be taken up for R&D. Three of these projects where the beneficiaries of the projects were contributing towards the cost of the project, were approved and have been taken up. The three projects where beneficiaries of the projects were not contributing towards the R&D effort were approved with the condition that beneficiaries should contribute 50% of the project cost. One of these projects where beneficiaries namely C-DAC and BHEL, agreed to contribute towards the project cost, has since been taken up. The details in regard to implementation of the four ongoing projects are at annexure.

The Standing Committee on R&D in its 11th Meeting held on 22nd August, 2007 decided to revamp the existing Task Forces and also decided to constitute two new Task Forces, namely:

l Task Force on Conservation & Efficiency

l Task Force on Renewable Sources of Energy

All the seven Task Forces has been entrusted with identification of the areas of R&D as well the specific R&D projects to be taken up during 11th Plan period in their respective fields. The Task Forces are to guide formulation of projects in these identified R&D areas and to monitor the progress of R&D Projects taken up.

40 number of R&D projects are under examination by the Task Forces, that can be taken up during the 11th Plan period. Most of the Task Forces have convened their meetings several times and are examining the received projects proposal. In order to speed up the process of identification of R&D projects, a meeting was chaired by Chairperson CEA on 26th Feb. 2008, wherein eight R&D projects were presented by the project proponents.

2.9.2InnovativeR&DProposals

Work regarding promotion of innovative methods of electricity generation continued and 11 proposals received from individuals through MoP, Prime Minister’s Office and President Secretariat were examined and commented upon.

2.9.3 R&DworksrelatingtoHydroPowerGeneration

The various R&D Schemes / Projects to be taken up in the Hydro Sector were identified in consultation with various agencies i.e. BHEL, NHPC, NML, IIT Roorkee, CPRI etc besides carrying out requisite co-ordination regarding the status of the various schemes and organizing meetings of Task Force for Hydro held at Delhi for which CE (HE&TD) is the convener and obtaining the necessary inputs for the Standing Committee headed by Chairperson, CEA, as required from time to time. This also included the scrutiny of the following proposals:

i) Silt Erosion Nanocomposite Coatings by Physical Vapour Deposition for Hydro Turbine Components by Dr. Ramesh Chandra, Associate Professor, I.I.T Roorkee.

ii) Design & Development of Silt Erosion Resistant Hydro Turbine Components by Dr. D.K.Diwedi, Asstt. Professor, I.I.T Roorkee.

iii) Development of Erosion Resistant Duplex Stainless Steel for use in hydro power plant by Dr. G.P.Chaudhary, I.I.T Roorkee.

Page 34: Annual Report 07 08

25

Central electricity authority Annual Report 2007-08

“Failing to plan is planning to fail.”

iv) Besides the MoU for the project mentioned at para i) above as received from CPRI was examined and requisite changes suggested in this regard.

2.10PreparationofDatabase

The data/information regarding R&D work in power sector being carried out by various agencies / organizations in Private and Government Sectors in India was obtained and compiled in the form of a Directory and is available on CEA Website. The Directory has been updated based on the revised information obtained from various Research Organizations.

2.11CEAChairs at Indian Institute ofTechnology,Delhi

An MoU exists between CEA and the Indian Institute of Technology, Delhi for creation of two CEA Chair Professorships, one in the Center

for Energy Studies alternatively Department of Mechanical Engineering and the other in Electrical Engineering Department, to fulfill following objectives concerning Power Sector.

l To take part in the academic programs of IIT, Delhi, as full time professors/faculty in the Center for Energy Studies alternatively Department of Mechanical Engineering and Electrical Engineering Department and coordinate HRD programs in the frontier areas of Power Management.

l To develop R&D programs relevant to the needs of CEA and in areas defined in the appendix to the MoU (subject to need based revision.)

l To initiate and develop HRD programs relevant to the needs of CEA and to coordinate courses for any batch of students from the CEA.

Talcher Super Thermal Power Station-N.T.P.C. Ltd. Installed Capacity : 3000 MW

Page 35: Annual Report 07 08

Central electricity authority Annual Report 2007-08

26 “Let our advance worrying become advance thinking and planning.”

Under the programme, a number of topics for research have been forwarded to IIT, Delhi.

A total number of 8 officers of CEA, Ministry of Power and NPTI are pursuing M. Tech and PhD courses at IIT, Delhi under the chairs. This would accrue benefits to the Power Sector in the long run. Till date 8 No. of officers have completed M. Tech from IIT Delhi. Two officers, one from CEA and the other from NPTI have been selected for admission to M. Tech programme for the academic session 2008-09 by IIT Delhi.

2.12 Energy Conservation

2.12.1Indo-German Energy EfficiencyProgramme

A pro jec t “Power P lan t Opt imiza t ion Component: Improvement in the availability and efficiency of Power Plants” under Indo – German Efficiency programme (IGEN) is being implemented jointly by M/s GTZ and CEA with the objective to promote energy efficiency and its conservation through improvement in the availability and efficiency of Power Plants. As per the MoU signed between the two countries the project is scheduled to be completed by Sept 2008. Implementation agreement between Ministry of Power and M/s GTZ was signed in November 2006.

The following are the outcome expected of the scheme:

1. Improved availability and efficiency of thermal power plants.

2. Establishment of mapped power plants data bank in CEA.

3. Report of Energy conservation impact in power plants.

4. Establishment of Energy Efficiency cell at Power Plants.

5. Training to the power plant professional on power plant optimization.

6. Standard Prescribed format for submitting Energy Audit Reports.

7. Organization of Dissemination Seminars.

The work of mapping of Thermal Power stations has been started in association with M/s GTZ and M/s Steag Encotec (India) Ltd. Under the programme about 85 stations of various state utilities are planned to be covered and 35 units of 200/ 500 MW capacity among 33 stations of the country have already been mapped. All Thermal Power Stations in the country have been advised to set up ‘Energy Efficiency Cell’ and appoint Energy Managers in compliance to the EC Act – 2001 and about 35 stations have so far reported the establishment of cell.

Under IGEN programme, a high level delegation of officers of CEA and MoP and two groups of engineers from CEA and state utilities like, APGENCO, WPDCL, MAHAGENCO, PSEB, KPCIL, MPPGCL and UPRVUNL visited Germany for familiarization, witness, discuss the state of art of cutting edge technology, Institutional facilities for Power Station personnel training, Research and Development projects and Thermal Power Stations being run by the power generating industry in Germany.

A high level interactive workshop was organized by CEA in collaboration with Steag (India) Ltd.on “Land Requirement of new Plants and Energy Efficiency” was organized in February, 2008 to deliberate upon the various issues involved. The workshop was inaugurated by Shri Anil Razdan, Secretary (Power).

The mapping reports prepared for six Thermal Power Stations of MAHAGENCO were discussed with the management and the senior officers from the concerned stations for implementation of the recommendations and on modalities for adoption of advance efficiency improvement technologies.

Page 36: Annual Report 07 08

27

Central electricity authority Annual Report 2007-08

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

2.12.2CleanDevelopmentMechanism

The Clean Development Mechanism (CDM) under Kyoto protocol to the United Nations Framework Convention on Climate Change (UNFCCC) provides an opportunity for the Indian Power sector to earn revenue through the reduction of Greenhouse Gases emissions particularly Carbon Dioxide (CO2).

CEA, accordingly took up in cooperation with GTZ-CDM India, to compile a CO2 database for all Grid connected Power stations in the country. The objective of the database is to facilitate the consistent and accurate quantification of CO2 emissions baseline by CDM project developers in the Indian Power sector. India is first CDM country in the world to have published such an official baseline for the power sector in the country as a whole. The database along with a User’s Guide is available on CEA website www.cea.nic.in. The latest version 3.0 contains the data upto 2006-07.

An article on “CEA’s Carbon Dioxide Baseline Emission for the Indian Power Sector” written by Shri D.S. Arora, Chief Engineer & Shri Praveen Gupta, Deputy Director was published in the magazine - Urjavaran.

2.12.3Asia Pacific Partnership (APP)-introducing Best Practices forEfficiency Improvement inPowerPlants

Asia Pacific Partnership (APP) on Clean Development and Climate is an innovative new effort to accelerate the development and deployment of clean energy technologies with founding members from Australia, China, India, Japan, Korea and USA.

The United States Department of Energy’s (USDoE) Office of Fossil Energy and NETL (National Energy Technology Laboratory, USA) is taking the lead in implementing activities targeted at improving the efficiency of coal fired power

plants in India under Asia Pacific Partnership (APP) Programme on Clean Development and Climate. Under APP programme, a task force on Power Generation and Transmission has been formed with an objective to facilitate demonstration and deployment of practices, technologies and processes to improve efficiency of the power generation.

Under the APP programme, NETL would provide all the technical expertise, heat rate improvement guidelines and other technical data assessment tools, training and demonstration etc. for few State Electricity Boards/ Generation companies to give exposure of best practices, techniques.

Ropar Thermal Power Station, of Punjab State Electricity Board and Kolaghat Thermal Power Station of WBPDCL has been shortlisted to carry out studies.

USAID along with CEA has taken up a study of ESP performance at one unit of Tuticorin Thermal Power Station. Unit No. 2, 210 MW has been selected for carrying out ESP performance studies.

Design and actual data in respect of unit # 2 ESPs were collected by the experts. Some of the options that will be looked into are: (a) alignment of plates (b) operational adjustments (c) gas distribution correction (d) performance related maintenance (e) improved AVC controllers (f) modifications to rapping system.

2.12.4Environment aspects of electricitygeneration

The following assignments were handled by this group during the year:

l CEA collected and compiled the monthly environmental related data for the year 2007-08 for thermal power stations that are in operation. Those power stations where

Page 37: Annual Report 07 08

Central electricity authority Annual Report 2007-08

28 “A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

stack emissions exceeded the norms during 2006-07 were addressed to take remedial measures and draw up action plan so that such emissions are brought down within the prescribed norms. Some of the thermal units do not have requisite infrastructure for environmental monitoring. Some of the units not meeting statutory environmental requirements are unable to install/replace existing ESPs etc. due to paucity of funds or lack of space.

l Examined World Bank Report on Country Environment Analysis for India in Power Sector & Highways Sector.

l Examined the case for toll on coal fired plant of Shri Shanker Sharma referred by Dr. Kirit S. Parikh, Member Planning Commission.

2.13DemandSideManagement

2.13.1National Energy ConservationAwards2007

CEA was associated as one of the members of the Technical Sub-Committee on “National Energy Conservation Awards 2007” to evaluate the performance and energy conservation efforts undertaken by various participating industries in respect of Dairy, Chlor-Alkali, Automobile, Fertiliser, and Aluminium sectors. A total of 62 proposals from these categories of industries were evaluated.

2.13.2EnergyEfficiencyofPowerSupply

CEA has been designated as the nodal agency by MoP to interact with the Japan Bank for International Cooperation (JBIC) Study Team, regarding improvement of energy efficiency of power supply in India. The objective of the study is to propose and formulate the future candidate projects regarding improvement in energy efficiency of India to be supported by Japanese ODA Loan, based upon the review of the needs of improvement in energy efficiency in India.

JBIC team visited CEA during February, 24 - March, 8, 2008 and discussions were held with Planning, Transmission, Distribution and Thermal Renovation & Modernization Groups of CEA. Data on the various new projects formulation in Generation, Transmission and Distribution apart from information on Indian Power Sector were furnished to JBIC team. JBIC study team also interacted with M/s. Dakshin Haryana Vidyut Vitran Nigam Ltd. regarding improvement in the distribution system.

2.13.3ComprehensiveAwardSchemeforPowerSector

With a view to ensuring optimum availability of generating units during daily peak period and to encourage thermal power stations to undertake planned maintenance of their units, a scheme for Meritorious Productivity Award was first conceived in 1983 when Plant Load Factors of utilities thermal power stations were around 50%. This Scheme was further reviewed and revised in 1992-93 and new schemes for Incentive Award for Efficient & Economic Operation of Thermal Power Stations for reducing their Specific Secondary Fuel Oil Consumption as also Auxiliary Power Consumption were also introduced.

To develop the spirit of competitiveness among the various power stations/projects and to encourage and motivate personnel engaged in the power projects/stations, to improve the efficiency, productivity and show better results, it was also considered to cover all important & relevant areas of power sector such as performance of thermal and hydro generating projects, transmission projects, early completion of thermal, hydro and transmission projects, distribution companies, nuclear projects. It was also felt that the comprehensive award scheme in the power sector will help in achieving the goal set by Ministry of Power for reliable, affordable

Page 38: Annual Report 07 08

29

Central electricity authority Annual Report 2007-08

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

and quality power supply for all consumers by 2012.

A Comprehensive Award scheme to institute the following awards in the various areas of power sector was prepared by CEA and approved by MoP:

l Thermal Power Station Performance Awards.

l Early Completion of Thermal Power Project Awards.

l Hydro Power Station Performance Awards.

l Early Completion of Hydro Power Project Awards.

l Transmission System Availability Awards.

l Early Completion of Transmission Power Project Awards.

l Nuclear Power Station Generation Award.

l Performance Award for distribution companies.

All stations/ projects of Central, State, Private Sector (Excluding Captive Power Plants) are eligible to compete for the awards under this scheme and the evaluation of performance shall relate to the financial year i.e. from 1st April to 31st March. Selected stations/projects shall be awarded suitably and there shall be no cash awards. The Comprehensive Award Scheme was implemented w.e.f the year 2004-05 and will continue thereafter on annual basis.

2.13.4Awardsfortheyear2006-07

Based upon the data/inputs furnished by various power utilities, the national awards for power utilities for meritorious performance during 2006-07 were distributed by Sh Sushil Kumar Shinde, Hon’ble Minister of Power during a function held on 20-03-2008. The list of awardees are given at Annexure-2A.

2.13.5Task Force on Conservation&EfficiencyunderR&Dprogramme

A Task Force on Conservation & Efficiency was formed in CEA under the Standing Committee for R&D in Power Sector. Chief Engineer (C&E Division) is nominated as convener of the task force and representatives from CPRI, IIT, MoST, TERI & NPC are included as members to assist the task force in identifying the R&D proposals on conservation & efficiency. The task force has already convened its first meeting.

2.14FuelManagementandAnalysis

2.14.1StandingLinkageCommittee(Short-Term)

Commitment to supply coal to new power projects is granted by Ministry of Coal based on the recommendations of the Standing Linkage Committee (Long Term) on the basis of normative parameters. After commissioning of the project, long term linkages are transformed into short term linkages based on actual requirements. Allocation on quarterly basis are made by the Standing Linkage Committee (Short term) [SLC (ST)], headed by an Additional Secretary in the Ministry of Coal, having representatives from the Ministry of Power, Ministry of Railways, Coal India Ltd. and CEA. For each quarter, the demand for allocation of coal was discussed with the respective power utilities in Pre-SLC (ST) meetings convened by CEA under the Chairmanship of Member (Planning), CEA, to assess the realistic coal requirement of individual power stations in the country, along with the proposed linked sources and was recommended to Ministry of coal for consideration in the SLC (ST) meetings. The assessment for coal requirement was made on the basis of generation targets for the period under consideration, current PLF, PLF for the same quarter during previous year, station-wise actual Specific Coal Consumption, maintenance schedule of units and new units expected to be

Page 39: Annual Report 07 08

Central electricity authority Annual Report 2007-08

30 “It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

commissioned. The norms of coal stock building vis-à-vis willingness of the SEB’s/ Utilities to maintain coal stock were also considered. While allocating the coal source-wise, rough estimates were carried out to assess the percentage of ash component for 35 Thermal Power Stations covered under MoE&F Notification to ensure that the annualized average content of ash in the coal supplied was less than 34%. Quantities of the imported coal assessed to be utilized by different thermal power stations during the quarter were also considered while recommending their coal requirement.

2.14.2MonitoringofCoalSupplytoPowerStations

The coal supply to 77 utility thermal power stations of the country (16 pit-head and 61 rail/road fed, having total installed capacity of 68449.5 MW) and their coal stocks was vigorously monitored in CEA on daily basis, based on the quarterly allocation made by SLC(ST).

Coal stocking norms for power stations were fixed by a Committee headed by Secretary, Planning Commission as 15 days for pit head and non-pit head varying from 20 days to 30 days depending on the distance of the power plant from the pit-head as per details given below:

l Pit-head Station 15 days

l Upto 500 Kms. away from Coal mine 20 days

l Upto 1000 Kms. away from Coal mine 25 days

l Beyond 1000 Kms. away from Coal mine 30 days

All India coal stock required at the 77 coal based power stations monitored by CEA based on norms given above is of the order of 22 Million Tonnes. However, under cash and carry scheme for supply and transportation of coal, as also due to inadequate stocking space, some of the

power stations/utilities were not able to keep high inventory, in view of liquidity problem.

The stations having coal stock for less than 7 days are classified as ‘Critical’ and those having coal stock for less than 4 days are classified as ‘Super Critical’. Efforts are made at all levels in CEA, Min. of Power, Min. of Coal, Coal Companies and Railways to bring such stations out of criticality.

The monitoring involved collection of information on day-to-day basis from various TPSs/ Utilities, preparation of daily coal stock report, overseeing of movement of coal as per linkage and intervening whenever deviation occured, collection of the information regarding quantity and quality of coal supplied to power stations etc.

The Infrastructure Constraints Review Committee, headed by Secretary (Co-ordination) in the Cabinet Secretariat, reviews the coal production and supply to thermal power stations in the country almost every month.

A Sub-group of the Infrastructure Constraints Review Committee headed by an Additional Secretary in the Ministry of Coal, consisting of the representatives from the MoP, CEA, Ministry of Railways and Coal India Ltd., every week reviewed and resolved the problems of coal supply to thermal power stations having coal stocks below 7 days requirement.

2.14.3Coal Supply Position during 2007-08

For the coal based generation target of 463.458 BUs of the country for the year 2007-08, requirement of coal was estimated as 340 Million Tonnes (MT), including 8 MT required to bring the All India coal stock at power stations from 14 MT to a normative level and to meet transit losses. In the beginning of the year,

Page 40: Annual Report 07 08

31

Central electricity authority Annual Report 2007-08

“The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

Ministry of Coal/Coal India Limited had given an indication that they would make available 285 Million Tonnes coal from CIL during the year 2007-08. At the levels of supplies of coal during 2006-07, 28 MT was expected from SCCL and 9 MT from captive mines (Bengal Emta, ICML and Panem). Thus, a total of 322 MT coal was expected from indigenous sources. To meet the estimated requirement of 340 MT of utility power stations, an import of 12 MT (equivalent to 18 MT gap of indigenous coal) was planned, which was subsequently revised to 14 MT in the month of November 2007 in view of a very large number of power stations with critical coal stock and depletion of all India coal stock to an alarmingly low level.

2.14.4ContingencyPlanforSupercriticalandcriticalthermalpowerplants

Due to heavy monsoon in the coal mining area followed by law and orders problems, production of coal and hence its supply to power stations was badly affected. All India coal stock at power stations got depleted to an alarmingly

low level of 8.67 MT against a normative requirement of 22 MT and number of ‘critical’ power stations went up to 29. To ensure that generation of power at the power stations is not affected adversely because of shortage of coal, a contingency plan was drawn jointly by Ministry of Coal, CIL, Railways, CEA and Ministry of Power. The contingency plan was implemented for a month w.e.f. 21st November 2007. During the period against a target of supply of total of 2157 rakes of coal to the ‘critical’ power stations, supply was only 1899 rakes resulting in only a marginal improvement in coal supply position. However, due to vigorous monitoring at all levels and all out efforts made by all concerned agencies, it was ensured that the generation of power was not affected due to shortage of coal and no power station reported any loss of generation on this account.

2.14.5Source-wiseReceiptofCoal

During the year 2007-08, source wise linkage and materialization thereof was as given below:

Linkage (MT)

ActualReceipt (MT)

%Receipt

CIL 318.402 277.351 87.11

SCCL 29.886 29.513 98.75

NEC 0.345 0.405 117.39

Captive Mines 10.872 11.263 103.60

Bengal Emta 4.245 4.281 101

ICML 2.625 2.778 106

Panem 4.002 3.905 98

Bermo 0.000 0.299 --

Import 10.230 10.153 99.25

Total 369.735 328.685 88.90

Page 41: Annual Report 07 08

Central electricity authority Annual Report 2007-08

32 “Honesty is the first chapter in the book of wisdom.”

The coal received during the year 2007-08 was 328.685 million tonnes (318.532 MT from indigenous sources and 10.153 MT of imported coal) against the linkage of 369.735 million tonnes. The total Coal consumption was 329.632 MT (in terms of equivalent raw coal). The annual coal receipt was 89% of the linkage. All India coal stocks at power stations during this period depleted from 14.12 million tonnes to 11.037 million tonnes.

During the year 61.33% coal was received through Indian Railways and 38.67% through their dedicated mode which includes coal transportation by MGR for pit head thermal power stations, Own wagons, Ropeway, Road etc. A summary of coal

(Million Tonnes)

STATUSYEAR

2004-05 2005-06 2006-07 2007-08

Demand 277.000 310.000 332.000 340.000

Linkage 302.26 308.98 338.553 369.735

Receipt (indigenous coal) 276.074 282.185 293.637 318.532

Receipt (Imported coal) 2.537* 10.443 9.664 10.153

Total Receipt (including Imported Coal) 278.611 292.628 303.301 328.685**

Opening Stock (includes Imported coal) 9.924 10.499 18.174 14.122

Consumption (includes Imported coal) 277.735 281.336 302.539 329.632

Closing Stock (includes Imported coal) 10.499 18.174 14.122 11.037

* Excluding Trombay.** In terms of equivalent raw coal

received by rail-fed stations and pit-head Thermal Power Stations is given below:

FiguresinMillionTonnes

Mode Linkage Receipt %Receipt

Pit-Head 137.954 127.104 92.14

Rail Fed 231.781 201.581 86.97

Total 369.735 328.685 88.90

2.14.6 Overall Coal Supply Position

Coal supply position for utility thermal power stations during the last 3 years and the current year is given as under:

2.14.7ImportofCoal

During the year 2007-08 against an initial target of 12 Million Tonnes for the year (subsequently revised to 14 Million Tonnes in

the month of November 2007), the power utilities in the country imported around 10.517 Million Tonnes of coal as per utility-wise details given below:

Page 42: Annual Report 07 08

33

Central electricity authority Annual Report 2007-08

“Ambition should be made of sterner stuff.”

2.14.8CoalQualityIssues

It was observed that uncrushed/oversized coal was still received by some of the thermal power stations in the country causing bottleneck in unloading. CEA had been sending statements giving details of the complaints about coal quality, received from power stations to Ministry of Coal and Coal India Ltd. every month. Thermal power stations reported supply of leftover poor quality coal mixed with over burden, stones and boulders. Because of poor quality coal, overall Specific Coal Consumption of the power stations in the country increased from earlier 0.715 kg/ kWhr to 0.731 kg/ kWhr during the year 2007-08. This resulted in increase in the cost of fuel, transportation and O&M, as also overloading and breakdown of the coal handling plant and equipments and increase in unloading time of rail rakes at the power stations.

(Figure in Million Tonnes)

Sl. No

Board/Utility AnnualTargetofImportedCoal

(MT)

ReceiptatPower Stations

(MT)

In transits at Ports(MT)

TotalImported(MT)

(1) (2) (3) (4) (5) (6)=4+51. HPGCL 0.360 0.166 0.000 0.1662. RRVUNL 0.500 0.000 0.000 0.0003. Torrent AEC 0.480 0.455 0.000 0.4554. GSECL 1.380 1.028 0.089 1.1175. MSPGCL 1.380 0.944 0.000 0.9446. Reliance Energy 0.420 0.428 0.149 0.5777. TNEB 1.560 1.798 0.000 1.7988. CESC 0.490 0.447 0.013 0.4609. WBPDCL 0.000 0.063 0.000 0.06310. NTPC* 3.630 2.732 0.119 2.85111. Trombay 1.800 2.086 0.000 2.086

Total 12.000 10.147 0.370 10.517

* The import target of NTPC was enhanced by 2.0 MT from 3.63MT to 5.63MT in the month of Nov. 2007 on insistence of MoC & Secretary (Co-ordination), Cabinet Sectt.

On the direction of Secretary (Coordination), Cabinet Sectt., a visit was made by a team of officers from CEA, MoC & CIL to Santaldih TPS of WBPDCL, Gandhinagar TPS of GSECL, Torrent Power, Chandrapur, Koradi and Khaparkheda TPSs of MAHAGENCO to look into the reasons of excessive coal consumption. A detailed analysis of the coal supplied to all the power stations, which reported excessive coal consumption, was carried out. It was found that the excessive consumption of coal was mainly on account of the following reasons:-

(i) There was lot of accumulated old stock at the mines, mainly at Rajmahal (ECL) and MCL (Ib), during the year 2006-07, as there was surplus production during the year. With the passage of time the heating value of the coal went down due to smouldering at the mine head. Obviously, when the same old coal having low heating value was supplied to the

Page 43: Annual Report 07 08

Central electricity authority Annual Report 2007-08

34 “The one exclusive sign of thorough knowledge is the power of teaching.”

power stations during the year 2007-08, they had to consume more coal.

(ii) Because of the low stock at the power station end, the power stations had to use coal scratched from the bed. This coal contained lots of mud. This has resulted in consumption of more coal.

(iii) The quality of coal supplied during the year 2007-08 was very poor. The coal contained lot of mud, stones, boulders and other extraneous materials.

(iv) Calorific Value of coal from MCL (Ib) is very low (<3000kcal/kg). During the year 2007-08 this was the only mine where excess coal was available. This excess coal was supplied to most of the power stations reporting low coal stock. This resulted in high coal consumption.

(v) Poor quality coal supplied to power stations resulting in its higher consumption.

(vi) Supply of lesser quantity of deshaled/ washed coal to some power stations during 2007-08 resulted in higher coal consumption.

2.14.9Monitoringofashcontents incoalsuppliedtoMoEFStations

As per MoEF Notification dated 19th September 1997, with effect from 1st June 2001, any thermal power plant located beyond 1000 kms from the pit-head and any thermal power plant located in urban area or sensitive area or critically polluted area, irrespective of their distance from pit-head except any pit head power plant are required to use coal having annual weighted average ash contents of less than 34%. There are 35 such identified coal based Thermal Power Stations in the country. The weighted average ash content of the coal supplied to these power stations was regularly monitored by CEA on quarterly basis. These stations were given quarterly linkage of raw coal and in some

cases washed coal, from various sources by the Standing Linkage Committee (Short-term) taking into consideration the matrix of source of supply which had been prepared to ensure an annual weighted average ash content of less than 34% ash in the coal used by each Thermal Power Station. As availability of washed/beneficiated coal was inadequate to meet the requirement of all the 35 Thermal Power Stations, raw coal of appropriate grade was linked for blending.

CEA impressed on CIL every quarter to ensure despatch of coal from different sources in such proportion that the annual weighted average ash content of the coal supplied to these Thermal Power Stations would be within the stipulated limit.

2.14.10RationalizationofLinkages

A Task Force under the Chairmanship of Director (OM), MoP, with representatives from CEA, Ministry of Railways, CIL and SCCL was constituted by the Ministry of Coal to recommend rationalisation of coal linkage to various existing power stations from the coal mines keeping the following criteria in consideration:

l Actual materialisation from the existing sources;

l Need to have various sources of supply in view of meeting the contingencies arising out of extraneous factors like breaches, bandhs, strikes, etc.

l Distance between the supply sources and the thermal power stations.

l Requirement of coal for Dadri Expansion (980 MW) being implemented for Commonwealth Games, 2010 in view of its importance and discussions at various forums.

l The committee submitted its report to Ministry of Coal on 31st March 2008 for its consideration.

Page 44: Annual Report 07 08

35

Central electricity authority Annual Report 2007-08

“Children are our most valuable natural resource.”

2.14.1111thPlanProjectsCoalRequirement

A comprehensive exercise has been carried out to work out the year wise coal requirement

2007-08 2008-09 2009-10 2010-11 2011-12 Total

CoalBasedCapacityAddition(MW)

a) Already under construction 7590 4565 11788 15542 8145 47630

b) Letter of Award to be placed - - - 520 8520 9040

Total 7590 4565 11788 16062 16665 56670

CumulativeCoalRequirement(MT)

a. From CIL Sources 18.1 41.6 70.8 124.9 194.7

b. From SCCL - - 1.1 2.7 2.6

c. For projects which have been allotted Captive Coal Blocks

2.2 7.6 13.5 18.5 23.5

d. Import (For Projects based on Imported Coal)

0.0 0.4 3.9 11.1 20.3

Total 20.3 49.6 89.3 157.2 241.1*

* Includes only partial coal requirement of the projects to be commissioned in 2011-12 and their full requirement will be reflected in 2012-13

from various sources for the coal based power project envisaged for commissioning during the 11th Plan period. The details are summarised below:

The actual requirement of coal for utility power stations in the beginning of the 11th Plan was 323 MT. Consolidated estimated coal

requirement, indigenous coal availability and shortfall in indigenous coal availability during various years of 11th Plan are as under:

Year Annual Coal Requirement

Indigenous Coal Availability

ShortfallinIndigenousCoalAvailability

2007-08 340.0 322.0# 18.0

2008-09 378.0 334.0£ 44.0

2009-10 412.3 408.0* 4.3

2010-11 480.2 446.6* 33.6

2011-12 564.1 477.7* 86.4

# Actual, £ As indicated by CIL and assessed for SCCL and Captive Mines * As per Working Group Report of Ministry of Coal

As per New Coal Distribution Policy issued by Ministry of Coal on 18th October 2007, CIL has been entrusted the responsibility of meeting the

requirement of power plants as per Fuel Supply Agreements (FSA) even if they have to import the coal.

Page 45: Annual Report 07 08

Central electricity authority Annual Report 2007-08

36 “The farther backward you can look, the farther forward you are likely to see.”

2.14.12Gas supply toGas basedPowerStations

Out of total 1,43.061.01 MW installed generating capacity in the country as on 31st March 2008, 14,656.21 MW (about 10.24 %) was gas/liquid (excluding diesel) fuel based. CEA monitored the supply of gas to power stations of total 13,408.92 MW capacities which use gas as the primary fuel. This included 24 MW Namrup gas fired steam turbine. The liquid fuels, being freely available, were not monitored by CEA.

2.14.13GasRequirement&SupplyPosition

The production and supply of gas had not been keeping pace with the growing demand of gas in the country, including for that of power sector. Even the commitments of gas allocations made earlier to power stations were not fulfilled. Supply of gas to gas based power plants during last few years had been as under:

S.No.

Years Capacityattheendofyear(MW)

GasRequired*(MMSCMD)

GasAllocation(MMSCMD)

GasSupplied(MMSCMD)

Shortfall(MMSCMD)

(1) (2) (3) (4) (5) (6) (7)=(4)-(6)

1 2000-01 9028.70 44.54 36.67 24.40 20.14

2 2001-02 9432.90 46.31 38.76 24.33 21.98

3 2002-03 9949.00 48.26 39.47 25.12 23.14

4 2003-04 10,154.90 49.25 39.47 25.62 23.63

5 2004-05 10,224.90 49.73 40.95 30.70 19.03

6 2005-06 10,919.62 53.38 # 35.37 18.01

7 2006-07 12,444.42 61.18 # 35.10 26.08

8 2007-08 13,408.92 65.67 # 38.14 @ 27.53

* Normative gas requirement at 90% Plf taking GCV of gas= 9000 K.Cal/ SCM (except for Ramgarh CCGT for which GCV is 4150 K Cal/ SCM), station heat rate- 2900K.Cal/ kWh for open cycle and 2000 K.Cal/ kWh for close cycle MMSCMD – Million Metric Standard Cubic Metre per Day. # Not available @ Based on annual fuel supply data furnished by gas based power stations

It may be seen from above that the gas supply for gas based power stations is inadequate. It was enough to operate these stations at about 52 % PLF only during 2006-07. Similarly the average gas supply during 2007-08 was 38.14 MMSCMD, against the requirement of

65.67SCMD to operate the stations at 90% PLF, which was sufficient to operate these stations at about 52% PLF.

The following gas based power stations (1129 MW) were s t randed due to non availability of gas:

Page 46: Annual Report 07 08

37

Central electricity authority Annual Report 2007-08

“Failing to plan is planning to fail.”

2.14.14Generationlossduetogasshortage

There was a shortage in availability of gas. This resulted in loss of generation of power. In case of gas based power stations having provision for the use of alternate fuels, such as naphtha and HSD, generation was augmented by use of

Sl.No.

NameofProject Capacity(MW)

Implementationagency/LocatedinState

GasRequirementat90%PLF(MMSCMD)

A.PendingforCommissioningduetoshortageofGas

1 Gautami CCPP 464 Gautami Power Ltd. /AP 2.23

2 Konaseema CCPP 445 Konaseema EPS/ AP 2.14

SubTotal(A) 909 4.37

B.CommissionedbutunabletogenerateduetoshortageofGas

1 Jegurupadu CCPP Extn. 220 GVK Industries Ltd./ AP 1.06

SubTotal(B) 220 1.06

GrandTotal(A+B) 1129 5.43

2.14.15GasRequirement forGasBasedPowerProjects envisagedduring11thPlan.

Installed generation capacity of gas based power stations at the end of 10th Plan (as on 31st March 2007) was 12444 MW

S.No. Year

GenerationLossduringtheyear(BUs)

AsreportedtoCEAbyGas BasedPowerStations

Basedonpossibleoperationofgaspowerplantsat90%PLF

1 2004-05 7.03 23.71

2 2005-06 7.69 23.88

3 2006-07 8.06 26.33

4 2007-08 9.34@ 31.17

@ Based on annual fuel supply data furnished by gas based power stations.

such liquid fuels. On account of the prevailing high costs of liquid fuels resulting in high cost of generation, the actual generation using these fuels was, however, dependent upon the requirement/acceptance by the beneficiaries. Loss of generation due to shortage in availability of gas as reported to CEA and based on possible operation of power plants at 90% PLF were as under:

and the estimated gas requirement for their operation at 90% PLF was 61.18 MMSCMD. The year-wise feasible capacity addition programme of gas based power plants for the 11th Plan and estimated additional gas requirement for their operation at 90% PLF is as given below:

Page 47: Annual Report 07 08

Central electricity authority Annual Report 2007-08

38 “Let our advance worrying become advance thinking and planning.”

2.14.16 Monitoring of Captive CoalMines

To meet the growing power demand in the country it is envisaged to add a Capacity of 78700 MW during the 11th Five Year Plan. Due to limited amount of gas availability and limitations in Hydro and nuclear power generation augmentation, bulk of this Capacity Addition is being planned through coal based thermal power projects only.

During last few years with growing thermal power generation, coal supply is proving to be a major cause of concern. With such a massive coal based capacity addition planned, there were apprehensions that coal

companies may not be able to cater to the enhanced coal requirement.

In view of the above facts GoI decided to allocate captive mines to the bulk users of coal and consequently many power utilities have been allocated captive mines.

The list of all the Captive Coal Mines allocated to Power utilities till date is enclosed atAnnexure-2B.

The status of development of mines is regularly submitted by the developers and based on the latest data received by CEA pertaining to Utilities and IPPs on development progress of coal mine blocks, a quarterly report on broad status of captive mines is generated.

Year 07-08(Actual)

08-09 09-10 10-11 11-12 Total

Capacity Addition (MW) 1000 2129 411 2553 750 6843

Gas Requirement(MMSCMD)

4.41 10.22 1.80 12.25 3.60 32.28

Torangallu Thermal Power Station-JSW Energy Ltd. Installed Capacity : 260 MW

Page 48: Annual Report 07 08

39

Central electricity authority Annual Report 2007-08

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

3.1 TransmissionPlanning

All issues relating to planning and development of Transmission System in the country are dealt in the Power System Wing of CEA. This includes evolving long term and short term transmission plans. The network expansion plans are optimized based on network simulation studies and techno economic analysis. This also involves formulation of specific schemes, evolving a phased implementation plan in consultation with the Central and State transmission utilities and assistance in the process of investment approval for the Central Sector schemes, issues pertaining to development of National Power Grid in the country and issues relating to trans-country power transfer. Transmission planning studies are being conducted to identify evacuation system from generation projects and to strengthen the transmission system in various regions. The studies for long-term perspective plans are also being carried out on All-India basis for establishing inter-regional connectivity aimed towards formation of the National Power Grid system. The National Power Grid system is being evolved to facilitate free flow of power across regional boundaries, to meet the shortfall of deficit regions from a surplus region, for evacuation of power from project(s) located in one region to the beneficiaries located in other region(s) as well as facilitate trading of electricity among buyers and sellers in various regions.

3.2 NationalElectricityPlan-Transmission

As per Section 3 of the Electricity Act 2003, the CEA has been entrusted with the responsibility of preparing the National Electricity Plan in accordance with the National Electricity Policy and notify such plans once in five years. The Act provides that the draft of National Electricity

CHAPTER – 3POWER SYSTEMS PLANNING AND DEVELOPMENT

Plan should be published inviting suggestions and objections from various stake holders and the CEA has to obtain approval of the Central Government before notifying the National Electricity Plan. The following process has since been completed:

1. Central Government has notified the National Electricity Policy.

2. Central Electricity Authority prepared a ‘Draft National Electricity Plan – Generation’, covering Generation Program up to end of 11th plan i.e. 2011-12 and invited suggestions and objections from the stakeholders.

3. Central Electricity Authority prepared a ‘Draft National Electricity Plan – Transmission’, covering Transmission Program up to end of 11th plan i.e. 2011-12 and invited suggestions and objections from the stakeholders.

4. Comments on the ‘Draft National Electricity Plan – Transmission’ were received from various utilities and stakeholders. The Draft Plan was also discussed in regional meetings of all the five Regions.

5. CEA prepared an updated National Electricity Plan consisting of Volume-I on ‘Generation’ and Volume-II on ‘Transmission’. The National Electricity Plan as approved by Government of India has been notified in August 2007.

The National Electricity Plan (the Plan) gives details about development of Transmission System in the country up to 11th plan period. Major highlights of the Plan are:

The existing highest level of AC transmission in India would be raised from 400kV to 765kV with construction and operation of 765kV transmission system. The programme is to have about 5200 circuit km of 765kV

Page 49: Annual Report 07 08

Central electricity authority Annual Report 2007-08

40 “A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

transmission lines and 24500 MVA of 765kV transformation capacity by 2011-12.

A ± 800kV Bipole multi terminal HVDC has been planned. This would have a capacity for 6000 MW of which 3000 MW would be utilized for power evacuation from Biswanath Chariyali where power from Hydro projects in NER would be pooled and 3000 MW for power evacuation from Siliguri, where power from Sikkim and Bhutan would be pooled. The power evacuated from NER/ Sikkim/Bhutan would be brought to Agra from where it would be injected in NR and WR grids. This would be the highest HVDC voltage under commercial operation in the world. Total length of HVDC Bipoles would be about 11000 km by 2011-12.

The Plan describes Growth Objectives, Development Process, Planning Philosophy and Criteria for speedy and smooth development of transmission system at State, Regional and National level with a view to optimize energy resources.

The Plan emphasizes need for a National Grid for India and provides detailed programme for its development. It is planned that, by end of 11th plan all the five regions in India would by synchronously connected. The Plan also envisages increasing total inter-regional transmission capacity from 14100 MW as at the end of 10th Plan to 36900 MW by end of 11th Plan period.

3.3 InterregionaltransmissionsysteminIndia–NationalPowerSystem

As prelude to the formation of national power system, regional power systems have been formed and as on today, strong regional grids exist in all the five regions. The process of integration of the regional power systems into one All-India Power System has also started. The Eastern, North-Eastern, Western and Northern

regions have been synchronously integrated and inter-regional transmission capacity of 1240 MW between ER and NER, 1760 MW between the ER and WR, and 4220 MW between ER and NR is operational in this integrated cluster of regions. Towards the Southern region, inter-regional transmission capacity of 3120 MW between ER-SR (Talcher-Kolar HVDC Bipole 2500 MW, Gazuwaka HVDC back-to-back 1000 MW and radial mode line 120 MW) and 1680 MW between WR-SR (Chandrapur back to back 1000 MW and radial mode Lines 700 MW) exists. With this the connectivity of Southern Region to the National Grid is already established in asynchronous mode. Further enhancement of Southern Region interconnectivity to National Grid power system is also being planned. The present total inter-regional transmission capacity is 16200 MW, which is now planned to be increased to 36900 MW by 2011-12.

Details of existing and planned inter-regional transmission capacity up to end of 11th Plan are shown in Annexure-3A.

3.3.1Study, analysis and formulation ofpoliciesonspecific issuesrelating totransmission

(i) Finalisation of share from exportable power of Subansiri (2000 MW) & Kameng (600 MW) HEPs to constituent states of N.R. & W.R. regions

(ii) Assessment of major transmission material requirement during 11th Plan

(iii) Meeting conducted by MOEA under the Chairmanship of Member(PS) CEA at Kathmundu Nepal to decide the revision of power exchange tariff from 2004-09 for bilateral exchange of power at 33 kV.

(iv) VIP reference of Chief Minister of Rajasthan regarding power from Ultra Mega Projects at Sasan & Mundra.

Page 50: Annual Report 07 08

41

Central electricity authority Annual Report 2007-08

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

(v) Response to issues raised by Hon’ble Chief Minister of Punjab during his meeting with Hon’ble Minister of Power

3.4NationalHVDC

NHVDC Project (Lower Sileru-Barsoor) is a Government sponsored project primarily funded by Department of Heavy Industry, Ministry of Power, Ministry of Communication & Information Technology, BHEL, APTRANSCO and CSEB. The last power flow on this link was on 30th March, 2003. Efforts have been made to utilize the NHVDC project and keep it the continuously in operation so that investment made could be put to use. Both APTRANSCO and CSEB have agreed to hand over this link to PGCIL for operation and maintenance and subsequently O&M charges would be borne by beneficiaries of the western and southern regions. Efforts to put the NHVDC link into operation are being hampered by law and order problems in the area.

3.5 Analysis of causes of failure oftransmissionlinetowerandsubstationequipment

3.5.1TransmissionLineTowers

Failures of 400 kV & 220 kV Transmission lines towers of Power Grid, MPPTCL were investigated and remedial measures suggested. Standing committee of experts submitted report in respect of the following lines;

l 400 kV Kishanpur- Wagoora Transmission Line of PGCIL

l 220 kV D/c Mehagaon- Malanpur Transmission Line of MPPTCL

l 220 kV D/C Bina-Damoh Transmission line of MPPTCL.

l 220 kV Chukha- Malbase- Birpara S/c Transmission Line of PGCIL

l 400 kV D/c Ba l ipora -Bonga igaon Transmission Line of PGCIL

l 400 kV S/c Singrauli-Lucknow Transmission Line of PGCIL

l 400 kV S/c Jeypore- Mera Mundali Transmission Line of PGCIL

3.5.2SubstationEquipment

As a part of activity of Standing Committee to assess the cause of failure of various S/S equipment of 220 kV and above voltage class, investigation in respect of the following utilities were carried out and detailed report prepared which have been uploaded in the website of the CEA;

a) 50 MVA 220/66 kV transformer at Dhansura of Gujarat Electricity Transmission Co.

b) 150 MVA 220/132 kV transformer at Ranasan of GETCO.

c) 100MVA 220/66 kV transformer at Mehsana of GETCO.

d) 40 MVA 132/66 kV transformer at Anjar of GETCO.

e) 50 MVA 220/66 kV transformer at Nakatrana of GETCO.

3.5.3TechnologyImprovementProgrammeinPowerSystem

After completion of training at Chicago, USA, following Pilot Projects have been taken up with SEBs in following areas:

i) Designof transmission line in snowboundhillyarea

A pilot project has been taken up on the subject “Design of transmission line in snow bound hilly area” in Himachal Pradesh. Un-charged span of zebra conductor has been installed at Kalpa in District Kinnaur of Himachal Pradesh

Page 51: Annual Report 07 08

Central electricity authority Annual Report 2007-08

42 “It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

at an altitude of around 8000 ft., where heavy snow fall occurs in winter season. For designing transmission line in snow bound hilly area, data regarding thickness of ice accumulation on conductor, wind velocity, etc., are required. For this purpose, two anemometers have already been installed at such locations. These anemometers are storing data of actual wind velocity in the vicinity. The data of ice loading with corresponding wind velocity data is expected to be conveyed by HPSEB associated Engineers by Dec. 2008 i.e during coming winter and then based on this data the ultimate design of EHV Transmission Lines for snow bound hilly areas would be carried out.

ii) Residuallifeassessmentofsubstationequipment

Construction of any transmission system requires a huge amount of investment and the cost of EHV Substation equipment contributes a major portion of cost of the transmission system. As the transmission lines and substations are growing older, there is a need of proper condition monitoring of substation equipment to assess the residual life of various types of substation equipment and ensure proper maintenance of the equipment. A pilot project on “Residual Life Assessment of Substation Equipment” has been taken up with the MSEB.

Following diagnostic tools have been procured and installed in 220/33 kV Mudsighi- 400/220 kV Kolhapur-II Substation of MSEB at Kolhapur;

i) Digital Earth Tester

ii) Transformer Winding Resistance Meter

iii) Contact Resistance Meter

iv) Automatic relay test kit (3 phase)

v) Circuit Breaker Operation Analyzer

vi) Leakage current monitor for lightning arrester

vii) Automatic Capacitance & Tan Delta Measuring Equipment.

In addition to above, the following equipment have been deployed at Ranasan 220 kV Substation of GETCO at Ahmedabad .

a) On line Dissolved Gas Analyzer*b) Frequency Response Analyzer for

Transformers.c) Partial Discharge Measuring Equipment for

Transformer

*Online Dissolved Gas Analyser is being installed at 220 kV Ranasan Substation of GETCO.

3.5.4TangibleBenefits

With the use of Diagnostic tools deployed by CEA, MSETCL could save number of power transformers, Lightning Arrestors and Circuit Breakers.

The equipment deployed at GETCO are being utilized very effectively. The main purpose of above tools is to bring awareness in the Power Utilities for carrying out condition based monitoring of the substation equipment. MSETCL& GETCO have purchased number of similar condition monitoring equipment tools and deployed them at their various substations for condition monitoring of substation equipment so that necessary R&M activities are carried out well before the failure of the equipment.

3.6PowerTransmissionProjects

3.6.1NeighbouringCountries

(i) TalaHydroelectric ProjectAuthority,Bhutan

CEA rendered complete design & engineering consultancy services for 400 kV

Page 52: Annual Report 07 08

43

Central electricity authority Annual Report 2007-08

“The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

Transmission Lines and associated 400/220kV substation at Malbase for evacuation of power from Tala HEP, Bhutan.

(ii) BhutanPowerCorporation

CEA provided consultancy relating to design and engineering of 132 kV S/C Tintbi- Yurmoo, 66 kV S/C Yurmoo- Bumthang and 66 kV Multi-circuit Malbase- Pasakha Transmission Line along with associated 33/11 kV substations.

Works completed:

l Preparation of technical specification for above transmission system

l Evaluation tenders for transmission lines

l Preparation of design document for 66 kV Multi-circuit towers

l Examination of structural drawings and witnessing of proto tower testing for various types of towers (BWBS, BWCS, BWDS) in snow zone.

(iii) Afghanistan

Review consultancy work for 110 kV S/C transmission line and 120 kV Substation associa ted wi th Salma Hydro Elect r ic Project.

3.6.2InIndia

i) Power Development Department, Govt. of J&K, Transmission Project under Prime Minister’s Reconstruction Program for Jammu & Kashmir Region.

Based on the specification vetted by CEA for various 220 kV & 132 kV transmission lines, JK, PDD invited bids for construction of the transmission line and substation. Orders have been placed for execution of the transmission lines and substation. Design and Engineering for most of the lines and substations for Jammu & Kashmir Region is under progress.

400 kV Gooty-Raichur D/C Transmission line (Quad), POWERGRID

Page 53: Annual Report 07 08

Central electricity authority Annual Report 2007-08

44 “Honesty is the first chapter in the book of wisdom.”

ii) Damodar Valley Corporation

Design of 220 kV D/C Transmission Line Towers types DA, DB. DC, DD, and witnessing of the proto testing of these towers carried out.

3.6.3Towertesting

Proto tower testing for different types of towers was witnessed

3.6.4AssistancetoDelhiTranscoLtd.

Assistance was provided to Delhi Transco Ltd. in respect of 220 kV underground XLPE Cable project and 220 kV GIS Substation.

3.7 ConstructionMonitoringofTransmissionProjects

The monitoring of construction of transmission lines and sub-stations at voltage

levels of 220 kV and above is being carried out with a view to achieve completion of transmission system to ensure evacuation of power from new generating power stations as well as to strengthen the power system network in the country. For the year 2007-08, programme for stringing of 160 ckm of 765 kV, 6907 ckm of 400 kV and 5448 ckm of 220 kV transmission lines was envisaged. Against this programme, the stringing of transmission lines actually achieved during the year 2007-08 was 370 ckm of 765 kV, 6947 ckm of 400 kV and 4160 ckm of 220 kV lines. Details of the transmission lines completed during the year 2007-08 are given in Annexure–3B.

Voltage-wise/sector-wise actual achievement vis-à-vis programme for the year 2007-08 in respect of lines are given inChartsItoIII.

Page 54: Annual Report 07 08

45

Central electricity authority Annual Report 2007-08

“Ambition should be made of sterner stuff.”

In respect of transformation capacity, a programme of addition of 2169 MVA at 765 kV, 12635 MVA at 400 kV and 11020 MVA at 220 kV was envisaged for the year 2007-08. Against this programme, the achievement during 2007-08 was 4500 MVA at 765 kV, 10265 MVA at 400 kV and 9658 MVA at 220 kV respectively as shown in the ChartsIVtoVI. In respect of +500 kV HVDC lines as against programme of nil, the achievement during 2007-08 was 120 ckm as shown in

ChartsVII. In respect of + 500 kV HVDC terminal as against programme of nil, achievement during 2007-08 was 1000 MW as shown in ChartVIII. Details of the sub-stations completed during 2007-08 are given in Annexure–3C. 765 kV Sipat-Seoni line-1 (351 ckm) operated at 765 kV alongwith 765 kV Seoni S/S (9x500 MVA) 4500 MVA has been successfully commissioned by POWERGRID which is the first of its kind in India.

Page 55: Annual Report 07 08

Central electricity authority Annual Report 2007-08

46 “The one exclusive sign of thorough knowledge is the power of teaching.”

Page 56: Annual Report 07 08

47

Central electricity authority Annual Report 2007-08

“Children are our most valuable natural resource.”

Page 57: Annual Report 07 08

Central electricity authority Annual Report 2007-08

48 “The farther backward you can look, the farther forward you are likely to see.”

3.8 Techno-economic/financialexamination

Evaluation reports submitted by WAPCO for construction of 110 kV S/C transmission line from Salma Dam to Heart City, Afghanistan have been examined from technical considerations.

3.9 LongTermPlanningStudies

Long term planning studies were carried out to evolve a composite system for evacuation of power from generation projects envisaged beyond 11th plan. Studies were carried out to identify long-term system strengthening requirements in various regions/states. A list of studies carried out to evolve long term perspective plan are as below:

Revised system studies for power evacuation from Nimo Bazgo at 66 kV and power transmission to Leh and Kargil area of Ladakh.

Studies for evacuation of power from the following thermal power projects in U.P. were carried out:

l Anpara ‘C’ - 1000 MW

l Anpara ‘D’ - 1000 MW

l Barai HEP - 1980 MW

l Mejia - 1980 MW

l Karchana HEP - 1320 MW

l Parichha Extn II - 1000 MW

l Tanda Extn - 1000 MW

l Roza TPS - 1000 MW

l Hardwaganj - 500 MW

Studies were carried out for evolving the power evacuation arrangement from various thermal projects in Rajasthan.

Revised studies for evolving transmission system associated with Mundra UMPP by establishing 400/220 kV Bachao S/S.

Transmission system associated with various Generating projects going for Open Access viz Mahan (1200 MW) STPP, Mundra Adani

Page 58: Annual Report 07 08

49

Central electricity authority Annual Report 2007-08

“Failing to plan is planning to fail.”

(2640 MW), EMCO (520 MW) TPS, NTPC Farakka III (500 MW), Nilanchal Power (560 MW) etc.

Transmiss ion planning s tudies for strengthening of 400 kV and 220 kV network in Western Region viz WRSSS-X, XI,XII schemes.

Transmission system associated with Krishnapatnam Ultra Mega Power Project (UMPP) (4000 MW).

Transmission system associated with Tilaiya UMPP (4000 MW).

Review of Transmission system associated with Chennai JV TPS (1000 MW).

System planning studies corresponding to 11th Plan were carried out to test and finalized the transmission system proposal of WBSEB for evacuation of power from Katwa TPS (100MW), Sagardighi TPS (1600MW), Bakreswar TPS Ext. (500MW) in WBSEB.

System planning studies corresponding to 12th Plan were carried out to finalize the transmission system for evacuation of power from various generating stations in Orissa (8000MW), Ultra Mega Power Project in Jharkhand (4000MW) and Nabi Nagar (1000MW) to Western Region and Northern Region with various alternatives and contingencies.

System planning studies corresponding to 10th Plan were carried out to test and finalize the transmission system proposal for evacuation of power from EMCO TPS (520MW) in MP. The above studies were carried out for open access provided by POWERGRID to the generating company.

Chitrapur(4x135 MW) TPS-Ranchi 400 kV quad D/C line.

LILO of one ckt. of 400kV D/C Baripada – Mendhsal line at Gurudijhatia (560 MW), TPS.

3.10ShortTermPlanningStudies

System studies were carried out for evolving transmission system for evacuation of power from generation projects anticipated during 10th Plan. A list of the studies carried out is as given below:

(i) Load flow study of DVC with various alternative and contingency to identify suitable transmission system requirements to evacuate power from 710 MW Mejia Ext. TPS (unit 4, 5 & 6) and Chandrapura Ext. TPS (2x250 MW).

(ii) Preparation of reports relating to the power evacuation arrangement from Rabi, Beas, Satluj, Chandrabhaga basin in Himachal Pradesh.

(iii) Load flow studies carried out to study the revised project report for infrastructural development at 220 kV & 132 kV transmission level under PM reconstruction plan for J&K state was examined and carried out fresh load flow studies with the proposals and recommended to MoP.

(iv) Transmiss ion planning s tudies for strengthening of 400 kV and 220 kV network in northern part of Tamil Nadu.

(v) Revised unit tripping scheme under HVDC pole outage of Talcher STPP Stage II.

3.11Examination ofDPR/FR ofHydroPower Projects for processing ofclearancebyCEA

Following is the list of DPRs/ FRs of hydropower projects examined for processing of clearance by CEA:

Northern Region Himachal Pradesh -3 nos.

i) Karcham Wangtoo HEP (1000 MW)ii) Songtam Karcham HEP (1000 MW)

iii) Sainj HEP (100 MW)

Page 59: Annual Report 07 08

Central electricity authority Annual Report 2007-08

50 “Let our advance worrying become advance thinking and planning.”

Uttaranchal -9 nos.

i) Rupsiabagar HEP (327 MW) ii) Bhaironghati HEP (381 MW) iii) Singoli Bhatwari HEP (3x33 MW) iv) Jakhol Sankari HEP (36 MW) v) Natwar Mori HEP (56 MW)vi) Alaknanda HEP (300 MW) vii) Bawala Nandprayag HEP (300 MW)viii) Devsari HEP (252 MW)

ix) Jhelum Tamak (152 MW)

Southern Region

i) Gundia HEP Stage-I (200 MW) in Karnataka

ii) Lower Jurala HEP (240 MW) in Andhra Pradesh

Eastern Regioni) Examined the revised project reports for

sub- transmission scheme phase-II part-I and sub- transmission scheme phase-II part-II of Bihar

ii) FR-cum-DPR for transmission system for export of power from different generation projects in Sikkim to NR/WR

Central Sectori) Transmission System associated with Sasan

(4000 MW) UMPPii) Transmission System associated with Mundra

(4000 MW) UMPP iii) Transmission System associated with Korba

III (500 MW)

(iv) Western Region System Strengthening Scheme-XI

3.12 Examination and appraisal ofTransmissionSchemes for approvalunder Section 68 ofElectricityAct2003

A list of transmission proposals examined for approval u/s 68 is given below:

Western Region System Strengthening Scheme-IX, X, XI, XII

Transmission system associated with Mundra, Sasan UMPP and Korba III.

Dedicated transmission system associated with generating projects going for open access viz Mahan, Mundra (Adani), EMCO and Torrent

Transmission system associated with North Chennai TPS (1000 MW).

Transmission system associated with Simhadri-II Generation Project of NTPC – Line connecting the Generation to the Grid

System Strengthening Scheme in Southern Region – IX

System Strengthening Scheme in Southern Region – X

System Strengthening Scheme in Southern Region – XI.

Transmission system for South-West Interconnection

Transmission system associated with Krishnapatnam UMPP

Transmission system for start up power to DVC and Maithon RB generation projects.

Supplementary transmission system associated with DVC and Maithon RB generation projects

Common scheme for 765kV pooling stations and network for NR (Common for Sasan UMPP+NKP+Maithon/ Koderma/Mejia/Bokaro/ Raghunathpur/ Durgapur + Import by NR from ER and from NER/SR/WR via ER) and Common scheme for network for WR (Common for NKP+Maithon/Koderma/ Mejia/Bokaro + Raghunathpur/Durgapur + Import by WR from ER and from NER/SR/WR via ER)

Page 60: Annual Report 07 08

51

Central electricity authority Annual Report 2007-08

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

Transmission system associated with Farakka Ext. TPS.

Transmission system for export of power from different generation projects in Sikkim to NR/WR

Establishment of 2x315 MVA, 400/220 kV sub-station at Bolangir (Orissa) with loop in and loop out of Meramundali-Jeypore 400 kV S/C line

Northern Region Strengthening - 765 kV system for NCR and around

220kV D/C line from Allain Duhangan to Nalagarh as a part of associated transmission system for evacuation of power from ADHEP (2x96 MW).

Installation of overhead lines under Transmission system associated with Tehri PSP - 1000 MW

Laying 220 kV transmission line for vacuation of power from Budhil HEP in Himachal Pradesh

Transmission schemes in Rabi basin for Chamera III HEP

Revised transmission schemes in Rabi basin for Chamera III HEP

Transmission System for Jhajjar (3x500 MW) & Dadri - II (2x490 MW) TPS

System Strengthening in Northern Region Grid for Karcham Wangtoo HEP.

Transmission system associated with Kotlibhel HEP

Transmission system for start-up power for DVC and Maithon RB generation projects

132 kV line for evacuation of power of Malana II HEP

System strengthening in South Western Part of Northern Grid

Northern Regional System Strengthening scheme IX-XII

Northern Regional System Strengthening scheme XIV-XX

Sasan and Mundra Ultra Mega Power Project (UMPP) in Northern Region

3.13ExaminationofPIBMemos

Transmission system associated with Eastern Regional system strengthening scheme – I.

3.14StandingCommitteeMeetings

Standing Committees on transmission planning for resolving issues related to transmission system planning have been constituted in 1980s and during April 2007 to March 2008, 7 nos. meetings of the Standing Committees (2 nos. for Northern Region, 1 no. for Western Region, 2 no. for Southern Region, 2 no. for Eastern Region) have been convened.

The issues pertaining to transmission system planning which were taken up during these meetings are given in Annexure–3D.

3.15InspectionofElectricalInstallations

The Indian Electricity Act, 2003 stipulates statutory inspection of electrical installations by Central and State Inspectors in respect of installations within their respective jurisdictions. The Electrical Inspectorate at the Central and State levels are assisted by designated Electrical Engineers to discharge these functions. The Chief Engineer (Electrical Inspectorate) has been appointed as Chief Electrical Inspector for the Central Government installations, State of Goa and those within Union Territories. The Central Government Inspector is assisted by five Regional Inspectorial Organizations (RIOs) with Headquarters at New Delhi, Chennai, Shillong, Mumbai & Kolkata in discharging the various responsibilities, briefly described as under:

Page 61: Annual Report 07 08

Central electricity authority Annual Report 2007-08

52 “A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

a) Statutory periodic inspection of electrical installations and issue of notices to the owners of installations for compliance under Rule 46 of the Indian Electricity Rules, 1956.

b) Scrutiny of references received under Rule 63/47A of I.E.Rules, 1956 for inspection and granting approval for energisation of High/Extra high voltage installations/generating units.

c) Inspection of electrical installations in Cinema house and issue of no objection certificates for grant of annual license to the cinema house under the respective Cinematography Act in force in the Union Territories.

d) Issue of Cinema operator’s certificate under Cinematography Act in force in the Union Territories and State of Goa.

e) Investigation of fatal and non-fatal electrical accidents and remedial measures to be taken

to avoid recurrence of such accidents in future.

f) Scrutiny of cases regarding unauthorized construction under overhead lines involving infringement of Rules 79, 80 & 82 of I.E.Rules, 1956.

g) Issue of Electrical Contractor licenses and competency certificates to Supervisors and wireman through the Licensing Board in respect of Union Territory of Puducherry.

h) Scrutiny of applications for relaxation of I.E.Rules and granting of such relaxation, if necessary.

3.16ResumeofInspectionWorkDone

The Central Electrical Inspectorate and its five Regional Inspectorial Organisations inspected a total number of 2,05,993 equivalent Medium voltage installations and collected a revenue of Rs. 398.60 lakhs during the year, the region-wise break up of which is given below:

RIOEquivalentMV*installations(Nos.) FeeCollected(RupeesinLakhs)

2006-07 2007-08 2006-07 2007-08

N Delhi 57,913 33,433 89.15 45.88

Chennai 40,393 56,765 126.85 100.06

Mumbai 33,841 57,320 65.37 107.03

Shillong 5,000 18,475 27.10 40.14

Kolkata 16,305 40,000 11.48 105.49

Total 1,53,452 2,05,993 319.95 398.6

Draft Central Electricity Authority (Measures relating to Safety and Electricity Supply) Regulations, 2008 were formulated under Section 53 read with Section 177 (2) (b) of Electricity Act, 2003 and put on CEA’s website

For Equivalent MV, 1HV installation = 3 MV installations

for obtaining views of all State Governments, Utilities, other Organizations, Associations and individuals. The Draft Regulations have been modified taking into consideration the comments / suggestions offered by them.

Page 62: Annual Report 07 08

53

Central electricity authority Annual Report 2007-08

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

3.16.1MajorAchievement in terms ofInspectionduring theYear 2005-06(Importantinstallationsinspected)

A) NewInspectionCases(Rule63/47A)

a) 400/220 kV S/S at Kankroli, Kota, Fatehabad, Maharani Bagh (GIS), Jullandhar, Bina, Seoni & Itarsi, Gwalior, Raigarh, Rajgarh, Misa, 400KV bays at Hiriyur Narendra, Munirabad, Mysore, Ukkanagaram, Hosur, Kolar, Devengiri, Tirunelveli, Khammam, Vijaywada and Kalivathampattu, Bongaigaon, 220/132 kV S/S at Raibareli, Dimapur, and 33/11/.4 kV S/S at Kimi and Tenga.

b) 765 kV Sipat-Seoni S/C line, 400 kV lines Kankroli -RAPP, Lilo of Dadri Ballabgarh at Maharani Bagh, Jullundhar - Ludhiana - Malarkotla, Teesta -Darjeeling - Siliguri, Raipur -Gooty, Devengiri - Narendra, Vijayawada - Gajuwaka, Tirunelveli - Trivandrum, Tirunelvel i - Madurai , Vindyachal -Korba, Raigarh - Khandwa, Khandwa - Seoni, Bina - Nagda, Nagda - Dehgam, 220 kV Unchahar - Raibareli and 132 kV Khupi - Kimi S/C line.

c) Generating Units at Unchahar TPS Stage-3, Mejia TPS, KHSTPP Unit V & VI (2x500 MW) Teesta HEP Stage V (3x170 MW), Sipat Unit IV (500 MW), NSPCL Bhilai Unit I (250 MW) and NHDC Unit 3 & 6 (6x65 MW).

B) PeriodicalInspections(underRule46ofI.E.Rules1956)

Extra emphasis was laid on Periodical inspection of large plants in Power and Petrochemical Sector under Rule 46 of I.E. Rules, 1956. Important projects covered are :

i) Generating plants at Unchahar TPS Stage-1&2, RAPP Unit 1-4, Tanakpur HPP Unit 1-3, Bokaro and Durgapur Steel Plant, Mejia TPS Bokaro TPS, Kaiga NPCIL Plant - U 3-4, Ramagundam, NLC.

(ii) 400/220 kV S/S at Siliguri, Misa, Bongaigaon, Udumalpet, Trivandrum, Narendra Dehgaon, Vapi, Itarsi, Simhadri, Ukkanagram, Vijaywada, Madurai and 220/132 kV Sub Station at Dimapur, Salakati, Nirjuli Jiribam and Aizawal, Refineries at Mathura, Digboi Numaligarh and Guwahati.

West Bengal State Electricity Transmission Company Limited

Page 63: Annual Report 07 08

Central electricity authority Annual Report 2007-08

54 “It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

4.1 Organizational Structure in GridOperationandManagement

All decisions with respect to grid operation in the Region are taken by the Regional Power Committee (RPC). The Regional Power Committee in each Region is a conglomerate of all the players partaking in grid operation, i.e. generating companies, transmission utilities, distribution utilities, power traders, etc. Its Secretariat is manned by the officers from Central Electricity Authority (CEA). Regional Power Committee operates through a number of Sub-committees, viz. Operation Sub-committee, Commercial Sub-committee, Protection Sub-committee, System Studies Sub-committee and Technical Coordination Sub-committee. The Operation Sub-committee, meets every month to review the grid operation in the previous month and plan grid operation for the next month. The Commercial Sub-committee carries out the energy accounting in the Region on a monthly basis and also the weekly billing for Unscheduled Interchanges and Reactive Energy. The Protection Sub-committee discusses and finalises protection schemes including protection coordination. The System Studies Sub-committee meets periodically for the purpose of System Studies. The Technical Coordination Sub-committee meets before the Regional Power Committee for putting up matters for decision in the Regional Power Committee. The RPCs play an important role in planning grid operation, since they are responsible for protection coordination, outage planning of generating units and transmission system, planning reactive compensation etc. Member (GO&D) of CEA is also a Member of the Regional Power Committee and helps arrive at amicable solutions in case of disputes between Members of the Committees through unbiased decisions

CHAPTER – 4GRID MANAGEMENT

CEA monitors the power supply position in the country, prepares the all-India monthly power supply position, coordinates all matters of grid operation and management between the five Regions, coordinates enquiry of grid disturbances, recommends to the Ministry of Power the quantum of allocation from the unallocated quota and also coordinates the implementation of the allocation through the Regional Power Committees, Regulations on matters pertaining to grid operation etc. The real time operation of the power system is looked after by the Regional Load Despatch Centres (RLDCs) set up in the five Regions. Regulations for inter-State transmission of electricity are made by the Central Electricity Regulatory Commission.

4.2 Power Supply Position

CEA takes out the All India Power Supply Position on a monthly basis, both in terms of energy and peak demand giving the requirement, availability and shortage in Million Units (MUs) as well as in percentage and the peak demand, peak met and peak shortage both in terms of Mega Watt (MW) and percentage. The total energy requirement in the country during 2007-2008 was 739,345 MUs as against 690,587 MUs during the previous year, registering an increase of 7.1%. The total energy availability in the country during 2007-2008 was 666,007 MUs as against 624,495 MUs during the previous year, registering an increase of 6.65%. The energy shortage during the year 2007-2008 therefore increased from 66,092 MU (9.60%) to 73,338 MUs (9.9%). The peak demand during the year 2007-2008 was 108,866 Mega Watt (MW) as against 100,715 MW during the previous year, registering an increase of 8.1%. The peak demand met during the year 2007-2008 was 90,793 MW as against

Page 64: Annual Report 07 08

55

Central electricity authority Annual Report 2007-08

“The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

86,818 MW during the previous year, registering an increase of 4.6%. The peak shortage therefore increased from 13,897 MW (13.80%) to 18,073 MW (16.60%). An overview of Region-wise power supply position in terms of energy and peak demand for the year 2007-2008 is presented in Exhibit-I and Exhibit-II

respectively. The State/ Region-wise power supply position during the year 2007-2008 is given at Annexure-4A. Energy requirement and Peak Demand grew at a very high rate in Eastern and North-Eastern Regions with their energy requirements growth at 11.2% and 13.1% respectively.

Exhibit-I

Exhibit-II

Page 65: Annual Report 07 08

Central electricity authority Annual Report 2007-08

56 “Honesty is the first chapter in the book of wisdom.”

4.3 OptimumUtilization of availableGeneratingCapacity-InterRegionalExchangesofPower

Northern, Western, Eastern and North-Eastern Grid with an installed generating capacity of 103641 MW as on 31.3.2008 and peak load of 81424 MW for the year 2007-08 have been integrated and are operating in synchronous mode. Southern Region, with an installed generating capacity of 39344 MW as on 31.3.2008 and peak load of 25955 MW for the year 2007-08, is connected with Eastern Region and Western Region through asynchronous HVDC links. The total inter-Regional transmission capacity as on 31.3.2008 is 16200 MW. The power transfer capacity as on 31.3.2008 was 5820 MW between Eastern Region and Northern Region, 1760 MW between Eastern Region and Western Region, 3620 MW between Eastern Region and Southern Region, 1240 MW between Eastern Region and North Eastern Region, 2080 MW between Western Region and Northern Region and 1680 MW between Western Region and Southern Region. Synchronous operation of the Northern, Western, Eastern and North-Eastern Regional Grids and its asynchronous operation with the Southern Grids with high capacity HVDC links helped in utilization of surplus power available in surplus areas to the deficit areas.

The Eastern Regional Power System which used to have off-peak surplus through out the year earlier, had surplus power only at certain times of the year. All Regional grids experienced shortages of varying degrees as well as certain seasonal/ off-peak surpluses. These surpluses were exported by surplus States of all the Regions. Eastern, North-Eastern and Southern Regions were net exporters, whereas Northern and Western Regions were net importers of energy during the year. Himachal Pradesh in Northern Region, Sikkim, Orissa, West Bengal and DVC in Eastern Region, all states in North Eastern Region except Manipur, (i.e. Arunachal Pradesh, Assam, Meghalaya, Mizoram,

Nagaland and Tripura) and Karnataka and Kerala in Southern Region were net exporters of energy during the year.

Govt. of India has set up Central Generating Stations through GoI Undertakings, viz. National Thermal Power Corporation (NTPC), National Hydro Power Corporation (NHPC), Nuclear Power Corporation (NPC), Tehri Hydro Development Corpn. (THDC), Satluj Jal Vidyut Nigam Ltd. (SJVNL), North-Eastern Electric Power Corpn. Ltd. (NEEPCO), in which the States have various shares. About 85% of the installed capacity is distributed as firm shares, whereas about 15% is the unallocated quota, which is allocated by GoI to the States depending upon relative shortages and contingent conditions. CEA keeps a close watch on the power supply position and recommends to the Ministry of Power the quantum of allocation from the unallocated quota. CEA also coordinates the implementation of the allocations through the Regional Power Committees.

Open Access is a key provision in the Electricity Act, 2003 for utilisation of power in surplus areas by needy states/utilities in deficit areas, besides bringing about competition and hence efficiency. All the above transactions took place through the provision of short-term open access. The growth of inter-state short-term Open Access transactions for the last four years, in terms of number of transactions and volume of transactions, is shown in Exhibit-III. The inter-regional energy exchanges, which included the long-term and short-term open access transactions, was 20061 MU during the year 2007-2008, as compared to 17853 MU during the previous year, showing a growth of 12.4%. An overview of inter-regional energy exchanges during 2007-2008 is presented in Exhibit–IV. Details of inter-regional exchanges of energy among the Regions during 2007-2008 and 2006-2007 are given in Table–I. The inter-regional exchanges helped a number of States / utilities in all the Regions to bridge the gap between demand and supply of power.

Page 66: Annual Report 07 08

57

Central electricity authority Annual Report 2007-08

“Ambition should be made of sterner stuff.”

Exhibit-IIIInterStateShort-TermOpenAccess

Exhibit-IVInter-RegionalEnergyExchanges(MU)

Page 67: Annual Report 07 08

Central electricity authority Annual Report 2007-08

58 “The one exclusive sign of thorough knowledge is the power of teaching.”

Table-IInter-RegionalEnergyExchanges(MU)

Region2006-2007 2007-2008

From To

i)Northern Western 289.1 900.6

Southern 250.8 427.7Eastern 18.8 0.2

SubTotal 558.7 1328.5

ii) Western Northern 192 1106.3Southern 3.5 110.1Eastern 2.9 29.9

SubTotal 198.4 1246.3

iii)SouthernNorthern 1358.8 2175.0Western 3256 2145.4Eastern 115.9 127.0

North-Eastern 0.6 154.2SubTotal 4731.3 4601.6

iv) Eastern Northern 4664.9 7370.2Western 5044.9 2940.1Southern 1418.1 1514.4

North-Eastern 667.7 443.8

SubTotal 11795.6 12268.5

v)N-Eastern Northern 337.6 393.9

Western 174.4 129.3

Southern 7.1 60.8

Eastern 49.7 31.7

SubTotal 568.8 615.7Total 17852.8 20060.6

4.4 OperationofRegionalGrids

4.4.1NorthernRegionalGrid

The Northern Grid has an installed capacity of 37879 MW as on 31-3-2008 consisting of 22436 MW thermal, 12975 MW hydro, 1180 MW nuclear and 1288 MW renewable energy sources. It had a peak load of 32462 MW (ex-bus) during the year. The Northern Grid faced an

energy shortage of 10.8% and a peaking shortage of 9.1% during the current year (2007-2008) as compared to energy and peak shortages of 11.0% and 15.5% respectively during last year (2006-2007). Northern Region was the biggest importer of power importing 7370.2 MUs from Eastern Region, 2175 MUs from Southern Region, 1106.3 MUs from Western Region and 393.9 MUs from North Eastern Region. Power was transferred

Page 68: Annual Report 07 08

59

Central electricity authority Annual Report 2007-08

“Children are our most valuable natural resource.”

from Eastern Region to Northern Region over 500 MW HVDC back-to-back station at Sasaram, 2000 MW Muzaffarpur-Gorahkpur 400 kV D/C line, 1600 MW Patna – Balia 400 kV D/C line and 1600 MW Biharshariff – Balia 400 kV D/C line. Northern Region is also connected to Western Region through Agra – Gwalior 765 kV line 1 (presently being operated at 400 kV) and 500 MW HVDC back to back link at Vindhyachal. With the commissioning of Agra – Gwalior, Patna – Balia and Biharshariff – Balia lines, the stability of the combined grid has improved and also this has facilitated free flow of power from the surplus areas to deficit areas.

4.4.2WesternRegionalGrid

The Western Grid has an installed capacity of 43040 MW as on 31-3-2008 consisting of 30871 MW thermal, 7199 MW hydro, 1840 MW nuclear and 3131 MW renewable energy sources. It had a peak load of 38277 MW (ex-bus) during the year. The Western Grid faced an

energy shortage of 15.8% and a peaking shortage of 23.2% during the current year (2007-2008) as compared to energy and peak shortages of 15.6% and 24.7% respectively during the previous year (2006-2007). One additional inter-regional link, i.e., Agra-Gwalior 765 kV line 1 (presently being operated at 400 kV) was added between NR and WR in March 2007. With the coming up of this line, the voltage, which was low in the Gwalior area, has improved. Power transfer from ER to WR is taking place over 220 kV triple circuit Korba – Budhipadar AC lines and 400 kV Raipur- Rourkela double circuit AC link (with series compensation) and with Southern Region through 1000 MW HVDC back-to-back link at Chandrapur.

4.4.3SouthernRegionalGrid

The Southern Grid has an installed capacity of 39344 MW as on 31-3-2008 consisting of 21208 MW thermal, 10685 MW hydro, 1100 MW nuclear and 6351 MW renewable energy

Western Region Transmission System, POWERGRID

Page 69: Annual Report 07 08

Central electricity authority Annual Report 2007-08

60 “The farther backward you can look, the farther forward you are likely to see.”

sources. It had a peak load of 26777 MW (ex-bus) during the year. The Southern Grid faced an energy shortage of 3.2% and a peaking shortage of 9.0% during the current year (2007-2008) as compared to energy and peak shortages of 2.70% and 7.0% respectively during last year (2006-2007). The Southern Region has been both importing and exporting power from/ to other Regions during the current year. They exported power to the extent of 4601.6 MU to other Regions out of which 2175 MU was exported to Northern Region and 2145.4 MU to Western Region. It imported 1514.4 MUs power from Eastern Region. The Talcher Stage-II Super Thermal Power Station (4X500 MW) in Eastern Region is dedicated power station for the Southern Region except for 200 MW to the home state of Orissa in ER. The power from this station and surplus power from ER flows over Talcher-Kolar HVDC bipole link with a capacity of 2,500 MW and HVDC back-to-back link at Gazuwaka with a capacity of 1000 MW. It is connected with Western Region through 1000 MW HVDC back-to-back link at Chandrapur.

4.4.4EasternRegionalGrid

The Eastern Grid has an installed capacity of 20491 MW as on 31-3-2008 consisting of 16354 MW thermal, 3934 MW hydro and 203 MW renewable energy sources. It had a peak load of 12031 MW (ex-bus) during the year. The Eastern Grid faced an energy shortage of 4.9% and a peaking shortage of 11.1% during the current year (2007-2008) as compared to energy and peak shortages of 3.0% and 4.1% respectively during last year (2006-2007). The Eastern Region grid operated in synchronism with Western, Northern and North-Eastern Regional grids. Unallocated power to the tune of 490 MW from NTPC stations in Eastern Region and 75 MW power surrendered by DVC were allocated to the beneficiaries of other Regions in April, 2007. However, due to the high rate at which the demand of Eastern Region has been

growing recently, additional allocation of 40 MW was made to Jharkhand on 29-12-2007 and 60 MW to Bihar on 1-3-2008 by reducing allocation to States of Northern, Western, Southern and North East Regions. As on 31-3-2008, 400 MW of power from the unallocated quota of Central Generating Stations in Eastern Region and 65 MW power surrendered by DVC is allocated to States in Northern, Western, Southern and North-East Regions.

The Eastern Region was the highest exporter of energy among all Regions, exporting a total of 12268.5 MUs. It exported 7370.2 MUs to Northern Region, 2940.1 MUs to Western Region, 1514.4 MUs to Southern Region and 443.8 MUs to North Eastern Region. There were marginal imports from all Regions totalling to 188.8 MUs. Eastern Region is the only State connected to all Regions. It is connected to Northern Region through Muzaffarpur-Gorahkpur 400 kV D/C line, Patna – Balia 400 kV D/C line, Biharshariff – Balia 400 kV D/C line, and HVDC back-to-back link at Sasaram, to Western Region through 220 kV triple circuit Korba – Budhipadar AC lines and 400 kV Raipur- Rourkela D/C AC lines, to Southern Region through Talcher-Kolar HVDC bipole link and HVDC back-to-back link at Gazuwaka and to North-Eastern Region through 400 kV Bongaigaon – Malda D/C lines and 220 kV Birpara – Salakati D/C lines.

4.4.5North-EasternRegionalGrid

The North-Eastern Grid has an installed capacity of 2231 MW as on 31-3-2008 consisting of 969 MW thermal, 1116 MW hydro and 146 MW renewable energy sources. It had a peak load of 1742 MW (ex-bus) during the year. The North-Eastern Grid faced an energy shortage of 12.3% and a peaking shortage of 22.7% during the current year (2007-2008) as compared to energy and peak shortages of 9.9% and 21.1% respectively during the corresponding period last year (2006-2007) mainly on account of

Page 70: Annual Report 07 08

61

Central electricity authority Annual Report 2007-08

“Failing to plan is planning to fail.”

transmission and distribution constraints. The North-Eastern Grid operated in synchronism with Northern Grid, Eastern Grid and Western Grid. North-Eastern Regional Grid is connected directly only to the Eastern Regional Grid and any export of power to the other Regions has to be wheeled through the Eastern Regional Grid. The energy exported from North-Eastern Region to Northern Region, Western Region, Southern and Eastern Region was 393.9 MUs, 129.3 MUs and 60.8 MUs and 31.7 MUs respectively. The total export from this Region to other Regions was 615.7 MUs. The power transfer from North-Eastern Region to Eastern Region is taking place over 400 kV Bongaigaon – Malda D/C lines and 220 kV Birpara – Salakati D/C lines.

4.5 MonitoringofCapacitorInstallationProgramme

In order to obtain a proper voltage profile in the regional Grids, the shunt capacitor requirement at regional level is assessed by respective Regional Power Committees (RPCs). The capacitor installation programme for the year is finalised in consultation with the constituents of the Region. The actual installation of shunt capacitors during the year 2007-2008 was 800 MVAR, 516 MVAR and 184 MVAR in Northern, Western and Southern Regions respectively leaving a shortfall of 3422 MVAR as per the details given at Annexure –4B. The progress of capacitor installation in the country has been slow. The matter is being followed up by CEA and RPCs. Capacitors were not required to be installed in the Eastern and North-Eastern Regions, as there was no problem of low voltage in these regions.

4.6 PowerExchange

The National Electricity Policy in sub-para (d) of Para 5.7.1 enjoins upon the appropriate Commission to undertake development of power market in consultation with all concerned. In this direction, the Central Electricity Regulatory Commission (CERC) published a Staff Paper

titled “Developing a common platform for electricity trading” in July 2006 to deliberate on the issues and problem areas connected with the development of power market in India and invited comments / suggestions on the viability, structure, management and operational arrangement of Power Exchange (PX), which provides a common platform for electricity trading to the power sector players. CERC also conducted a public hearing in the matter on 19th December 2006.

Based on the comments / suggestions received, the Commission issued an order dated 18th January 2007, stating that setting up of a Power Exchange at the earliest would be desirable step in the direction of transparent market development in power sector. CERC also issued detailed guidelines vide order dated 6th February 2007 for establishment and operation of the Power Exchange.

During the year 2007-08, CERC accorded approval to one firm, M/s Indian Energy Exchange Limited, vide order dated 31st August 2007 to set up a Power Exchange (PX). According to the order, the PX shall start as a platform for scheduled, day-ahead trading of electricity. All settled trades shall be compulsorily advised to the concerned RLDC for being scheduled, subject to transmission capacity availability.

In order to accommodate collective transactions emanating from power exchange as well as conventional bilateral trading, the Commission has revised the Open Access Regulations and notified CERC (Open Access in Inter-state Transmission) Regulations, 2008 on 25th January 2008. These regulations would come into force w.e.f. 1st April 2008.

4.7 RegulationsforTechnicalStandardsforConnectivitytotheGrid

As per the Electricity Act, 2003, any generating company may establish, operate and maintain a generating station without obtaining a license, if it complies with the technical standards

Page 71: Annual Report 07 08

Central electricity authority Annual Report 2007-08

62 “Let our advance worrying become advance thinking and planning.”

relating to Connectivity to the Grid which are to be specified by the Central Electricity Authority (CEA). CEA made the Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007. These regulations were published in March, 2007. The objectives of these regulations are as follows:

(1) The aim of these regulations is to ensure the safe operation, integrity and reliability of the grid.

(2) The new connection shall not cause any adverse effect on the grid. The grid shall continue to perform with specified reliability, security and quality as per the Central Electricity Authority (Grid Standards for Operation and Maintenance of Transmission Lines) Regulations, as and when they come into force. However, these regulations are not to be relied upon to protect the plant and equipment of the requester or user.

A requester is required to be aware, in advance, of the standards and conditions his system has to meet for being integrated into the grid.

4.8 InfrastructureofRPCSecretariats

All the Regional Power Committees, except North-Eastern RPC at Shillong have their own office building and staff quarters. Land measuring 10.5 acres was jointly purchased by NERPC and PowerGrid at Shillong for office-cum-residential complexes of NERPC and NERLDC. Out of this, about 1.97 acres of land has been kept for office-cum-residential complex of NERPC, Shillong and 0.13 acres of land for common areas to be shared by NERPC, Shillong. Transfer of title of land from Powergrid to CEA/NERPC was notified by the Revenue Department, Govt. of Meghalaya vide letter dated 20/4/2007. Revised SFC memo for estimated cost of Rs. 1144/- lakhs has been approved by MOP vide their letter dated 28/01/2008. The construction work has been awarded to “M/s Infrastructural Development

Consortium”, Shillong by CPWD, Shillong vide letter dated 26/2/2008. Regional Inspectorial Organisation (North-East Region) Office would also be accommodated in the same building.

4.9 Power & Te lecommunicat ion Co-ordinationCommittee(PTCC)

CEA continued to process the cases for expeditious PTCC clearance of EHT transmission lines of voltages 220 kV and above through discussions with Bharat Sanchar Nigam Ltd. (BSNL), Railways and SEBs / Power Utilities. CEA also rendered assistance to the Power Utilities in resolving complex PTCC cases of voltage level of 132 kV and below.

During the year 2007-08, 85 new cases of power lines were received for PTCC clearance. CEA have sent Induced Voltage (IV) calculation & comments for 78 cases to D Es (T), PTCC, BSNL for issuing necessary route approvals. This includes 4 cases of 765kV transmission system.

During the year 2007-08, about 2345 circuit kms of 220 kV transmission lines, about 8122 circuit kms of 400 kV and 1061 circuit kms of 765kV transmission lines were accorded PTCC clearance for Power Utilities to commission their transmission lines on schedule.

Bar charts indicating the circuit kilometers of 220kV, 400 kV and 765 kV transmission lines and number of cases that were accorded PTCC clearance during the last five financial years are also given below:-

It may be seen from the charts that though the number of the cases processed have reduced while circuit kilometers of 400kV transmission lines have increased. The numbers of cases received during the year were only 85. But these involved a number of long lines.

During the year 2007-08, one week (17th to 21st September 2007) PTCC Training was

Page 72: Annual Report 07 08

63

Central electricity authority Annual Report 2007-08

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

Page 73: Annual Report 07 08

Central electricity authority Annual Report 2007-08

64 “A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

organised at Gujarat Energy Training & Research Institute (GETRI), Vadadora where participants from Power utilities, BSNL and Railways were invited. CEA provided the faculty for the above training.

4.10 Establishment of Load DespatchandTelecommunicationfacilitiesforPowerSector

All the five Unified Load Despatch and Communication (ULDC) schemes have been implemented and are in operation. CEA has been providing technical input to the Group / Committee (USMG) created for the expansion and O&M of the RLDCs system.

4.11 National Load Despatch Centre(NLDC

The scheme for establishment of National Load Despatch Centre (NLDC) having communication links with all the five Regional

Load Despatch Centres (RLDCs) for data exchange is under execution. The scheme is scheduled to be commissioned by May, 2008.

4.12FrequencyAllocationCoordinationforMicro-waveandPowerLineCarrierCommunication(PLCC)

CEA co-ordinates and follows up with Wireless Planning and Co-ordination (WPC) Wing of Department of Telecommunications (DoT) to achieve timely frequency allocation for PLCC system of new power transmission lines and VHF/ UHF / Microwave systems of power utilities.

During the financial year 2007-08, frequency allocation for PLCC for 70 cases have been made. CEA intervened for early allocation for the case of Lanco Amarkantak Power Private Limited (LAPPL) and many others with WPC Wing of DoT for expediting the allocation of frequency for their new power lines.

Simhadri Super Thermal Power Station-N.T.P.C. Ltd Installed Capacity : 1000 MW

Page 74: Annual Report 07 08

65

Central electricity authority Annual Report 2007-08

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

CHAPTER – 5HYDRO POWER DEVELOPMENT

5.1 Hydro Potential and its Development

The re-assessment studies of hydro-electric potential of the country, completed by Central Electricity Authority in 1987, have assessed the economically exploitable hydro power potential

as 84044 MW at 60 % load factor. A total of 845 hydro-electric schemes have been identified in the various basins. The hydro potential of 84044 MW at 60% load factor when fully developed would result in an installed capacity of about 1,50,000 MW on the basis of probable average load factor.

The basin-wise details of hydro electric potential development are indicated in the chart below. As on 31.03.2008, the hydro-electric schemes in operation account for only 20.57 % and those under execution for 4.93 % of the total potential at 60% LF. Thus, the bulk of the potential (74.50%) remains yet to be developed.

The re-assessment studies have also identified 56 sites for Pumped Storage Schemes

(PSS) with probable total installation of about 94,000 MW. At present 10 PSS (4559.60 MW) are under operation, 2 PSS (1250 MW) are under construction.

In addition, the study for the assessment of small hydro potential has been completed in June, 1996 by CEA. 1512 small hydro-electric schemes with aggregate installed capacity of about 6782 MW on canal falls/ rivers have been identified.

Page 75: Annual Report 07 08

Central electricity authority Annual Report 2007-08

66 “It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

5.2 50,000 MW Hydro-Electric initiative

Under the 50,000 MW Initiative, 162 hydro-electric projects spreading in 16 states for the purpose of preparation of Preliminary Feasibility Reports (PFRs) in the year 2003-04 were taken up by CEA as nodal agency with CPSUs/State agencies as Consultants. CEA’s role included overall coordination, facilitating collection of data, and quality control by vetting conceptual planning, assessment of power benefits and selection of project parameters, evacuation of power and monitoring of works. National Hydro-Electric Power Corporation, WAPCOS, North-eastern Electric Power Corporation, Satluj Jal Vidyut Nigam and number of State Power Utilities were associated to complete these feasibility studies. The PFRs were completed in Sept., 2004 for all these projects with an installation of 47,930 MW.

As a follow up of preparation of PFRs, it has been decided to take up implementation/ preparation of DPRs for attractive schemes selected from PFR schemes thereby providing a shelf of projects for execution in the near future. Out of 162 schemes (47930 MW) for which PFRs have been prepared, at first instance, based on their preliminary techno-economic analysis, 78 schemes (34020 MW) whose first year tariff works out below Rs. 2.50/kWh have been considered as low tariff H.E. schemes and have been selected for taking up of detailed survey & investigation and preparation of DPR/implementation . The details of these schemes are enclosed at Annex-5(A). Out of these, action has been initiated for 77 schemes (33951MW) for S&I and preparation of DPR by CPSUs/SPSUs/SEBs/IPPs. Umjaut scheme (69 MW) in Meghalaya is not being considered due to coming up of Shillong water supply scheme at upstream.

Out of these, DPRs of 17 schemes (4060 MW) have already been prepared. DPRs for 23 schemes (13623 MW) are scheduled to be prepared during 2007-08 and 2008-09. The work

of preparation of DPRs of balance 37 schemes (19268 MW) is held up due to proposed change in Agency /Allotment by State Govt., MOEF Problem and local agitation. These projects are expected to yield benefits during 12th Plan and beyond.

5.3 Construction Monitoring of Hydro Projects

The monitoring mechanism has been strengthened for timely completion and to achieve capacity addition targets of the sanctioned and on-going power projects in the country (Central, State and Private Sectors), CEA has nominated a nodal officer for each project, both at the conception stage as well as during execution. The nodal officer keeps track of and facilitates resolution of problems which may delay the project by escalating the issues to appropriate levels for immediate resolution. Regular visits were made by the officers to the project sites for progress review and in this context, 56 no of visits were made in the year 2007-08. In addition to above visits, review meetings are organized regularly and quarterly review meetings are held in CEA to discuss criticality of each projects. Review meetings are held with project authorities for identifying bottlenecks and taking corrective measures. Meetings are also held with major equipment suppliers and other major contractors executing the major works of dam, head race tunnel, power house etc., for solving the major constraints delaying the execution of the projects at project site/their works. Efforts are being made to minimize contractual problems to avoid delays in project execution. Further, the expenditures incurred by the projects are being monitored to ensure that the physical progress commensurate with the financial progress.

5.4 Hydro capacity addition during 2007-08

Target hydro capacity addition for the year 2007-08 was 2751 MW and the capacity achieved

Page 76: Annual Report 07 08

67

Central electricity authority Annual Report 2007-08

“The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

against this target was 2423 MW (about 88%) from 22 units of 5 projects with Central Sector contributing 1030 MW (2 projects, 11 units) , and State Sector contributing 1393 MW (3 projects, 11 units). The main slippages in capacity additions were Ghatghar PSS (250 MW), and Priyadarshani Jurala (78 MW) in State Sector. There were contractual problems between Power Machines, Russia & Power Machines, India and OHPC. CEA took up the matter with both the parties and helped in resolving some of the commercial issues so as to get both the units of Balimela Extn HE Project commissioned during the current year. Project-wise details are given at Annexure-5A.

5.4.1 Hydro capacity addition programme during 2008-09

A hydro capacity addition of 1097 MW (4 Projects, 11 Units) has been programmed in State Sector. There is no hydro capacity addition envisaged in Central & Private in the year 2008-09. Project-wise details are given at Annexure - 5B.

5.4.2 Survey & Investigation of Hydro Projects

In order to accelerate the pace of hydro development in the country, CEA provides assistance to various Central/State agencies in the matter of survey, investigation and preparation of DPRs of hydro projects. CEA has been monitoring the physical and financial progress of survey and investigation of all the hydro schemes. During the year, following works were handled in this regard:

l The progress of Survey & investigation works received from various SEB’s / Agencies was analysed and periodically updated.

l The proposal for Devasari Dam (300 MW) in Uttaranchal submitted by SJVNL was examined in CEA and recommended to MoP for approval.

5.5 Power Project Planning & Optimization Studies

During the year, project planning & optimization studies including power potential studies were carried out for Kolodyne St.-II (460 MW) in Mizoram, Seli (320 MW) and Raoli HE Project (420 MW) in H.P., Nyukcharong Chhu HE Project (165 MW) in Arunachal Pradesh and Myntdu St.-II HE Project (140 MW) in Meghalaya. The Power Chapters were prepared in respect of the above projects and sent to CWC for incorporation in the DPRs being prepared by them.

A note on power potential study for Balpahari MPP (20 MW) of DVC in Jharkhand was also prepared and sent to CWC.

5.6 Studies and other Activities Related to Hydro Power Planning

l Review of Hydro Electric Potential and Basin-Wise Optimization Studies

A proposal was prepared and sent to Ministry of Power for Review of Hydro-Electric Potential in the country and for carrying out basin-wise optimization studies for optimum development of hydro-electric potential in different River Basins of the country.

l Indus-Water Treaty Matters

Matters relating to Indus-Water Treaty, 1960 were dealt to ensure optimal development/ design of the HE Schemes in Indus system as per the provisions of the Treaty to the satisfaction of Pakistan. Studies were carried out to ascertain adequacy of the Pondage and to appreciate its sensitivity to the pattern of operation of Kishanganga Plant (330 MW) in J&K as per Indus Water Treaty Provisions in connection with preparation of reply on Pakistan’s objections.

l Updated Report of Durgaduani Mini Tidal Project (3.65 MW) in West Bengal was examined and commented upon.

l Revision of Design Energy

Page 77: Annual Report 07 08

Central electricity authority Annual Report 2007-08

68 “Honesty is the first chapter in the book of wisdom.”

Proposals for revision of design energy for Tehri St.-I and Nathpa- Jhakri Project were studied and observations were sent to the project authorities. Reservoir Simulation Studies were also carried out for fixation of generation targets of these projects.

5.7 A Techno-economic Study was carried out for analyzing the viability of construction of Gurudeshwar Weir of Sardar Sarovar and submitted to Ministry of Power.

Feasibility Study Report of Alternative Critical Storage – Run-of-River Schemes

A format was developed for preparation of Feasibility Study Reports of Alternative Critical Storage – Run-of-River Projects (10 Nos.) in Arunachal Pradesh, as desired by Member, Planning Commssion, which included 6 Nos. Projects by NHPC viz. Dibang (3000 MW), Upper Subansiri (2000 MW), Middle Subansiri (1600 MW), Lower Subansiri (2000 MW), Middle Siang (1000 MW) and Lower Siang (1600 MW), 2 Nos. Projects viz. Kalai (2600 MW) & Hutong (3000 MW) by WAPCOS and 2 Nos. Projects viz. Talong (300 MW) & Kameng Dam (600 MW) by NEEPCO. The Feasibility Study Reports, as prepared by NHPC, WAPCOS and NEEPCO were vetted and comparative analysis was carried out based on assessment of present worth of costs and benefits.

A paper on “Climatic Change with special focus on Himalayan Glaciers” was prepared. Proposal for Asian Development Bank Funding of Sawara Kuddu HE Project (111 MW) in Himachal Pradesh was examined and commented upon.

5.8 Advance action for capacity addition in the 12th Plan and beyond

As per the studies carried out by CEA to assess the requirement of additional capacity during the 12th Plan (2012-17), the requirement

of installed capacity to meet the all India peak demand and energy requirement at the end of 12th Plan would require a capacity addition of 82,200 MW in the 5 years period of 2012-17, out of which 30000 MW is proposed to be added through hydro projects.

An exercise has been carried out in CEA to identify candidate Hydro Projects for inclusion in the 12th Plan and beyond. A shelf of 105 schemes aggregating to ( 42593 MW ) with high degree of confidence have been selected for meeting 12th Plan target. List of these schemes is given at Annexure-5C. To realize the planned benefits during 12th Plan, advance action on the identified hydroelectric schemes has been initiated. Review meetings are being convened in CEA periodically.

5.9 Co-operation with Neighbouring Countries

Development of water resources of India and neighbouring countries, Nepal, Bhutan and Afghanistan for mutual benefits has been under discussions with these countries. During the year, following works were handled:

Ø Prepared ‘Draft Policy for Import of Power from Neighbouring Countries’.

Ø Prepared a note on “Approach to the development of Hydro potential in SAARC Region”.

Ø Mulit-disciplinary Team of Experts from CEA, CWC, GSI and WAPCOS visited Punatsangchhu-II Project site for site selection.

Ø Examiantion of Repayment schedule of loan and interest in respect of Tala HE Project in Bhutan.

Ø Examination of issues related to Review of Kurichu Power Tariff.

Ø Preliminary studies for assessment of power

Page 78: Annual Report 07 08

69

Central electricity authority Annual Report 2007-08

“Ambition should be made of sterner stuff.”

benefits at Sapta Kosi High Dam Project in Nepal were carried out.

5.9.1 International Co-operation

Ø Proposal for Energy Master Plan for Common Market for Eastern & South African Countries (COMESA) countries was studied and commented upon.

Ø Proposal for Bilateral cooperation with Saudi Arabia, USA and Canada in the development of Hydro Potential were dealt with.

5.10 Hydro Power Plants Performance & Operation Monitoring

v Performance of 804 units in 271 hydro stations with aggregate Installed Capacity of 34546.10 MW was analyzed in respect of their outages & generation and report on the review of HE stations for the year 2006-07 was finalized and is under publication.

v Mid term review of generation performance of hydro-electric stations of the country for the year 2007-08 was carried out in Nov./ Dec., 2007 after withdrawal of South-West

monsoon by interaction with SEBs, Power Deptts. And CPSUs. The generation targets were reviewed for the remaining part of the year 2007-08.

v Month-wise/station-wise hydro generation targets for year 2008-09 were drawn in consultation with various utilities and tentatively fixed at 118450.00 MU which was about 8.2% higher than generation targets for the year 2007-08.

v To accord recognition to hydro power stations for their all round performance, Performance data of HE Stations having installed capacity of 100 MW and above was analyzed and four HE Stations were recommended for National Award for best performance under “National Award for the year 2006-07 for Meritorious Performance in Power Sector”.

5.10.1 Hydel Generation Performance during year 2007-08 (April’07 - March’08)

The region wise summary of Hydel Generation performance in the country is as follow:

Region TargetMU

GenerationMU

Deviation (+/ -)MU (%)

Northern 48973.00 50734.71 1761.71 (+)3.60Western 17076.00 18340.76 1264.76 (+)7.41Southern 31732.00 39514.84 7782.84 (+)24.53Eastern 7063.00 9835.73 2772.73 (+)39.26N-Eastern 4606.00 4998.08 392.08 (+)8.51All India 109450.00 123424.12 13974.12 (+)12.77

Against target of 109450.00 MU, the actual energy generation during the year (upto 31.03.08) was 123424.12 MU which is 12.77% more than the target. Hydel generation has exceeded the target in all regions due to good monsoon during the year 2007.

5.11 Renovation and Modernization of Hydro Electric Power Projects

5.11.1 R&M Phase-I Programme

Recognising the benefits of the R&M programme, Govt. of India set up a National

Page 79: Annual Report 07 08

Central electricity authority Annual Report 2007-08

70 “The one exclusive sign of thorough knowledge is the power of teaching.”

Committee in 1987 to formulate strategy on R&M of hydro power projects. Based on the recommendations of the National Committee and subsequent reviews, a programme for renovation, modernization and uprating of Hydro Power Stations was formulated by Central Electricity Authority in which 55 schemes were identified with an aggregate capacity of 9653 MW. The total cost of these schemes was estimated as Rs.1493 crores with expected benefit of 2531 MW.

5.11.2 R&M Phase-II Programme

As per the hydro policy of Govt. of India, declared in 1998, Renovation & Modernization (R&M) of Hydro Power Plants were accorded priority. Accordingly, 67 hydro R&M schemes having an aggregate capacity of 10318 MW were identified to be undertaken under Phase-II programme till the end of 10th Plan to accrue a benefit of 3685 MW at an estimated cost of Rs. 2161 crores.

5.12 National Perspective Plan

The National Perspective Plan document for hydro power stations was formulated by CEA in the year 2000 incorporating R&M proposals under Phase-II programme above along with the left out schemes of National Committee i.e. Phase-I programme which were under implementation or were yet to be implemented. This Plan indicated the benefit of about 7755 MW during the 9th, 10th and 11th Plans through R&M of existing 117 schemes with an aggregate installed capacity of 19370 MW at an estimated cost of Rs.4654 crores.

5.12.1 8th, 9th & 10th Plan Achievements

Under the hydro R&M programme, 65 (15 in Central Sector and 50 in State Sector) hydro electric schemes (13 up to the 8th Plan, 20 in the

9th Plan & 32 in the 10th Plan) with an installed capacity of 10511 MW at a cost of Rs.1726 crores have been completed by the end of the 10th Plan (i.e by 31st March 2007) and have accrued a benefit of 2351 MW through Life Extension, Uprating and Restoration.

5.12.2 11th & 12th Plan Programme

For the 11th Plan, a total of 62 hydro R&M schemes are programmed with an installed capacity of about 11340 MW at an estimated cost of Rs. 4024 Crores to accrue a benefit of about 4392 MW through Life Extension, Uprating and Restoration. During Dec., 2007 M/s. RRVPNL(Rajasthan Rajya Vidyut Prasaran Nigam Limited) declared two hydro R&M schemes of Rajasthan as closed due to non- receipt of approval from the Madhya Pradesh as the projects are Inter-State projects. Hence a total no. of 60 hydro R&M schemes are now under implementation during the 11th Plan. Out of 60 schemes, till date 2 schemes (1 in Central Sector and 1 in State Sector) with an installed capacity of 134 MW at a cost of about Rs. 35 Crs. have been completed and has accrued a benefit of 50 MW through Life Extension & Uprating. 40 schemes are ongoing and on remaining 18 schemes, the works have yet to take off.

Further, 17 nos. of hydro electric schemes having an installed capacity of 2186 MW, which were originally programmed for completion during 11th Plan, have now been shifted to 12th Plan, as RLA studies could not be completed or units are running comparatively satisfactorily. On completion of the R&M works of these schemes, there will be a benefit of 1936 MW through Life Extension and Uprating at an estimated cost of Rs. 846 crores (provisional).

Page 80: Annual Report 07 08

71

Central electricity authority Annual Report 2007-08

“Children are our most valuable natural resource.”

5.13 Plan-wise summary of hydro R&M schemes (as on 31.03.2008)

Sl.No

Plan Period No.of Projects Installed Capacity

(MW)

Cost (Rs. in Crs.) Benefit(MW)

CentralSector

StateSector

Total Estimated Actual

1. Upto 8th Plan (Schemes completed)

2 11 13 1282.00 126.00 127.00 429.00

2. 9th Plan (Schemes completed)

8 12 20 4892.00 597.00 570.00 1093.00

3. 10th Plan(Schemes Completed)

5 27 32 4337.00 1016.00 1029.00 829.00

4. 11th Plan

i) Schemes Programmed 9 51 60 11069.00 3987.00 390.00(Till date)

4392.00

a. Schemes Completed 1 1 2 134.00 40.00 35.00 50.00

b. Schemes Ongoing 5 35 40 9591.00 2562.00 356.00 2900.00

c. Schemes yet to commence

3 15 18 1344.00 1384.00 - 1443.00

5. 12th Plan

Schemes which have been shifted from 11th Plan

- 17 17 2186.00 846.00 - 1936.00

Abbreviations: MW – Mega Watt; Res – Restoration; U – Uprating; LE – Life Extn. Note: - Installed Capacity, Benefit & Cost rounded to nearest zero.

5.14 Programme for the year 2007-08

As per the 11th Plan programme, the following 9 schemes, having an aggregate installed

capacity of about 1969 MW, were programmed for completion during the year 2007-08 to accrue a benefit of 50 MW at an estimated cost of about Rs.207 crores.

S.No. Name of Scheme(I.C. in MW),Agency1. *Jawahar Sagar (3x33), RRVUNL2. *Rana Pratap Sagar (4x43), RRVUNL3. Mettur Dam, (4x10), TNEB4. Tanakpur(3x31.4), NHPC5. Khodri, Ph.A (4x30), UJVNL6. Chilla, Ph.A (4x36), UJVNL7. Lower Sileru(4x115), APGENCO8. Upper Sileru (4x60), APGENCO9. Koyna St.I & II(4x70 + 4x80),MSPGCL

* Declared closed by the Project Authorities during Dec., 2007.

Page 81: Annual Report 07 08

Central electricity authority Annual Report 2007-08

72 “The farther backward you can look, the farther forward you are likely to see.”

5.15 Achievement during the year 2007-08

The following two schemes having an aggregate installed capacity of about 134 MW have been completed during the year 2007-08 at an actual cost of Rs.34.66 crores to accrue a benefit of 50 MW through Life Extension & Uprating.

S. No.

Name of Scheme(Installed Capacity in MW), Agency

1 Mettur Dam (4x10), TNEB2 Tanakpur(3x31.4), NHPC

5.15.1 Reasons for Non-achievement of targets / completion during the year 2007-08

The reasons for non-achievement of target / delay in completion of programmed R&M hydro schemes are given as under:-

a) Duetodelayinfinalizationofawardofsupply order

1. Khodri, Ph.A (4x30), UJVNL

2. Chilla, Ph.A (4x36), UJVNL

b) Due to delay in execution

1. Lower Sileru(4x115), APGENCO

2. Upper Sileru (4x60), APGENCO

3. Koyna St.I & II(4x70 + 4x80),MSPGCL

5.16 Miscellaneous works undertaken/completed

i) Enquiry Committee for damage of 50 MW generator of Rihand HEP-

An enquiry committee was formed under the Chairmanship of C.E.(HE&RM) to find the reasons for damage to 50 MW generating unit. The committee submitted the report to UPJVNL and fixed the responsibilities.

ii) RM&LE proposal of Obra HEP-

UPJVNL requested CEA to appraise the DPR for RM&LE works for Obra HEP. Though the proposal estimate was less than 500 crores (concurrence of CEA is required for any Hydro R&M Scheme involving estimated cost exceeding Rs. 500 Crores), CEA appraised the DPR and sent recommendations to UPJVNL.

iii) Flooding of Dehar HEP of BBMB –

After flooding of Dehar HEP in Aug. 2006, CEA helped in early restoration of Unit no 1, 3 & 4 before monsoon, in 2007. In the same context, CEA also issued ‘Guidelines for prevention of flooding of Hydro Electric Projects’, to all the SEBs/PSUs.

iv) Demand/ Supply of generating equipments–

The requirement of E&M equipment/ materials in respect of Hydro R&M schemes during the 11th /12th Plan period was assessed for submitting a report to MoP on ‘Preparedness of BHEL and other power equipment manufacturers’.

v) R&M of Umium II HEP of MeSEB –

CEA assisted MeSEB in finalization of Revised qualifying requirement and tender documents for early completion of R&M works.

5.17 Programme for the year 2008-09

During the year 2008-09, it is programmed to complete 9 schemes having an installed capacity of 3009 MW. On completion of these schemes, there will be a benefit of 655 MW through Life Extension and Uprating at an estimated cost of about Rs. 266 crores. These 9 schemes also include the schemes which could not be completed during the year 2007-08.

Page 82: Annual Report 07 08

73

Central electricity authority Annual Report 2007-08

S.No.

Name of Scheme, (Installed Capacity in MW), Agency

1. Khodri, Ph.A (4x30), UJVNL

2. Chilla, Ph.A (4x36), UJVNL

3. Lower Sileru (4x115), APGENCO

4. Upper Sileru (4x60), APGENCO

5. Srisailam RB(7x110), APGENCO

6. Koyna St.I & II, (4x70 + 4x80), MSPGCL

7. Koyna St.III (4x80), MSPGCL

8. Lingnamakki (2x27.5), KPCL

9. Sabarigiri(6x50), KSEB

5.18 Concurrence of CEA to Hydro Electric Schemes

5.18.1 The Central Electricity Authority is responsible for concurrence of hydro power development schemes of central, state and private sectors after enactment of the Electricity Act, 2003 in June, 2003. Hydro scheme of an Electricity Board or Generating Company estimated to involve capital expenditure exceeding such sum, as may be fixed by the Central Govt, from time to time by notification in the official Gazette, is required to be submitted to the Central Electricity Authority for its concurrence as per provisions of Section 8 of The Electricity Act, 2003.

The Government of India vide their notification No.SO 550 (E) dated 18.04.2006 have fixed the following limits of capital expenditure for the hydro power schemes beyond which CEA’s concurrence is required.

(i) Rs.2500 crore, provided that –

a) the scheme is included in National Electricity Plan (NEP) as notified by Central Electricity Authority (CEA) and conforms to the capacity and type as mentioned in NEP.

b) The site for setting up the hydro generating station has been allocated through the transparent process of bidding in accordance with the guidelines issued by Central Government.

(ii) Rs.500 crore for any other scheme not covered by clause (a) and (b) to para (i) above.

5.18.2 Techno-Economic Appraisal/ Concurrence of Hydro Schemes

During the year 2007-08, CEA had appraised and accorded concurrence to four Hydro Generation schemes aggregating to 3470 MW capacity with a financial investment of Rs. 18613.40 crore.

Sl.No.

Name of Scheme/ State/Executing Agency

InstalledCapacity

(MW)Estimated Cost

Date ofConcurrence

by CEA

1 Rangit Stg.-IV HEP in Sikkimby M/s Jal Power Corpn. Ltd. 3X40=120 Rs.726.16 crores

Estimated Completed Cost 06.07.2007

2 Lower Jurala HEP in AndhraPradesh by M/s APGENCO 6X40=240 Rs. 908.34 crores

At May’07 Price Level 24.07.2007

3 Pare HEP in ArunachalPradesh by M/s NEEPCO 2X55=110 Rs. 553.25 crores

At June’07 Price Level 24.09.2007

4 Dibang MPP in ArunachalPradesh by M/s NHPC Ltd.

12X250=3000

Rs. 16425.65 croresAt Nov.’07 Price Level 23.01.2008

TOTAL 3470 MW Rs. 18613.40 crores

“Failing to plan is planning to fail.”

Page 83: Annual Report 07 08

Central electricity authority Annual Report 2007-08

74 “Let our advance worrying become advance thinking and planning.”

5.18.3 Reduction in Cost of Hydro Power Generation Projects

It has been observed that in most of the cases, the cost estimates indicated by the project proponents in their Detailed Project Report (DPR) are on the higher side due to various reasons. On receipt of the DPR, the same is thoroughly scrutinized by the various appraisal divisions of CEA, CWC & GSI before the proposal is considered by CEA for its concurrence. Review meetings are convened from time to time by Member (H), CEA, with the project developers and Chief Engineers of

Appraisal divisions of CEA, CWC and GSI in order to sort out the outstanding issues/ remove bottlenecks in the DPR with the objective of minimizing the time for appraisal process and optimising the proposed capital cost.

During the year 2007-08, four (4) hydro power projects aggregating to 3470 MW capacity were accorded concurrence and net reduction in the cost achieved for these projects works out to about Rs 1396.57 crore (about 7 %) both in soft as well as hard cost as detailed in Annexure-5D.

Baspa-II, Jai Prakash Hydro Power Ltd. Installed Capacity: 300 MW

Page 84: Annual Report 07 08

75

Central electricity authority Annual Report 2007-08

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

6.1 Selection of sites for Thermal Power Projects

In the context of the need to set up additional thermal power stations to meet the power requirements of the country up to the year 2012 AD and beyond, CEA has in September, 2001 constituted a committee under the Chairmanship of Member (Thermal) and consisting of members from different Ministries/ Deptts./ SEBs etc. for selection of sites for large coastal/pit head and other Thermal Power Stations. As the process of selection of sites is of continuous nature, the above mentioned Committee has been converted into a Standing Committee. Teams consisting of the members of the Committee from CEA, Planning Commission, MOE&F, CMPDI, Railways, etc. are being constituted for visiting from time to time the sites tentatively identified by the State agencies, Central Mine Planning & Design Institute (CMPDI) and National Remote Sensing Agency (NRSA). These teams also interact with various States/ Central departments for assessing the availability of various inputs required for setting up of Thermal Power Plants like land, water, fuel etc. The Scheme has been approved for continuation in 11th Plan also by Planning Commission.

CHAPTER – 6 THERMAL POWER DEVELOPMENT

Based on the site visits of the Site Selection Committee and also reports obtained by CEA with assistance of CMPDI & NRSA through satellite mapping, a large shelf of potential sites has been created. Many sites from this shelf have been identified for benefits during the 11th Plan. The reports of CMPDI & NRSA have been forwarded to concerned State Govts/NTPC for development of the identified sites. The NRSA reports for coastal sites have also been given to the site selection committee of Nuclear Power Corporation, who are in the process of identifying coastal sites for new Nuclear Power Plants. CEA has awarded additional study to M/s CMPDI on 26th March 2007 for identification of coal based potential pithead sites using remote sensing techniques near 12 coal blocks located in South Karanpura, Wardha Valley, Ib Valley and Talcher coalfields. Draft Report of the study identifying 25 new pithead sites in the states of Jharkhand, Orissa & Chattisgarh has been submitted by CMPDI.

During the year 2007-08, following sites have been identified by the site selection teams for setting up Thermal Power Stations subject to certain constraints:-

S. No. State Name of site District Capacity(MW)1. Punjab Rajpura Patiala 1000-20002. Punjab Ghagga Muktsar 30003. Chattisgarh Udaipur Sarguja 40004. Gujarat Dholera Bhavnagar 40005. Tamilnadu Cuddalore Cuddalore 40006. Tamilnadu Marakkanam Villupuram 40007 Tamilnadu Cheyyur Kanchipuram 40008. Maharashtra Malvan Sindudurg 40009. Maharashtra Solapur Solapur 132010 Maharashtra Solapur Solapur 1000 (CCGT)

Page 85: Annual Report 07 08

Central electricity authority Annual Report 2007-08

76 “A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

6.2 Setting up of Ultra Mega Power Projects (UMPPs)

The Ministry of Power, Govt. of India in association with Central Electricity Authority & Power Finance Corporation has launched an initiative for development of nine (9) coal based Ultra Mega Power Projects (UMPPs) of about 4000 MW capacity each under tariff based international competitive bidding. To facilitate tie-ups of inputs and clearances, project specific Shell companies as wholly owned subsidiaries of the Power Finance Corporation Ltd. have been set up. These companies undertake initial development works like preparation of feasibility reports, tie up of necessary clearances including water, land, fuel, power selling etc. prior to award of the Project to the successful bidder and bidding process for the ultra mega power projects.

The ultra mega power projects are to be developed with a view to minimise cost of power to the consumers. Because of bigger capacity, the cost of the project would be lower due to economy of scale. The layout of the project would be compact and all the systems would be optimized to result in lower cost of power. Further, these projects would be environmental friendly as supercritical technology is proposed to be adopted to reduce emissions. A time bound action plan for preparation of project report, tie-up of various inputs/clearances, appointment of consultants, preparation of RFQ/RFP is being followed. Once the developer is selected, the ownership of the Shell Company is transferred to the successful bidder.

Out of nine (9) UMPPs identified by Ministry of Power/CEA four (4) UMPPs are proposed to be set up at pit head sites one each in Madhya Pradesh, Chhattisgarh, Orissa and Jharkhand and five (5) UMPPs are to be set up at coastal sites one each in Gujarat, Karnataka, Maharashtra, Andhra Pradesh and Tamil Nadu. It is proposed to set up pithead projects as integrated

proposals with corresponding captive coal mines for which Ministry of Coal has already earmarked coal blocks. For the coastal projects, imported coal shall be used.

Three (3) UMPPs namely Sasan in M.P, Mundra in Gujarat and Krishnapatnam in Andhra Pradesh have been awarded and transferred to the developers selected through tariff based competitive bidding namely Reliance Power Ltd. for Sasan UMPP and Krishnapatnam UMPP and Tata Power Company for Mundra UMPP. In respect of the fourth UMPP at Tilaiya in Jharkhand, the first stage bidding process (RFQ) for qualification of bidders has been carried out. The second stage bidding process (RFP) for obtaining final bids from the qualified bidders would be undertaken shortly.

Efforts are being made to expedite development of other five (5) UMPPs to be located in Orissa, Chhattisgarh, Maharshtra, Karnataka and Tamil Nadu. These projects could be taken up for bidding as and when the sites are finalized by State Governments and feasibility studies are completed. The salient features of the proposed Nine UMPPs are given at Annexure-6A.

Joint Monitoring Committees (JMCs) have been set up for each project with Member (Thermal) as Chairman for monitoring the progress of the UMPPs and the Committees held meeting every month to speed up the process and provide the inputs to Govt. of India.

6.3 Standing Committee constituted for processing the proposals for IPPs/CPPs seeking coal blocks/linkage

In pursuance of the Ministry of Power’s direction regarding the procedure for processing the proposals for IPPs/ CPPs seeking coal blocks/ linkage, a Standing Committee under the Chairmanship of Member Thermal has been constituted by to examine such proposals.

Page 86: Annual Report 07 08

77

Central electricity authority Annual Report 2007-08

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

During the year 2007-08, three (3) meetings of Standing Committee had taken place on 25.10.2007, 27.11.2007 (continued on 07.12.2007) and 03.03.2008 and various proposals received from Ministry of Coal through MoP were discussed in the meetings. The Standing Committee since its inception has recommended 39 number of applications for IPPs totaling to 24437 MW (Annexure-6B), 24 number of applications of State/ Central utilities totaling to 17020 MW during the year 2007-08.

6.4 Negotiations for price with BHEL for Boiler Turbine Generator Package

Govt. of Chhattisgarh had constituted a Committee for negotiation of prices with BHEL for awarding the work of BTG packages for Korba West TPP 1x500 MW, Marwa 2x500 MW TPP and similarly, Govt. of Madhya Pradesh constituted for Satpura TPS unit 10 & 11 2x250 MW . Chief Engineer (TP&I) represented CEA in the Committees. The Committees finalized the prices for the above plants and LoI were issued.

6.5 Construction Monitoring of Thermal Power Projects

CEA is closely monitoring the progress of various constructional activities of thermal power projects under execution in the country for timely commissioning. Regular visits are made by CEA officers to the sites for assessing the progress of various construction activities and rendering necessary advice/assistance in resolving the problems being faced by the project authorities to meet the schedule of commissioning. Joint Coordination Meetings (JCMs) are held in CEA with project authorities, main plant & equipment manufacturers and other equipment suppliers to review the progress. Monitoring mechanism in the CEA has been strengthened and Nodal Officers have been nominated for each project for close monitoring of the progress of a project. The major constraints in timely achievement of

various milestones are identified and taken up at various levels in MOP/State Govt. /Project authorities to resolve the issues.

6.6 Thermal capacity addition programme during 2007-08

During the year 2007-08, thermal capacity of 6620 MW was added against a target of 12704 MW. The details of the projects commissioned during the year are given at Annexure-6C.

6.6.1 Thermal capacity addition programme during 2008-09

9304.2 MW thermal capacity is expected to be added during 2008-09. Details are shown in Annexure-6D.

6.6.2 Ach ievement o f Commerc ia l Operation of Newly Commissioned Units

After synchronization of the units, the status of completion of pending works is also monitored and follow-up action taken for early commercial operation of the units. Out of 30 No. thermal units, which were under stabilization during 2007-08, the commercial operation of Vindhyachal STPS-III U-10, Rayalaseema TPS-II Unit-3 & 4, Ratnagiri CCPP (Dabhol) Block-II & III, New Parli TPS U-1, Korba East TPP U-1 & 2, Dhuvaran CCPP Ext. ST, Dholpur CCPP (Ph-I) GT-1, GT-2 & ST, OP Jindal STPP (Ph-I) U-1, Mejia TPS U-5, Paras TPS Extn. U-1 has been achieved. However, the thermal units viz, Parichha TPS Extn.U-4, Giral TPP U-1, Kahalgoan STPP U-5, Sipat STPP U-4, Sanjay Gandhi TPP U-5, Mejia TPS U-6, Yamunanagar TPP U-1, Santaldih TPP U-5, Durgapur Extn. U-7, Bellary TPP U-1, SagardIghi TPP U-1, Bakreshwar TPP U-1, GHTPP U-3 and OP Jindal TPP U-2 & 3 are still under stabilization and will be declared on commercial operation in due course.

Page 87: Annual Report 07 08

Central electricity authority Annual Report 2007-08

78 “It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

6.7 Thermal Technology Development

6.7.1 Supercritical Technology

CEA has been actively associated in technology scanning, analysis about their suitability for our conditions and developing road map for introduction of new technologies for thermal power generation. The choice of a technology is governed by one or more of the following considerations:

(i) Higher energy conversion efficiency resulting in less fuel consumption and consequently low level of pollutant emission.

(ii) Reduced environmental degradation through use of pollution abatement technologies.

(iii) Higher plant availability.

(iv) Better overall economics.

The maturity and provenness of the technology, its availability at competitive cost and reliable support during project life are also given due consideration.

At present, the largest thermal unit size in operation is 500 MW and a few units of 600 MW under construction with sub-critical steam parameters. CEA has been facilitating adoption of higher size units with super-critical technology. Six (6) Nos. 660 MW units of NTPC with supercritical parameters are under construction. These units are designed with parameters of 247 Kg/Cm2, 537/5650C. Three (3) Nos. Ultra Mega Power Projects, each of 4000 MW which have been awarded, would also be deploying supercritical technology. Many more units of NTPC and State utilities slated for commissioning in 12th Plan are also planned to be of supercritical type. Many of these units would have higher parameters of 247 kg/cm2, 565/5930C.

It is considered prudent that with the introduction of 800-1000 MW supercritical units, simultaneous development of indigenous manufacturing capacity should also take place along with technology transfer so as to ensure availability of service and spares for the whole life of the plant. M/s BHEL have already signed technology collaboration agreement with

Ramagundam STPS N.T.P.C

Page 88: Annual Report 07 08

79

Central electricity authority Annual Report 2007-08

“The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

M/s Alstom for super-critical boilers and with M/s Siemens for turbines upto 1000 MW size. Discussions were held with various inter-national manufacturers to sensitize them to the demand of supercritical units in India. As a result, M/s L&T have formed joint venture companies with M/s MHI, Japan to manufacture supercritical boilers and turbines in India. Thus, there are two indigenous manufacturers capable of supplying supercritical units. In order to facilitate the participation of new joint ventures, formed to set up indigenous manufacturing facilities, the qualification requirements were reviewed and recommendations sent to utilities.

6.8 Regulations for Technical Standards for construction of Thermal Power Plants

The Electricity Act, 2003 mandates CEA to specify technical standards for construction of electric plants and electric lines. Accordingly, these standards were prepared for thermal generating stations which included coal/lignite, gas and diesel based thermal generating stations. These standards forming part of Regulations for electric plants & electric lines were sent for pre-publication. The comments from the stake holders have been received and the regulations are under finalization.

6.9 Regulations for Safety Requirements for Construction and O&M of Electrical Plants and Electric Lines

As required by Electricity Act, 2003, draft regulations for Safety requirements for construction & O&M of electrical plants and electric lines were prepared and the same have been pre-published.

6.10StandardTechnicalSpecificationfor500 MW Units

CEA had taken up the preparation of standard technical specification for boiler- turbine-

generator package for 500 MW units and above wi th sub-cr i t ica l parameters in association with utilities and manufacturers. Draft specification has been prepared and is under finalization.

6.11 Land requirement for Thermal projects

A Committee of Experts was appointed by CEA to examine the land requirement of thermal projects. The Committee has submitted its report which has been circulated to utilities.

6.12 N o r m s f o r A u x i l i a r y P o w e r Consumption for Nuclear Units

A study to evaluate actual auxiliary power consumption in nuclear stations was carried out to enable establishment of realistic norm for fixation of tariff and recommendations were sent to Tariff Committee.

6.13 Important activities

Other important technology related activities carried out/under progress during 2007-08 include the following :

a) Participated in the Conference/workshop on Carbon Capture and Sequestration organized by Carbon Sequestrat ion Leadership Forum in USA, Norway and Saudi Arabia.

b) The study on use of high concentration ash slurry disposal in Indian thermal power stations was under progress.

c) Study and analysis of the failure of wagon tippler no.6 of Panipat TPP was completed and report submitted.

d) The issue of qualification of BHEL for 600 MW units was examined and recommendations were sent to utilities.

Page 89: Annual Report 07 08

Central electricity authority Annual Report 2007-08

80 “Honesty is the first chapter in the book of wisdom.”

6.14 Design and Engineering of thermal projects

The following design & engineering assignments as a part of consultancy work were carried out :

a) Review Consultancy for Yamunanagar Thermal Power Project (2x300 MW).

b) Review Consultancy for Hisar Thermal Power Project (2x600 MW)

c) R O plant for Karaikal combined cycle gas power plant

d) Ash handling system of unit 4 of Kutch Lignite TPS

e) Dry fly ash collection system for Gandhinagar T.P.S. Stage-II

f) R&M of coal handling plant of Chandrapura TPS of DVC

g) Ratnagiri Gas & Power Pvt. Ltd. –revival of Dabhol units.

6.15 Renovation & Modernisation of Thermal Power Stations

Renovation and Modernisation (R&M) and Life Extension (LE) of existing old power stations have been recognized as an effective option to achieve additional generation from existing units at low cost and short gestation period. Besides generation improvement, other benefits achieved from R&M include improvement in environmental emissions and improvement in availability, safety and reliability.

6.15.1 R&M (Phase-I) Programme

R&M programme was initiated in 1984 as a centrally sponsored programme for 34 nos. of thermal power stations covering 163 nos. of thermal units in the country. The programme was successfully completed in the year 1992.

6.15.2 R&M (Phase-II) Programme

The Phase-II R&M programme for 44 nos. of thermal power stations was taken up in the year 1990-91. Power Finance Corporation (PFC) was to provide loan assistance to the State Electricity Boards (SEBs) for the R&M works. However, this programme could not progress as per schedule mainly due to non-availability of funds and poor financial conditions of State Electricity Boards (SEBs).

By the end of 8th Plan i.e., March 1997, an additional generation of 5000 MU/year was achieved. Also, Life Extension works on 4 units of Neyveli TPS aggregating to 300 MW capacity were completed. An amount of Rs. 862 crore was incurred during 8th Plan. CEA reviewed the Phase-II R&M programme and balance activities still required to be carried out were included in the 9th Plan R&M programme.

6.16 9th Plan Programme

During the 9th Plan Programme, 127 units (17306 MW) at 29 power stations at an estimated cost of Rs. 913 crore were taken up for R&M. In addition, another 25 units (1685 MW) for Life Extension at an estimated cost of Rs.1700 crore were taken up.

6.16.1 10th Plan Programme

At the beginning of 10th Plan, R&M works on 57 units (14270MW) at an estimated cost of Rs. 977 crore were identified for sustenance of their performance for completion during the plan. The works on 14 units had been completed and for balance units major activities have been completed.

106 old thermal units (10413 MW) were identified for Life Extension works. Based on subsequent techno-economic examination, the Life Extension works on 26 units (1698 MW) were not found techno-economically viable. LE works on 11 units (985 MW) had been completed

Page 90: Annual Report 07 08

81

Central electricity authority Annual Report 2007-08

“Ambition should be made of sterner stuff.”

& 21 units (2203 MW) had been transferred to Partnership-in-Excellence (PIE) programme.

6.16.2 11th Plan Programme

During the 11th Plan, 77 number thermal units of total capacity of 19205 MW have been taken up for R&M for generation sustenance. In addition, 81 units of total capacity 13032 MW have been taken up for Life Extension programme with a view to give extended life of 10-15 years plus increased generation of 11000 MU/year assuming an increase in PLF of about 10%. Details of units for R&M/LE programme during 11th Plan are appended in Annexure-6E.

6.16.3 Programme for the year 2007-08

R&M works not completed during the 10th Plan period were being carried out during the year 2007-08. Further, new units were identified for carrying out R&M/LE works during 11th Plan and actions initiated in this regard. LE works on unit No. 2 (1x40MW) of Obra TPS had been completed and the execution of LE works on another 14 units (1924 MW) are in progress. Order for LE works on another 10 units (1580MW) i.e. unit 9,10,11, 12 & 13 (5x200MW) of Obra TPS, unit 3 & 4 (2x110MW) of Bhatinda TPS, Unit No. 2 (120MW) of Ukai TPS and Unit No. 1 & 2 (2x120MW) of Gandhinagar TPS were placed. The work on these units are likely to be started shortly. The activities related to PIE programme continued to be implemented.

6 . 1 6 . 4 F u t u re Vi s i o n f o r R & M Programme

Prior to 1977, all the thermal units installed in the country were of less than 200 MW ratings. Majority of such units were non-reheat type with low design efficiency. The first 200 MW of Russian (LMZ) design was commissioned at Obra TPS in 1977. Thereafter, the unit size of 200/210MW became the standard unit size till 1984 when first 500 MW unit was commissioned at Trombay TPS. From 1983 onwards, KWU design 210MW units

with higher steam parameters and improved heat rate were installed.

Today, 200/210/250MW and 500 MW units (57237 MW) consisting of 75 % of coal/lignite based installed capacity form the backbone of Indian Power industry. So far, R&M activities were confined to old, small size units to sustain their operation, improve plant availability and extend their operating life. However, such units are highly inefficient and beset with various operational problems. It is aimed at to gradually decommission such units.

A large number of 200/210 MW of LMZ design machines and few 500 MW machines are in operation for 15-25 years. Such machines through efficiency integrated R&M provide a good opportunity for performance enhancement through technology intensive R&M. Plant specific energy audit studies and techono-economic analysis are proposed to be carried out for defining & implementation of efficiency integrated R&M/LE scheme. At present, three power stations viz., Bokaro 'B' TPS (3x210MW), Kolaghat TPS (3x210MW) and Nasik TPS Unit-3 (1x210MW) have been identified for efficiency integrated R&M study through bilateral cooperation with German Government. Further, few units Bandel TPS Unit-5 (210MW), Koradi TPS Unit-1 (210MW) and Panipat TPS (2x110MW) have also been identified for efficiency integrated R&M through World Bank assistance.

6.17 “Partnership in Excel lence” Programme

A three phase programme named 'Partnership in Excellence' (PIE) was launched by Ministry of Power in August 2005 for an initial period of two years (i.e. upto August 2007) with a view to improve performance of such stations which were running at PLF much below 60%. CEA identified 26 thermal power stations comprising of 81 units (8564MW) having PLF below 60% to have partnership with better performing utilities viz.

Page 91: Annual Report 07 08

Central electricity authority Annual Report 2007-08

82 “The one exclusive sign of thorough knowledge is the power of teaching.”

NTPC, Tata Power. Out of these 26 Stations, the programme on 4 stations was not found feasible and in another 4 stations, improvement is being carried out by the concerned utilities themselves. NTPC was chosen as partner in respect of 16 stations whereas M/S Tata Power was selected as partner for Dhuvaran TPS (units 5&6 of 140 MW each). CEA had been actively associated in scheme identification, monitoring and facilitating in implementation of R&M/LE programmes through interaction with utilities, equipment suppliers, agencies associated with R&M/LE works and visiting power plants regularly.

The programme had started showing results at a number of power stations in the form of improvement in PLF, plant availability, specific oil consumption and auxiliary power consumption. There was an over-all increase in PLF from 43.9% to 52.1% during the year 2007-08 as compared to PLF before the implementation of PIE programme.

The PIE programme activities were discontinued at Bandel & Santaldih of WBPDCL in March 2007 on the request of the Utility. However, based on the request of the utilities, the PIE programme was extended at Durgapur, Bokaro 'B' & Chandrapura of DVC, Ennore Power stations of TNEB and in Dhuvaran TPS of GSECL upto 31st December, 2007 whereas in other stations i.e., stations of UPRVUNL, DPL, IPGCL, JSEB & TVNL, the programme was extended up to March, 2008.

6.18 Fly Ash Generation & Utilization

A) Fly Ash Utilisation

a) At present, the installed capacity of coal/lignite based thermal power stations in the country is about 86015 MW as on 31.03.08 and the figure is likely to increase with commissioning of a large thermal capacity during 11th Plan. The total ash being generated at present by thermal power

stations pertaining to power utilities works out to be of the order of 114 million tones per annum. It is estimated that from a total thermal capacity (coal/lignite) based TPSs by end of 11th Plan, the ash generated in the form of fly ash (80-90%) and bottom ash (10-20%) would be of the order of 173 MT per annum considering 38% ash content in coal as an average and at 80% PLF. Since the economics prefer installation of coal/lignite based TPSs near the source of coal/lignite i.e. pit head, ash generated is to be utilized in various ways by locating industries in the vicinity depending upon the characteristics and other engineering properties of the ash. The beneficiation of coal by reduction in the percentage ash content and by blending with imported coal will reduce the total quantity of ash generation.

b) Presently, the manufacturing of ash based products is at developmental stage and needs to be made more environmental friendly. Some of the areas of application of fly ash include:

Ø Brick/Block/Tiles manufacturing

Ø Cement manufacturing

Ø Roads and embankment construction

Ø Structural fill for reclaiming low lying areas

Ø Mine- filling

Ø Agriculture, Forestry and Wasteland development

Ø Part replacement of cement in mortar, concrete and ready mix concrete

Ø Hydraulic structure (Roller compacted concrete)

Ø Ash Dyke Raising Ø Building components: Mortar, Concrete,

Concrete Hollow Blocks, Aerated Concrete Blocks etc.

Page 92: Annual Report 07 08

83

Central electricity authority Annual Report 2007-08

“Children are our most valuable natural resource.”

Ø Other medium and high value added products (ceramic tiles, wood, paints) pavement blocks, light weight aggregate, extraction of alumina, Cenospheres, etc.

c) As mentioned above, by the end of 2012, the ash likely to be generated from coal/lignite thermal capacity shall be of the order of 173 million tones per annum. A number of measures are being taken to encourage various sectors to consume ash.

The targets of ash utilization are primarily governed by the MoE&F Notification dated 14th September, 1999 and its amendment notification dated 27th August, 2003 as well as Hon’ble High Court of Delhi directions vide its judgments dated 4th December, 2002, 10th March, 2004 as well as 5th August, 2004.

d) The existing thermal power plants as on September, 1999 are to achieve ash utilization level of 100% in a phased manner by 2013-14 in accordance with 15 year action plan as per notification dated 14th September, 1999. The new power plant commissioned subsequent to September, 1999 are to achieve ash utilization level of 100% in a phased manner as per 9 year action plan and with effect from the date of publication of the notification dated 14th September, 1999. Besides, MoE&F has also issued as amendment notification dated 27th August, 2003 and has extended the scope of ash utilization by various construction agencies by stipulating specific targets for those within 50 km and 50 to 100 km radial distance of the location of thermal power plant. Construction agencies located within 50 km are to achieve ash utilization level targets of 100% up to August, 2005 and those located from 50 to 100 km distance are to achieve ash utilization level of 100% by August, 07.

A draft Notification No.So:313 dated 3rd April, 2007 was issued by MoE&F on Utilization of fly ash generated from thermal power stations, under Environment protection Act, 1986 to

supersede existing Notification dated 14th September, 1999 read with amended Notification dated 27th August, 2003. A committee was constituted by MoE&F in August 2007 to consider the suggestion/ objections received regarding above Draft Notification dated 3rd April 2007. Chief Engineer (TCD), CEA was one of the Members of the above Committee which has submitted its recommendation to MoE&F in January 2008. A final view on this is yet to be taken by MoE&F.

B) Monitoring of Fly Ash Generation and Utilization

CEA continues to monitor the fly ash generation and ash utilization of coal/lignite based thermal power plants pertaining to power utilities of the Centre and the States. CEA has initiated half yearly monitoring of data during the year 2007-08. The following activities were carried out:

a) The data pertaining to 2007-08 was sought from 85 coal/ lignite based power plants pertaining to 29 power utilities in 17 States. The overall percentage of ash utilization during the year has been worked out to be 53.02. The ash utilization in various modes during the year was compiled (See graph-I).

b) The progressive ash utilization data up to the year 2007-08 has been compiled (See Graph-II). State-wise, power utility wise and region-wise abstract of the data was compiled.

c) Data on the physical, chemical and geo-technical properties of ash of various thermal power plants was compiled.

d) A report on fly ash generation and utilization data of 85 Nos of thermal power stations as utility- wise, state- wise, region -wise, sector -wise for the year 2007-08 was prepared. The actual ash generated was 116.96 MT and ash utilized was 62.02 MT and the overall percentage was 53.02.

Page 93: Annual Report 07 08

Central electricity authority Annual Report 2007-08

84 “The farther backward you can look, the farther forward you are likely to see.”

Page 94: Annual Report 07 08

85

Central electricity authority Annual Report 2007-08

“Failing to plan is planning to fail.”

Dadri Thermal Power Station N.T.P.C. Ltd.

Page 95: Annual Report 07 08

Central electricity authority Annual Report 2007-08

86 “Let our advance worrying become advance thinking and planning.”

7.1 Accelerated Power Development and Reforms Programme (APDRP)

CEA has been appointed as the Advisor-cum-Consultant for the State of J&K for APDRP Schemes. APDRP schemes estimated to cost Rs. 1100.13 crores have been sanctioned in respect of the following sub-transmission and distribution (ST&D) schemes of J&K which are under progress and are expected to be completed in 11th Plan.

Sl.No.

Scheme for the Circle /town

Estimated cost (Rs. crores)

1. Jammu Circle I 174.042. Jammu Circle II 145.553 Jammu Circle III

(Batote Circle)95.62

4 Srinagar Circle I & II 227.035 Bijbehara (Anantanag &

Phulwama) South Circle217.78

6 Sopore (Baramula & Kupwara), North Circle

240.08

Total 1100.13

An amount of Rs. 679.10 crore has been released up to 31-03-2008 of which Rs. 584.02 crores have been utilized.

The scheme for strengthening and improvement of Sub-transmission and distribution system for Leh and Kargil has been finalised in consultation with PDD J&K and the same has been sanctioned in principle for an estimated amount of Rs.48.73 crores by Government of India on 2.11.2006.

The schemes cover creation of new 66/11 kV and 33/11 kV sub-stations, augmentation of 33/11 kV substations, addition and augmentation of distribution transformers, reconductoring

CHAPTER – 7 DISTRIBUTION AND RURAL ELECTRIFICATION

and addition of new 33 kV, 11 kV and LT lines, metering and meter testing facilities, communication facilities, consumer indexing and distribution automation etc.

CEA is regular ly moni tor ing the implementation of APDRP schemes in various Circles of J&K and there has been considerable reduction in DT failure rate and improvement in reliability of Power Supply.

7.2 Status of Metering

There are 1558 number of 11kV feeders in J&K and out of these 95% have been metered. There are 10 lakh consumers in the state of J&K and 40% of them have been metered.

7.3 National Awards to Power Utilities for Meritorious Performance during 2006-07

The performance of Power Utilities was assessed on the basis of a number of distribution indices, viz. AT&C losses, Metering (11 kV, consumers and Distribution Transformers), Reliability of Power Supply and Financial Turnaround. The National Awards for meritorious performance for the year 2006-07 were given to MGVCL (Gujarat), Torrent Power Ltd (Gujarat), and MESCOM (Karnataka) by Hon’ble Minister of Power on 20.3.2008.

7.4 Transmission & Distribution losses

The average Transmission and Distribution (T&D) losses in the country for the year 2006-07 were 28.65 % (Provisional) of the energy available for supply. 11 States and 6 UTs have T&D losses below the level of losses at the national level. All the constituents of Southern Region have recorded the T&D losses below the national level, whereas

Page 96: Annual Report 07 08

87

Central electricity authority Annual Report 2007-08

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

in NER, none of the States could achieve the same results. Among the UTs, the UT of DNH has the lowest figure of T&D losses (11.22%), whereas Kerala attained the lowest level of losses (19.11%) among the States. State wise percentage T&D losses are given in Annexure-7A.

7.4.1 Aggregate Technical and Commercial losses

The Aggregate Technical and Commercial (AT&C) losses in the country for the year 2006-07 were 32.07%. 30 No. of utilities have shown reduction in AT&C losses compared to the previous year 2005-06. 18 Utilities out of 77 have recorded AT&C losses below the national average of 32.07%. Percentage AT&C losses of various utilities are given in Annexure-7B.

7.4.2 11 kV Feeder Outages of Power Distribution

The Indian Electricity Act, 2003 empowers Central Electricity Authority (CEA) to collect and make public the information pertaining to performance of Distribution Companies (DISCOMs) and State Electricity Boards (SEBs). Accordingly, information relating to outages of 11 kV feeders, collected for the State Capitals and towns with population more than one lakh on monthly basis was released on the web-site of CEA. The information for the month of February, 2008 as well as cumulative figures from April 2007 to February 2008 is given in Annexure-7C.

7.5 Regulations

The “Central Electricity Authority (Construction of Electrical Plants and Electric Lines) Regulations, 2007” in respect of lines and sub-stations of 33 kV and below is under finalisation.

The Amendment to “Central Electricity Authority (Installation and Operation of meters) Regulations, 2006” is under finalisation.

7.6 Specifications for Distribution Transformers

Standard technical specifications for 11 kV/433-250 V and 33 kV/ 433-250V class distribution transformers have been finalised.

7.7 Distribution System Improvement in Union Territories

7.7.1 Andaman & Nicobar Islands

1. Examination of the Scheme for augmentation of DG capacity and T&D system for southern group of Islands from Little Andaman to Campbell Bay for providing reliable power to permanent houses being constructed for Tsunami affected families

2. Examination of the scheme for augmentation of DG capacity and T&D system at Neil, Havelock & Long Islands in UT of A&N

3. Examination of the Scheme for establishment of 25 MW multi fuel based power plant at South Andaman by UT Administration & proposal of M/s SPCL for establishment of 20 MW bio mass based power plant at South Andaman

4. Convening of a meeting chaired by Member(GO&D) to discuss the proposal of M/s SPCL for establishment of 20 MW bio mass based power plant at South Andaman

5. Attended meeting in MoP regarding regularization of 677 No.s of daily Mazdoors in Electricity Deptt of A&N & the proposal for regularization of 677 post of Mazdoor (Gr D) in Electricity Deptt was examined & comments were sent to UT Administration & MoP.

6. Matter regarding functional justification for creation of the post of Chief Engineer & supporting staff in Electricity Department of A&N was examined & recommendations were conveyed to MoP.

Page 97: Annual Report 07 08

Central electricity authority Annual Report 2007-08

88 “A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

7. Examination of the proposal of IPP for correction of the variable cost due to difference in density of HSD oil from ambient temp to site conditions.

8. Examination of the matter regarding change of the scope of the works by PGCIL for the DPR for restoration/ revival of power sector at various Islands of UT as approved by CCEA.

9. Participated in various meetings held in MoP to review the progress of the works for restoration / revival of power infrastructure damaged due to Tsunami in UT of A&N Islands

7.7.2 Lakshadweep

1. Technical clearance of the scheme for augmentation of distribution system in the Minicoy Island of UT during 11th Plan period.

2. Technical clearance of the scheme for augmentation of distribution system in the Kavaratti Island of UT during 11th Plan period

3. Technical clearance of the scheme for augmentation of distribution system in the Andrott Island of UT during 11th Plan period

4. Technical clearance of the scheme for augmentation of distribution system in the Amini Island of UT during 11th Plan period

5. Examination of the scheme reports for augmentation of distribution system in the Kilten, Kadmat, Agatti Chetlet & Kelpeni Islands of UT during 11th Plan period.

7.7.3 Dadra & Nagar Haveli

1. Technical clearance of the scheme for upgradation of Meter Test bench in Electricity Deptt of D&NH

2. Examination of the scheme for augmentation of 220/66 KV Khardapada S/S from 3x100 MVA to 4x100 MVA capacity

3. Examination of the scheme for laying of U/G cabling system at Silvasa town in UT of D&NH

4. Examination of the scheme for augmentation of 66/11 KV Silly S/S from 2x15 MVA to 3x15 MVA

5. A t t e n d e d S F C m e e t i n g t a k e n b y Secretary(Power) on 7-8-07 to consider the scheme for augmentation of 66/11 KV Kharadpada S/S from 30 MVA to 60 MVA in UT of D&NH

7.7.4 Daman & Diu

Examination of the technical bids for award of works for the scheme for strengthening of 66 KV transmission system in Daman

7.7.5 Delhi/ NDMC / NCRPB

Ø Assistant to NCRPB for preparation of report for Study Group for preparation of functional Plan for Power -2021 for NCR area

Ø Technical clearance of the proposal for establishment of new 33/11 KV S/Ss in NDMC area during 11th Plan period

Ø Matter regarding LILO of 66 KV cable from Park street S/S to DMRC at B D Marg for power supply to Badarpur- Central Sect (DMRC) Metro line

Ø Monitoring the progress of various on going sub-transmission & distribution works being carried out by BSES / NDPL/NDMC in Delhi

Ø Conduction of mock test exercise to test the reliability of power supply to Parliament House before each Parliament Session.

Page 98: Annual Report 07 08

89

Central electricity authority Annual Report 2007-08

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

7.8 Rajiv Gandhi Grameen Vidyutikaran Yojana-Scheme of Rural Electricity Infrastructure and Household Electrification

Central Govt. has launched Rajiv Gandhi Grameen Vidyutikaran Yojana of Rural Electricity Infrastructure and Household Electrification on 4th April, 2005 for the attainment of the National Common Minimum Programme (NCMP) goal for providing access to electricity to all households in five years. The scheme aimed at electrification of 125,000 un-electrified villages and un-electrified hamlets and electrification of 7.8 crore households. The estimated cost of the scheme (including 11th Plan) was Rs.16000 crores approximately and Rs.5000 crores were earmarked for capital subsidy in phase-1 during the 10th Plan Period.

Government of India has approved the continuation of the scheme in 11th Plan for attaining the goal of providing access to electricity to all households, electrification of about 1.15 lakh unelectrified villages and electricity connections to 2.34 crore BPL households by 2009 with a capital subsidy of Rs. 28,000 crores.

7.9 RuralElectrification7.9.1StatusofRuralElectrificationinthe

Country

During 2007-08 (up to Jan, 2008) 4,378

number of inhabited villages have been electrified and 112432 pump sets have been energized. Cumulatively, 487242 inhabited villages constituting 82.1% have been electrified out of a total of 593732 inhabited villages and 15462729 pump sets have been energized in the country. It is observed that:

l 7 States namely Andhra Pradesh, Delhi, Goa, Haryana, Kerala, Punjab and Tamil Nadu and all UTs except Andaman & Nicobar Islands have achieved 100% village electrification.

l 12 States namely Gujarat, Himanchal Pradesh , J&K, Karnataka, Madhya Pradesh, Chhattisgarh, Maharashtra, Manipur, Sikkim, Uttar Pradesh, Uttrakhand & West Bengal have achieved more than the National Average of village electrification (82.1%).

l 10 States namely Arunachal Pradesh, Assam, Bihar, Jharkhand, Meghalaya, Mizoram, Nagaland, Orissa, Rajasthan & Tripura are lagging behind the National Average of village electrification.

The charts showing the Plan-wise and State wise progress of village electrification and pump sets energisation as on 31.01.2008 are shown below:

Page 99: Annual Report 07 08

Central electricity authority Annual Report 2007-08

90 “It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

Page 100: Annual Report 07 08

91

Central electricity authority Annual Report 2007-08

“The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

8.1 Design & Engineering of Hydro Electric Projects

Central Electricity Authority renders design & engineering services for detailed engineering to Hydro Power Projects under execution in the Central/State Sectors and neighbouring countries. Design & Engineering includes complete design, techno-economic analysis, preparation of specifications, tender evaluation, selection and sizing of equipments, detailed layout and schematic drawings for hydro turbine, generator, transformer, switchyard equipment and other auxiliaries.

The legacy of CEA in rendering the design and engineering of Hydro Electric Projects is for a period of 48 years since 1960. Seventy five (75) hydro electric projects in India and neighbouring countries having aggregate installed capacity of over 15757 MW (Annexure-8A) were completely designed and engineered by this organisation during this period are in successful commercial operation. The design consultancy of hydro electric projects include projects with conventional hydro

CHAPTER – 8 DESIGN & ENGINEERING SERVICES

generating units, bulb/ tubular type units, pumped storage schemes and underground power stations with unit capacity from few KW to 250 MW. CEA is fully equipped to provide state of the art design and engineering services for hydro power projects of any type and capacity.

8.2 Programme and Achievement during 2007-08

During 2007-08, CEA continued consultancy services for design and engineering of electrical and mechanical works of seven (7) nos. hydro electric projects and took up the consultancy services for Punatsangchu St.I HEP of Bhutan. Out of these eight (8) projects, five (5) are in India and three (3) are in neighbouring countries with aggregate installed capacity about of 4173 MW including large hydro power projects such as Loharinag Pala (600 MW), Tala (1020 MW), Punatsangchu St.I etc. The Hydro Power Projects for which design & engineering services were rendered by CEA during 2007-08 are as given below:-

HYDRO POWER STATIONS FOR WHICH DESIGN & ENGINEERING SERVICES ARE BEING RENDERED BY CEA

S.No. Project Stae/Executing Agency Capacity (MW)Northern Region1. Koteshwar Uttaranchal/THDC 4x1002. Lohari Nagpala Uttaranchal/NTPC 4x1503. Tapovan Vishnugad Uttaranchal/NTPC 4x1304. Rampur Himachal Pradesh/SJVNL 6x68.66North Eastern Region5. Myntdu Meghalaya/MeSEB 2x42Neighbouring Countries6. Tala Bhutan/THPA 6x1707. Salma Afghanistan/WAPCOS 3x148. Punatsangchu St.I Bhutan 6x182.5

Total 4172.96

Page 101: Annual Report 07 08

Central electricity authority Annual Report 2007-08

92 “Honesty is the first chapter in the book of wisdom.”

During the year, all the six units of Tala H.E. Project (1020 MW) for which consultancy services were provided by CEA, were successfully commissioned.

Some of the major works completed during the year under consultancy services are as given below:-

During the year, technical specifications for seven auxiliary equipments were prepared for Myntdu and about 1000 manufacturer’s drawings were examined for Myntdu & Salma H.E. Projects. Tenders for E&M equipments of Loharinag Pala & Tapovan Vishnugad H.E. Projects and 400 KV GIS equipments for Loharinag Pala and auxiliary equipments of Myntdu H.E. Project were evaluated and also participated in the pre and post tender evaluation meetings. During the year, layout drawings of Power house, Switchyard etc. were also finalized for Loharinag Pala and Tapovan Vishnugad H.E. Projects.

8.3 Design & Consultancy Assignments (Civil aspects) for Thermal/ Hydro/ Power Transmission Projects

CEA carried out detail design and engineering and review consultancy for 9 nos. of thermal/hydro & power system projects in respect of civil engineering works involving preparation of technical specification & tender drawings, bill of quantities, tender evaluation, preparation of detail design and construction drawings for civil structures including scrutiny of designs and drawings of civil works received from turnkey vendors/ manufacturers/ contractors. The works carried out during the year as consultancy assignments are given at Annexure-8B.

8.3.1 Consultancy and Technical support

a) CEA have rendered consultancy services to Energy & Power Department Govt. of

Sikkim to set-up a Central Load Despatch Center (CLDC). The scheme has been succesfully completed during the year and is under operation.

b) Consultancy services are being rendered to Power Development Department (PDD), Government of Jammu Kashmir for design and development of PLC Communication System and SCADA expansion to collect data from new sub-stations which are being constructed under Hon’ble Prime Minister’s Reconstruction Programme. The data from new substations shall be acquired by Remote Terminal Units (RTU) and integrated into the existing Unified Load Despatch & Communication Scheme. The Technical Specifications for Kashmir Region has been prepared and submitted to PDD J&K. The preparation for Technical Specifications for Jammu Region are at final stage of completion.

c) Technical specifications for Energy Management Centre (EMC) at Indore have been furnished to Narmada Control Authority (NCA) under works of Consultancy.

d) Technical specifications have been prepared and furnished to Leshka Hydro Electric Project (HEP) of Meghalaya State Electricity Board (Me.S.E.B.) for Tele-communication and SCADA system.

e) Technical support is being provided to M/s WAPCOS for establishing PLCC system and 48V DC power supply system for Salma Dam HEP in Afghanistan.

f) Participating in the discussions in the meetings organized by BIS, CIGRE, etc. and providing the technical input in preparation of standards for Load Despatch and Telecommunication (LD&T) equipment for Power Sector and electromagnetic compatibility.

Page 102: Annual Report 07 08

93

Central electricity authority Annual Report 2007-08

“Ambition should be made of sterner stuff.”

The Electricity Act, 2003 passed by Parliament was notified in June, 2003. The Act replaces the three earlier Acts, namely, the Indian Electricity Act 1910, Electricity (Supply) Act, 1948 and the Electricity Regulatory Commission Act, 1998. As per the 2003 Act, CEA has inter-alia been entrusted with duties and functions relating to collection/recording of data/information relating to generation, transmission, distribution, trading and utilization of electricity and to carry out studies relating to cost, efficiency, competition etc. to evaluate the financial performance of the power sector.

CHAPTER – 9 ECONOMIC AND COMMERCIAL ASPECTS

OF THE POWER INDUSTRY

9.1 Performance of State Electricity Boards/ State Power Utilities

9.1.1 Average realization vis-a-vis Average Cost of Supply

The average realisation from sale of power during the last five years 2001-06 was 267, 255, 338, 283 and 272 paise per unit respectively. The corresponding figures of average cost of supply were 348, 335, 349, 359 and 348 paise/unit respectively. The table below gives the average cost of supply and average realization covering all sectors in the country on the basis of the data made available by various SEBs/Utilities:-

Average Cost of Supply and Average Realization of Electricity from All Sectors (including Agriculture)

(Fig. in paise/ unit)

Year Average Cost of Supply Average Realisation (including Agriculture)

Gap

1980-81 41.90 32.30 9.601984-85 65.07 49.39 15.681989-90 105.68 78.58 27.101990-91 112.32 86.84 25.481991-92 120.23 95.32 24.911992-93 139.02 112.28 26.741993-94 154.78 125.27 29.511994-95 156.00 134.23 21.771995-96 179.38 151.28 28.101996-97 205.35 176.13 29.221997-98 228.16 192.79 35.371998-99 246.98 198.91 48.071999-00* 296.19 225.66 70.532000-01* 314.62 249.24 65.382001-02$ 348.33 266.99 81.342002-03@ 335.49 255.20 80.292003-04$ 349.29 338.30 10.992004-05# 358.83 282.60 76.232005-06** 348.00 272.00 76.00* For 14 SEBs $ For 14 SEBs @ For 9 SEBs # For19 States (32 Utilities)

**For18States (20utilities).

The data up to 2002-03 is based on annual accounts of SEBs & afterwards compiled by CEA.

Page 103: Annual Report 07 08

Central electricity authority Annual Report 2007-08

94 “The one exclusive sign of thorough knowledge is the power of teaching.”

9.1.2 Commercial Losses

Various power utilities in the country suffered losses of Rs. 21192, 19107, 23880 and 19546 crores without subsidy during the years 2002-03, 2003-04, 2004-05 and 2005-06 respectively. State wise details of total commercial losses of power utilities for the period 1991-92 to 2005-06 are indicated in the table below:-

Year Losses (Rs. in crores)

1991-92 3000

1992-93 4560

1993-94 5060

1994-95 6125

1995-96 8770

1996-97 11305

1997-98 13963

1998-99 20860

1999-00 26353

2000-01 25259

2001-02* 27068

2002-03* 21192

2003-04* 19107

2004-05* 23880

2005-06* 19546

*Source : PFC Reports

9.1.3 Settlement of Dues

The gap between average revenue realization and average cost of supply constantly increased. All this caused erosion in the volume of internal resources generation by the SEBs and led them to virtual bankruptcy. The level of commercial losses of the SEBs/ utilities depended inter-alia on the unaccounted energy losses, effective subsidies incurred towards sales to agriculture

and domestic sectors, efforts to neutralize them through cross subsidization and the level of subsidies provided by the State Governments. Gross subsidy on energy sales has been increasing over the years because of the policy of some of the states to provide electricity at subsidized rates to agriculture and domestic consumers.

Consequently SEBs were unable to make full payments to CPSUs for purchase of power and coal resulting in accumulation of huge outstanding amount to be paid by SEBs. This adversely affected the growth and performance of Central Power Sector Utilities (CPSUs). This payment deficit continues to rise & threaten the viability of the Central Power Utilities. Poor credit worthiness of SEBs has also effectively blocked investments by the private sector despite the enabling and encouraging framework laid down by the Centre. Even in the post reform period, managerial and financial inefficiency in the state sector utilities adversely affected capacity addition and system improvement programmes.

In pursuance of the reforms process, the expert group formed by the govt. under the Chairmanship of Member (Energy), Planning Commission recommended a scheme for one time settlement of dues payable by the SEBs to CPSUs and Railways. This one time settlement scheme of dues (launched in 11th May, 2001) owed by SEBs/Utilities to CPSUs, was aimed at making loss making power utilities bankable. In terms of the Scheme 60% of interest/surcharge on the delayed payments/dues as on 30.9.2001 was waived and the rest of the dues were securitized through tax-free bonds issued by respective State Governments.

Considerable progress has been made since in the settlement of dues payable by SEBs to CPSUs and the Railways. All State Governments signed the tripartite agreement envisaged under the scheme, which was between the State

Page 104: Annual Report 07 08

95

Central electricity authority Annual Report 2007-08

“Children are our most valuable natural resource.”

Government, Reserve Bank of India and the Government of India. Out of these, 27 States have issued bonds amounting to Rs. 31581 crore. Goa had no outstanding dues. The Government of the National Capital Territory of Delhi securitized its outstanding dues by converting the dues into long-term advances of Rs. 3,376 crore payable to the CPSUs concerned separately under bi-partite Agreements, as they do not have the power to issue bonds.

CEA has been monitoring the status of the outstanding dues payable by SEBs to CPSUs. The total dues outstanding to various CPSUs for the period 2002-03 to 2007-08 is given in table below.

9.1.4 Trend in Outstanding Dues to CPSUs by SEBs/ Utilities

Year Total OutstandingDues (Rs. Crore)

2002-03 41490.70

2003-04 8093.76

2004-05 6248.15

2005-06 2601.22

2006-07* 2937.39

2007-08* 3596.11

*As reported by CPSUs upto 31-03-08

A statement indicating the status of outstanding dues as per the information received from CPSUs up to 31-03-08 is given in Annexure-9A.

With securitization of past dues by the State Governments and creation of the discipline of payment for current bills, the raising of the requisite resources from the market for the ambitious capacity addition programme of the CPSUs would become feasible.

9.2 Tariff and average rates of electricity supply and electricity duty

In fulfillment of its obligation under Section 73(i) & (j) of the Electricity Act, 2003, CEA brings out a publication titled “Electricity Tariff & Duty and Average Rates of Electricity Supply in India”. The latest edition (March, 2008) which is under the process of publication, will contain revisions / amendments in the tariffs up to 31st July, 2007. Average rates of electricity supply presented in this edition have been worked on the basis of the tariff orders issued by the State Electricity Regulatory Commissions and tariff notifications issued by the concerned Power Departments/Utilities. The tariffs applicable as on 31st July, 2007 have been considered for the current analysis.

Further, the publication gives a comparative study to know the trends of average rates of electricity in various states of the country. Though, it is somewhat difficult to compare the tariffs applicable in the various States, because of different parameters considered by the State Electricity Boards/State Electricity Regulatory Commissions for fixing consumer tariff, an attempt has been made to work out average rates for various categories of consumers for the purpose of broad comparison. The methodology followed involves assumption of certain sanctioned load (kW) and monthly electricity consumption level for each category of consumers separately. Considering the rates of sale of electricity for various slabs as notified by the supplier, the average per unit rate have been worked out. The electricity duty/ taxes applicable are added to these rates to arrive at the final average per unit amount payable.

A statement indicating estimated average category-wise rates of electricity for various utilities in the country updated up to 31-03-2008 is given at Annexure-9B.

Page 105: Annual Report 07 08

Central electricity authority Annual Report 2007-08

96 “The farther backward you can look, the farther forward you are likely to see.”

9.3 Certification by CEA for deemed exportbenefitsunderExport-Import Policy

Proposals regarding issue of certificates in respect of supplies to the projects made by the domestic supplier as “Capital Goods” for the following power projects were examined during the year: -

a) Sarbari Small Hydro Power Project (2x2.5MW) of M/s DLS Hydrowatt Ltd, Mumbai.

b) Gugal Small Hydel Project (4x2.5 MW) of M/S S.R.S. Energy Private Ltd.,Bangalore.

c) Hullahalla Mini Hydel Project(3x4MW) o f M/S L imbava l i Power P r iva te Ltd.,Bangalore.

d) Birahi Ganga Hydro Power Project(2x2.4MW) Project of M/s Birahi Ganga Hydro Power Project Ltd., New Delhi

e) Somavathi Mini Hydel Power Project (2x3MW) of M/S SRM power Private Ltd.,Bangalore.

f) G r o u p C a p t i v e C o a l B a s e d T h e r m a l P o w e r P l a n t ( 2 x 6 3 M W ) KeelavelayudhapuramTuticorin of Indo-Barath Powergencom Ltd.,Chennai.

g) Toss Mini Hydel Project(2x2.5MW) of Sai Engineeering Foundation, New Shimla.

Certificates were issued for availing “Deemed Export” benefits by the indigenous suppliers under the EXIM Policy to the projects at Serial Nos a), b), & c) above. In the case of the projects at Sl.No. d) & e), the respective project authorities were asked to furnish additional document /clarification to process the case but they have not pursued the matter further. On preliminary examination proposal at Sl No.f) & g) were found to be at a premature stage. Concerned project authorities were requested to approach

CEA after completing the formalities as per the guidelines issued by CEA for processing such cases.

9.4 Referencesontechno-financialmattersin power sector

The following references on issues concerning technical/financial matters of power sector were received from MoP/ other Central Govt. Ministries/ Trade and Industry Associations during the year and CEA’s comments/ recommendations, were sent to MoP/ concerned departments.

Ø Representation of M/s Meta Copper Ltd. Zuarinagar, Goa received from Ministry of Commerce & Industry regarding problems faced by EOUs, particularly sourcing power from Independent Power Producers (IPPs).

Ø Request of Haryana Power Generation Co. Ltd (HPGCL) for grant of Project Authority Certificate by MOP for facilitating their IPP viz. M/s Reliance Power Ltd to avail deemed export benefits in respect of r 2x600 MW Hissar (Mega) Thermal Power Project.

Ø Representation of M/s Jaipur Vidyut Vitran Nigam Ltd, to Ministry of Commerce and Industry for grant of Deemed Export Benefits for procurement / supply of Vehicle mounted Mobile Crane.

Ø Reference from Deptt. of Economic Affairs, Ministry of Finance regarding supply of information for preparation of Economic Survey 2008.

Ø Reference from Deptt. of Commerce, Ministry of Commerce & Industry seeking clarification regarding setting up of Captive Power Plant (CPP) and whether supply of power by CPP to EOUs can be considered as Capital Goods, on the application for grant of 100% EOU status to M/s Wardha Power Company Pvt. Ltd.

Page 106: Annual Report 07 08

97

Central electricity authority Annual Report 2007-08

“Failing to plan is planning to fail.”

Ø Reference from Planning Commission seeking CEA’s Comments on Agenda Item for Empowered Sub-Committee on the Committee on Infrastructure, regarding “Definition and Composition of Infrastructure.

Ø Reference from Tamil Nadu Electricity Boards (TNEB) seeking guidelines for International Competitive Bidding (ICB) procedure for availing deemed export benefits for TNEB Power Projects.

Ø Recommendations of Parliamentary Standing Committee on Commerce, Deptt.of Commerce & Industry regarding preparation of Action Plan with implementation schedule to provide power to EOUs at International Benchmark Rates.

Ø Issues relating para-6 of the Notification constituting the 13th Finance Commission issued by Ministry of Finance.

9.5 Data bank for cost of generation of power

The process of creating a data bank regarding cost of power generation and pooled cost of electricity classified by type of generation for various Utilities/SEBs/Electricity Departments is under progress. With the creation of a large number of utilities in the form of distribution companies (DISCOMs), the work of data collection, shifting and compilation had increased manifold. For the sake of clarity and to make it possible to have intra-regional comparison of the cost of generation at a glance, the format has been changed to present the data region-wise instead of alphabetical order followed in the previous report. Statements indicating power station- wise cost of generation for various Central & State utilities in the country for the period 2000-01-to 2005-06 is given at Annexure-9C and that for the year 2006-07 in the new format is given at Annexure-9D.

9.6 Progress in Bidding Process of Ultra Mega Power Projects (UMPPs)

CEA has been constantly associated with the finalization of Request for Qualification, (RFQ), Request for Proposal (RFP) and Power Purchase Agreement (PPA) for setting up of Ultra Mega Power Projects in the country and in this regard had represented in various committees. The successful bidders for three Ultra Mega Power Projects have already been selected through the tariff based International Competitive Bidding Process, based on the capacity and Super-critical technology, specified in the RFQ & RFP documents issued by the Shell companies and these Shell companies already stand transferred to the successful developers. The bidders quoted the tariff for 25 years. Power Finance Corporation was the Nodal agency for the entire bid-process. The status for various UMPPs is as under:

(i) Mundra UMPP in Gujarat

The Letter of intent (LOI) was awarded to M/s Tata Power Ltd. on 28th December 2006 with a levelised tariff of Rs.2.264/kWh. The project was handed over on 23.04.07.

(ii) Sasan UMPP in Madhya Pradesh

Revised financial bids were called as per the decision of Empowered Group of Ministers. The letter of Intent (LOI) was awarded to M/s Reliance Power Ltd. on 1st August, 2007 with a levelised tariff of Rs. 1.196/ kWh. The project was handed over on 07.08.2007.

(iii) Krishnapatnam UMPP in Andhra Pradesh

The Letter of Intent (LOI) was awarded to M/s Reliance Power Ltd. on 30th November, 2007 with a levelised tariff of Rs. 2.33/ kWh. The project was handed over on 29.01.2008.

(iv) Tilaiya UMPP in Jharkhand

The process for selection of the developer for the project is in progress. The RFQ documents were

Page 107: Annual Report 07 08

Central electricity authority Annual Report 2007-08

98 “Let our advance worrying become advance thinking and planning.”

issued on 25th September, 2007. The RFQ stage was completed on 12.11.2007 and 13 bids were received. The bids are under evaluation.

9.7 Consultancy services

Ø Haryana Electricity Regulatory Commission (HERC) entered into an agreement with CEA to provide consultancy services in matters relating to their licensees viz Haryana Vidyut Prasaran Nigam Ltd.(HVPNL), Uttar Haryana Bijli Vitran Nigam Ltd(UHBVNL) and Dakshin Haryana Bijli Vitran Nigam Ltd. (DHBVNL)/ engaged in transmission and distribution of power in the State. Validity of the MOU was extended for a period of one year (up to 31-08-2008) on the request of HERC.

Ø CEA has agreed to render advice to Punjab State Electricity Regulatory Commission (PSERC) for their accord of “in-principle” approval for cost of Goindwal Sahib TPS (2x270 MW).

Ø CEA is rendering consultancy to DVC for preparing the bidding documents for selection of joint venture partner for the distribution work in their command area.

CEA is render ing consul tancy to Government of Meghalaya in respect of state power policy and in selection of a consultant to evaluate the State Power Policy and the Memorandum of Agreement(MoA) undertaken by GoMe.

9.7.1 Nuclear Power Tariff Fixation

Ø In terms of provisions of DAE Act, 1962, CEA has examined the power tariff proposal of NPCIL in respect of (i) pooled power tariff for Kaiga Units 1&2 (2x220 MW) with Kaiga Units 3&4 (2x220MW) & (ii) Tarapur Units-3&4(2x540MW) and comments sent to NPCIL.

Ø CEA associated in the studies relating to the review of Nuclear Power tariff as desired by the “ Expert Committee to determine the normative values for parameters of operation of atomic power stations for fixing nuclear power tariff ” constituted by DAE.

9.7.2 Hydro Electric Projects of Bhutan

Ø Tariff and IRR calculations for Punatsangchhu –I HEP (1095MW) in Bhutan for various scenarios of project funding done and sent to MoP.

Ø Examined the reference from MoP in regard to loan repayment schedule, for Tala HEP and sent the comments thereon.

Ø CEA examined the issues relating to review of power tariff of Kurichhu HEP (4x50 MW).

9.7.3 Development of Transmission Projects

Ø Comments on “Standard Transmission Service Agreement for procurement of Transmission Services” prepared and sent to members of Empowered Committee constituted by Ministry of Power.

Ø Comments on “Project Specific Request for Qualification (RFQ) for the Independent Transmission Project (Scheme enabling import of NER/ ER surplus by NR)” prepared and sent to members of Empowered Committee.

9.8 Nominationofofficerstothefollowingcommittees

Ø Expert committee for Bid evaluation for Krishnapatnam and Tilaiya UMPPs.

Ø Bid evaluation committee for Bhaiyathan TPP (1200-1500 MW) of Chhattisgarh State Electricity Board.

Page 108: Annual Report 07 08

99

Central electricity authority Annual Report 2007-08

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

9.9 Electricity Act, 2003 and Follow Up

9.9.1 Electricity (Amendment) Act, 2007

The Electricity (Amendment) Act, 2007 amending certain provisions of the Electricity Act, 2003 has been enacted on 29th May, 2007 and brought into force w.e.f.15th June, 2007. The main features of the Electricity (Amendment) Act, 2007 are:-

Ø Central Government jointly with State Government to endeavour to provide access for electricity to all areas including villages and hamlets through rural electricity infrastructure and electrification of households.

Ø No licence required for sale from captive units.

Ø Deletion of the provision for “Elimination” of cross subsidies. The provision for reduction of cross subsidies would continue.

Ø Definition of theft expanded to cover use of tampered meters and use for unauthorised purpose. Theft made explicitly cognizable offence and non- bailable.

9.9.2 Formulation of Regulations under the Electricity Act, 2003

As per Section 177 of the Electricity Act, 2003, the Authority have been vested with the powers to make regulations. Following regulations have been notified:

i) Installation & Operation of Meters – notified on 17.3.2006.

ii) Procedures for Transaction of Business – notified on 18.8.2006.

iii) Technical Standards for Connectivity to the Grid u/s 73 (b) of the Electricity Act, 2003 – notified on 21.02.07.

iv) Furnishing of Statistics, Returns & Informations. Notified on10.04.2007

Following regulations are under finalization after following procedure of previous publication:

i) Grid Standards for Operation & Maintenance of Transmission Lines u/s 34 of the Electricity Act, 2003.

ii) Technical Standards for Construction of Electrical Plants and Electric Lines u/s 73(b) of the Electricity Act, 2003.

iii) Suitable Measures relating to Safety & Electricity Supply u/s 53 of the Electricity Act, 2003.

iv) Amendment proposed in CEA Regulations on Installation and Operations of Meters” u/s 55(1) and 73(e) of the Electricity Act, 2003.

v) Safety Requirements for Construction, Operation & Maintenance of Electrical plants & Electric lines. u/s 73 (c) of the Electricity Act, 2003.

9.10 Restructuring of State Electricity Boards/Electricity Departments/Power Departments

All the States have signed MoU/ MoA with MoP for unbundling/ corporatisation of State Electricity Boards (SEBs)/ Power Deptts./ Electricity Departments. So far, out of 21 States in which all matters relating to generation, transmission and distribution of electricity were managed by respective SEBs, 13 States have reorganized their SEBs viz. Andhra Pradesh, Assam, Delhi, Gujarat, Haryana, Karnataka, Madhya Pradesh, Maharashtra, Orissa, Rajasthan, Uttar Pradesh, Uttrakhand, and West Bengal.

Individual States are approaching the Central Government from time to time seeking extension of time for reorganization of their State Electricity Boards. As per the Electricity Act, 2003, the period of extension of continuing the SEBs is to be decided mutually by the State Government and

Page 109: Annual Report 07 08

Central electricity authority Annual Report 2007-08

100 “A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

Central Government. While considering request for extension on a case by case basis, the Central Government takes into consideration the progress made in the reorganisation and then decides as to how much extension should be agreed to. The Central Government has conveyed its consent to the following States for extension of time for reorganizing the SEBs:-

S. No.

Name of State Extension accorded upto

1. Bihar 30.04.20082. Chhattisgarh 30.04.20083. Himachal Pradesh 31.03.20084. Jharkhand 31.03.20085. Kerala 09.06.20086. Meghalaya 31.03.20087. Punjab 31.05.20088. Tamil Nadu 09.06.2008

Besides the above, in eight States, viz. Arunachal Pradesh, Goa, J&K, Manipur, Mizoram, Nagaland, Sikkim, and Tripura, all matters relating to generation, transmission and distribution of electricity are managed by the respective Power Departments/ Energy Department. The Electricity Act, 2003 is silent about State Power Departments. However, the State of Tripura has created Tripura State Electricity Corporation Limited (TSECL) as a single corporation to look after generation, transmission, distribution, trading & SLDC operations.

In addition, there are six Union Territories viz. Andaman & Nicobar Island, Chandigarh, Dadra & Nagar Haveli, Daman & Diu, Lakshadweep and Puducherry, each with its own Power Department.

9.11 Analysis of Tariff Orders

Tariff orders received from State Electricity Regulatory Commissions (SERCs) of the States of Karnataka for the Financial Year 2007-08,

Maharashtra for the Financial Year 2006-07, Himachal Pradesh for the Financial Year 2007-08 and Bihar for the Financial Year 2006-07 were analyzed. The issues like Transmission & Distribution losses, Annual Revenue Requirements, Power Purchase Cost, Employee Cost, Repair & Maintenance Expenses, Administrative & General Expenses, Average Rate of Electricity and Revenue Gap etc. have been analyzed during the period under report.

Tariff analysis notes for the Financial Year 2006-07 for Uttrakhand and Jammu & Kashmir for the Financial Year 2007-08 were under preparation.

9.12 Appointment of Primary consultant for Jharkhand State Electricity Regulatory Commission

To assist the Jharkhand State Electricity Regulatory Commission for privatization of power in the city of Ranchi, CEA has taken up the task of Review Consultant to the State Commission.

9.13 Distribution Franchise

With a view to develop a model RfP and DF Agreement, a study of distribution franchise arrangement of Maharashtra State Electricity Distribution Company (MSEDCL) is under process.

9.14 Analysis of Electricity Wholesale Price Index (WPI) vis-a-vis other Commodities

Earlier, CEA had conducted a study on Electricity WPI viz-à-viz different consumer categories for the period 1982-2004. The study was sent to MoP in August, 2006. Later on, MoP desired that WPI Data should be obtained from the Ministry of Commerce since 1960 and a comparative study of WPI of Electricity be made with WPI of other commodities. The WPI historical data could only be obtained from 1968-69 from source. As such,

Page 110: Annual Report 07 08

101

Central electricity authority Annual Report 2007-08

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

the period of this study is restricted from the financial year 1968-69 to 2005-06.

In this analysis, an attempt has been made to compare the movement in composite electricity price index with WPI for different electricity consumer categories such as Domestic Consumers, Agriculture Consumers; Industrial Consumers, Commercial Consumers etc. Comparative Analysis of Electricity (Composite) (WPI) from 1968-69 to 2005-06 (Converted Series with Base year 1993-94=100) has been done at 5 years intervals.

Further, the study compares Electricity (Composite) Wholesale Prices with Kerosene Oil, Petrol, Food Articles, Edible Oil, Sugar, Diesel and Non-Coking Coal. Final report is almost ready for circulation to all concerned.

9.15 Task Force on Measures for operationalization of Open Access

The Planning Commission has set up a Task Force on Measures for operationalization of Open Access in the Power Sector. Chairperson, CEA is a Member of the Task Force. The Economic & Commercial Wing has been coordinating work for the Task Force at the level of CEA.

9.16CertificationofCapitalGoods

BOQ of various electromechanical equipment for generating units, associated auxiliaries, equipment for transmission lines etc. for 6 nos. of micro, mini & small HE schemes (shown below), received for the purpose of certification for capital goods were examined and commented upon.

S l . No.

Project Installed Capacity (MW)

1 Sarbari Mini HEP 2 x 2.5 2 Hulla Halla Mini HEP 3 x 4 3 Samavathi Mini HEP 2 x 3 4 Bhadra L.Bank Canal

Mini HEP 1 x 1.5

5 Gugal Small HEP 4 x 2.5 6 Kotli Behel Stg. IA HEP 3 x 6

9.17 Constitution of Electricity Regulatory Commissions (ERCs)

All the States except Arunachal Pradesh & Nagaland have constituted/notified their respective State Electricity Regulatory Commission (SERC). The States of Manipur & Mizoram have constituted a Joint ERC. All the SERCs except the SERC of Sikkim & Goa are functional.

A separate Joint Electricity Regulatory Commission (JERC) has been notified by the Central Government for Union Territories namely Andaman & Nicobar Island, Chandigarh, Dadra & Nagar Haveli, Daman & Diu, Lakshadweep and Puducherry. It is yet to be functional. On the request of Government of Goa, it has been decided to include the State in JERC for UTs. The nomenclature of JERC for UTs is being changed to include Goa also. However till then SERC of Goa will remain non-functional. Status of Reforms and Restructuring in Power Sector is given at Annexure9E.

9.18 Assistance to Ministry of Power

l Material supplied for updation of booklet titled “INDIAN POWER SECTOR –Challenges & Investment Opportunities.”

l Material supplied regarding Higher investments for GCC countries – Report by Citigroup.

l Material supplied regarding Task Force on connectivity and promotion of Trade & Investment in North East.

l Material supplied regarding Questionnaire from “The Economic Times” for interview of Hon’ble Minister of Power.

l Material supplied regarding Paper on Strategies for growth of Power Sector, Surya Foundation, New Delhi.

l Material supplied regarding “India 2008” Reference Annual.

Page 111: Annual Report 07 08

Central electricity authority Annual Report 2007-08

102 “It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

l Material supplied regarding use of DG Sets without permission and permission for purchase of power from any source by the industries.

l Material supplied for DG (Media & Communication) PIB on an article featured on the 60th Anniversary of the Independence, 2007.

l Material supplied for India Energy Summit, 2007.

l Material supplied regarding PMO reference regarding letter form Shri Gopichand P. Hinduja about power sector issues.

l Material supplied regarding “comments on Cabinet notes received from Ministry of Labour and Employment – Amendment of Labour Laws.”

l Material supplied regarding “Action points of the 19th meeting of Eastern Zone Council held in Ranchi on 30th May, 2005 – Progress for the quarter ending 30th June, 2007”.

l Material supplied for “Updating copy Panels Information Folder of India International Trade Fair.”

l Material supplied for 20th World Energy Congress held in Rome, Italy during 11th to 17th November, 2007.

l Material supplied regarding “Measures to improve performance of Power Sector.”

l Material supplied regarding Economic Survey 2007-08.

l Material supplied for “Address by Hon’ble President of India to both Houses of Parliament”.

l Material supplied for inclusion in the Finance Minister’s speech for Budget 2008-09.

l Material supplied regarding Recommendations of the Investment Commission contained in

its Second Report (December, 2007) titled “Thrust Areas.”

9.18.1 Legal Assistance/Advice to Utilities

l Advice rendered to M/s Chamundeshwari, Electricity Supply Corporation Ltd., Mysore (CESCLM) regarding motivation of the field officers to detect theft of electricity.

l Advice rendered to Shri K.L Gugnani SE (Retd.) DVB, seeking opinion on payments to be made to the licensee for releasing connection on 11 KV.

l Advice rendered to WBSEB regarding congnizance u/s 151 of the Electricity Act, 2003.

l Material supplied for Eighth Meeting of Central Advisory Committeee.

l Material supplied for discussion on Review of quantum of Power Procurement from Renewable Sources by Karnataka Electricity Regulatory Commission (KERC).

l Material supplied regarding Indian Energy Summit -2007 – Energy for sustainable competitiveness.

9.19 Court Cases

Following court cases were dealt with:-

Ø Writ Petition (Civil) 79/2005 filed in Supreme Court of India regarding Pollution by Thermal Power Plant.

Ø Writ Petition (Civil) 328 of 1999 filed in Supreme Court of India regarding Power Crisis in NCT of Delhi.

Ø IA No.12712 of 2007 and OP No. 25822 of 2007 by Shri K.S.R.Nair vs. KSEB, Govt. of Kerala and others in Kerala High Court.

Ø Writ Petition No. 27650 of 2003 filed by MPSEB in the Jabalpur High Court against Central Electricity Authority (CEA) and others.

Page 112: Annual Report 07 08

103

Central electricity authority Annual Report 2007-08

“The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

Ø Maharashtra Electrici ty Regulatory Commission (MERC) Case No. 70/2000- Tata Power Company Ltd. vs. Reliance Energy Ltd. in Appellate Tribunal. Now shifted to Supreme Court.

Ø Appeal No. 49 & 50 of 2006 filed in Appellate Tribunal for Electricity UP Power Corporation Ltd., Lucknow vs. Union of India.

Ø Writ Petition No. 495/06-M/s Eastern Energy and Mines (India) Pvt. Ltd. vs. State of Jharkhand and others.

Ø MCC No. 1415/2006 arising out of Writ Petition No. 13041/2005 (S) filed by MPSEB Takniki Karamchari Sangh Birsinghpur Zone vs. MPSEB and others for restoration of Writ Petition.

Ø CWJC 5627/06 filed by Shri Mahendra Prasad Gupta, Advocate vs. Union of India and others in the Hon’ble Patna High Court.

Ø Miscellaneous Petition (MP) No. 1/2006 in Writ Petition No. 9720/2006 in Madurai Bench of Madras High Court Shri K. Muthuswamy vs. CEA & PGCIL.

Ø WP No.1912 of 2004 between MPSEB vs. NTPC and others in Jabalpur High Court.

Ø WP No.1241/2002 between MPSEB vs. State of Orissa and others.

Ø WP No.12614/2006 by Shri P.R.Rajak & others vs. State of M.P., MPSEB and others in Jabalpur High Court.

Ø Misc. Petition (MD) No.1177 of 2007 Shri V.Gunasakharan vs. CEA & PGCIL in Madurai Bench of Madras High Court.

Ø Misc. WP No.10265 of 2005 by Evangalical Church of India vs. TNEB & others in Chennai High Court.

Ø WP (C) 40/2005 by Shri N.B. Bhandari vs. UoI, CEA and others in Sikkim High Court.

Ø WP (C) No.3248 of 2007 by Northern Power Erectors Ltd. vs. UoI, CEA & others at Delhi High Court.

9.20 Re-organization of States – Redressal of Grievances of Employees

Consequent upon reorganization of erstwhile States of Bihar, Madhya Pradesh and Uttar Pradesh to Bihar & Jharkhand, MP & Chhattisgarh, and Uttar Praseh & Uttaranchal (renamed Uttarakhand) respectively, the issue of distribution of employees of the State Electricity Boards of the erstwhile States and their grievances are to be examined and decided by Chairperson, CEA as an Appellate Authority in accordance with the Central Government Order. Several representations have been received from employees of Bihar/Jharkhand and MP/ Chhattisgarh and are under examination for recommendation to concerned States. Five (5) cases have already been disposed off.

Page 113: Annual Report 07 08

Central electricity authority Annual Report 2007-08

104 “Honesty is the first chapter in the book of wisdom.”

10.1 Power Generation

Generation of power in the utilities stood at about 704451 million units during the Year

CHAPTER – 10POWER GENERATION

2007-08 ( from April,07 to March, 08). This represents the growth of 6.3% over the same period during previous year 2006-07 as per details given below:

Power Generation during 2007-08

Category Programme(MU)

Actual(Tentative)

(MU)

Shortfall(-) /Excess (+)

(MU)

% of Programme

% of last year (2006-07)

Generation

Hydro 109450 123570 (+)14120 112.9 9.0

Nuclear 22713 16776 (-)5937 73.9 -9.8

Thermal 572194 558815 (-)13379 97.8 5.9

Bhutan Import 5643 5290 (-)353 93.8 75.8

Total All India 710000 704451 (-)5549 99.2 6.3

It is seen from above table that during the year, Hydro generation exceeded the targets by 14120 MU, however Thermal generation & Nuclear generation was less than the target by 13379 MU & 5937 MU respectively. The main reasons observed for low power generation are as follows:

l Low generation in Nuclear Plants due to the fuel constraints.

l Shortage of gas for operation of the existing gas based stations.

l Non-availability of gas for new units at Gautami and Konaseema CCPP in Andhra Pradesh with aggregate capacity of 909 MW resulting in delay of commissioning of units.

l Delay in the commencement of generation from some of the newly commissioned units due to non-completion of balance of plant works.

The sector wise PLF/Generation during 2007-08 is given below:

SECTOR PLF (%) TARGET (MU) ACTUAL (MU)

CENTRAL SECTOR

THERMAL 86.7 237449 240363

NUCLEAR 46.4 22713 16776

HYDRO Not Applicable 39790 41810

TOTAL - 299952 298949

Page 114: Annual Report 07 08

105

Central electricity authority Annual Report 2007-08

“Ambition should be made of sterner stuff.”

STATE SECTOR

THERMAL 71.9 277604 261781

HYDRO - 64299 76271

TOTAL - 341903 338052

PVT SECTOR UTILITIES

THERMAL 90.8 25436 26415

HYDRO - 1646 1622

TOTAL - 27082 28037

PVT SECTOR IPPs

THERMAL - 31705* 30256.

HYDRO - 3715 3867

TOTAL - 35420 34123

BHUTAN IMPORT

HYDRO - 5643 5290

10.2 Plant Load Factor of Thermal Power Stations

During the year 2007-08, the average PLF of thermal and nuclear power plants was 78.6%

and 46.4% respectively. 46 thermal stations achieved PLF higher than the All-India average PLF of 78.6% as per details given in the table below:

List of Thermal Power Stations which has achieved PLF above national average of 78.6% during the year 2007-08

Sl.No. Name of Stations State Sector

InstalledCapacity

(MW)

PLF (%)

1 TORRENT POWER SABARMATI GUJARAT Private 330.0 101.4

2 DAHANU MAHARASHTRA Private 500.0 101.2

3 BUDGE BUDGE WEST BENGAL Private 500.0 100.4

4 DADRI (NCTPP) UTTAR PRADESH Central 840.0 98.1

5 UNCHAHAR UTTAR PRADESH Central 1050.0 97.7

6 KORBA STPS CHHATTISGARH Central 2100.0 96.1

7 RIHAND STPS UTTAR PRADESH Central 2000.0 95.5

8 GHTP (LEH.MOH.) PUNJAB State 420.0 95.1

9 SOUTHERN REPLACEMENT. WEST BENGAL Private 135.0 95.1

(*Includes import from some of the Captive Plants)

Page 115: Annual Report 07 08

Central electricity authority Annual Report 2007-08

106 “The one exclusive sign of thorough knowledge is the power of teaching.”

10 TALCHER STPS ORISSA Central 3000.0 94.0

11 SURATGARH RAJASTHAN State 1250.0 93.0

12 VINDHYACHAL STPS MADHYA PRADESH Central 3260.0 92.6

13 TITAGARH WEST BENGAL Private 240.0 92.1

14 TORR POWER AECO. GUJARAT Private 60.0 92.1

15 KOTA RAJASTHAN State 1045.0 91.8

16 TANDA UTTAR PRADESH Central 440.0 91.8

17 BAKRESWAR WEST BENGAL State 840.0 91.7

18 SINGRAULI STPS UTTAR PRADESH Central 2000.0 91.7

19 RAMAGUNDEM - B ANDHRA PRADESH State 62.5 91.5

20 METTUR TAMIL NADU State 840.0 90.8

21 KOTHAGUDEM NEW ANDHRA PRADESH State 500.0 90.2

22 RAMAGUNDEM STPS ANDHRA PRADESH Central 2600.0 90.2

23 SIMHADRI ANDHRA PRADESH Central 1000.0 88.6

24 ROPAR PUNJAB State 1260.0 88.6

25 NEYVELI FST EXT TAMIL NADU Central 420.0 88.3

26 Dr. N.TATA RAO ANDHRA PRADESH State 1260.0 88.0

27 KORBA-II CHHATTISGARH State 200.0 87.3

28 TUTICORIN TAMIL NADU State 1050.0 86.5

29 TROMBAY MAHARASHTRA Private 1150.0 85.9

30 KHAPARKHEDA II MAHARASHTRA State 840.0 85.3

31 WANAKBORI GUJARAT State 1470.0 85.2

32 BADARPUR DELHI Central 720.0 84.7

33 TALCHER ORISSA Central 470.0 84.5

34 NORTH CHENNAI TAMIL NADU State 630.0 84.2

35 RAICHUR KARNATAKA State 1470.0 84.2

36 KOTHAGUDEM ANDHRA PRADESH State 680.0 83.9

37 FARAKKA STPS WEST BENGAL Central 1600.0 83.6

38 RAYALASEEMA ANDHRA PRADESH State 840.0 83.2

39 PANIPAT HARYANA State 1360.0 82.6

40 KORBA-WEST CHHATTISGARH State 840.0 82.5

41 IB VALLEY ORISSA State 420.0 82.2

42 NASIK MAHARASHTRA State 880.0 81.6

43 NEYVELI ST II TAMIL NADU Central 1470.0 81.5

44 MEJIA WEST BENGAL Central 1340.0 80.6

45 ANPARA UTTAR PRADESH State 1630.0 80.2

46 KORBA-III CHHATTISGARH State 240.0 79.4

Page 116: Annual Report 07 08

107

Central electricity authority Annual Report 2007-08

“Children are our most valuable natural resource.”

It may be seen from the above table that 22 thermal power stations had the distinction of achieving PLF above 90%.

All-India Sector-wise/Organization-wise

PLF, Thermal Generation, Target & Actual is given in the Annexure -10A.

The trend in All India PLF from 1990-91 onwards is given below:

10.3 Generating Capacity Addition

Capacity addition during the last 6 years is given below:-

Year Central Sector State Sector Private Sector Total

2000-01 659.00 2297.00 819.66 3775.66

2001-02 905.00 1393.95 816.30 3115.25

2002-03 1210.00 11141.30 655.30 2979.40

2003-04 3035.00 818.62 232.00 4085.62

2004-05 2710.00 1168.92 70.00 3948.92

2005-06 1320.00 1363.00 785.8 3468.80

2006-07 3890.00 1671.00 1291.80 6852.80

2007-08 3240.00 2898.04 4593.76 10731.80

Page 117: Annual Report 07 08

Central electricity authority Annual Report 2007-08

108 “The farther backward you can look, the farther forward you are likely to see.”

10.4 Installed Electricity Generation Capacity

The All India aggregate ins ta l led capacity of electric power generating stations under various utilities as on 31.3.2008 was 143061.01 MW comprising 35908.76 MW of hydro, 91906.84 MW of thermal, 4120.00 MW of nuclear and 11125.41 MW Renewable

Sector-wise generating capacity addition during 2007-08 is also shown in the chart as follows:

Energy Sources (RES). The percentage share of hydro, thermal, nuclear and RES stood at 25.10%, 64.24%, 2.88%, and 7.78% respectively of the total installed capacity. The aggregate installed capacity of Central Sector power stations was 48360.99 MW, State Sector 74689.36 MW and Private Sector 20010.66 MW. The sector-wise details are as follows:

Type

(MW)

Central Sector

(MW)

State Sector

(MW)

Private Sector

(MW)

Total

(MW)

Hydro 8592.00 26086.76 1230.00 35908.76

Thermal 35648.99 46486.33 9771.52 91906.84

Nuclear 4120.00 0.00 0.00 4120.00

Res 0.00 2116.27 9009.14 11125.41

Total 48360.99 70224.48 74689.36 143061.01

Page 118: Annual Report 07 08

109

Central electricity authority Annual Report 2007-08

“Failing to plan is planning to fail.”

State-wise/ Region-wise/ Sector-wise and prime mover wise summary of installed capacity under utilities is given in Annexure

(Capacity in MW)

Year (at the end of)

Thermal Nuclear Hydro Wind* Total

Dec.1947 854 - 508 - 1362

Dec.,1955 1755 - 940 - 2695

March, 1961 2736 - 1917 - 4653

March, 1966 4903 - 4124 - 9027

March, 1974 9058 640 6966 - 16664

March, 1980 16424 640 11384 - 28448

March, 1985 27030 1095 14460 - 42585

March, 1990 43764 1565 18307 - 63636

March, 1991 45768 1565 18753 - 66086

March, 1992 48086 1785 19194 - 69065

March, 1996 60083 2225 20986 - 83294

March, 1997 61012 2225 21658 900 85795

March, 1998 64005 2225 21904 968 89102

March, 1999 67566 2225 22479 1024 93294

March, 2000 70193 2680 23857 1155 97885

March, 2001 72343 2860 25153 1270 101626

March, 2002 74429 2720 26269 1628 105046

March, 2003 76762 2720 26767 1628 107877

March, 2004 77969 2720 29507 2488 112684

March, 2005 80902 2770 30942 3812 118426

March, 2006 82410 3360 32326 6191 124287

March, 2007 86015 3900 34654 7760 132329

March, 2008 91907 4120 35909 11125 143061

*R.E.S: Renewable Energy Sources – for details see Annexure 10B

-10B. The growth of installed generating capacity (reconciled) in the country is shown in the table as follows:-

Page 119: Annual Report 07 08

Central electricity authority Annual Report 2007-08

110 “Let our advance worrying become advance thinking and planning.”

11.1 Hydroelectric Potential in N.E. Region

As per Re-assessment Studies carried out by CEA, hydro potential of the North Eastern Region in terms of installed capacity has been estimated

CHAPTER – 11 POWER DEVELOPMENT IN NORTH-EASTERN REGION

as 58971 MW. Out of the above, 1202.7 MW have been harnessed so far while projects amounting to 2724 MW is under construction. The State-wise estimated hydro-electric potential of North-Eastern Region and its status of development is given below:

Region / State Identifiedpotentialas per Re-assessment

Study (MW)

Capacity Developed (Above 3 MW Capacity)

(MW)

Capacity Under Construction

(Above 25 MW Capacity) (MW)

Meghalaya 2394 185.2 124Tripura 15 15 0Manipur 1784 105 0Assam 680 375 0Nagaland 1574 99 0Arunachal Pradesh 50328 423.5 2600Mizoram 2196 0 0Total 58971 1202.7 2724

11.2 Survey & Investigation of Hydro Projects

The Government has also approved a Three Stage Clearance procedure for hydro projects to be executed by CPSUs in consultation with MoF and MoEF. Under Stage-I, the CPSUs will incur expenditure on survey & investigation and preparation of pre-feasibility report. Under Stage-II, the CPSUs will undertake activities relating to detailed investigation and preparation of Detailed Project Report. During this Stage, pre-construction activities and infrastructure development including land acquisition will also be undertaken. Under Stage-III, approval of PIB/CCEA would be sought for investment decision in respect of construction of the projects.

11.3 Preparation of DPRs under 50,000 MW Hydro Initiative

Out of 62 (30416 MW) schemes for which PFRs have been prepared in North Eastern Region, 25 schemes (22382 MW) whose first year tariff works out below Rs. 2.50/kWh have been considered as low tariff H.E. schemes and have been selected for taking up of detailed survey & investigation and preparation of DPR / implementation. Out of these, DPR of 4 nos schemes namely Talong (160MW), Dibbin (125MW), Badao (60MW) and Mawhu (90 MW) have already been prepared. The details of other schemes under Survey and Investigations are enclosed at Annexure-11A.

Page 120: Annual Report 07 08

111

Central electricity authority Annual Report 2007-08

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

11.4 Mega Hydro Electric Projects planned in North-Eastern Region

The Region presents very attractive sites for providing large storage with multi-purpose aspects of development. Four major developments are under various stages viz., Siang Basin projects (13,600 MW), Subansiri Basin projects (5600 MW), Dibang (3,000 MW) in Arunachal Pradesh and Tipaimukh (1,500 MW) in Manipur.

11.4.1 Siang basin projects – Arunachal Pradesh

Due to large submergence and displacement of population, the original project locations, 4 km upstream of Rotung village in Arunachal border was modified into three separate schemes. The three schemes envisage total capacity of 13600 MW in three power houses. Brief details of these three schemes are as under:

Sl No.

N a m e o f t h e scheme

Location (Distt./Village.)

Capacity(MW)

Present Status

1 S i a n g U p p e r /Intermediate H.E ProjetU p s t r e a m o f Yingk iong nea r Pugging village on Siang River

E a s t S i a n g /Pugging

11,000 Cost Estimates of NHPC for St-I activities cleared by CEA on 14.03.2001. Project is yet to be taken up for investigation.

2 Siang Middle H.E. Project15 km upstream of Raying near Roing village on the Siyom River which is a tributary of Siyom River

West Siang / Roing 1000 Cost estimates of St-II activities cleared by CEA on 21.02.2003. DPR of the project submitted by NHPC in Sept., 2003 and returned by CEA in September, 2003 due to non-tie up of essential inputs. However, examination of technical aspects was continued in CEA / CWC. Clearance of TAC of MOWR was required before accord of concurrence by CEA. Environmental clearance accorded by MOEF on 11.02005. meanwhile, State govt. allocated the project for execution to IPP and MoA on BOOT basis has been signed on 22.02.2006 between Reliance Energy Ltd. And Govt. of Arunachal Pradesh.

3. Siang Lower H.E. ProjectU p s t r e a m o f P a s i g h a t n e a r Routung village

Near Pasighat / Routung

1600 Commercial viability of the project of NHPC accorded by CEA on 25.03.2004. Site clearance (Stage-II) accorded by MoEF on 18.08.2004 State govt. has allocated the project for execution to IPP and MoA on BOOT basis has been signed on 22.02.2006 between JP Associate Ltd. And Govt. of Arunachal Pradesh.Further in pursuant to Tripartite Agreement signed on 13.12.2007, all respects of obligation transferred to Jaipraksash Power Ventures Limited.

Page 121: Annual Report 07 08

Central electricity authority Annual Report 2007-08

112 “A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

11.4.2 Subansiri basin Projects - Arunachal Pradesh

The original project has been modified into three separate schemes owing to submergence of important town “Daporijo” of Arunachal Pradesh. To avoid submergence of Daporijo town Govt. of Arunachal Pradesh accorded approval for

development of three separate projects in place of earlier single project proposal which would cause less of submergence, displacement of people and damage to the environment. Original proposal is modified into three separate schemes. The three separate schemes envisage total capacity of 5600 MW and are as under:

Sl. No.

Name of Scheme Location (District/Village)

Capacity(MW)

Present status

1. Subansiri Upper H.E. Project.Upstream of Daporijo near Mengal village on Subansiri River.

Upper Subansiri / Menga

2,000 Cost estimates of NHPC for St-II activities cleared by CEA on 07.02.2003. Proposal for site clearance (Stage-II) rejected by MoE&F on the basis of recommendation of Indian Board of Wild Life (IBWL) in case of Subansiri Lower Project. The standing committee of IBWL recommended the construction of Subansiri Lower Project with condition that there would be no construction of dam upstream of Subansiri river in future. The same condition has also been reaffirmed by Hon’ble Supreme Court in its order dt. 21.04.2004. the matter has been taken up by NHPC with MoE&F to reconsider the decision. DPR is yet tot be submitted to CEA for concurrence.

2. Subansiri Middle H.E. Project

Upstream of Tamen village on Kamla river which is tributary of Subansiri river

Lower Subansiri / Tamen

1600 Cost estimates of NHPC for St-II activities cleared by CEA on 04.02.2003. proposal for site clearance (Stage-II) rejected by MoE&F on the basis of recommendation of IBWL in case of Subansiri Lower Project. The standing committee of IBWL recommended the construction of Subansiri Lower Project with condition that there would be no construction of dam upstream of Subansiri river in future. The same condition has also been reaffirmed by Hon’ble Supreme Court in its order dt. 21.04.2004. the matter has been taken up by NHPC with MoE&F to reconsider the decision. DPR is yet to be submitted to CEA for concurrent.

3. Subansir i Lower H.E. Project

Gerukamukh village near original site on Subansiri River

Lower Subansiri / Gerukamukh

2000 The project has been approved by CCEA on 09.09.2003 & is under construction by NHPC. The project is likely to be commissioned by 2011-12.

Page 122: Annual Report 07 08

113

Central electricity authority Annual Report 2007-08

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

11.4.3 Tipaimukh Dam project (6x250= 1500 MW) – Manipur

Tipaimukh Dam Project is a multipurpose project involving hydro power generation, flood control and irrigation. The Scheme envisages construction of a dam across the river Barak immediately downstream of the confluence of the Tuivai River. The scheme would have an installed capacity of 6x250 MW. The project has been entrusted to M/s NEEPCO.

The project was techno-economically appraised by CEA in meeting held on 09.01.2003. Formal TEC was accorded to the project vide CEA letter dated 2-7-2003 at an estimated cost of Rs.5163.86 crores at December, 2002 price level including IDC of Rs.757.26 crores. Part estimate of Rs. 9.52 crores for undertaking some works on priority under Stage-II activities of the project was recommended by CEA on 2-4-2004.

Revised Cost Estimates of the project was cleared by CEA for an amount of Rs. 6701.97 crores including IDC of Rs. 816.40 crores at December, 2004 price level on 6-5-2005.

PIB meetings were held on 25-10-2005 and 31.01.2006. As per decision taken in PIB meeting held on 31.01.2006, the project was recommended for placement before CCEA for consideration, subject to the following observations: Ø Costs relating to flood moderation, diversion

of National Highways and external security may be borne by the concerned administrative departments. The costs should be updated and availability of funds confirmed in the Note for CCEA.

Ø Ministry of Power may take up the issue of high NPV cost with the Ministry of Environment and Forest and reflect the outcome in the Note for CCEA.

Ø Ministry of Power may persuade the State Governments of Mizoram and Manipur to reduce their share of free power from the project.

Ø Project costs may be updated to December 2005 prices.

Ø Ministry of Power would obtain Environment and Forest clearance before submitting the proposal for consideration of CCEA.

Ø Risks relating to law and order and R&R to be explained clearly in the CCEA Note, along with strategies for risk mitigation. Views of Manipur and Mizoram Governments in this regard to be brought on record.

Ø PPAs may be firmed up before the project is submitted for consideration of CCEA.

Ø Adequacy of technical investigations, including critical design parameters, may be confirmed by the project authority to avoid any future surprises.

As per PIB observations, updated revised cost estimates at November, 2005 price level was submitted by NEEPCO to CEA on 22.03.2006. CEA finalized the cost at Rs.5026.84 crores (excluding IDC, flood moderation, diversion of national highway and external security) at November, 2005 price level on 8-6-2006.

Subsequently, CEA in August, 2006 intimated NEEPCO that the IDC component on this cost would be Rs 828.99 crores thus making the total cost as Rs. 5855.83 crores. This cost did not include the cost of flood moderation, diversion of National highway and external security.

In a meeting taken by Secretary (Power) on 26.2.2008 in MoP, NEEPCO indicated that MoWR have conveyed approval for meeting cost of flood component on 15.12.2005. Ministry of Shipping, Road Transport and Highways conveyed their ‘In principle approval’ to meet cost of NH diversion on 14.9.2006. MHA conveyed ‘In principle approval’ on 28.9.2006 for cost of providing external security with the mention that decision regarding this would be required to be taken by CCEA.

Page 123: Annual Report 07 08

Central electricity authority Annual Report 2007-08

114 “It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

The project is yet to be accorded environment and forest clearance by MoEF. Two PILs (17/2006 & 19/2006) were filed in Imphal Bench of Guwahati High Court against the public hearing meeting held in Manipur earlier on 17.11.06 and 22.11.06. Public hearing was held on 26.3.2008 in Temenglong district. The case for forest clearance have been referred to State Govts of Manipur and Mizoram in April, 2006.

11.4.4 Dibang Multipurpose Project-(12x250 = 3000MW) – Arunachal Pradesh

Dibang Multipurpose Project located on Dibang River in Lower Dibang Valley district of Arunachal Pradesh has been conceived to provide flood moderation benefits to the downstream areas of the project besides power generation. The scheme would have installed capacity of 12x250=3000 MW.

The DPR of the project submitted by NHPC in December, 2005 was returned by CEA on 13.04.2006 due to non tie up of essential inputs/clearance. Also, the project required clearance from flood moderation aspects from CWC before being considered by CEA for concurrence.

In a meeting between Hon’ble Chief Minister of Arunachal Pradesh and Hon’ble Minister of Power held in July, 2006, it was decided that this project is to be executed through a joint venture between NHPC and Govt. of Arunachal Pradesh. MOU for execution of project as a joint venture signed between NHPC and Govt. of Arunachal Pradesh on 21.09.2006. Later, a MoA was signed on 24th June, 2007 between Govt. of Arunachal Pradesh and NHPC for execution of the project by NHPC on ownership basis without any equity participation by the State Govt.

Thereafter, appraisal of DPR was revived and CEA accorded concurrence to the project on 23.1.2008. The estimated present day cost of the project at Nov., 2007 Price level including IDC

and FC without provision for external roads and bridges is Rs.15886.39 crores and with external roads and bridges is Rs.16425.65 crores.

The project was considered at PIB meeting held on 28.1.2008 which have recommended the proposal for consideration of CCEA for Rs. 15886.39 crores without provision of cost component for external roads and bridges.

11.5 Eleventh Plan Hydro Projects

Seven hydro power stations with installed capacity of 4533 MW have been identified in 11th Plan as per details given in Annexure-11B.

11.6 Status of Various Hydro Power Projects in North-Eastern Region

11.6.1 Central Sector Projects

(A) Sanctioned Projects

(i) Tuirial HEP (2x30 = 60 MW), Mizoram, NEEPCO: The project was approved in July, 1998 at an estimated cost of Rs.368.72 crores with likely completion by 2006-07. This project was under execution with loan assistance from JBIC and presently under hold due to poor law & order conditions and intensive agitation by claimants of Crop Compensation. Continuation or otherwise of the project is being reviewed due to increase in the project cost to about Rs.686.95 crore making the power tariff very high. The resumption of work is dependent upon viability of the project, which is under consideration of the Govt. The project cost is financed substantially under loan assistance of 11695 Million Japanese Yen from Japan Bank of International Co-operation (JBIC).

(ii) Kameng HEP (4x150 = 600 MW), Arunachal Pradesh, NEEPCO: The project was approved in December, 2004 for an estimated cost of Rs.2496.90 crores (at March, 2004

Page 124: Annual Report 07 08

115

Central electricity authority Annual Report 2007-08

“The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

price level) with completion in 5 years. Now, the revised commissioning schedule is December, 2010 to March, 2011 at an interval of one month each. Bichom dam work could not proceed for want of revised drawings consequent to lowering of spillway crest level. Dam excavation is likely to resume from April, 2008. Excavation of Power House under hold for want of completion of piling works which is likely to re-commence from April, 2008 and HRT is under progress. An expenditure of Rs.651.15 crores has been incurred up to January, 2008. CEA officer visited the project site in Nov. 2007 and advised NEEPCO that HRT works in Face-II & Bichom Dam works are critical & needs extra efforts by NEEPCO and the contractors.

(iii) Loktak Down Stream (66 MW), Manipur, NHPC: The project is now proposed to be executed by a Joint Venture between NHPC and Government of Manipur with revised capacity of 66 MW. CEA accorded TEC on 15.11.2006 to the revised proposal. Govt. approval awaited.

(iv) Teesta-V HEP (3x170 = 510 MW), Sikkim, NHPC: The project was approved in February, 2000 at a cost of Rs.2198.04 crores, to be executed by NHPC with completion in February, 2007. All the three units have been commissioned on 28.03.2008, 06.02.2008 and 20.03.2008 respectively. Two units have been declared commercial on 25.02.08 & 31.03.08 respectively.

(v) Subansiri Lower (8x250 = 2000 MW), Arunachal Pradesh, NHPC: Project was approved in September, 2003 for Rs.6285.33 crores to be executed by NHPC and is scheduled for completion by September, 2010. Major civil, E&M and Hydro-Mechanical works have been awarded. River diversion achieved on 25.12.2007. Civil works of Head Race Tunnel, Pressure shaft,

surge chamber and power house are is in progress. MoU with State Government is yet to be signed. The project is now likely to be commissioned by January, 2012. Work progress suffered recently due to Power House back hill slope failure & consequent disruption of access to Dam & Intake. A four member expert Committee comprising of Shri R. Jeysheelan, Ex-Chairman, CWC, Shri B.M. Hukku, Ex-Dy. Director General, GSI, Dr. K. Venkatachalam, Ex-Director, Shri Ashok Kumar, Chief Engineer (HPM), CEA, has been constituted on 04.03.2008 for examining the hill slope failure.

(B) CEA Cleared Projects

(i) Tuvial HEP (3x70= 210 MW), Mizoram, NEEPCO

The scheme was considered in TEC meeting held on 17.11.98 and was found to be in order. The formal clearance letter was issued on 19.2.1999. The estimated completed cost was Rs. 1258.84 crores including IDC of Rs.58.89 crores and present day cost at March, 1997 price level is Rs. 964.22 crores including IDC component of Rs. 47.31 crores.

NEEPCO submitted Revised cost estimate of the project in July 2003. CEA vide its letter dated 28.05.2004 approved an amount of Rs 1122.51 crores (April, 2003 P.L) including IDC component of Rs. 15.18 crores. Design energy of 620.82 GWh has been taken corresponding to TG efficiency of 92% (instead of 87% taken at the time of TEC).

As per minutes of meeting taken by Secretary (Power) on 12.01.2006, at the request of the State govt. of Mizoram, Ministry of Power/ NEEPCO agreed to hand over the project to the State government. Besides, it was suggested that State Govt. may consider making NEEPCO a joint Venture partner. The decision of State Govt. is awaited.

Page 125: Annual Report 07 08

Central electricity authority Annual Report 2007-08

116 “Honesty is the first chapter in the book of wisdom.”

(ii) Pare HE Project (2x55=110 MW) in Arunachal Pradesh

The DPR of Pare HE Project (2x55=110 MW) submitted by NEEPCO to CEA on 26.12.2005 was returned on 13.01.2006 due to non tie up of essential inputs/clearances.

GSI made serious observations about geological investigation of project in Feb,, 2006 and keeping in view that DPR was returned to NEEPCO on 22.03.2006. It was suggested that the scheme be reviewed in light of GSI observations along with designs and cost estimates may be resubmitted for concurrence. Examination of DPR was resumed on 12-6-2007 when GSI gave clearance to the project.

Pare H.E. Project was accorded concurrence of CEA on 24th Sept. 2007 for an estimated present day cost of Rs. 553.25 crores including IDC & FC of Rs. 49.26 crores at June 2007 Price Level.

The project was considered at PIB meeting held on 28.1.2008 which recommended the proposal for consideration of CCEA.

11.6.2 State Sector Projects

(A) Sanctioned Projects

(i) Myntdu (Leshka) Stage-I (2x42 = 84 MW), Meghalaya by MeSEB: The project was accorded TEC on 20.09.1999 at an estimated cost of Rs.391.33 crores (completion cost at 01/99 PL) with the commissioning target by October, 2006. State Government accorded the Administrative approval on 09.06.2003. The Main Dam works have been awarded to M/s SEW Construction Company, Hyderabad. Works of HRT, Surge Shaft & Pressure shaft allotted to M/s Skanska Cementation (I) Ltd., Kolkata. Power House (Civil works) and tail race works awarded to M/s SEW Construction Ltd, Hyderabad in February, 2006. Excavation of Dam, and Head Race Tunnel (HRT) is in progress. Due to delay in award of works, the project

originally envisaged for commissioning in the 10th Plan has slipped to 11th Plan. An expenditure of Rs.375.32 crores have been incurred up to January, 2008.

(ii) New Umtru HEP (2x20 = 40 MW), Meghalaya, MeSEB: The project was approved by MeSEB with an estimated cost of Rs.194.3 crores and foundation stone was laid by Hon’ble Chief Minister, Meghalaya on 02.12.2007. Civil works have been awarded on 20th December, 2007.

(B) CEA cleared Projects

Bairabi Dam (2x40= 80 MW), Mizoram, by Power & Electricity Deptt, Govt. of Mizoram

The project was accorded TEC on 9.11.2000 for the cost of Rs. 441.67 crores at March, 2000 price level including IDC of Rs 11.25 crores. The completion cost was Rs. 549.43 crores. One of the conditions stipulated in TEC letter was that if time gap between TEC and actual start of work is more than 3 years or more, a fresh TEC of the project is required.

At the request of State govt., validity of TEC had been extended several times. Since, the State Govt. has not been able to find suitable partners for construction of project and the project proposal would also require updation of cost estimates, CEA did not find it appropriate to grant further extension of validity of TEC. The State Govt. was informed accordingly on 26.12.2007.

11.7 Status of Construction of Thermal Power Projects in North-Eastern Region

a) Lakwa Waste Heat Recovery Project (ST-37.2 MW), Assam

Lakwa Waste Heat Recovery Project (Steam Turbine-37.2 MW) by Assam Power Generating Company Ltd. In the Sibsagar District of Assam

Page 126: Annual Report 07 08

117

Central electricity authority Annual Report 2007-08

“Ambition should be made of sterner stuff.”

state is under construction. EPC contract was placed on M/s BHEL on 20.03.06. The piling work in the HRSG & STG areas have been completed. HRSG-II structural work and column erection started. However, the construction work has been delayed due to non-engagement of labour and Machinery by M/s BHEL. All the civil works are stopped since 11.12.2007. The works at the site are stand still for the last 4 months.

b) HFO Based DGPP at Dimapur (22.92MW) by Government of Nagaland

Heavy Fuel Oil Based Diesel Generating Power Project at Dimapur (22.92MW) by Department of Power,Govt.of Nagaland in the Kohima District of Nagaland State was taken up for execution. Turn-key order was placed on M/s BHEL by Dept. of Power, Govt. of Nagaland on 21.07.03 for execution of the project. Out of an estimated cost of Rs105.57 crores, DONER had sanctioned and released an amount of Rs.32 crores to BHEL. Presently the work is held-up for want of balance funds. During the meeting held in Ministry of Power, Government of India on 04th Dec’06, it was decided to revive the project for which Planning Commission was requested to provide funds to DONER. However, the project has been dropped from the capacity addition programme of 11th Plan.

11.8 Detailed status of New Thermal Power Projects in North-Eastern States

Projectsidentifiedforcommissioningduring 11th Plan and for which LoA is yet to be placed

A) Tripura Gas (750 MW) by Power Development Company, Joint Venture of IL&FS, ONGC and Govt. of Tripura

ONGC in joint venture with IL&FS & Govt of Tripura propose to set up (3x250 MW) combined cycle gas based power plant at Paltan in

Tripura. Gas supply agreement has been signed with ONGC in April, 05. MOE&F clearance has been received on 7.02.07. Mega status has been obtained on 07.03.06. Pre-bid conference with the bidders for main plant held on 15.09.07 and the Bids have since been opened on 21.12.07. Order for main plant is yet to be placed. The transmission system for the project is yet to be finalized.

B) Other New Projects

NEEPCO has proposed to set up three coal based thermal power projects, one in Assam & the other two in Meghalaya. They have also proposed to set up a gas based power station in Tripura. The details of new thermal power projects in North-Eastern States is given as per Annexure-11C.

11.9 Renovation & Modernisation in North-Eastern Region

11.9.1 Thermal Power Stations

In the North Eastern region, Renovation & Modernisation (R&M) works were envisaged for Bongaigaon and Namrup thermal power stations of Assam Power Generation Corporation Limited (APGCL) during the 10th Plan.

However, operation of the existing 4x60 MW units of Bongaigaon TPS (BTPS) were found to be economically unviable. Accordingly, NTPC has been assigned to set up a 3x250 MW coal based power project at the existing location of BTPS. As per notification dated 20.11.2007 of transfer scheme 2007 of BTPS by Govt. of Assam, the work of handing over of land & building and disposal of the balance assets of BTPS like plant & machines is in progress.

The R&M Phase-II scheme of Namrup TPS was started in later part of 10th Plan. The scheme mainly included the capital restoration of 23 MW GT Unit-2 which was lying idle for long. The unit was successfully commissioned in Dec.2007 and is running normally. Since 2x100 MW Namrup Replacement Power Project (NRPP) is planned up

Page 127: Annual Report 07 08

Central electricity authority Annual Report 2007-08

118 “The one exclusive sign of thorough knowledge is the power of teaching.”

at Namrup to replace the existing old units, only need based works are proposed to be carried out till commissioning of the new NRPP Project.

R&M Phase-II of Lakwa TPS (4x15 MW+3x20 MW) is under execution with part financing arranged from PFC. The scheme mainly includes procurement of capital spares for gas turbine units as well as gas compressor spares besides some other R&M works.

11.9.2 Hydro Power Stations

Eight (8) existing hydro schemes of North-Eastern Region with an aggregate installed

capacity of 494 MW have been identified for R&M works to accrue a benefit of 100 MW. The R&M activities of four schemes have already been completed at an actual expenditure of Rs. 105.68 crores to accrue a benefit of 61 MW. The remaining four schemes are under various stages of implementation and are likely to be completed during the 11th Plan to accrue a benefit of 39 MW at an estimated cost of Rs. 176 crores.

The Scheme-wise status of the R&M works of the hydro schemes of North Eastern Region (as on 31.03.2008) is given hereunder:-

S . No.

Name of Scheme, Agency, State

I n s t a l l e d Cap.(MW)

Cost ( R s . i n crores)

Benefits (MW)

Status

1. Khandong, U-1, NEEPCO, Meghalaya

1x25 0.62* 25 U-1 Restoration works completed in 1991-92

2. Gumti, TSECL, Tripura

3x5 17.50* - R&M works completed in 1994-95

3. Khandong, NEEPCO, Meghalaya

2x25 3.35* - R&M works completed in 2003-04

4. Umium St.I MeSEB, Meghalaya

4x9 84.21* 36 RM&LE works completed in 2002-03

5. Loktak, NHPC, Manipur

3x30(Derated)

19.13@ 15 R&M and Restoration works are ongoing. Likely to be completed by 2009-10

6. Umium St.II, MeSEB, Meghalaya

2x9 90.46@ 18 RM&LE works yet to commence. JBIC funding. Likely to be completed by 2011-12

7. Kopili, NEEPCO Assam

2x50 +2x50

66.42@ - R&M works yet to commence. DPR finalized and sent to Board for approval. Likely to be completed by 2011-12

8. Kyrdemkulai, MeSEB, Meghalaya

2x30 168.00@ 66 RM&U works to commence after completion of Umium Stage-II works. DPR under preparation. Likely to be completed in XIth Plan.

9. Khandong, NEEPCO, Meghalaya

2x25 5.00@ 50 R&M works yet to commence

* Actual, @ Estimated

Page 128: Annual Report 07 08

119

Central electricity authority Annual Report 2007-08

“Children are our most valuable natural resource.”

11.10 Installed capacity in the N.E. Region

The total installed capacity in the Region is as under:

Sector Installed Capacity (MW)Hydro 1116.0*Thermal 968.8**RES 146.1Nuclear 0.00Total 2230.9* Excluding small hydro schemes covered

under Renewable energy Sources.

** Excluding 110 MW share from Kahagaon TPS of Eastern Region

11.11 IdentificationofCandidateHydroProjects for 12th Plan

Action has been initiated to take up / complete their survey and investigation / DPR preparation and other construction activities well in advance so as to achieve the ambitious programme of capacity addition in the coming plans. Accordingly, a shelf of 39 candidate projects with an installed capacity of about 25805 MW has been prepared for North-Eastern Region.

11.12 H y d r o P o w e r G e n e r a t i o n Performance

Hydro Power generation during the year 2007-08 (upto Feb’ 08) in the North Eastern Region was 5011.18 MU(tentative) against a target of 4606 MU, which is 108.8 % achievement.

Committee A committee was constituted by MoP under the Chairmanship of Member (Hydro), CEA for the problem regarding sudden closure of Ranganadi HE Project (3 x 135 MW) of NEEPCO due to leakage in the water conductor system, to find the reasons and suggest remedial measures

in which CE (HE&TD) also participated as a member of the team and a report for the same was prepared and sent to MoP.

11.13 Sectoral Development of Power System in the North Eastern Region

The road map for accelerated development program in transmission in NER has been evolved on the basis of the detailed exercise carried out in CEA for meeting ambitious load demand/growth in the NER states up to 2017 period with a focus to utilize generation from the hydro projects coming up in the region to the extent of regional needs and transmission of surplus outside NER.

The intra and inter-state transmission works from 132kV to 400kV level for power supply within the region has been identified and programmed for implementation in three phases viz. phase-I(2008-11), Phase-II(2008-11) and Phase-III (2014-17) have been proposed. The total requirements of fund for development of transmission system for NER is of the order of Rs.17000 Crores which includes intra-state as well as inter-state requirements and also the sub-transmission system upto 33kV.

For evacuation of power from various exportable hydro projects being envisaged during 11th Plan & beyond, master plan has been formulated with suitable pooling and de-pooling points to enable optimal transmission system development by adopting the state-of-art-technology viz. high capacity (6000MW) +800kV UHVDC bi-pole technology, high capacity AC lines etc.

The details of the transmission road map in NER has been covered in the report of Sub Group -I which was constituted under the Chairmanship of Member (PS), CEA by Ministry of DONER in consultation with MoP as a follow-up action to the Passighat proclamation. The sub-group submitted its report with recommendations on transmission, sub-transmission and distribution

Page 129: Annual Report 07 08

Central electricity authority Annual Report 2007-08

120 “The farther backward you can look, the farther forward you are likely to see.”

in NER, associated funding mechanism, logistic and other related issues of NER to the Ministry of DONER and MoP in Dec., 2007.

11.14 DONER Schemes

1. Technical clearance of the scheme for installation of 2x2.5 MVA , 33 /11 KV S/S at Willong with associated transmission line in Manipur, proposed to be funded under Non Lapsable Central Pool of Resources (NLCPR).

2. Technical clearance of the scheme for construction of 33 KV D/C Transmission Line from Lawngtlai to Saiha in Mizoram to be funded under Non Lapsable Central Pool of Resources (NLCPR).

3. Examination of the Revised cost estimates (RCE) for the scheme for project 66 KV D/C transmission line from LLHP to Bulbuley S/s & establishment of 66/11 kV, 2x10 MVA S/s at Bulbulay at Sikkim under Non Lapsable Central Pool of Resources (NLCPR).

4. Examination of the Scheme for “Installation of 2x1 MVA, 33 /11 kV S/s at Chakpikarong at Chandel district in Manipur, proposed to be funded under Non Lapsable Central Pool of Resources (NLCPR).

5. Examination of the Scheme for “Installation of 2x1 MVA,33 /11 kV S/s at Henglep at Churachandpur district in Manipur, proposed to be funded under Non Lapsable Central Pool of Resources (NLCPR).

11.15 Status ofRural Electrification inNorth Eastern Region

(a) During 2007-08 ( upto Jan, 2008) 11 numbers of inhabited villages have been electrified and no pump sets have been energized. Cumulatively, 29626 inhabited villages constituting 73.4% have been electrified out of a total of 40377 inhabited

villages and 8430 pump sets have been energized in the North-Eastern states.

(b) Representatives of CEA attended meetings of Monitoring Committee taken by Secretary (Power) regarding the implementation of RGGVY. 46,926 no. of villages and 26.22 lakhs households including 21.34 lakhs BPL househoplds have been electrified under the scheme up to 27/3/2008. Rs. 7105.51 crores has been released up to 27/3/08. The projects under the scheme will be subject to Three Tier Quality Control Mechanism.

(c) Representatives of CEA attended meetings taken by Secretary (Power) to review the Quarterly Performance of REC.

(d) Prepared comments/ material regarding rural electrification on the points raised in summary records of discussions of the various meetings of the committees such as Standing Committee on Energy, Consultative committee on Power and National Conference of Chief Secretaries etc.

(e) Prepared material for the speech of President / Prime Minister / Finance Minister in respect of rural electrification.

(f) Prepared material in respect of Energy Coordination Committee – Recommendation of Expert Committee on Integrated Energy Policy.

(g) Furnishing draft material for replying to Parliament Questions, VIP references, Annual Report of MoP & CEA.

(h) Prepared notes on rural electrification in North-Eastern Region in respect of PMO references.

Page 130: Annual Report 07 08

121

Central electricity authority Annual Report 2007-08

“Failing to plan is planning to fail.”

11.16 Implementation of Sub-Transmission & Distribution (ST&D) Schemes in NER

The Transmission and Distribution (T&D) losses in the states of North Eastern Region and Sikkim are high, varying from 40 to 65%. In order to improve the sub-transmission and distribution (ST&D) system with the objective of reduction in losses, improvement in quality of power supply, Central Electricity Authority (CEA) was directed in pursuance of the decisions taken during the conference of Power Ministers’ of North-Eastern States held on 6.9.1999 to formulate a scheme for improvement of transmission/ sub-transmission

and distribution network in the North Eastern Region. CEA in consultation with the constituent states in the NER and Sikkim formulated a scheme for the development of sub-transmission and distribution network to be financed from the Non Lapsable Central Pool of Resources (NLCPR). The estimated cost of the scheme was around Rs.452.66 crores with the central fund commitment of Rs.239.92 crores. Subsequently, the schemes were revised for an estimated cost of Rs.375.56 crores with a central fund commitment of Rs.294.22 crores. Rs. 275.89 crores has been released in North Eastern States up to 30-11-2006. 57 schemes out of a total of 94 schemes have been completed.

North Eastern Region Transmission System, PoWERgRID

Page 131: Annual Report 07 08

Central electricity authority Annual Report 2007-08

122 “Let our advance worrying become advance thinking and planning.”

12.1 Training of Manpower in CEA

As human resource is an essential resource for carrying out any business or service utility of an organization. Human resources are required to be developed to produce the quality service product/service at reasonable price with. To attain this objective, the technical, managerial and behavioral competence of the human resources are developed and enhanced through training. Keeping above objective in view, HRD, CEA has been organizing various training programmes in technical, managerial, IT & health areas to keep them abreast of technology and bringing about the attitudinal change in consonance with the need of rapidly changing era of action globalization. HRD has also been making its best efforts to keep stock of the infrastructure available for the development of human resources in the power sector. CEA has been advising/recommending various measures to the training institute/power sector organization

CHAPTER – 12 TRAINING AND HUMAN RESOURCE DEVELOPMENT

for the improvement in the training infrastructure and methodologies for enhancing the skills of the programme and the productivity. CEA has been following up with the utilities/ organization the status of implementation of the National Training Policy for the power sector. To fulfill its statutory role under Rule 3 of IE Rules 1956, CEA has been sending teams to visit power sector institutes for their evaluation in terms of infrastructure utilization and quality of training programmes and facilitate CEA accreditation for them. In this direction, CEA has laid down guidelines for the evaluation and accreditation of training institutes in Power Sector.

12.1.1 Refresher Training and Development Programmes

The in- service refresher training and development programmes for CEA personnel at various levels in the relevant fields of

Induction level Training Programme of Assistant Director-I

Page 132: Annual Report 07 08

123

Central electricity authority Annual Report 2007-08

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

specialization conducted at professional institutes of national and international repute were organized. The officers/officials were deputed for various training programmes, technical courses, workshops, seminars, conferences etc involving 5700 man-days during the year 2007-08 which is 54% more than that during last year. The programmes organized for enhancing the managerial and interpersonal skills and for awareness about good health included the topics such as Effective communication for managers and leaders, Right to Information Act, Communication and listening skills, Yoga, Motivation, leadership and team building; Stress Management, etc.

12.1.2 Induction Training for Direct Recruit Assistant Directors Grade-I

An Induction level training was imparted to seventeen (17) direct recruit Assistant Directors (ADs) Grade-I who joined the CEA through UPSC and 3 departmental ADs. The training was organized for a period of 27 weeks from 17th September 2007 to 20th March, 2008. The training course comprised of theoretical training (15 weeks) and practical training (12 weeks). The theoretical training was imparted at NPTI, Faridabad. The Practical Training was imparted at NTPC, NHPC and PGCIL. During the Practical Training, the trainees were posted at hydro power plants, thermal power stations, sub-stations, HVDC stations and RLDCs (Regional Load Dispatch Centres), etc. This provided opportunity to the officers of CEA to gain operation and maintenance experience in the power plants and transmission & distribution systems.

12.1.3 Refresher Training for Assistant Director Grade-II

23 Assistant Directors Grade-II of CEA were imparted 26 weeks refresher course training through NPTI Faridabad from 5th February, 2007 to 4th August, 2007. The training programme comprised 14 weeks theoretical training (including 2 weeks site visits) and 12 weeks on job training.

The on-job training was imparted at various thermal, gas, hydro, nuclear power stations, HVDC stations, Regional Load Dispatch Centres and Power Distribution Utilities.

12.1.4 Training under DRUM Programme

Officers were deputed to attend training programmes like Customer Satisfaction, Communication and Outreach; Electrical Safety Procedures, Accident Prevention & Disaster Management; Performance Benchmarking & Quality of Supply; Change Management in Power Distribution; GIS Supported Network Planning Analysis and Asset Management, etc. organized under the Distribution Reform, Upgrades and Management Programme (DRUM) – a joint programme developed under the Ministry of Power and the U.S. Aid for International Development (USAID), NDPL, Rohini, New Delhi. Twenty-two Officers of CEA were imparted training of 110 man-days under DRUM programme during the year 2007-08.

12.1.5 Computer Training programme for CEA personnel

A basic computer training course in MS Office was conducted in CEA which was attended by 97 CEA employees.

12.1.6 Lecture series

Lecture by eminent experts in the power sector has been initiated to share their experiences and expectations with CEA officers. A series of lectures were also taken up by the CEA officer who attended training programmes in India/abroad to usher in the culture of knowledge sharing with other CEA officers.

12.2 Sponsoring of CEA Officers for appearing in Energy Auditor & CertificateinProjectManagement

Four officers were sponsored for Energy Auditor Examination to be conducted by Bureau

Page 133: Annual Report 07 08

Central electricity authority Annual Report 2007-08

124 “A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

of Energy Efficiency and five officers sponsored for Certificate in Project Management course being conducted by the Centre for Excellence in Project Management and the Project Management Associates.

12.3 Foreign Training Programmes for Power Sector Personnel

Foreign training programmes/ study tours were planned, processed and conducted during the year 2007-08 for CEA engineers involving 452 Mandays. These Engineers of CEA were trained and deputed abroad for project consultancy, International Conferences/ Seminars/ Workshops and technology transfer. The details of officers who visited abroad during the year 2007-08 are given in Annexure 12A.

12.4 Training under Apprentice Act, 1961

Twelve (12) ITI qualified D/men and 35 vocational apprentices have undergone training in CEA under the Apprentice Act 1961 during the year 2007-08.

12.5 Guidelines for Recognition of Training Institutes in the Power Sector

CEA formulated and brought out comprehensive Guidelines for the recognition of training institutes imparting training to power sector personnel. The guidelines include the provisions of the gradings and ratings of the training institutes by carrying out scientific assessment of institute taking into consideration various parameters against norms set in the guidelines.

12.6 Recognition of Training Institutes

For ensuring the development of the training infrastructure in the Power Sector and the implementation of statutory requirements of training etc. as per Sub Rule 2(A) & 2(B) of Rule 3 of IE Rules 1956, the Power Training Institutes/ Centres of various SEBs/Utilities are visited by CEA for giving recognition. The following 25 training Institutes/ Centres were visited and accorded recognition/renewal of recognition during the year 2007-08:

S.No. Name of the Institute

1 National Power Training Institue, Faridabad

2 National Power Training Institute(NR), Badarpur

3 Training, Research & Development Centre of MSPGCO Ltd. at Nashik

4 Training Institute of MSEDC at Nashik

5 Centre for Power Sector of YASHADA

6 Employee Development Centre, Rihand STPS, NTPC, Rihand

7 Employee Development Centre, Singrauli, TPS, NTPC

8 Employee Development Centre, Vindyachal STPS, NTPC

9 Power Engineers Training and Research Centre at Moolamattom of KSEB

10 Employee Development Centre at Hyderabad of PGCIL

11 Employee Development Centre at Itrasi of PGCIL

12 Employee Development Centre at Misa of PGCIL

13 Officers Training Institute, Rajasthan Rajya Vidyut Prasaran Ltd., Jaipur

Page 134: Annual Report 07 08

125

Central electricity authority Annual Report 2007-08

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

12.7 Human Resource Development and Capacity Building

The Planning Commission constituted a Working Group on Power to formulate the power programme for 11th Five Year Plan. Under this, various sub-groups were constituted. One of the sub-groups was on Human Resource Development and Capacity Building. CEA provided the input for preparation of report by the sub-group to review the existing manpower in the Power Sector and training facilities; and also to assess the manpower and training arrangement requirement in Power Sector.

12.8 “Adoption of ITI” Scheme

Central Electricity Authority and the Ministry of Power organized an International Conclave on “Key Inputs for Accelerated Development of Power Sector” during 11th Plan & Beyond” on 4th & 5th July, 2007 wherein 85 industries such as BHEL, Dong Fang, L&T, MHI, Ansaldo, Alstom, VA Tech, and Toshiba, 125 research institutions, State Governments, Central and State Regulatory Commissions, Ministry of Labour & Employment and Heavy Industry, public sector companies and 25 other

organizations participated. As a sequel to one of the key recommendations of the Conclave that the (ITIs) located close to the project site be adopted by the project developers and major EPC contractors, the CEA interacted with Directorate General, Employment & Training (DGE&T) and with the power developers in the Central, State and Private Sectors to motivate them to implement the “Adopt an ITI” scheme. CEA has been playing facilitator role in the process of adoption of ITIs and also monitoring the status of implementation of ITI adoption by various power utilities.

12.9 Recreation and Sports Club

The Recreation Club of CEA has been a major source of inspiration for the employees of CEA for the development of extra-curricular activities. This is achieved by way of conducting indoor and outdoor games every year. The Recreation Club also takes part in both indoor and outdoor Inter-Ministry/Inter-CPSU Tournaments.

Duing 2007-08, the CEA sports teams participated in the Inter-CPSU/ Inter-Ministry tournaments under the following events:-

14 Power Generating Training Institute at Korba STPS of CSEB

15 Employee Development Centre at Korba STPS of NTPC

16 O&M Training Institute, CESC Ltd, Kolkata.

17 Plant training Centre, Titagarh,CESC.Ltd

18 Budge Budge Generating Station, CESC,Ltd

19 Southern Generating Station, CESC Ltd.

20 Torrent Power Training Institute at Sabarmati, Ahmadabad

21 Training Centre, GMR Energy, Mangalore

22 Employment Development Centre at Unchahar TPS of NTPC

23 Technical Training Centre at Dahanu Thermal Power Station of Reliance Energy Ltd.

24 JSW Energy Centre for Excellence, Bellary (Kar.)

25 Jindal Institute for Power Technology, Raigarh (Chhattisgarh)

Page 135: Annual Report 07 08

Central electricity authority Annual Report 2007-08

126 “It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

I. AthleticSh. Dinesh Rawat is an outstanding athletic of CEA. He has won two Gold Medals in the National All India Civil Services Athletics Meet held at Panchkula, three Gold Medals in the XXIX National Masters Athletic Championship held at Guwahati and four Gold Medals in the Inter PSU Athletics Championship and was declared as the best Athlete of the tournament.

II. Football

The Football team of CEA participated in the Central Secretariat Football Tournament and won Delhi State Football Championship.

III. Carrom (Men)

Carrom Men Team of CEA won Gold Medal in Team Championship in the Inter CPSU Carrom Tournament organized by BTPS at Faridabad. Sh. P.S. Gosain & Sh. A.K. Saigal secured 2nd Position in Doubles.

IV. Carrom(Women)

Women Carrom Team of CEA won Silver Trophy in Inter-CPSU Carrom Tournament organized by BTPS at Faridabad. Smt. Ranju Bhalla & Km. Sudha secured 2nd Position in Doubles.

V. Table Tennis

Table Tennis Team of CEA was 1st Runner-Up in CPSU Table Tennis Tournament at Faridabad. Sh. Sanjeev Kumar Beri & Sh. Sanjeev Dhingra were Runner-Up in Doubles.

VI. Chess

Sh. D.K. Gupta achieved 6th Position in Delhi State Chess Championship organized by Delhi Chess Association (participated in personal capacity).

The CEA sports teams have also participated in the CPSU Tournament of Badminton, Volleyball and Cricket.

CEA’s Man & Women Carrom Team

Page 136: Annual Report 07 08

127

Central electricity authority Annual Report 2007-08

“The one exclusive sign of thorough knowledge is the power of teaching.”

Annexure-2A[Item 2.13.4]

AWARDEES FOR THE YEAR 2006-07Sl. No.

Awarded Station/ Project/ Co. Organisation Category

A. GOLD SHIELD WINNERS1. Simhadri TPS (1000 MW) NTPC Thermal Power Station Performance2. Hasdeo Bango (3x40 MW) Chhattisgarh SEB Hydro Power Station Performance

3. Transmission System (220 kV & 400 kV)

APTRANSCO Transmission System Availability

4. Transmission System North Eastern Region (132 kV )

PGCIL Transmission System Availability

5. A C Sub-Station Extension 220/132 kV with ICT (160 MVA)

Pitampur of MP Power Transmission Co.Ltd.

Early completion of Transmission Power Project.

6. Madhya Gujarat Vij Co. Ltd. MGVCL, Gujarat Power Distribution CompanyB. SILVER SHIELD WINNERS

1. Talcher STPS (3000 MW) NTPC Thermal Power Station Performance

2. Korba STPS (2100 MW) NTPC Thermal Power Station Performance3. Dahanu TPS (500 MW) Reliance Energy

Limited, MaharashtraThermal Power Station Performance

4. Bhira and Bhira Pump Storage Scheme (6x25 + 1x150 MW)

Tata Power Co.Ltd. Hydro Power Station Performance

5. Western Regional Transmission System (220 kV & 400 kV)

PGCIL Transmission System Availability

6. 400 kV D/C Kahalgaon – Patna-Balia (Quad) Transmission Line

PGCIL Early completion of Transmission Power Project.

7. Torrent Power Electric Co.Ltd. TPCL, Gujarat Power Distribution CompanyC. BRONZE SHIELD WINNERS1. Vindhyachal STPS(2760MW) NTPC Thermal Power Station Performance2. Torangallu TPS (260 MW) JSW Energy Co.

KarnatakaThermal Power Station Performance

3. Valuthur (95 MW) TNEB Gas Based TPS Performance4. Vijayawada TPS (1260 MW) APGENCO Thermal Power Station Performance5. Rayalaseema TPS (420 MW) APGENCO Thermal Power Station Performance6. Kodasali (3x40 MW) Karnataka Power

Corpn.Ltd.Hydro Power Station Performance

7. Ukai (4x75 MW) Gujarat State Electricity Co.Ltd. (GSECL)

Hydro Power Station Performance

8. Mangalore Electricity Supply Co.Ltd.(MESCOM)

MESCOM, Karnataka Power Distribution Company

Page 137: Annual Report 07 08

Central electricity authority Annual Report 2007-08

128 “Children are our most valuable natural resource.”

Annexure-2B [Item 2.14.16]

LIST OF CAPTIVE COAL MINES ALLOCATED TO POWER UTILITIES

Mine Block Allottee Date of Allot. Of Coal Mine

Beneficiary Project

Ben. Proj. Comm. Sch.

Pakri Baradih NTPC 10/2004 Basket of NTPC Projects ExistingKerandoi NTPC 01/2006 Barh St-II

(2X800MW)2011-12

Chatti Bariatu NTPC 01/2006 Barh St-II (2X800MW)

2011-12

Dulanga NTPC 01/2006 Darlipalli (3200MW)

2011-12

Talaipalli NTPC 01/2006 Lara (4000MW)

Chhatrasal SASEN UMPP 10/2006 Sasen UMPP 2011-12Brahmini & Chichropatsimal

NTPC & CIL JV 01/2006 Kahalgaon Exp. And Farakka Exp.

2010-11

Gidhmuri & Patoria CSEB 09/2004 Bhaiyathan 2011-12Parsa CSEB 08/2006 Bhaiyathan 2001-12Tokisud (N) sub captive coal Mine, Hazaribagh

GVK Power Ltd. (Goidwal Sahib)

01/2002 Goidwal Sahib 2011-12

Gare-Palma IV 2 &3 Jindal power Ltd. 07/1998 O.P. Jindal STPS (4x250 MW)

2007-08

Barjora (N) Kagra Joydev Kasta (E)

DVC 10/2004 Mejia U-5&6 (2x250 MW) 2007-08

Pachwara (N) WBPDCL 04/2005 Sagardighi (2x300 MW)Bakereshwar (2x210 MW

Santaldih (1x250 MW) 2007-08Barjora, Gangaramchak & Bhadulla- Gangaramchak

WBPDCL 06/2003 -----do--------- --do---

Tara(E) WBSEB 14.07.95Barang-I (1 to 4) Manoradeep & Kiloni

KPCL 11/2003 Ballary Raichur

2007-08

Utkal –C Utkal Coal Ltd. 06/1998 Chaudwar (108 MW) UPL TPP Ph-I (120MW)Ph-II

(240 MW)

Existing 06/2008

Gare Palme-IV/7 Raipur alloy & Steel Ltd. 04/2000 Captive TPSTara CMDCL 08/2003 Prem Nagar TPS JV of IFFCO-

CSEBBadam TVN Ltd 11/2003 Tenughat st-III

(3x210 MW)2008-09

Jamkhani (Orissa) Bhushan Ltd 11/2003 Bhushan Ltd (40+60 MW)

40 commed. 60 ready for

commn.Pachwara (C) PSEB 12/2001 Lehra Mohabat GHTP St-II 2007-08Utkal-E NALCO 08/2004 Captive 01/2009Utkal-D Orissa Mining Corpn. 12/2003Mahan JV of Hindalco & Essar 05/2006

Page 138: Annual Report 07 08

129

Central electricity authority Annual Report 2007-08

“The farther backward you can look, the farther forward you are likely to see.”

Annexure -3A [Item 3.3]

1/2INTER-REGIONAL TRANSMISSION CAPACITY

EXISTING AND PLANNED UP TO 2011-12Power Transfer Capacity (MW)

Name of System At the end of 9th Plan i.e. end of 2001-02

Additions during 10th Plan 2002-07

At the end of 10th Plan

i.e. end of 2006-07

Additions during

11th Plan 2007-12

At the end of 11th Plan i.e. end of 2011-12

ER – SR :

Gazuwaka HVDC back to back 500 500 1000 1000

Balimela-Upper Sileru 220kV S/C 120 120 120

Talcher-Kolar HVDC Bipole 2000 2000 2000

Upgradation of Talcher– Kolar HVDC bipole

500* 500

ER-SR total 620 2500 3120 500 3620

ER –NR :

Muzaffarpur - Gorakhpur 400kV D/C (Quad Moose) with TCSC

2000 2000 2000

Dehri-Sahupuri 220kV S/C 120 120 120

Sasaram HVDC back to back 500 500 500

Patna-Balia 400kV D/C quad 1600 1600 1600

Biharshariff-Balia 400kV D/C quad 1600* 1600

Barh-Balia 400kV D/C quad 1600 1600

Sasaram–Fatehpur 765kV S/C line-1 2100 2100

Gaya–Balia 765kV S/C 2100 2100

Shifting of Sasaram HVDC back-to- back to Narendra Kolhapur

(-) 500 (-) 500

ER-NR total 120 4100 4220 6900 11120

ER - WR :

Rourkela-Raipur 400kV D/C 1000 1000 1000

TCSC on Rourkela-Raipur 400kV D/C

400 400 400

Budhipara-Korba220kV D/C+S/C 360 360 360

Ranchi-Sipat 400kV D/C (40% SC) 1200 1200

Ranchi-Rourkela-Raipur 400kV D/C with fixed series capacitor, TCSC in parallel line

1400 1400

Ranchi – Sipat Pooling Point 765kV S/C

2100 2100

ER-WR total 360 1400 1760 4700 6460

ER - NER :Birpara-Salakati 220kV D/C 240 240 240

Page 139: Annual Report 07 08

Central electricity authority Annual Report 2007-08

130

Power Transfer Capacity (MW)

Name of System At the end of 9th Plan i.e. end of 2001-02

Additions during 10th Plan 2002-07

At the end of 10th Plan

i.e. end of 2006-07

Additions during

11th Plan 2007-12

At the end of 11th Plan i.e. end of 2011-12

Malda-Bongaigaon 400kV D/C 1000 1000 1000Bongaigaon-Siliguri 400kV D/C Quad

1600 1600

ER-NER total 1240 0 1240 1600 2840NR - WR :Vindhyachal HVDC back to back 500 500 500Auria-Malanpur 220kV D/C 240 240 240

Kota-Ujjain 220kV D/C 240 240 240Agra-Gwalior 765kV S/C line-1 400kV op. 1100 1100 1100Agra-Gwalior765kV S/ C line-2 400kV op.

1100 1100

Kankroli-Zerda 400kV D/C 1000 1000

NR-WR total 980 1100 2080 2100 4180WR-SR :Chandrapur HVDC back to back 1000 1000 1000Barsur–L.Sileru 200kV HVDC mono pole 200 200 200Kolhapur-Belgaum 220kV D/C 240 240 240Ponda – Nagajhari 220kV D/C 240 240 240Narendra/Kolhapur HVDC back-to back with Narendra-Kolhapur 400kV D/C line(By shifting Sasaram HVDC b-to-b module of 500 capacity to Narendra/ Kolhapur + putting new HVDC b-to-b module of 500 MW at Narendra/Kolhapur. Thus total capacity of the Narendra/Kolhapur link = 1000 MW)

1000 1000

WR-SR total 1680 0 1680 1000 2680NER/ER-NR/WR :Biswanath Chariyali–Siliguri–Agra 800kV HVDC bi-pole line of 6000MW capacity with 3000MW terminal modules at Bishwanath Chariyali and Agra

3000 3000

3000MW terminal modules at Siliguri and Agra (2nd module) on Biswanath Chariyali–Siliguri-Agra 800kV HVDC bi-pole line

3000 3000

NER/ER-NR/WR total 0 0 0 6000 6000TOTAL ALL INDIA (200kV & above) 5000 9100 14100 22800 36900

IR Capacity increased from 14100 MW to 16200 MW i.e., addition of 2100 MW during 2007-08.Following Inter-Regional lines were added during 2007-08:1. Talcher – Kolar HVDC capacity increased by 500 MW (July 2007) 500 MW2. Biharshariff-Balia 400kV Quad D/C (Oct 2007) 1600 MW

2/2

“Failing to plan is planning to fail.”

Page 140: Annual Report 07 08

131

Central electricity authority Annual Report 2007-08

Annexure 3B Item : 3.7

1/7 STATEMENT SHOWING THE TRANSMISSION LINES

COMPLETED DURING THE YEAR 2007-08Sl.No.

Name of the transmission

lines

No. of Circuits

ExecutingAgency

Line length(CKM)

StringingComptd.

upto Mar-07(CKM)

Stringingduring2007-08(CKM)

Month ofCompl-

etion

1 2 3 4 5 6 7 8I. ± 500 kV HVDC Lines

Talchar-Kolar (Aug.) 500 MW PGCIL 0 0 0 Sep-07TOTAL CKM OF FULLY COMPLETED (CS) DURING THE YEAR

0 0

TOTAL CKM OF PARTIALLY COMPLETED (CS) DURING THE YEAR

120

TOTAL (CS) 120TOTAL (ALL INDIA) 120

II. 765 kV LINESSipat - Seoni Line1 S/C PGCIL 351 346 5 Sep-07TOTAL CKM OF FULLY COMPLETED (CS) DURING THE YEAR

351 5

TOTAL CKM OF PARTIALLY COMPLETED (CS) DURING THE YEAR

365

TOTAL (CS) 370TOTAL (SS) 0TOTAL (ALL INDIA) 370

III. 400 kV LINES1 Balia - Lucknow D/C PGCIL 632 632 0 Apr-072 Maithon - Ranchi D/C PGCIL 400 349 51 May-073 Line from Singrauli to a

point 2.3 Km near existing Vindhyachal - Kanpur Line.

D/C PGCIL 5 5 0 May-07

4 Gooty - Raichur D/C PGCIL 294 228 66 May-075 Vindhyachal - Korba S/C PGCIL 291 286 5 Jun-076 Lucknow - Bareilly D/C PGCIL 511 463 48 Jul-07

7 LILO of Bareilly - Mandaula at Bareilly

2xD/C PGCIL 37 36 1 Jul-07

8 Satna - Bina Ckt-II S/C on D/C

PGCIL 272 272 0 Jul-07

9 LILO of Lucknow - Moradabad at Bareilly

D/C PGCIL 22 20 2 Aug-07

10 Satna - Bina Ckt-I D/C PGCIL 273 273 0 Aug-0712 LILO of S/C Bhilai - Satpura

at SeoniD/C PGCIL 4 3 1 Sep-07

13 Biharshariff - Balia (Quad) Ckt-I

S/C on D/C

PGCIL 242 118 124 Sep-07

“Let our advance worrying become advance thinking and planning.”

Page 141: Annual Report 07 08

Central electricity authority Annual Report 2007-08

132

Sl.No.

Name of the transmission

lines

No. of Circuits

ExecutingAgency

Line length(CKM)

StringingComptd.

upto Mar-07(CKM)

Stringingduring2007-08(CKM)

Month ofCompl-

etion

1 2 3 4 5 6 7 8

14 LILO of Sultanpur - Lucknow at Lucknow

D/C PGCIL 42 31 11 Dec-07

15 LILO one ckt of Hissar - Moga at Fatehabad

D/C PGCIL 59 11 48 Dec-07

16 Nagda - Dehgam D/C PGCIL 664 328 336 Dec-07

17 LILO of Rourkela - Raipur at Raigarh

D/C PGCIL 37 25 12 Dec-07

18 LILO of Korba - Raipur, S/C at Bhatapara

D/C PGCIL 5 0 5 Dec-07

19 Bina - Nagda D/C PGCIL 662 104 558 Dec-07

20 Biharshariff - Balia (Quad) Ckt-II

S/C on D/C

PGCIL 242 118 124 Jan-08

21 Narendra - Davangere D/C PGCIL 310 50 260 Jan-08

22 Ludhiana - Jallandhar S/C PGCIL 85 1 84 Mar-08

23 Seoni - Khandwa (Quad) D/C PGCIL 703 584 119 Mar-08

24 Khandwa - Rajgarh ckt II D/C PGCIL 440 211 229 Mar-08

25 LILO of both Ckt of Gazuwaka-Vijayawada at Vemagiri S/S

D/C PGCIL 156 0 156 Mar-08

26 Malerkotla - Ludhiana S/C PGCIL 36 0 36 Mar-08

27 LILO of both ckt of S. Sarovar - Nagda at Rajgarh

D/C PGCIL 16 0 16 Mar-08

TOTAL CKM OF FULLY COMPLETED 400 kV LINES (CS) DURING THE YEAR

5117 2312

TOTAL CKM OF PARTIALLY COMPLETED 400 kV LINES (CS) DURING THE YEAR

3376

Total CKM OF 400 kV LINES (CS)

5688

1 Purulia Pump Storage-Arambagh

D/C West Bengal 418 418 0 Apr-07

2 Purulia Pump Storage-Durgapur ckt 1

S/C West Bengal 370 370 0 Apr-07

3 Lonikhand-Padghe diversion at Chakan MIDC

S/C Maharashtra 4 0 4 May-07

4 Dehgam (PGCIL)-Ranchodpura D/C Gujarat 125 88 37 Jul-07

5 LILO of Jhanoor- Vapi at Akhakol

D/C Gujarat 28 0 28 Nov-07

6 LILO of Bhusawal-Koradi Ist Ckt.at Akola

D/C Maharashtra 80 0 80 Jan-08

2/7

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

Page 142: Annual Report 07 08

133

Central electricity authority Annual Report 2007-08

Sl.No.

Name of the transmission

lines

No. of Circuits

ExecutingAgency

Line length(CKM)

StringingComptd.

upto Mar-07(CKM)

Stringingduring2007-08(CKM)

Month ofCompl-

etion

1 2 3 4 5 6 7 8TOTAL CKM OF FULLY COMPLETED 400 kV LINES (SS) DURING THE YEAR

1025 149

TOTAL CKM OF PARTIALLY COMPLETED 400 kV LINES (SS) DURING THE YEAR

1110

TOTAL CKM OF 400 kV LINES (SS)

1259

TOTAL CKM OF 400 kV LINES (ALL INDIA)

6947

IV. 220 kV LINES1 Unchahar - Raibareilly S/C PGCIL 43 28 15 Jul-072 LILO of one ckt of Unchahar-

Lucknow at RaibareillyD/C PGCIL 12 0 12 Jul-07

3 MTPS-Durgapur D/C DVC 64 0 64 Aug-074 LILO Patratu-Chandil D/C at

Ranchi2xD/C PGCIL 29 0 29 Sep-07

TOTAL CKM OF FULLY COMPLETED 220 kV LINES (CS) DURING THE YEAR

148 120

TOTAL CKM OF PARTIALLY COMPLETED 220 kV LINES (CS) DURING THE YEAR

261

Total CKM OF 220 kV LINES (CS)

381

1 LILO of S P Koil-Tharamani at Siruseri

D/C Tamilnadu 20 20 0 Apr-07

2 Tap line of Mamidipally-Chandrayanagutta to Hyderabad Airport

D/C Andhra Pradesh 1 0 1 Apr-07

3 245 kV XLPE UG cable Asifnagar-Karwan

Andhra Pradesh 3 0 3 Apr-07

4 Mada- Barmer D/C Rajasthan 258 232 26 Apr-075 Satara MIDC-Vankusawade D/C Maharashtra 30 0 30 Apr-076 Seoni 400 kV(PG)-Seoni(MP) D/C Madhya

Pradesh9 0 9 May-07

7 LILO Theur-Jejuri at Hulkarwadi

D/C Maharashtra 38 33 5 May-07

8 Nasik-Kalwa-III&IV D/C Maharashtra 2 0 2 Jun-079 Khinvsar-Bhopalgarh S/C Rajasthan 36 19 17 Jun-0710 Birsinghpur-Jabalpur D/C Madhya

Pradesh274 156 118 Jun-07

3/7

“A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

Page 143: Annual Report 07 08

Central electricity authority Annual Report 2007-08

134

Sl.No.

Name of the transmission

lines

No. of Circuits

ExecutingAgency

Line length(CKM)

StringingComptd.

upto Mar-07(CKM)

Stringingduring2007-08(CKM)

Month ofCompl-

etion

1 2 3 4 5 6 7 811 LILO Birsinghpur(T)-

Birsinghpur(H) 2nd Ckt at Birsinghpur S/S

D/C Madhya Pradesh

12 0 12 Jun-07

12 Kanhan-Umred S/C on D/C S/C Maharashtra 50 38 12 Jun-07

13 LILO of Birsinghpur(T)-Nowrozabad D/C at Birsinghpur S/S

2xD/C Madhya Pradesh

23 0 23 Jul-07

14 LILO of Nellor-Renigunta at Nellore

D/C Andhra Pradesh 20 19 1 Jul-07

15 LILO Vijjeswaram-VTPS at Kamavarapukota

D/C Andhra Pradesh 46 0 46 Jul-07

16 Myvadi Sw.Stn.-Ponnapuram Ckt-I

D/C Tamil Nadu 19 0 19 Jul-07

17 Hissar (BBMB)-Hissar IA (2nd Ckt)

S/C Haryana 1.5 1 0.5 Aug-07

18 LILO of STPS-Durgapur circuit -I at Asansol

D/C West Bengal 80 74 6 Aug-07

19 Chalakurthy-Kondamallepalli S/C on D/C

S/C Andhra Pradesh 43 5 38 Aug-07

20 Mamidipalli-Yeddumailaram 2nd ckt stringing

S/C Andhra Pradesh 63 0 63 Aug-07

21 Neelamangala-DB Pura D/C Karnataka 33 20 13 Aug-07

22 LILO of Sharawati- Hubli at Sirsi Sw. Stn.

D/C Karnataka 13 0 13 Aug-07

23 LILO Dausa-Bharatpur at Mandawar

D/C Rajasthan 16 0 16 Sep-07

24 Barsinghsar-Nagaur S/C Rajasthan 104 36 68 Sep-07

25 LILO Ratangarh-Bikaner at Sridungargarh

D/C Rajasthan 5 0 5 Sep-07

26 Sagardighi-Gokarna D/C West Bengal 90 90 0 Sep-07

27 JTPS-Raigarh Industrial Estate (Panjipatra)

D/C Chhattisgarh 40 0 40 Sep-07

28 Talapally-Chalakurthy S/C on D/C

S/C Andhra Pradesh 26 26 0 Sep-07

29 Myvadi Sw.Stn.-Ponnapuram Ckt-II

D/C Tamil Nadu 19 0 19 Sep-07

30 LILO Rajkot-Morbi at Hadala D/C Gujarat 1 0 1 Sep-07

31 Rajkot-Morbi D/C Gujarat 145 0 145 Sep-07

32 LILO 1 ckt of Indore-Dewas at Indore (East)

D/C Madhya Pradesh

1 0 1 Sep-07

33 Bhatapara (Suhela) – Bemetara D/C Chhattisgarh 89 89 0 Oct-07

34 Bhatapara (Suhela) – Mahasamund

D/C Chhattisgarh 124 98 26 Oct-07

4/7

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

Page 144: Annual Report 07 08

135

Central electricity authority Annual Report 2007-08

Sl.No.

Name of the transmission

lines

No. of Circuits

ExecutingAgency

Line length(CKM)

StringingComptd.

upto Mar-07(CKM)

Stringingduring2007-08(CKM)

Month ofCompl-

etion

1 2 3 4 5 6 7 8

35 Mejia-Durgapur S/C West Bengal 64 0 64 Oct-07

36 Yamunanagar TPP-Jorian (Yamunanagar)

D/C Haryana 22 22 0 Oct-07

37 Yamunanagar TPP – Salempur (connected to Nissing bypassing Salempur)

D/C Haryana 86 0 86 Oct-07

38 LILO of Alagar koil(North Madurai)- Karaikudi at Valuthur S/S

D/C Tamil Nadu 193 0 193 Oct-07

39 LILO Shimoga-Mysore at Yachanyalli

D/C Karnataka 6 0 6 Nov-07

40 Maharani Bagh-Lodhi Road Ckt-I

S/C on D/C

Delhi 1.2 0 1.2 Dec-07

41 Kailash Chandrapur - Padmanavpur

D/C Orissa 68 3 65 Dec-07

42 Padmanavpur - Balasore ckt-1 D/C Orissa 22 0 22 Dec-07

43 LILO of Apta-Chinchwad at Urse

D/C Maharashtra 22 0 22 Dec-07

44 G. NOIDA-NOIDA (P) ckt-1 S/C on D/C

Uttar Pradesh 27 0 27 Dec-07

45 Korba (E)-Bhatapara D/C Chhattisgarh 284 205 79 Dec-07

46 LILO of Dhule-Dondaicha at Amalner

D/C Maharashtra 61 3 58 Dec-07

47 Talandage-Kagal Five Star MIDC

D/C on M/C

Maharashtra 4 0 4 Dec-07

48 LILO Ramagundam-Warangal at Pulakurthy

D/C Andhra Pradesh 21 0 21 Dec-07

49 2nd LILO Nellore-Renigunda at Nellore (400 kV S/S)

D/C Andhra Pradesh 20 0 20 Dec-07

50 LILO Kayathar-Sankaneri at Tiruneveli (400 kV S/S)

D/C Tamil Nadu 44 0 44 Dec-07

51 LILO of Korba – Amarkantak at Pendra

D/C Chhattisgarh 23 0 23 Dec-07

52 LILO of Korba (E) – Bhatapara 2nd Ckt. at Champa

D/C Chhattisgarh 2 2 0 Dec-07

53 Maharani Bagh-Lodhi Road Ckt-II

S/C on D/C

Delhi 1.2 0 1.2 Jan-08

54 Hatia-Lohardaga D/C Jharkhand 120 0 120 Jan-08

55 Rajendra Steel-Siltara 2nd S/C S/C Chhattisgarh 2 0 2 Jan-08

56 Dhanki-Adalsar D/C Gujarat 18 0 18 Jan-08

5/7

“It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

Page 145: Annual Report 07 08

Central electricity authority Annual Report 2007-08

136 “The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

Sl.No.

Name of the transmission

lines

No. of Circuits

ExecutingAgency

Line length(CKM)

StringingComptd.

upto Mar-07(CKM)

Stringingduring2007-08(CKM)

Month ofCompl-

etion

1 2 3 4 5 6 7 8

57 LILO of Malharpeth-Wankuswade for Satara MIDC S/S

D/C Maharashtra 60 53 7 Jan-08

58 LILO of Somanhalli- T K Halli at Kanakapura

D/C Karnataka 6 0 6 Jan-08

59 LILO of Kozhikode - Idukki line at Malaparamba

D/C Kerala 2 0 2 Jan-08

60 LILO Jindal-Washala at Ghatghar (by modification only)

D/C Maharashtra 0 0 0 Jan-08

61 PGCIL S/S-Nalasopara S/C Maharashtra 4 0 4 Jan-08

62 Adalsar-Bala D/C Gujarat 22 0 22 Jan-08

63 LILO of Nanikhakhar-Shivlakha D/C at Varsana

D/C Gujarat 7 0 7 Jan-08

64 LILO for Duni D/C Rajasthan 4 0 4 Feb-08

65 LILO of Khaperkheda-Bhandara 2nd ckt at Kanan

D/C Maharashtra 20 0 20 Feb-08

66 LILO Paricha-Safai at Bharthana

D/C Uttar Pradesh 8 0 8 Feb-08

67 Vetloor 400 kV S/S - Jurala D/C Andhra Pradesh 66 0 66 Mar-08

68 LILO from Mamidipally- Yeddumallaram at Shadnagar

D/C Andhra Pradesh 36 0 36 Mar-08

69 Dichpally 400 kV S/S- Dichpally

D/C Andhra Pradesh 8 0 8 Mar-08

70 Sharavati Generating Station-Dugadimane

M/C Karnataka 28 0 28 Mar-08

71 Tirunelveli (400 kV)-Veeranam S/C on D/C

Tamil Nadu 31 0 31 Mar-08

72 Kodikurichi-Chekkanoorani S/C Tamil Nadu 31 0 31 Mar-08

73 Theruvali -Narendrapur-Chandaka

D/C Orissa 750 746 4 Mar-08

74 IB Thermal-Budhipadar(2nd D/C)

D/C Orissa 52 11 41 Mar-08

75 LILO of STPS-Arambagh at Bishnupur

2xD/C West Bengal 4 0 4 Mar-08

76 LILO of Bhanjnagar-Chandaka at Mendhasal

D/C Orissa 12 12 0 Mar-08

6/7

Page 146: Annual Report 07 08

137

Central electricity authority Annual Report 2007-08

“Honesty is the first chapter in the book of wisdom.”

Sl.No.

Name of the transmission lines No. of Circuits

ExecutingAgency

Line length(CKM)

StringingComptd.

upto Mar-07(CKM)

Stringingduring2007-08(CKM)

Month ofCompl-

etion

1 2 3 4 5 6 7 8

77 LILO of Bhilai- Bansoor(2nd ckt) at Gurur

D/C Chhattisgarh 14 0 14 Mar-08

78 Bhauti (PG)-Orai S/C Uttar Pradesh 90 0 90 Mar-08

79 LILO of Fatuha-Khagaul at Patna PG

D/C Bihar 20 0 20 Mar-08

TOTAL CKM OF FULLY COMPLETED 220 kV LINES (SS) DURING THE YEAR

4101 2108

TOTAL CKM OF PARTIALLY COMPLETED 220 kV LINES (SS) DURING THE YEAR

1671

Total CKM OF 220 kV LINES (SS)

3779

TOTAL CKM OF 220 kV LINES (ALL INDIA)

4160

LEGEND: * Outside programme S Slippage S/S Substation S/C Single circuit ckm Circuit kilometer kV Kilo-volt D/C Double circuit LILO Loop in Loop out Aug Augmentation M/C Multi circuit TPS Thermal Power station $ Reported late S/C on D/C : MVA Mega Volt Ampere Addl. Additional Single circuit on double circuit towers MW Mega Watt @ Test charged

7/7

Page 147: Annual Report 07 08

Central electricity authority Annual Report 2007-08

138 “Ambition should be made of sterner stuff.”

Annexure 3C Item : 3.7

1/5

STATEMENT SHOWING THE SUB STATIONS COMPLETED DURING 2007-08

Sl.No.

Name of the Sub-station VoltageRatio

(kV/kV)

ExecutingAgency

Capac-ity

(MVA)

Month ofcompletion

1 2 3 4 5 6I. ± 500 kV HVDC Terminal

Talchar (Aug.) 500 MW PGCIL 500 Sep-07Kolar (Aug.) 500 MW PGCIL 500 Sep-07TOTAL (Central Sector) 1000TOTAL (State Sector) Nil 0TOTAL(All India) 1000

II. ± 500 kV HVDC B/BTOTAL (Central Sector) Nil 0TOTAL (State Sector) Nil 0TOTAL (All India) 0

III. 765 kV (Sub-station)Seoni Sub station ( 7x ( 500-333 )) 765/400 PGCIL 1500 Sep-07Seoni New (3x500) 765/400 PGCIL 1500 Mar-08Seoni Extn. (3x500) 765/400 PGCIL 1500 Mar-08TOTAL (Central Sector) 4500TOTAL (State Sector) 0TOTAL(All India) 4500

IV. 400 kV (Sub-station)1. Ranchi (ICT-I) 400/220 PGCIL 315 May-072. Gwalior (New) 400/220 PGCIL 315 May-073. Wagoora (3rd ) (3x105) 400/220 PGCIL 315 Jun-074. Muzaffarpur (ICT-II) 400/220 PGCIL 315 Jun-075. Moga (Aug) 400/220 PGCIL 315 Jun-076. Bareilly Sw. Stn. Extn. 400 PGCIL Jul-077. Kadapah Extn. 400/220 PGCIL 315 Aug-078. Delhi (GIS) 400/220 PGCIL 630 Sep-079. Gooty Extn. 400/220 PGCIL 315 Sep-0710. Kolar Extn. 400/220 PGCIL 500 Sep-0711. Gazuwaka Extn, 400/220 PGCIL 315 Oct-0712. Ranchi ICT-II 400/220 PGCIL 315 Nov-07

Page 148: Annual Report 07 08

139

Central electricity authority Annual Report 2007-08

“The one exclusive sign of thorough knowledge is the power of teaching.”

Sl.No.

Name of the Sub-station VoltageRatio

(kV/kV)

ExecutingAgency

Capac-ity

(MVA)

Month ofcompletion

1 2 3 4 5 613. Fatehabad (New) ICT-I 400/220 PGCIL 315 Dec-0714. Patna 2nd ICT 400/220 PGCIL 315 Dec-0715. Raigarh (New) ICT-I 400/220 POWERGRID 315 Dec-07

16. Bhatapara (New) 400/220 PGCIL 315 Dec-0717. Munerabad Extn. 400/220 PGCIL 315 Dec-0718. Seoni ICT-I 400/220 PGCIL 315 Jan-0819. Khammam Extn. 400/220 PGCIL 315 Jan-0820 Raigarh (New) ICT-II 400/220 PGCIL 315 Feb-0821. Seoni II ICT 400/220 PGCIL 315 Mar-0822. Gwalior (New) II ICT 400/220 PGCIL 315 Mar-0823. Amritsar (Aug) 400/220 PGCIL 315 Mar-0824. Rajgarh (New) 400/220 PGCIL 315 Mar-0825. Hiriyur Extn. 400/220 PGCIL 315 Mar-0826. Vijayawada Extn. 400/220 PGCIL 315 Mar-08TOTAL (Central Sector) 400 83751. Ranchodpura(Vadavi)(2nd) 400/220 Gujarat 315 Jan-08

$ 2. Alamathy 400/230 Tamil Nadu 630 Jan-08* 3. Mamidipally 400/220 Andhrapradesh 315 Jan-08

4. Dichpally 400/220 Andhrapradesh 630 Feb-08TOTAL (State Sector) 400 1890TOTAL(All India) 10265

V. 220 kV (Sub-station)1. Raebareilly ICT-I 220/132 POWERGRID 100 Sep-072. Raebareilly ICT-II 220/132 POWERGRID 100 Dec-07TOTAL (Central Sector) 220 2001. Siruseri 230/110 Tamilnadu 200 Apr-072. Rania (2nd) 220/132 Haryana 100 May-07

* 3. Gadchandur 220/33 Maharashtra 25 May-074. Kamavarepukota 220/132 Andhra Pradesh 100 Jul-075. Ponnapuram 230/110 Tamil Nadu 100 Jul-076. Agia 220/132 Assam 50 Jul-07

* 7. Subramanyapura 2nd ICT (Aug) 220/66 Karnataka 50 Aug-07* 8. Devanahalli Int. Air Port 220/66 Karnataka 100 Aug-07* 9. Sankaneri 230/110 Tamil Nadu 100 Aug-07

10. Ponnapuram 2nd ICT 230/110 Tamil Nadu 100 Aug-07

2/5

Page 149: Annual Report 07 08

Central electricity authority Annual Report 2007-08

140 “Children are our most valuable natural resource.”

Sl.No.

Name of the Sub-station VoltageRatio

(kV/kV)

ExecutingAgency

Capac-ity

(MVA)

Month ofcompletion

1 2 3 4 5 611. Mahasamund 220/132 Chhatisgarh 160 Aug-0712. Indore(E) 220/33 Madhya Pradesh 100 Aug-07

* 13. Kamba (Bhivandi-II) 220/22 Maharashtra 50 Aug-0714. Tambati(Aug) 220/22 Maharashtra 25 Aug-0715. Kondamallepalli 220/132 Andhra Pradesh 100 Aug-07

* 16. Alwar Aug (100-50) 220/132 Rajasthan 50 Sep-0717. Tambati (Aug) 220/22 Maharashtra 25 Aug-07

* 18. Baraut (160-100) 220/132 Uttar Pradesh 60 Sep-07* 19. Kurkumbh 220/33 Maharashtra 50 Sep-07* 20. Bahadurgarh 2nd ICT 220/132 Haryana 100 Sep-07* 21. Ghatnandre 3rd ICT 220/33 Maharashtra 100 Sep-07* 22. Vita Aug (50-25) 220/33 Maharashtra 25 Sep-07

23. Sirsi 220/66 Karnataka 50 Sep-07* 24. Sankaneri Addl 230/110 Tamil Nadu 100 Sep-07* 25. Ingur Addl 230/110 Tamil Nadu 100 Sep-07* 26. Kodikurichi Addl 230/110 Tamil Nadu 100 Sep-07

27. Temburni 220/33 Maharashtra 25 Oct-0728. C.R.Patna (Yachanahalli) 220/66 Karnataka 200 Oct-07

* 29. Kalyandurg 220/132 Andhra Pradesh 100 Oct-07* 30. Rewa (Addl) 220/132 Madhya Pradesh 160 Oct-07* 31. Agra Cantt. (Aug) 220/33 Uttar Pradesh 23 Oct-07

32. Valuthur 230/110 Tamil Nadu 300 Oct-0733. Shahjahanpur Aug (160-100) 220/132 Uttar Pradesh 60 Nov-07

* 34. HSR Layout Aug 2x(150-100) 220/66 Karnataka 100 Nov-07* 35. NRS Aug (150-100) 220/66 Karnataka 50 Nov-07* 36. Tharamani Addl 230/110 Tamil Nadu 100 Nov-07* 37. Daultabad ICT-I 220/66 Haryana 100 Nov-07

38. Zainkote (Aug) 220/132 Jammu & Kashmir 150 Dec-0739. Burla 220/132 Orissa 200 Dec-0740. Tarkera (4th) 220/132 Orissa 100 Dec-07

* 41. Balimela 1st 220/33 Orissa 20 Dec-0742. Krishna Nagar (2x160) 220/132 West Bengal 320 Dec-0743. Asansol 220/132 West Bengal 160 Dec-07

* 44. Firozabad Extn. 220/132 Uttar Pradesh 100 Dec-07* 45. Khurja Extn. 220/132 Uttar Pradesh 40 Dec-07

3/5

Page 150: Annual Report 07 08

141

Central electricity authority Annual Report 2007-08

“The farther backward you can look, the farther forward you are likely to see.”

Sl.No.

Name of the Sub-station VoltageRatio

(kV/kV)

ExecutingAgency

Capac-ity

(MVA)

Month ofcompletion

1 2 3 4 5 6* 46. Hathras 220/132 Uttar Pradesh 40 Dec-08* 47. Gazipur 220/132 Uttar Pradesh 100 Dec-07

48. Mandawar (Dausa) 220/132 Rajasthan 100 Dec-0749. Khinvsar S/S 1X100 MVA 220/132 Rajasthan 100 Dec-07

* 50. Amalner 220/132 Maharashtra 100 Dec-0751. Talangde (Five Star MIDC) Kagal 220/33 Maharashtra 50 Dec-07

* 52. Moulali 220/132 Andhra Pradesh 160 Dec-07* 53. Shapur Nagar 220/132 Andhra Pradesh 160 Dec-07* 54. Hatia 220/132 Jharkhand 300 Jan-08* 55. Chandil 3rd Transformer 220/132 Jharkhand 100 Jan-08

56. Urse (1x50) 220/33 Maharashtra 50 Jan-08

* 57. Amalner (1x100) 220/132 Maharashtra 100 Jan-08* 58. Pirangut 220/22 Maharashtra 50 Jan-08* 59. Adalsar 220/22 Gujarat 50 Jan-08* 60. Eklahare(200-50) 220/132 Maharashtra 150 Jan-08* 61. Gobi 230/110 Tamil Nadu 100 Jan-08* 62. Siruseri 230/110 Tamil Nadu 100 Jan-08* 63. Thatchankurichi 230/110 Tamil Nadu 100 Jan-08* 64. Kilpauk(Aug) 50 to 100 230/110 Tamil Nadu 50 Jan-08* 65. Vinnamangalam(Aug.)50 to 100 230/110 Tamil Nadu 50 Jan-08* 66. Ingur(Aug) 50 to 100 230/110 Tamil Nadu 50 Jan-08* 67. Kanakapura 220/66 Karnataka 100 Jan-08* 68. Bidadi Add Tr. 220/66 Karnataka 100 Jan-08

69. Malaparamba 220/110 Kerala 100 Jan-0870. Versana 220/66 Gujarat 100 Jan-08

* 71. Duni 220/132 Rajasthan 50 Feb-0872. Udhyog Vihar (Aug) 220/132 Rajasthan 50 Feb-08

* 73. Handia (Addl.) 220/33 Madhya Pradesh 160 Feb-08* 74. Nimrani (Addl) 220/132 Madhya Pradesh 160 Feb-08* 75. Jalna (50-25) 220/33 Maharashtra 25 Feb-08* 76. SICOM(Chandrapur) 220/33 Maharashtra 50 Feb-08

77. Hinjewade (50-25) 220/22 Maharashtra 25 Feb-0878. Gokul Aug. (160-100) 220/132 Uttar Pradesh 60 Feb-0879. C.B. Ganj (160-100) 220/132 Uttar Pradesh 60 Feb-0880. Tekkali 220/132 Andhra Pradesh 100 Mar-08

4/5

Page 151: Annual Report 07 08

Central electricity authority Annual Report 2007-08

142

Sl.No.

Name of the Sub-station VoltageRatio

(kV/kV)

ExecutingAgency

Capac-ity

(MVA)

Month ofcompletion

1 2 3 4 5 6

81. Shadnagar 220/132 Andhra Pradesh 100 Mar-0882. Shahapur 220/110 Karnataka 100 Mar-08

* 83. Kilpauk(Aug) 50 to 100 230/110 Tamil Nadu 50 Mar-08

* 84. Karimangalam(Addl.) 230/110 Tamil Nadu 100 Mar-08

85. Parvati(1x200+1x50) 220/22 Maharashtra 250 Mar-08

* 86. Varora 220/33 Maharashtra 25 Mar-08

* 87. Umred 220/33 Maharashtra 25 Mar-08

* 88. Colourchem(Thane) 220/22 Maharashtra 50 Mar-08

* 89. Ranjangaon Aug.(1x50+1x100) 220/22 Maharashtra 150 Mar-08

* 90. Sarnath Aug.(160-100) 220/132 Uttar Pradesh 60 Mar-08

91. Salempur 220/66 Haryana 100 Mar-08

* 92. Alephata 220/132 Maharashtra 100 Mar-08

* 93. Bishnupur 220/132 West Bengal 320 Mar-08

* 94. Rajpur 220/11 Gujarat 25 Mar-08

* 95. Sridungargarh 220/132 Rajasthan 100 Mar-08

* 96. Siwan(new)Gopalgang 220/132 Bihar 200 Mar-08

TOTAL (State Sector) 220 9458TOTAL (All India ) 220 9658

LEGEND:

* Outside programme S Slippage B/B Back to BackS/C Single circuit ckm Circuit kilometer S/S SubstationD/C Double circuit LILO Loop in Loop out kV Kilo-voltM/C Multi circuit TPS Thermal Power station Aug AugmentationS/C on D/C : MVA Mega Volt Ampere $ Reported late Single circuit on double circuit towers MW Mega Watt Addl. Additional@ Test charged

5/5

“Failing to plan is planning to fail.”

Page 152: Annual Report 07 08

143

Central electricity authority Annual Report 2007-08

Annexure-3 D[Item 3.14]

1/3

ISSUES PERTAINING TO TRANSMISSION SYSTEM PLANNING TAKEN UP DURING 2007-08

24th Meeting of the Standing Committee on Power System Planning in Southern Region held on June 18, 2007 at Bangalore

Review of Progress of Schemes under construction by PGCIL.Review of Transmission system for evacuation of power from Tuticorin JV (2x500 MW) and North Chennai JV (2x500 MW).Implementation of Reactors to contain over-voltage in Southern Region.Establishment of a 400/230 kV S/S near Tirunelveli and Associated Transmission System for evacuation of power from Wind Projects in Tamil Nadu.Transmission Systems for Evacuation of power from Krishnapattnam UMPP (4000 MW) and corresponding requirements for additional transmission capacity between SR-WR.Issues raised by KSEB- Shifting of one 315 MVA 400/220kV transformer from Trivandrum to Madakathara and Termination of Tirunelveli –Edamon 400kV circuit under Kudankulam evacuation system at EdamonReview of Transmission Systems for Evacuation of power from Neyveli (TSII Exp) project of NLC- Termination of one circuit of Neyveli(TSII) - Pulgalur 400 kV D/C at Neyveli (TSII Expansion) switchyard by utilizing one circuit of Neyveli(TSII) – Neyveli(TSII Expansion) 400 kV 2xS/C tie-linesTransmission System for Evacuation of Power from Simhadri-II TPS (2x500 MW) of NTPCTransmission System for Evacuation of Power from Nagarjuna TPS (1015 MW) in Karnataka, of M/s Nagarjuna Power Corporation Ltd

25th Meeting of the Standing Committee on Power System Planning in Southern Region held on March 28, 2008 at Hyderabad

Deliberations on Issues raised by KSEB- Shifting of one 315 MVA 400/220kV transformer from Trivandrum to Madakathara and Termination of Tirunelveli –Edamon 400kV circuit under Kudankulam evacuation system at Edamon.Transmission System for Vallur TPS (2x500 MW+1x500 MW) of NTECL (JV of NTPC & TNEB).Approval of modifications in the originally approved evacuation scheme of RGCCPP sought by KSEB.Transmission system for evacuation of power from Kothagudam TPS (1X500 MW) in Andhra Pradesh.Transmission System for Evacuation of Power from Simhadri-II TPS (2x500 MW) of NTPC.Transmission system for Evacuation of Power from Wind Power Projects (WPP) and Requirements of Grid connectivity of WPP.Transmission proposal of KSEB under regional strengthening scheme.Inter-connection of Kolhapur HVDC station with existing Kolhapur substation of PGCIL under SR-WR Interconnection project Provision of Fourth Transformer at Ghanapur (Hyderabad) 400/220kV S/S of PGCIL Confirmation of the minutes of 20th meeting of the Standing Committee held on 22.04.2006 at Nainital, Uttaranchal.

“Let our advance worrying become advance thinking and planning.”

Page 153: Annual Report 07 08

Central electricity authority Annual Report 2007-08

144

Evacuation of power from Allain Dhuhangan HEP. Providing 2 nos 220kV bays to HP at Nalagarh S/S of PGCIL Transmission System of Northern Region for import of power from NER - 400 KV Bongaigaon - Siliguri D/C Quad and Purnea-Biharsharif D/C line as part of system strengthening scheme of Northern Region. Evacuation system for Dadri Thermal Extn. (2x490MW). Transmission system for power evacuation from Sasan and Mundra UMP.Sasan Transmission System In WR:Mundra Transmission System In WR: Western Region System Strengthening SchemeStrengthening in States’ system of WR constituentsTransmission system for power evacuation from hydro projects in Uttranchal

Standing Committee In Western Region meeting and two follow up meetings were convened during 2007-08.

Transmission System for evacuation of power from Krishnapattnam UMPP (4000 MW) and requirements for additional transmission capacity between SR-WRTransmission System associated with Mundra (4000 MW) and Sasan (4000 MW) UMPPsTransmission system for Korba-III (500 MW) Expediting 765/400kV pooling station near Sipat in view of the proposed generation projects of Mahan(1200MW), Lanco-I & II(600MW), Dheeru(600MW) in Chhattisgarh which has sought open access

Standing Committee meeting on Power System Planning in Eastern Region held at Puri on 5th May 2007

Augmentation of Talcher-II transmission system Talcher II-Rourkela 400 kV Quad D/C Talcher II- Behrampur-Gazuwaka 400 kV D/C with switching station at Behrampur and required series compensationEstablishment of 400/220 kV substation at Bolangir by LILO of Meramundali-Jeypore 400 kV S/C line.Transmission system for the new generation capacity planned by DVC viz Koderma (2x500 MW), Bokaro Extn (1x500 MW), Mejia- Extn (2x500 MW), Durgapur (2x500 MW) and Raghunathpur (2x500 MW) together with review of transmission system associated with North Karanpura (3x660 MW) and Maithon RB (1000 MW) Interconnectivity of 400 kV Ranchi substation220 kV bays for DVC at Maithon (PG) and Ranchi (PG)Transmission proposal of WBSETCL for evolving Intra/Inter State Transmission System during 11th Plan Period

Standing Committee meeting on Power System Planning in Eastern Region held at Ranchi on 5th November 2007.

Transmission System for Export of power from different generation projects in Sikkim to NR/WR.Transmission System for development of pooling stations in Sikkim and transfer of power to a new poolingstation on NER-NR/WR HVDC interconnector.

2/3

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

Page 154: Annual Report 07 08

145

Central electricity authority Annual Report 2007-08

Transmission System for development of pooling stations on NER-NR/WR HVDC interconnecter.Associated transmission system for Nabinagar TPP (4x250 MW) of JV of NTPC and Railways.Transmission System for Farakka-III (500MW MPP of NTPC)Transmission proposal of WBSETCL for evolving intra/inter state transmission system during 11th Plan Period.

22nd Meeting of the Standing Committee on Power System Planning in Northern Region

Development of Gujarat-Rajasthan-Punjab transmission corridor

Transmission system from the new generation capacity planned by DVC for supply of power to Delhi, Punjab and Haryana including review of transmission system associated with North Karanpura MPP.

Evacuation system for Jhajjar TPS (1500 MW) and Badarpur-II TPS (2x500 MW)

Northern Region System Strengthening Scheme.

Evacuation System for Hissar TPS (1200 MW).

Transmission system for power evacuation from hydro projects in Uttranchal.

23rd Meeting of the Standing Committee on Power System Planning in Northern Region

Evacuation of power from Jhajjar TPS (1500 MW)

Transmission system associated with Dadri II TPS (2x490 MW)

Transmission system associated with Bawana CCGT (1500 MW)

Region System Strengthening Scheme – New Proposal

Second 400 kV line from Dulhasti HEP(3x130 MW)

Evacuation system from Kotlibhel-1A(195 MW), Kotlibhel-1B (320 MW) and Kotlibhel-2 (530 MW) HEPs in Uttarakhand.

Evacuation of power from Chamera-III (230 MW) and Budhil (70MW)

Details of scope of works under DVC schemes

North East – Northern /Western Interconnection –I - Interregional transmission system

Provision of two additional bays at Parbati Pooling Station

Sharing of charges for transmission system associated with Sasan and Mundra UMPPs

Long term Open Access with Northern Region Constituents

Sorang HEP (100 MW)

Lohari Nagpala (600 MW)

Bhilangana HEP (22.5 MW)

Open access for thermal projects in ER

Dadri SEZ of Reliance

Tapovan Vishnugad

3/3

“A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

Page 155: Annual Report 07 08

Central electricity authority Annual Report 2007-08

146

Annexure 4A [Item No.4.2]

1/2Power Supply Position during 2007-2008

State / System / Region

Require-ment

Availa-bility

Surplus /Deficit (-)

Peak De-mand

Peak Met Surplus /Deficit (-)

( MU ) ( MU ) ( MU ) ( % ) ( MW ) ( MW ) ( MW ) ( % )

Chandigarh 1,446 1,146 0 0.0 275 275 0 0.0

Delhi 22,439 22,301 -138 -0.6 4,075 4,030 -45 -1.1

Haryana 29,353 25,652 -3,701 -12.6 4,956 4,821 -135 -2.7

Himachal Pradesh 5,992 5,814 -178 -3.0 1,061 1,010 -51 -4.8

Jammu & Kashmir 11,782 8,362 -3,420 -29.0 1,950 1,439 -511 -26.2

Punjab 42,372 38,795 -3,577 -8.4 8,672 7,340 -1,332 -15.4

Rajasthan 36,738 35,597 -1141 -3.1 6,374 5,564 -810 -12.7

Uttar Pradesh 62,628 51,335 -11,293 -18.0 11,104 8,568 -2,536 -22.8

Uttaranchal 7,047 6,845 -202 -2.9 1,200 1,150 -50 -4.2

Northern Region 219,797 196,147 -23,650 -10.8 32,462 29,495 -2,967 -9.1

Chhattisgarh 14,079 13,409 -670 -4.8 2,421 2,188 -233 -0.6

Gujarat 68,747 57,614 -11,133 -16.2 12,119 8,885 -3,234 -26.7

Madhya Pradesh 41,560 35,700 -5,860 -14.1 7,200 6,436 -764 -10.6

Maharashtra 114,885 93,846 -21,039 -18.3 18,441 13,575 -4,866 -26.4

Daman & Diu 1,774 1,580 -194 -10.9 240 215 -25 -10.4

D.N.Haveli 3,388 3,372 -16 -0.5 460 424 -36 -7.8

Goa 2,740 2,707 -33 -1.2 457 408 -49 -10.7

Western Region 247,173 208,228 -38,945 -15.8 38,277 29,385 -8,892 -23.2

Andhra Pradesh 64,139 61,511 -2,628 -4.1 10,048 9,162 -886 -8.8

Karnataka 40,320 39,230 -1,090 -2.7 6,583 5,567 -1,016 -15.4

Kerala 15,663 15,284 -379 -2.4 2,918 2,730 -188 -6.4

Tamil Nadu 65,780 63,954 -1,826 -2.8 10,334 8,690 -1,644 -15.9

Pondicherry 1,841 1,841 0 0.0 276 276 0 0.0

Lakshadweep 24 24 0 0 6 6 0 0

Southern Region 187,743 181,820 -5,923 -3.2 26,777 24,368 -2,409 -9.0

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

Page 156: Annual Report 07 08

147

Central electricity authority Annual Report 2007-08

State / System / Region

Require-ment

Availa-bility

Surplus /Deficit (-)

Peak De-mand

Peak Met Surplus /Deficit (-)

( MU ) ( MU ) ( MU ) ( % ) ( MW ) ( MW ) ( MW ) ( % )

Bihar 9,155 7,933 -1,222 -13.3 1,882 1,243 -639 -32.0

DVC 13,387 13,039 -348 -2.6 1,852 1,803 -49 -2.6

Jharkhand 5,139 4,458 -681 -13.3 865 787 -78 -9.0

Orissa 18,846 18,500 -346 -1.8 3,142 2,905 -237 -7.5

West Bengal 29,020 27,902 -1,118 -3.9 5,283 4,987 -296 -5.6

Sikkim 286 267 -19 -6.6 69 66 -3 -4.3

Andaman- Nicobar 240 180 -60 -25.0 40 32 -8 -20

Eastern Region 75,833 72,099 -3,734 -4.9 12,031 10,699 -1,332 -11.1

Arunachal Pradesh 391 302 -89 -22.8 101 75 -26 -25.7

Assam 4,816 4,412 -404 -8.4 848 766 -82 -9.7

Manipur 530 501 -29 -5.5 119 97 -22 -18.5

Meghalaya 1,620 1,232 -388 -24.0 455 279 -176 -38.7

Mizoram 288 246 -42 -14.6 97 58 -39 -40.2

Nagaland 377 334 -43 -11.4 91 88 -3 -3.3

Tripura 777 686 -91 -11.7 171 141 -30 -17.5

North-Eastern Re-gion 8,799 7,713 -1,086 -12.3 1,742 1,347 -395 -22.7

All India 739,345 666,007 -73,338 -9.9 108,866 90,793 -18,073 -16.6

2/2

“It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

Page 157: Annual Report 07 08

Central electricity authority Annual Report 2007-08

148 “The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

Annexure 4B [Item No.4.5]

Status of Capacitor Installation during 2007-08 (All figures in MVAR)

State /U.T. / System/ Region

Installedas on

1/04/2007

Requirementduring

2007-2008

Programmeof SEBs

2007-2008

Actual Additionduring

2007-2008

Balance

(A) (B) (C) (D) (E=B-D)

Northern Region

Delhi 3456 274 274 0 274

Haryana 2610 1295 1295 163 1132

Punjab 5335 378 378 115 263

Rajasthan 3539 261 261 193 68

U.P. 5712 538 538 100 438

Uttaranchal 220 230 230 133 97

Himachal Pradesh 420 110 110 94 16

Jammu & Kashmir 147 1073 1073 0 1073

Chandigarh 100 63 63 2 61

Total (NR) 21539 4222 4222 800 3422

Western Region

Gujarat 4621.507 0

Madhya Pradesh 3749.4 396

Chhattisgarh 633.435 100

Maharashtra 5916.549 20

Goa 149.8 0

Total (WR) 15070.691 516

Southern Region

Andhra Pradesh 6583.4 110 110 10 100

Karnataka 4312.35 60 60 174.11 0

Kerala 1005 15 15 0 15

Tamil Nadu 3947.5 20 20 0 20

Total (SR) 15848.25 205 205 184.11 135

Total 52457.941 4222 205 1500.11 3422

Page 158: Annual Report 07 08

149

Central electricity authority Annual Report 2007-08

“Honesty is the first chapter in the book of wisdom.”

Annexure-5A [Item 5.4]

1/2Hydro Capacity Addition during the year 2007-08

(Programme : 2751 MW)

SlNo.

Name of Project/State/Organisation

Nos. xSize= Capacity MW

UnitNo.

Capacity (MW)

Targetat beginning of

the year

Date of Rotation

Date of commissioning

Units Commissioned during 2006-07

Central Sector

1 OmkareshwarMP/ NHDC8x65= 520 MW

12345678

6565656565656565

May 07May 07July 07July 07Aug 07Aug 07Sep 07Sep 07

07.07.0728.07.0716.08.0701.09.0718.09.0725.09.0701.10.0712.10.07

21.07.0709.08.0729.08.0713.09.0729.09.0718.10.0727.10.0704.11.07

2 Teesta VSikkim/NHPC.3x170 MW.

231

170170170

Jan 08Feb 08Feb 08

01.02.0815.02.0828.01.08

06.02.0820.03.0828.03.08

Sub Total (CS) 1030

State Sector

3 PuruliaW.B. / WBSEB4x225 MW

4321

225225225225

May 07July 07Sep 07Nov 07

27.03.0707.07.0728.10.0707.12.07

18.07.07*27.08.07*23.11.07*20.01.07*

4 Maneri BhaliUttarakhand / UJVNL4x76 MW

4132

76767676

Oct 07Jan 08Nov 07Dec 07

10.01.0807.01.0822.01.0819.01.08

16.01.0810.03.0825.01.0810.03.08

5 Balimela Extn.Orissa/OHPC2x75 MW

12

7575

May 07July 07

31.07.0707.02.07

05.01.0827.03.08

6 Priyadarshni Jurala AP/APGENCO6x39= 234 MW

123

393939

July 07Oct 07Jan 08

04.08.06--

28.03.08--

Sub Total (SS) 1393

Total 2423 pumping mode•

Page 159: Annual Report 07 08

Central electricity authority Annual Report 2007-08

150 “Ambition should be made of sterner stuff.”

B Hydro Capacity slippage from the year 2007-08

SlNo.

Name of Project/State/Organisation

Nos.xSize= Capacity MW

UnitNo.

Capacity (MW)

Targetat beginning of the year

Reasons for slippage

State Sector

1 Ghatghar PSS Maharastra./GOMID2x125 MW

21

125125

Jun 07Aug 07

Units erection got initially delayed due to single shift working and repairs of shaft seal of Unit #2 supplied by M/s BHEL. The commissioning activities also suffered due to shortage of material for phase dis-connector switch supplied by M/s BHEL.

13 Priyadarshni Jurala AP/APGENCO6x39= 234 MW

23

3939

Oct 07Jan 08

Unit erection got initially delayed due to single shift working.

Total (slippage) 328

2/2

Page 160: Annual Report 07 08

151

Central electricity authority Annual Report 2007-08

“The one exclusive sign of thorough knowledge is the power of teaching.”

Annexure-5B [Item 5.4.1]

1/2

Hydro Capacity Addition programme for 2008-09

ProgrammeSl. No

Project name / State / Executing Agency/

Capacity

MW Commi- ssioning

Broad Status

1 Baglihar J&KJKPDC3x150 MW

150150150

Sep 08 Oct 08Nov 08

Dam- 88%(20.22/23.1 lac cum) concreting completed. Slow progress due to damage caused by floods in July/August, 2005.Intake Structure- 94% (2.28/2.41 lac/cum) concreting completed.HRT-:Excavation completed. Overt lining 99% (1936/1960 m) & Invert lining 99%(2044/2050 m) completed.Surge Shaft-Excavation & concreting completed. Orifice raft & back filling plates completed. All the three units boxed up and are under preservation. Dry testing .is in progress.Flooring and false ceiling work is in progress in GIS floor. Fabrication of gates & Hoists in progress. 10 Nos. transformers brought to transformer hall and 77% erection completed.

2. Ghatghar MaharastraWRD2x125 MW

125125

May 08July 08

All Civil and H&M works completed.Unit #1 & #2: Rotated on 19.02.2008 and 20.12.2008.Pre-commissioning tests of Unit # 1 are under progress.

3. Priydarshni JuralaAndhra PradeshAPGENCO 6x39 MW

393939

July 08Nov-08Jan 09

Intake (12 nos.) – Fabrication of 20 stop-log gates and monorail hoist completed. Erection of hydraulic hoist for intake gates completed for 8 gates and are in progress for other gates. Power House - Power House concreting in progress. Unit #1- Synchronization on 28.03.2008.Unit #2- Stator building in service bay completed. Erection of unit is in progress.Unit #3- Draft tube erection and concreting completed. Raising of side walls & floors are in progress.Unit #4 & #5- Draft tube erection and concreting completed. Raising of side walls & floors are in progress.Unit #6- Draft tube erection and concreting completed. Raising of side walls & floors are in progress.

Page 161: Annual Report 07 08

Central electricity authority Annual Report 2007-08

152 “Children are our most valuable natural resource.”

Programme

Sl. No

Project name / State / Ex-ecuting Agency/ Capacity

MW LikelyCommng

Broad Status

4. Varahi Karnataka.KPCL2x115 MW

115115

Dec-08Feb-09

Penstock- All 101 erected and concreted.Pressure Shaft- Out of 117 shells, 107 shells from inter adit to wye chamber erected and concreted.Power House- LOA for civil works issued to M/s IHP Pvt. Ltd., Pune on 30.11.2005. LOA for E&M works issued to M/s VATECH on 31.05.2006. Reinforcement, shuttering and RCC works in Power House are in progress. Erection & concreting of distributor for Unit-1 & 2 completed. Generator barrel concreting is in progress. Assembly of stator & rotor is also in progress.

5. Kutiyadi Adl. KeralaKSEB Extn.2x50 MW

50 Mar-09 Intake - Excavation of Intake and appurtement structures completed.Head Race Tunnel (HRT) Excavation completed. 598m overt & 505m Invert lining completed. Surge Shaft - Excavation completed.Penstock (surface)- Penstock track excavating work in progress. Fabrication of steel liner ferrules completed except for ‘Y’ pieces and expansion joints. Forest clearance for 1.6 Ha land obtained on 4.12.06. Erection of steel liner in progress.Power House–Concreting works almost completed and finishing work is in progress.Unit # 1: Stator positioned and rotor has been low-ered. Alignment of unit is in progress.Unit # 2: Stator assembly & rotor assembly com-pleted in service bay.

Total 1097

2/2

Page 162: Annual Report 07 08

153

Central electricity authority Annual Report 2007-08

“The farther backward you can look, the farther forward you are likely to see.”

Annexure-5C [Item-5.8]

1/3HYDRO PROJECTS IDENTIFIED FOR BENEFITS

DURING 12th PLAN (TENTATIVE)Sl.No.

Name of scheme Type State Agency Installed Capacity

(MW)

Benefit in12th Plan

1 Bajoli Holi ROR H.P. IPP 180 1802 Dhamvari Sunda ROR H.P. HPSEB 70 703 Jhangi Thopan @ ROR H.P. IPP 480 4804 Thopan Powari@ ROR H.P. IPP 480 4805 Kutehr ROR H.P. IPP 260 2606 Luhri ROR H.P. SJVNL 776 7767 Pudital Lassa STO H.P. IPP 36 368 Renuka dam STO H.P. HPSEB 40 409 Sainj ROR H.P. HPSEB 100 10010 Tidong-II ROR H.P. IPP 70 7011 Kashang - I ROR H.P. HPJVVNL 65 6512 Kashang-II ROR H.P. HPSEB 65 6513 Kashang -III ROR H.P. HPJVVNL 65 6514 Kashang -IV ROR H.P. HPJVVNL 48 4815 Shongtong Karcham ROR H.P. HPSEB 402 40216 Baglihar-II ROR J & K PDC 450 45017 Kiru ROR J & K To be decided 600 60018 Kawar ROR J & K To be decided 520 52019 Kishan Ganga ROR J & K NHPC 330 33020 Parnai ROR J & K PDC 37.5 37.521 Pakhal Dul STO J & K NHPC 1000 100022 Ratle ROR J & K To be decided 690 69023 Sawalkot ROR J & K PDC 1200 120024 Chutak ROR J & K NHPC 44 4425 Nimboo Bazgo ROR J & K NHPC 45 4526 Kotlibhel-St-1A ROR Uttaranchal NHPC 195 19527 Kotlibhel-St-1B ROR Uttaranchal NHPC 320 32028 Kotlibhel-St-II ROR Uttaranchal NHPC 530 53029 Lata Tapovan ROR Uttaranchal NTPC 171 17130 Vishnugad Pipalkoti ROR Uttaranchal THDC 444 44431 Arkot Tiuni ROR Uttaranchal UJVNL 72 7232 Alaknanda (Badrinath) ROR Uttaranchal IPP 300 30033 Mapang Sirkari ROR Uttaranchal IPP 370 37034 Bowala Nand Prayag ROR Uttaranchal UJVNL 300 30035 Devsari Dam ROR Uttaranchal SJVNL 252 252

Page 163: Annual Report 07 08

Central electricity authority Annual Report 2007-08

154

Sl.No.

Name of scheme Type State Agency IC(MW)

Benefit in12th Plan

36 Hanol Tiuni ROR Uttaranchal IPP 60 6037 Jakhol Sankari ROR Uttaranchal SJVNL 33 3338 Maleri Jhelam ROR Uttaranchal THDC 55 5539 Jelam Tamak ROR Uttaranchal THDC 60 6040 Lakhwar STO Uttaranchal NHPC 300 30041 Mori Hanol ROR Uttaranchal IPP 60 6042 Nand Prayag Lingasu ROR Uttaranchal UJVNL 141 14143 Naitwar Mori (Dewra

Mori)ROR Uttaranchal SJVNL 33 33

44 Pala Maneri ROR Uttaranchal UJVNL 480 48045 Rupsiyabagar

KhasiyabaraROR Uttaranchal NTPC 260 260

46 Singoli Bhatwari ROR Uttaranchal IPP 99 9947 Tamak Lata ROR Uttaranchal UJVNL 280 28048 Tuini Plasu ROR Uttaranchal UJVNL 42 4249 Dhauli Ganga

IntermediateROR Uttaranchal NHPC 210 210

50 Gauri Ganga St III-A ROR Uttaranchal NHPC 120 12051 Kishau Dam STO Uttaranchal THDC 600 60052 Shahpur Kandi STO Punjab PSEB 168 16853 Hosangabad ROR MP NHDC 60 6054 Handia ROR MP NHDC 51 5155 Baurus ROR MP NHDC 55 5556 Matnar ROR Chhattisgad CSEB 60 6057 Dummugudem STO A..P. APID 320 32058 Pollavaram MPP STO A..P. APID 960 96059 Pulichintala ROR A..P. APGENCO 120 12060 Chinnar ROR Kerala KSEB 28 2861 Achenkovil STO Kerala KSEB 30 3062 Pambar ROR Kerala KSEB 40 4063 Kundah PSS PSS Tamil Nadu TNEB 500 50064 Gundia ROR Karnataka KPCL 400 40065 Ramam St-I ROR W. B. WBSEDCL 36 3666 Ramam St-III ROR W. B. NTPC 120 12067 Panan ROR Sikkim IPP 280 28068 Dikchu ROR Sikkim IPP 96 9669 Rolep ROR Sikkim IPP 60 6070 Rangit-II ROR Sikkim IPP 66 6671 Rangit-IV ROR Sikkim IPP 120 12072 Lachen ROR Sikkim NHPC 210 210

2/3

“Failing to plan is planning to fail.”

Page 164: Annual Report 07 08

155

Central electricity authority Annual Report 2007-08

Sl.No.

Name of scheme Type State Agency IC(MW)

Benefit in12th Plan

73 Rangyong ROR Sikkim IPP 80 8074 Rongnichu STO Sikkim IPP 96 9675 Teesta St.-II ROR Sikkim IPP 480 48076 Teesta-III ROR Sikkim IPP 1200 60077 Teesta St.-IV ROR Sikkim NHPC 495 49578 Teesta-VI ROR Sikkim IPP 500 50079 Jorethang Loop ROR Sikkim IPP 96 9680 Pare ROR Ar. P NEEPCO 110 11081 Siang Lower STO Ar. P IPP 2025 202582 Siang Middle (Siyom) STO Ar. P IPP 1000 100083 Dibbin ROR Ar. P IPP 125 12584 Badao ROR Ar. P To be decided 60 6085 Talong ROR Ar. P IPP 160 16086 Etalin STO Ar. P To be decided 4000 400087 Attunli ROR Ar. P To be decided 500 50088 Nyamjunchhu St-I ROR Ar. P IPP 98 9889 Nyamjunchhu St-II ROR Ar. P IPP 97 9790 Nyamjunchhu St-III ROR Ar. P IPP 95 9591 Dibang STO Ar. P NHPC 3000 300092 Tawang-I ROR Ar. P NHPC 750 75093 Tawang-II ROR Ar. P NHPC 750 75094 Subansiri Upper STO Ar. P NHPC 2000 200095 Subansiri Middle STO Ar. P NHPC 1600 160096 Ranganadi-II STO Ar. P NEEPCO 130 13097 Tato-II ROR Ar. P IPP 700 70098 Hirong ROR Ar. P IPP 500 50099 Demwe STO Ar. P IPP 3000 3000100 Lower Kopili ROR Assam APGCL 150 150101 Upper Borpani ROR Assam APGCL 60 60102 Tipaimukh STO Manipur NEEPCO 1500 1500103 Loktak D/S ROR Manipur NHPC 66 66104 Turial STO Mizoram NEEPCO 60 60105 Mawhu ROR Meghalaya NEEPCO 90 90

@ Proposed to be combined as one scheme

3/3

“Let our advance worrying become advance thinking and planning.”

Page 165: Annual Report 07 08

Central electricity authority Annual Report 2007-08

156

Ann

exur

e-5D

[Ite

m 5

.18.

3]

CO

ST R

ED

UC

TIO

N A

CH

IEV

ED

BY

CE

A IN

HA

RD

CO

ST &

SO

FT C

OST

AT

TH

E T

IME

OF

AC

CO

RD

ING

CO

NC

UR

RE

NC

E T

O V

AR

IOU

S H

YD

RO

PO

WE

R P

RO

JEC

TS

DU

RIN

G 2

007-

2008

Figu

res I

n C

rore

s

Sl.

No

Proj

ect/P

rom

oter

Inst

alle

d

capa

city

(MW

)D

ate

of

Cle

ar-

ance

As p

er D

PRA

s per

TE

CSa

ving

in

Har

d C

ost

Savi

ng in

Sof

t C

ost

Tota

l sa

ving

% sa

v-in

g in

H

ard

Cos

t

%

sav-

ing

in

Soft

C

ost

Har

d C

ost

Soft

C

ost

Tota

lH

ard

Cos

tSo

ft

Cos

tTo

tal

1.R

angi

t Sta

ge IV

/ M

/s

Jal P

ower

Cor

pora

-tio

n Li

mite

d3x

40 =

120

6.07

. 07

581.

5276

.11

657.

6355

4.42

90.3

164

4.73

27.1

0N

il27

.10

4.66

0

2.Lo

wer

Jura

la H

EP /

M/s

APG

ENC

O6x

40 =

240

24.0

7. 0

777

8.2

106.

8788

5.07

778.

7212

9.62

908.

34N

ilN

ilN

il0

0

3.Pa

re H

EP /

M/s

NEE

PCO

2x55

= 1

1024

.09.

07

566.

258

.67

624.

8750

3.99

49.2

655

3.25

62.2

19.

4171

.62

10.9

816

4.D

iban

g M

PP /

NH

PC12

x250

= 3

000

23.0

1. 0

815

174.

9925

46.3

817

721.

3713

877.

1426

13.8

216

490.

9612

97.8

5N

il12

97.8

58.

550

Tota

l34

70

1710

0.91

2788

.03

1988

8.94

1571

4.27

2883

.01

1859

7.28

1387

.16

9.41

1396

.57

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

Page 166: Annual Report 07 08

157

Central electricity authority Annual Report 2007-08

Annnexure -6A[Item 6.2]

SALIENT FEATURES OF THE NINE ULTRA MEGA POWER PROJECTS

S.No.

Name of

UMPP

State District Name of Shell

Company

Capacity (MW)

Power Trans

mission Voltage (kV)

Status Levelised tariff

(Rs/kwh)

Year of Commissioning worked out as

per PPA

1 Mundra UMPP

Gujarat Kutch Costal Gujarat Power Limited

5x800 400 Awarded to Tata Power Company.

2.26367 U 1- Aug.2012U 2-Feb. 2013U 3- Aug. 2013U 4- Feb 2014U 5- Aug 2014

2 Sasan UMPP

M.P Sidhi Sasan Power Limited

6x660 400/765 Awarded to Reliance Power Limited

1.19616 U-1- May 2013U-2- Dec 2013U 3- July 2014U 4- Feb 2015U 5- Sept. 2015U 6- April 2016

3 Krishna- patnam UMPP

A.P. Nellore Coastal Andhra Power Limited

5x800 400 Awarded to Reliance Power Limited

2.33296 U 1- Sept.2013U 2-April 2014U 3- Oct. 2014U 4- April 2015U 5- Oct. 2015

4 Tilaiya UMPP

Jhark-hand

Hazar-ibagh

Jharkhand Intergated Power Limited

4000 765 - -

5 UMPP in Chhattisgarh

Chhatt-isgarh

Sarguja Akaltara Power Limited

4000 - - -

6 UMPP in Tamil Nadu

Tamil Nadu

Kanch-ipuram

Coastal Tamil Nadu Power Limited

4000 - - -

7 UMPP in Orissa

Orissa Sunder-garh

Orissa Intergated Power Limited

4000 - - -

8 UMPP in Maharashtra

Mahar-ashtra

Coastal Maharashtra Mega Power Limited

4000 - - -

9 UMPP in Karnataka

Karna-taka

Coastal Kar-nataka Pow-er Limited

4000 - - -

“A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

Page 167: Annual Report 07 08

Central electricity authority Annual Report 2007-08

158

Annexure –6B[Item 6.3]

1/4

CONSOLIDATED LIST OF IPP PROJECTS RECOMMENDED BY STANDING COMMITTEE OF CEA FOR GRANT OF

COAL LINKAGE/LOASr. No.

Name of the project(State)

Capacity (MW) LOA already granted by SLC/

Capacity for which LOA already recommended

by the Standing Committee of CEA

(MW)

Fresh/ additional Capacity for which LOA

recommended by Standing

Committee of CEA(MW)

Remarks

1. Navbharat Power Ltd.(Orissa)

2 x 520(1040)

1x520 1x520

2 Sterlite Energy Pvt. Ltd.(Orissa)

4x600(2400)

1x600 3x600

3 GMR Energy Ltd.(Orissa)

2x500(1000)

1x500 1x500 IPP informed to CEA that they intend to set up 3x350 MW plant.

4 Dheeru Power Gen. Pvt. Ltd.(Chhattisgarh)

2x350 (700)

1x350 1x350

5 RKM Powergen Pvt. Ltd.(Chhattisgarh)

4 x 350(1400)

1x350 2x350 Water linkage is adequate for 3x350 MW capacity only.

6 Lanco Group Limited(Orissa)

2x660(1320)

1x660 1x660

7 Lanco Amarkantak Power Private Limited Ph-III(Chhattisgarh)

1x600(600)

- 1x600

8 Jindal Photo(Orissa)

4x250(1000)

1x250 3x250

9 EMCO Energy Limited Ph-II(Maharashtra)

1x250(250)

- 1x250

10 SKS Ispat & Power(Chhattisgarh)

3x220(660)

1x220 2x220

11 Mahanadi Aban Lyod Chiles Offshore Ltd.(Orissa)

2x515(1030)

- 2x515 Name of the company as per details received in CEA is Mahanadhi Aban Power Co. Ltd.

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

Page 168: Annual Report 07 08

159

Central electricity authority Annual Report 2007-08

Sr. No

Name of the project(State)

Capacity (MW) LOA already granted by SLC/

Capacity for which LOA already recommended

by the Standing Committee of CEA

(MW)

Fresh/ additional Capacity for which LOA

recommended by Standing

Committee of CEA(MW)

Remarks

12 Adhunik Thermal Energy Limited(Jharkhand)

4x250(1000)

- 4x250

13 BALCO(Chhattisgarh)

1200 - 1200 IPP informed to CEA that they intend to set up 4x300 MW plant.

14 Rosa Power Supply Company Limited(UP)

2x300(Ph-II)

- 2x300

15 Gorra TPP of M/s Patni projects ltd.(Chhattisgarh)

4x135 - 4x135

16 Bhengari PP of Mahavir Global Coal Ltd. (Chhattisgarh)

2x250+1x5001000

- 2x250 Water allocation is sufficient for 500 MW capacity only.

17 CESC (Unit-3)(West Bengal)

1x250 - 1x250

18. KVK Nilanchal Power Pvt Ltd(Orissa)

300 MW+2x350 MW

300 MW 350 Allocated water sufficient for 650 MW capacity only.

19 Aryan Coal Benefications Pvt. Ltd.(Chhattisgarh)

2x125 MW - 2x125

20 Goindwal Sahib Thermal Power project(Punjab)

2x270 MW - Tapering linkage recommended

Tokisud coal block has been allocated. Allocation of additional coal block was under consideration of Ministry of Coal.

21 Today Homes and Infrastructure Pvt. Ltd.(Madhya Pradesh)

2x500 MW - 2x500

22 East Coast Energy Pvt Limited – Bhavanapadu TPP(Andhra Pradesh)

2640 MW - Ph-I- 2x660 MW

23 CESC Limited (Orissa)

600 MW Ph- I (Ultimate1000 MW)

Ph- I-600 MW

2/4

“It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

Page 169: Annual Report 07 08

Central electricity authority Annual Report 2007-08

160 “The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

Sr. No

Name of the project(State)

Capacity (MW) LOA already granted by SLC/

Capacity for which LOA already recommended

by the Standing Committee of CEA

(MW)

Fresh/ additional Capacity for which LOA

recommended by Standing

Committee of CEA(MW)

Remarks

24 Visa Power Limited –Cuttak Power Plant(Orissa)

Ph-I-2x250 MWPh-II-2x250 MW(Ultimate 4x250 MW)

- Ph-I-2x250 MW Water is adequate •for around 600 MW capacity.Company revised •the capacity from 4x250 MW units to 4x300 MW units. The application to Ministry of Coal is for 4x250 MW.

25 TRN Energy Private Limited(Chhattisgarh)

675 MW - 675

26 Ispat Industries Limited(Chhattisgarh)

4x300 MW(1200)

- 4x300

27 Bhushan Power & Steel(Chhattisgarh)

1500 MW(3x500 )

- 1x500 Water allocation is24 million cubic meter per annum adequate for about 700 MW.

28Athena Chhattisgarh Power Pvt. Ltd.(Green Infrastructure Private Limited-GIPL)(Chhattisgarh)

2x660 MW(1320 MW)

- 660 Water allocation of 20 million cubic meter per annum approved by Water Resource Deptt., Govt. of Chhattisgarh adequate for about 660 MW

29 DCM Shriram Consolidated Limited(DSCL) (Chhattisgarh)

2x300 - 2x300

30 BLA Chhattisgarh Thermal Power P. Limited(Chhattisgarh)

Phase-I-1x270Phase-II-1x270

- 1x270 Company intends to set up plant in two phases.

31 Sophia Power Company Limited(Maharashtra)

St-I- 3x660 + St-II- 1x660

- 3x660 Land is sufficient for stage-I only.

32 Thermal Powertech Corporation (India) Ltd. (Andhra Pradesh)

2x660 - 2x660

3/4

Page 170: Annual Report 07 08

161

Central electricity authority Annual Report 2007-08

“Honesty is the first chapter in the book of wisdom.”

Sr. No

Name of the project(State)

Capacity (MW) LOA already granted by SLC/

Capacity for which LOA already recommended

by the Standing Committee of CEA

(MW)

Fresh/ additional Capacity for which LOA

recommended by Standing

Committee of CEA(MW)

Remarks

33 Essar Power (Orissa)Limited(Orissa)

2x600 - 2x600

34 SV Power Pvt Ltd (Chhattisgarh)

2 x 50 2 x 50 Washery rejects mixed with raw coal.

35 Aryan Coal Benefications Pvt. Ltd.(Chhattisgarh)

30 30 Washery rejects mixed with raw coal.

36 Bhengari Power Project of M/s Mahavir Energy & Coal Beneficiation Limited Ph-I(Chhattisgarh)

30 30 Washery rejects mixed with raw coal.

37 Bhengari Power Project of M/s Mahavir Energy & Coal Beneficiation Limited- (Chhattisgarh)

12 12 Biomass with coal as support fuel.

38 Bhengari Power Project of M/s Mahavir Energy & Coal Beneficiation Limited Ph-II(Chhattisgarh)

30 30 Washery rejects mixed with raw coal.

39 Gupta Power (Prop. Gupta Coalfields & Washeries Limited)(Maharashtra)

2x60 2x60 Washery rejects mixed with raw coal.

Total 24437

4/4

Page 171: Annual Report 07 08

Central electricity authority Annual Report 2007-08

162 “Ambition should be made of sterner stuff.”

Annexure-6C [Item 6.6]

THERMAL POWER PROJECTS COMMISSIONED IN 2007-08Sector/Project Name State Implement-

ing AgencyUnit Capacity Actual

Date of Com-missioning

CENTRAL SECTORKahalgaon St-2,Ph-1 Bihar NTPC U-6 500 16-Mar-08Sipat-2 Chhattisgarh U-4 500 27-May-07Ratnagiri (Dhabol) JV Ph-II,

Maharastra RGPPL Block-3 740 28-Oct-07

Block-3Mejia TPS WB DVC U-6 250 1-Oct-07

Sub-Total : 1990STATE SECTORRayalseema AP APGENCO U-4 210 20-Nov-07Korba East TPP St-5 Chhattisgarh CSEB U-2 250 11-Dec-07Dhuvaran CCPP Extn. Gujarat GSECL ST 40 13-Aug-07Yamuna Nagar TPP Haryana HPGCL U-1 300 13-Nov-07

U-2 300 29-Mar-08Bellary Karanataka KPCL U-1 500 3-Dec-07Paras TPP Extn Ph-1 Maharastra MSPGCL U-1 250 31-May-07Sanjay Gandhi (Birsinghpur)

MP MPPGCL U-1 500 18-Jun-07

TPP Extn. St-3Guru Har Govind TPS-II Punjab PSEB U-3 250 3-Jan-08Dholpur CCGT Rajasthan RRVUNL GT-2 110 16-Jun-07

ST 110 27-Dec-07Bakereshwar TPS WB WBPDCL U-4 210 23-Dec-07Durgapur TPS Extn DPL U-7 300 24-Nov-07Sagardighi TPP WBPDCL U-1 300 21-Dec-07SantaldihTPP Extn. Ph-1 U-5 250 10-Jul-07

Sub-Total : 3880PRIVATE SECTORO.P.Jindal STPP Chhattisgarh Jindal Power

Ltd.U-1 250 2-Sep-07

U-2 250 6-Mar-08U-3 250 10-Feb-08

Sub-Total : 750Total

(11th Plan):6620

Page 172: Annual Report 07 08

163

Central electricity authority Annual Report 2007-08

“The one exclusive sign of thorough knowledge is the power of teaching.”

Annexure-6D [Item 6.6.1]

1/2

THERMAL POWER PROJECTS IDENTIFIED FOR COMMISSIONING DURING 2008-09

Project Name/Sector State Implementing Agency

Unit Capacity Anticipated Commi- ssioning

DateCENTRAL SECTORKahalgaon St-2,Ph-2

Bihar NTPC U-7 500 8-Oct

Bhilai TPP Ph-I Chhattisgarh NTPC U-1 250 8-AprU-2 250 8-Sep

Sipat-2 U-5 500 8-JunSipat-I U-1 660 8-NovChandrapura TPS Extn.

Jharkhand DVC U-7 250 8-Aug

U-8 250 9-FebBarsingsar Lignite Rajasthan NLC U-1 125 8-Dec

U-2 125 9-MarSub-Total : 2910

STATE SECTORVijayawada TPP -IV

AP APGENCO U-1 500 8-Nov

Kutch Lignite TPS Extn

Gujarat GSECL U-4 75 8-Jun

Surat Lignite TPP Extn.

GIPCL U-3 125 8-Nov

Amarkantak TPS Extension

MP MPPGCL U-5 210 8-May

Guru Har Govind TPS-II

Punjab PSEB U-4 250 8-Jul

Chhabra TPS Rajasthan RRVUNL U-1 250 8-OctU-2 250 8-Dec

Giral Lignite-II U-2 125 8-SepKota TPP U-7 195 8-NovSuratgarh TPP U-6 250 8-NovValuthur CCPP Extn. TN TNEB GT 59.8 8-Apr

ST 32.4 8-JunBakereshwar TPS WB WBPDCL U-5 210 8-Aug

Page 173: Annual Report 07 08

Central electricity authority Annual Report 2007-08

164 “Children are our most valuable natural resource.”

Sagardighi TPP U-2 300 8-JulSub-Total : 2957

PRIVATE SECTORGautami CCPP AP Gautami Power

LtdGT-1 145 8-Sep

GT-2 145 8-SepST 174 8-Sep

Konaseema CCPP AP Konaseema EPS GT-1 140 8-SepGT-2 140 8-SepST 165 8-Sep

Lanco Amarkantak TPS Ph-1, U-1

Chhattisgarh Lanco Amarkantak

Power Pvt. Ltd.

U-1 300 8-Sep

O.P. Jindal STPP Jindal Power Ltd. U-4 250 8-JunSugen CCPP (Akhakhol)

Gujarat Torrent Power Gen. Ltd.

Blk-I 376 8-Aug

Blk-II 376 8-OctBlk-III 376 8-Dec

Toranagallu TPP Karanataka JSW Energy

(Vijayanagar) Ltd

U-1 300 8-Oct

U-2 300 9-JanTrombay TPS Extn Maharashtra Tata Power

CompanyU-8 250 8-Oct

Sub-Total 3437Total

(2008-09)9304.2

2/2

Page 174: Annual Report 07 08

165

Central electricity authority Annual Report 2007-08

“The farther backward you can look, the farther forward you are likely to see.”

Annexure-6E [Item 6.16.2]

1/4STATE SECTOR

10TH PLAN SCHEMES SPILLED OVER TO 11TH PLAN IN STATE SECTOR

Sl. No.

Name of Utility Name of Station

Unit No. Year of Commi- ssioning

Capacity (MW)Rated Derated

Punjab1 PSEB Ropar 1 1984 210 2102 2 1985 210 2103 3 1988 210 2104 4 1989 210 2105 5 1992 210 2106 6 1993 210 210

Total 6 1260 1260Maharashtra7 MSEB Koradi 5 1978 200 2008 6 1982 210 2109 7 1983 210 210

Total 3 620 62010 Chandrapur 1 1983 210 21011 2 1984 210 21012 3 1985 210 21013 4 1986 210 21014 5 1991 500 50015 6 1992 500 500

Total 6 1840 184016 Parli 3 1980 210 21017 4 1985 210 21018 5 1987 210 210

Total 3 630 630SUB TOTAL 18 4350 4350

ADDITIONAL UNITS FOR R&M WORKS DURING 11TH PLAN IN STATE SECTOR

Sl. No.

Name of Utility Name of Station

Unit No. Year of Commissi-

oning

Capacity (MW)Rated Derated

Delhi19 IPGCL Rajghat 1 1989 67.5 67.520 2 1989 67.5 67.5

Total 2 135 135

Page 175: Annual Report 07 08

Central electricity authority Annual Report 2007-08

166

Jharkhand21 JSEB Patratu 9 1984 110 11022 10 1986 110 110

Total 2 220 220West Bengal

23 DPL Durgapur 6 1985 110 110Total 1 110 110

Bihar24 VPGCL (JV of

NTPC & BSEB)Muzaffarpur 1 1985 110 110

25 2 1986 110 110Total 2 220 220

SUB TOTAL 7 685 685TOTAL OF STATE SECTOR R&M : 25 5035 5035

CENTRAL SECTOR 10TH PLAN R&M SCHEMES SPILLED OVER TO 11TH PLAN

Sl. No. Name of Utility Name of Station

Unit No. Year of Commissioning

Capacity (MW)Rated Derated

26 NTPC Singrauli 1 1982 200 20027 2 1982 200 20028 3 1983 200 20029 4 1983 200 20030 5 1984 200 20031 6 1986 500 50032 7 1987 500 500

Total 7 2000 200033 Vindhyachal 1 1987 210 21034 2 1987 210 21035 3 1989 210 21036 4 1990 210 21037 5 1990 210 21038 6 1991 210 210

Total 6 1260 126039 Korba 1 1983 200 20040 2 1983 200 20041 3 1984 200 20042 4 1987 500 50043 5 1988 500 500

2/4

“Failing to plan is planning to fail.”

Page 176: Annual Report 07 08

167

Central electricity authority Annual Report 2007-08

44 6 1989 500 500Total 6 2100 2100

45 Ramagundem 1 1983 200 20046 STPS 2 1984 200 20047 3 1984 200 20048 4 1988 500 50049 5 1989 500 50050 6 1989 500 500

Total 6 2100 2100SUB TOTAL 25 7460 7460

ADDITIONAL UNITS FOR R&M WORKS DURING 11TH PLAN

Sl. No. Name of Utility

Name of Station

Unit No. Year of Commissioning

Capacity (MW)Rated Derated

51 NTPC NCTPP, 1 1992 210 21052 Dadri 2 1992 210 21053 3 1993 210 21054 4 1994 210 210

Total 4 840 84055 Tanda 1 1988 110 11056 2 1989 110 11057 3 1990 110 11058 4 1998 110 110

Total 4 440 44059 Unchahar 1 1988 210 21060 2 1989 210 210

Total 2 420 42061 Rihand Stg I 1 1988 500 50062 2 1989 500 500

Total 2 1000 100063 Kahalgaon 1 1992 210 21064 2 1994 210 21065 3 1995 210 21066 4 1996 210 210

Total 4 840 84067 Farakka Stg-I 1 1986 200 20068 STPS 2 1986 200 200

3/4

“Let our advance worrying become advance thinking and planning.”

Page 177: Annual Report 07 08

Central electricity authority Annual Report 2007-08

168

69 3 1984 200 200Total 3 600 600

70 Farakka Stg-II 1 1992 500 50071 STPS 2 1994 500 500

Total 2 1000 100072 Talcher TPS 1 1982 110 11073 Stg-II 2 1983 110 110

Total 2 220 22074 Talcher Kaniha 1 1995 500 50075 Stg-I, STPS 2 1996 500 500

Total 2 1000 100076 DVC Durgapur 3 1966 140 14077 4 1981 210 210

Total 2 350 350SUB TOTAL 27 6710 6710TOTAL CENTRAL SECTOR R&M: 52 14170 14170TOTAL OF R&M : 77 19205 19205

4/4

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

Page 178: Annual Report 07 08

169

Central electricity authority Annual Report 2007-08

Annexure-7A [Item 7.4]

STATE-WISE TRANSMISSION AND DISTRIBUTION LOSSES (%)STATES/UTs 2003-04 2004-05 2005-06 2006-07*

1 HARYANA 32.07 32.11 30.51 33.352 HIMACHAL PRADESH 22.76 28.90 23.55 19.773 JAMMU & KASHMIR 45.54 41.08 44.93 51.984 PUNJAB 25.96 25.42 27.56 26.615 RAJASTHAN 43.74 44.68 39.92 35.606 UTTAR PRADESH 35.17 34.39 32.63 33.497 UTTARAKHAND 49.23 39.30 35.96 34.488 CHANDIGARH 39.06 30.37 31.64 25.139 DELHI 43.66 45.40 48.61 33.0010 BBMB 1.22 0.98 - -1 GUJARAT 24.20 30.43 27.91 24.872 MADHYA PRADESH 41.44 41.30 40.07 39.243 CHHATTISGARH 42.55 28.06 31.06 31.714 MAHARASHTRA 34.12 32.40 31.60 31.645 D & N HAVELI 15.10 16.00 19.94 11.226 GOA 45.05 35.97 19.68 20.907 DAMAN & DIU 16.88 15.56 21.58 22.091 ANDHRA PRADESH 27.73 23.96 20.06 18.652 KARNATAKA 23.29 26.08 29.77 25.913 KERALA 21.63 22.48 23.50 19.114 TAMILNADU 17.16 19.28 18.66 19.545 LAKSHADWEEP 11.85 10.20 11.19 12.876 PUDUCHERRY 11.60 18.15 18.48 18.761 BIHAR 36.66 38.88 43.96 50.672 JHARKHAND 25.35 19.62 26.82 26.213 ORISSA 57.09 44.02 45.56 40.864 SIKKIM 54.99 50.49 10.73 26.865 WEST BENGAL 31.01 28.54 24.84 23.646 A & N ISLS. 25.95 12.63 24.32 23.107 DVC 2.69 2.69 - -1 ASSAM 39.31 51.76 40.34 33.692 MANIPUR 65.18 70.61 63.12 53.473 MEGHALAYA 16.73 28.35 40.19 35.344 NAGALAND 55.00 48.26 58.99 54.795 TRIPURA 46.44 59.54 41.11 34.756 ARUNACHAL PRADESH 47.54 42.96 49.72 57.797 MIZORAM 55.54 66.14 39.19 38.18

All India 32.53 31.25 30.42 28.65Note * ProvisionalSource : DMLF Division CEA. (General Review)

“A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

Page 179: Annual Report 07 08

Central electricity authority Annual Report 2007-08

170

Annexure-7B [Item 7.4.1]

1/2

AGGREGATE TECHNICAL AND COMMERCIAL (AT &C) LOSSES (%)

State/UT Power Utilities 2003 -04 2004-05 2005-06 2006-07Delhi DVB

BSES Rajdhani Power Ltd. 45.73 41.97 41.25 32.93BSES Yamuna Power Ltd. 55.54 51.70 48.58 43.25North Delhi Power Ltd. 48.16 35.90 28.01 28.33

Haryana DHBVN Ltd. 40.53 43.96 40.78 34.48UHBVN Ltd. 40.09 43.37 41.90 28.96

Himachal HPSEB 9.27 21.71 15.15 13.18J & K Electricity Deptt 68.79 68.34 66.73 67.68Punjab PSEB 25.52 24.00 25.84 24.87Rajasthan Jodhpur VVNL 45.75 47.56 47.04 37.21

Jaipur VVNL 41.67 43.22 42.26 38.06Ajmer VVNL 46.20 49.75 47.54 42.61

Uttar Pradesh UPPCL MVVNL, Lucknow 39.48 38.72 47.19 45.12

PVVNL, Meerut 38.28 32.40 42.43 31.51DVVNL, Agra 51.46 58.02 55.60 50.21PVVNL, Varanasi 45.36 58.07 46.08 NA

Uttarakhand UtPCL 43.48 45.63 38.20 42.85Gujarat Gujarat Urja Vikas Nigam Ltd

(GEB/GUVNL)35.48 35.15

PGVCL 43.06 38.27MGVCL 24.60 20.07DGVCL 22.40 20.59UGVCL 27.57 20.15

Madhya Pradesh MPSEB 41.52 54.27 50.36MP Paschim KVVCo 46.91 NAMP Poorva KVVCo 47.91 52.15MP Madhya KVVCo 43.20 56.64

Chhattisgarh CSEB,Chhattisgarh 30.99 32.30 37.84 36.12Maharashtra MSEB 38.95 26.62 50.22

Maharashtra State Elecy. Distribution Co.Ltd.

36.74 39.35

GOA GOA 21.28 18.34 15.18 19.39

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

Page 180: Annual Report 07 08

171

Central electricity authority Annual Report 2007-08

State/UT Power Utilities 2003 -04 2004-05 2005-06 2006-07Andhra Pradesh APEPDCL, Visakhapatnam 16.57 14.27 12.68 12.46

APSPDCL, Tirupati 17.06 20.55 16.51 17.2APNPDCL, Warangal 9.79 21.91 19.21 26.61APCPDCL 18.99 23.95 18.82 18.24

Karnataka KPTCLBESCOM, Bangalore 28.91 27.62 35.75 31.36MESCOM, Mangalore 25.82 26.63 20.80 12.65HESCOM,Hubli 31.66 41.64 40.38 33.84GESCOM,Gulberga 43.86 42.99 52.73 46.98CESCOM,Chamundi 46.03 40.58

Kerala KSEB 32.74 32.12 25.95 25.02Tamil Nadu TNEB 20.64 19.40 20.53 20.10Lakshadweep Electricity DepttPuducherry PPCL 20.52 16.44 16.06 16.54Bihar BSEB 66.26 66.01 67.46 NAJharkhand JSEB 62.47 68.26 52.91 NAOrrisa SESCO, Berhampur 38.22 35.65 45.48 42.17

NESCO, Balasore 45.06 39.51 41.31 32.52CESCO, Bhubneswar 49.96 55.82 42.54 46.96WESCO, Bhubneswar 38.33 35.88 33.95 36.93

Sikkim Energy & Power Deptt. 66.55 63.60 64.37 NAWest Bengal WBSEB 32.87 23.91 26.59 NAAssam ASEB 43.35 39.31

CAED Co.Ltd,Assam 37.75 NALAED Co.Ltd,Assam 28.25 NAUAED Co.Ltd,Assam 39.68 NA

Manipur Electricity Deptt 69.73 88.50 77.83 94.32Meghalaya MeSEB 39.31 38.16 33.36 37.32Nagaland Deptt. Of Power 55.55 43.22 44.76 52.19Tripura Electricity Deptt 14.82 20.93 24.92 NAArunachal Pradesh

Power Deptt. 16.26 25.54 37.17 52.03

Mizoram Power & Electricity Deptt. 38.44 24.62 17.17 44.97ALL INDIA 34.78 34.33 34.54 32.07

SOURCE: Draft Report of Power Finance Corporation Limited on Performance of State Power Utilities for the years 2004-05 to 2006-07 NA - Not available

2/2

“It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

Page 181: Annual Report 07 08

Central electricity authority Annual Report 2007-08

172 “The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

Annexure 8AItem No. 8.1

1/2

HYDRO POWER STATIONS IN OPERATION FOR WHICH CONSULTANCY SERVICES HAVE BEEN RENDERED BY CEA

Sl. No. Name of the Power Station Installed capacity (MW) Year of CommissioningIN INDIANORTHERN REGION1. Baira Siul 3x60=180 1980-812. Salal-I 3x115=345 19873. W.Y. Canal-A 2x8=16 19864. W.Y. Canal-B 2x8-16 19875. W.Y. Canal-C 2x8=16 19896. Giri Bata 2x30=60 19787. Lower Jhelum 3x35=105 1978-798. Upper Sindh-1 2x11=22 1973-749. Western Yamuna Canal 2x8=16 200410. Chenani 5x4.6=23 1971-7511. Stakna 2x2=4 1986-8712. Kargil 3x1.25=3.75 199513. R.P. Sagar 4x43=172 1968-6914. J.Sagar 3x33=99 1972-7315. Mahibajaj I 2x25=50 198916. Mahibajaj II 2x45=90 198617. Anoopgarh I 3x1.5=4.5 1987-8818. Anoopgarh II 3x1.5=4.5 1987-8819. RMC Mangrol 3x2=6 199220. Surat Garh 2x2=4 199221. Ranjit Sagar 4x150=600 200022. Upper Singh-II 2x35=70 2000-0123. Nathpa Jhakri 6x250=1500 2002-0324. Tehri Stage-I 4x250=1000 2007-08WESTERN REGION25. Ukai 4x75=300 1974-7626. Kadana 4x60=240 1990-9627. Ukai LBC 2x2.5=5 1987-8828. Gandhi Saar 5x23=115 1960-6429. Bargi 2x45=90 198830. Ban Sagar Tons 3x105=315 1991-9231. Hasdeo Bango 3x40=120 199432. Paithon 1x12=12 198433. Rajghat 3x15=45 199934. Koyna IV 4x250=1000 1999-200035. Sardar Sarovar CHPH 5x50=250 200336. Indira Sagar 8x125=1000 2004-0537. Sardar Sarovar RBPH 6x200=1200 2006-07

Page 182: Annual Report 07 08

173

Central electricity authority Annual Report 2007-08

“Honesty is the first chapter in the book of wisdom.”

Sl. No. Name of the Power Station Installed capacity (MW) Year of CommissioningSOUTHERN REGION38. Lower Sileru 4x115=460 1976-7839. N.J. Sagar PSS 1x110+7x100=810 1978-8540. Kadamparai 4x100=400 1987-9041. Srisailam LBPH 6x150=900 2001-0342. Pykara Ultimate 3x50=150 2005-06EASTERN REGION43. Kosi 4x5=20 1970-7844. Subernrekha I 1x65=65 197745. Subernrekha II 1x65=65 198046. Sone Western Canal 4x1.65=6.6 199347. Eastern Gandak 3x5=15 1994-9648. Sone Eastern 2x1.65=3.3 199649. Rengali 5x50=250 1985-9250. Upper Kolab 4x80=320 1988-9351. Lower Lagyap 2x6=12 197952. Upper Rongnichu 4x2=8 1993-9453. Myangchu 2x2=4 199354 Rammam II 4x12.75=51 1995-9655. Teesta Canal Falls I,II,III 3x3x7.5=67.5 1997-9956. Upper Indravati 4x150=600 2000-0157. Chandil 2x4=8 -NORTH EASTERN REGION58. Kyrdemkulai 2x30=60 197959. Umiam St.I 4x9=36 196560. Umiam St.II 2x9=18 197061. Umiam Umtru St.IV 2x30=60 199262. Gumti 3x5=15 1976-8463. Khandong 2x25=50 198464. Kopili 2x50=100 198865. Kopili Extn. 2x50=100 1996-9766. Loktak 3x35=105 1983&9167. Ranganadi 3x135=405 2002-0368. Doyang 3x25=75 2000IN NEIGHBOURING COUNTRIES69. Gandak 3x5=15 -70. Trisuli 3x7=21 -BHUTAN71. Chukha 4x84=336 1986-8872. Gyesta 3x0.5=1.5 -73. Khaling 3x0.2=0.6 -74. Tala 6x170=1020 2007-08BURMA75. Sedawgyi 2x12.5=25 -

1/2

Page 183: Annual Report 07 08

Central electricity authority Annual Report 2007-08

174 “Ambition should be made of sterner stuff.”

ANNEXURE-8B [Item 8.3]

1/2

LIST OF PROJECTS FOR WHICH DETAIL DESIGN & ENGINEERING SERVICES WERE PROVIDED DURING THE PERIOD 2007-08

Sl. No.

Name of Project & Scope of Consultancy Services

Works carried out/in progress

1. Faridabad T P S (3x55 MW), Haryana Power Generation Corporation Ltd. Consultancy works: Raising of Ash Dyke

Construction drawing was prepared and issued to project authorities. Site visit of Ash pond in connection with ongoing construction work and observations were sent to CE (FTPS), Faridabad. Received letter regarding to frame the proposal for ash dyke raising up to EL.235 M and reply was sent to project authorities. Site of Ash Pond Area was visited for settlement of main ash bund on upstream side of spillway.

2. Transmission Project under Prime Minister’s Reconstruction Programme in J&K Consultancy services to Power Development Deptt., Govt. of J&K:Construction of Transmission Lines and Sub-stations in Jammu and Kashmir Region

Jammu region ( Sub-station): Comments on draft technical specifications for Jammu region was sent. Technical evaluation of bids received against NITs of 132kV D/C Ramban- Khellani-Kishtwat Transmission Line & 132 kV S/C Thahri-Bhalessa Transmission Line was examined and comments sent to SE & TD Division of CEA Bids against NITs of 220/132 kV substation at Mir Bazar and Bugdam (Kashmir) was examined discussed with the project authority. Schedule of quantities and tender drawings for substations in Jammu region were modified.

3. Tintibi-Trongsa Bumthang 132 kV S/C

Transmission lines and associated sub-stations, Eastern Bhutan.

Technical specification and tender document for 132 kV S/C transmission line and associated sub-station was prepared. Design of tower foundation for 66kV Quadruple Circuit tower type QE(30-60 degrees deviation) and their extension was carried out and drawing was released for construction to BPC. Supply and construction design of 132 kV S/C Transmission from Tin Tibi-Yarmoo and 66 kV S/C line from yarmoo Boomthang.: hard/dense soil for normal and normal with extension (+3m & +6m) tower type BWB, BWC,BWD (no snow) and BWBS, BWCS, BWDS (snow) towers were examined Technical specification and tender document for 132 kV S/C transmission line and associated sub-station was prepared. Design of tower foundation for 66kV Quadruple Circuit tower

Page 184: Annual Report 07 08

175

Central electricity authority Annual Report 2007-08

“The one exclusive sign of thorough knowledge is the power of teaching.”

Sl. No.

Name of Project & Scope of Consultancy Services

Works carried out/in progress

type QE(30-60 degrees deviation) and their extension was carried out and drawing was released for construction to BPC. Supply and construction design of 132 kV S/C Transmission from Tin Tibi-Yarmoo and 66 kV S/C line from yarmoo Boomthang.: hard/dense soil for normal and normal with extension (+3m & +6m) tower type BWB, BWC,BWD (no snow) and BWBS, BWCS, BWDS (snow) towers were examined.

4 Panipat TPS– R& M and up-rating of Unit-IConstruction of Chemical Dosing House

The architecture details –plans & section drawing for chemical dosing house was examined and comments sent to TE & TD Division of CEA.

5. Deen Bandhu Chotu Ram TPP Yamunanagar (2x300MW),Haryana-

Review consultancy works for Civil works of Thermal Power Plant

Field Quality Plans for Railway Siding Works was reviewed and observations sent to TE &TD Division. FQP of the mill reject system were reviewed and comments thereon sent to TE & TD Division. Compliance report on “stability analysis” : layout & details of Ash dyke were reviewed and observations thereon were sent to TE & TD Division.

6 Rajiv Gandhi TPP ( Hissar ) (2x600 MW), Haryana Review consultancy for civil works for the construction of Thermal Power Plant

Documents/FQP/DBR were reviewed and observations were sent to TE & TD Division Comments sent to Director (TETD) on design and drawings of TG building Unit-I foundation layout and RCC details of Pile caps, Pedestals and Tie beams. Comments on TG building of Pile layout for Unit- II was sent. Documents related with Ash Pond and NDCT were reviewed and observations were sent to TE &TD Division.

7 Karaikal CCPP ( 32.5 MW), Pondicherry

Consultancy for the construction of R.O. Plant

Documents/ drawings were reviewed and comments sent to TAS Division. Drawings/ Documents for R.O. Plant were checked. Construction drawings were released to project authorities.

8 Kutch Lignite TPS, GujaratConsultancy for the construction of dry fly ash extraction and storage scheme.

Drawings/documents were approved for construction for ash handling complex and ash disposal line.

9 Raghunathpur TPS, DVC Phase-I (2x600 MW) Review consultancy for civil works for the construction of Thermal Power Plant

Documents/drawings/DBR/FQP related with civil and structure have to be reviewed.

2/2

Page 185: Annual Report 07 08

Central electricity authority Annual Report 2007-08

176 “Children are our most valuable natural resource.”

AN

NE

XU

RE

-9A

(I

tem

9.1

.4)

OU

TST

AN

DIN

G D

UE

S PA

YAB

LE

TO

CE

NT

RA

L

PUB

LIC

SE

CTO

R U

ND

ER

TAK

ING

S(C

PSU

s)*

up

to 3

1-03

-200

8( i

n R

s. C

rore

s)

Sl.

No.

Nam

e of

sta

te/S

EB

/Uti

lity

NT

PC

NH

PC

PG

CIL

NE

EP

CO

NP

CIL

DV

CN

LC

SJV

NL

BB

MB

TH

DC

TO

TA

L

1A

ndhr

a Pr

ades

h37

.65

37.6

52

Ass

am19

.30

19.3

0

3B

ihar

3.73

3.73

4H

VPN

L (

HSE

B)

0.51

0.51

5H

imac

hal P

rade

sh1.

651.

250.

193.

096

Jam

mu

& K

ashm

ir42

.80

-0.4

06.

8012

.96

62.1

57

Kar

nata

ka(K

PTC

L)

144.

1214

4.12

8E

scom

1.70

1.70

9K

eral

a40

.15

40.1

510

Meg

hala

ya2.

2953

.22

55.5

111

Miz

oram

2.55

2.55

12N

agal

and

0.64

0.64

13Pu

njab

0.01

0.01

14R

ajas

than

1.07

36.0

737

.14

15R

ajas

than

Dis

com

0.04

3.00

3.04

16T

amin

adu

1.00

573.

8057

4.80

17T

ripu

ra5.

795.

79

18U

ttar

Prad

esh

-0.0

11.

121.

1119

WB

SEB

13.3

413

.34

20D

TL

(DV

B)

1310

.83

8.41

82.0

014

01.2

421

Cha

ndig

arh

123.

5312

3.53

22Po

ndic

hery

12.8

012

.80

23Jh

arkh

and

1048

.16

1048

.16

24M

EA

(Pow

erN

epal

)3.

913.

9125

M/s

NFL

0.01

0.01

26B

.S.L

. Pro

jS/N

agar

0.11

0.11

27B

eas

Proj

ect t

alw

ara

0.01

0.01

Tot

al13

10.8

357

.88

2.29

81.5

088

.93

1065

.23

808.

521.

2516

6.72

12.9

635

96.1

1*

As

per

the

info

rmat

ion

rece

ived

fro

m C

PSU

s

Page 186: Annual Report 07 08

177

Central electricity authority Annual Report 2007-08

“The farther backward you can look, the farther forward you are likely to see.”

Ann

exur

e-9B

(I

tem

-9.2

) (1

/3)

STAT

E-W

ISE

EST

IMAT

ED

AV

ER

AG

E R

ATE

S O

F E

LE

CT

RIC

ITY

(U

pdat

ed u

pto

31.0

3.20

08)

S.

No.

N

ame

of U

tility

Tari

ff e

ffec

tive

from

Dom

estic

1K

W (1

00

KW

h/ M

onth

)D

omes

tic 4

KW

(400

K

Wh/

Mon

th)

Dom

estic

10K

W

(1

000

KW

h/ M

onth

)C

omm

erci

al 2

KW

(300

KW

h/ M

onth

)C

omm

erci

al 1

0KW

(150

0 K

Wh/

Mon

th)

Com

mer

cial

30K

W

(4

500

KW

h/ M

onth

)C

omm

erci

al 5

0KW

(7

500

KW

h/ M

onth

)A

gric

ultu

re 2

HP

(4

00 K

Wh/

Mon

th)

Agr

icul

ture

5H

P

(1

000

KW

h/ M

onth

)A

gric

ultu

re 1

0HP

(2

000

KW

h/

Mon

th)

1.A

ndhr

a Pr

ades

h

01-

04-2

007

238.

50

396.

63

492.

25

599.

33

624.

67

628.

89

629.

73

29.3

8 23

.75

21.8

8 2.

Ass

am

0

4-08

-200

631

0.00

41

1.50

44

5.00

52

8.33

52

8.33

53

6.31

53

6.31

24

0.00

24

0.00

24

0.00

3.

Bih

ar

01-

11-2

006

233.

20 U

294.

05

362.

52

515.

87 U

503.

85

500.

09

499.

33

51.5

0 R

S51

.50

RS

51.5

0 R

S76

.32

R51

.94

R61

.50

US

61.5

0 U

S61

.50

US

4.C

hhat

tishg

arh

0

1-10

-200

618

9.10

23

8.50

33

4.58

43

6.41

51

9.17

51

9.37

51

9.41

32

.50

32.5

0 42

.50

5.G

ujar

at

01-

04-2

007

348.

00 U

462.

00 U

526.

80 U

564.

58

595.

42

590.

14

589.

08

55.0

0 55

.00

55.0

0 26

4.00

R36

8.50

R42

7.90

R6.

Har

yana

01-

11-2

006

356.

20

410.

05

450.

82

468.

00

468.

00

468.

00

468.

00

17.5

0 17

.50

17.5

0 7.

Him

acha

l Pra

desh

0

1-04

-200

721

6.00

26

3.50

28

3.00

45

0.67

43

7.33

44

8.44

44

7.56

20

8.00

20

5.00

20

4.00

8.

Jam

mu

& K

ashm

ir

01-

04-2

007

129.

50

188.

88

214.

75

222.

00

262.

00

268.

67

270.

00

49.5

0 40

.33

27.5

0 9.

Jhar

khan

d

01-

01-2

004

163.

00 U

183.

00

182.

00

438.

67

438.

67

438.

67

438.

67

28.7

5 28

.75

28.7

5 74

.00

R

10.

Kar

nata

ka

0

1-11

-200

629

2.43

D41

8.30

D48

2.32

D63

7.88

D65

1.18

D65

3.39

D65

3.84

D45

.00

G45

.00

G55

.00

G29

2.43

E41

3.05

E47

3.92

E61

8.63

E63

0.53

E63

2.51

E63

2.91

E11

0.00

H11

0.00

H11

5.00

H26

0.93

F38

1.55

F44

2.42

F60

9.87

F62

3.18

F62

5.39

F62

5.83

F11

.K

eral

a *

0

1-04

-200

618

7.00

39

8.89

51

7.61

72

7.84

88

9.90

96

2.74

96

9.98

74

.80

74.8

0 74

.80

12.

Mad

hya

Prad

esh

1

6-04

-200

734

7.44

U44

2.25

U46

3.18

U61

5.86

61

7.31

61

7.55

61

7.60

18

8.75

21

3.50

22

1.75

34

1.74

R43

0.38

R45

1.05

R13

.M

ahar

asht

ra

0

1-05

-200

727

0.36

42

2.57

56

0.09

53

3.98

59

9.14

64

6.83

65

0.81

90

.00

I90

.00

I90

.00

I75

.00

J75

.00

J75

.00

J14

.M

egha

laya

0

1-10

-200

418

0.00

24

6.25

27

5.50

40

9.33

44

6.67

45

2.89

45

4.13

11

6.00

11

6.00

11

6.00

15

.O

rissa

01-

04-2

007

135.

20

247.

00

286.

00

384.

80

443.

04

452.

75

454.

69

102.

00

102.

00

102.

00

16.

Punj

ab

0

1-04

-200

624

7.10

37

4.15

40

8.80

46

9.30

46

9.30

46

9.30

46

9.30

0.

00

0.00

0.

00

17.

Raj

asth

an

01-

01-2

005

417.

50 U

396.

88 U

392.

75 U

556.

67

554.

00

555.

78

556.

13

78.7

5 75

.60

74.5

5 39

0.25

R36

3.81

R35

8.53

R18

.Ta

mil

Nad

u

01-

04-2

007

120.

00

216.

25

269.

50

602.

00

607.

60

608.

53

608.

72

0.00

0.

00

0.00

19

.U

ttar P

rade

sh

1

0-05

-200

724

9.00

U35

9.00

U35

9.00

U45

2.33

U45

2.33

U45

2.33

U45

2.33

U22

4.00

U22

4.00

U22

4.00

U59

.00

R20

9.00

R23

9.00

R20

9.00

R26

9.00

R27

9.00

R28

1.00

R45

.00

R45

.00

R45

.00

R20

.U

ttara

ncha

l

01-

04-2

006

215.

00

215.

00

215.

00

315.

00 W

315.

00 W

315.

00 W

315.

00 W

81.6

0 U

78.0

0 76

.80

U36

5.00

M36

5.00

M36

5.00

M36

5.00

M69

.00

R65

.40

R64

.20

R21

.W

est B

enga

l

01-

04-2

007

248.

33 U

406.

43 U

529.

24 U

443.

27 U

583.

96 U

604.

05 U

608.

07 U

147.

00

147.

00

147.

00

237.

11 R

391.

49 R

523.

26 R

441.

48 R

583.

59 R

603.

93 R

608.

00 R

22.

Aru

nach

al P

rade

sh

01-

02-2

000

162.

50

211.

88

231.

75

370.

00

390.

00

393.

33

394.

00

--

-23

.G

oa

01-

04-2

002

122.

00

170.

75

216.

50

327.

00

357.

00

373.

67

377.

00

102.

00

102.

00

102.

00

24.

Man

ipur

0

3-09

-200

226

2.20

29

9.70

30

2.20

30

2.20

30

2.20

38

1.80

38

1.80

27

2.20

27

2.20

27

2.20

25

.M

izor

am (D

istt.

HQ

& su

b.D

ivn.

A

rea)

2

5-07

-200

517

0.00

24

7.50

24

9.00

26

6.67

26

6.67

26

6.67

26

6.67

69

.94

69.9

4 69

.94

Oth

er A

reas

180.

00

195.

00

198.

00

26.

Nag

alan

d

01-

04-2

006

272.

00

310.

25

337.

70

398.

00

431.

60

437.

20

438.

32

150.

00

150.

00

150.

00

27.

Sikk

im

01-

04-2

006

105.

75

266.

06

322.

43

335.

25

396.

45

408.

15

410.

49

180.

00

247.

50

326.

25

28.

Trip

ura

0

1-07

-200

621

5.00

36

5.00

36

5.00

35

3.33

45

6.67

45

6.67

45

6.67

87

.46

87.4

6 13

4.92

29

.A

& N

Isla

nds

0

1-07

-200

313

0.00

27

5.00

32

6.00

40

6.67

46

5.33

47

5.11

47

7.07

90

.00

90.0

0 90

.00

30.

Cha

ndig

arh

0

1-08

-200

517

9.00

30

4.00

30

4.00

34

7.00

34

7.00

34

7.00

34

7.00

16

5.00

16

5.00

16

5.00

31

.D

adra

& N

agar

Hav

eli

0

1-10

-200

613

0.00

17

2.50

20

4.00

24

8.33

26

5.67

26

8.56

26

9.13

55

.00

55.0

0 55

.00

32.

Dam

an &

Diu

0

1-10

-200

613

0.00

17

2.50

20

4.00

24

8.33

26

5.67

26

8.56

26

9.13

55

.00

55.0

0 55

.00

33.

Del

hi B

YPL

/BR

PL/N

DPL

01-

10-2

006

277.

20

346.

50

434.

70

596.

75

596.

75

622.

76

622.

76

162.

20

162.

20

162.

20

34.

Del

hi N

DM

C

01-

04-2

006

158.

00

252.

25

327.

70

462.

00

525.

00

525.

00

525.

00

--

-35

.La

ksha

dwee

p

01-

09-2

004

100.

00

300.

00

300.

00

480.

00

480.

00

480.

00

480.

00

--

-36

.Po

ndic

herr

y

16-

04-2

002

55.0

0 11

3.75

15

0.50

27

4.74

32

5.34

33

3.78

33

5.47

0.

00

20.6

7 19

.83

37.

Torr

ent P

ower

Ltd

. (A

hmed

abad

)

01-

04-2

007

345.

15

399.

26

427.

64

527.

88

586.

51

592.

79

594.

54

311.

64

311.

64

311.

64

38.

Kol

kata

(CES

C)

0

1-04

-200

727

9.84

46

2.48

53

3.62

45

0.53

57

9.26

59

7.30

60

0.91

-

--

39.

D.V

.C.

(A) B

ihar

Are

a

01-

09-2

000

--

--

--

--

--

(B) W

est B

enga

l Are

a-

--

--

--

--

-40

.D

urga

pur P

roje

cts L

td.

0

1-04

-200

718

9.00

25

4.93

26

4.33

27

2.43

29

3.40

29

4.83

29

5.12

47

9.39

47

9.39

47

9.39

41

.M

umba

i ( B

.E.S

.T )

01-

04-2

007

123.

77

317.

59

597.

01

503.

62

947.

60

1079

.63

1106

.03

--

-M

umba

i (R

elia

nce

Ener

gy)

2

4-04

-200

723

5.99

44

9.24

61

3.86

65

8.16

84

1.40

82

8.34

82

8.34

11

5.41

11

5.41

11

5.41

M

umba

i ( T

ATA

'S )

0

1-05

-200

724

0.12

44

4.52

64

8.92

73

6.65

69

1.45

96

4.82

96

4.82

-

--

Page 187: Annual Report 07 08

Central electricity authority Annual Report 2007-08

178

Ann

exur

e-9B

(I

tem

-9.2

) (2

/3)

STAT

E-W

ISE

EST

IMAT

ED

AV

ER

AG

E R

ATE

S O

F E

LE

CT

RIC

ITY

(U

pdat

ed u

pto

31.0

3.20

08)

(Rat

es in

Pai

se/K

Wh)

S.

No.

N

ame

of U

tility

Tari

ff e

ffec

tive

from

Smal

l Ind

ustr

y 10

KW

(

1500

K

Wh/

Mon

th)

Med

ium

In

dust

ry 5

0KW

(750

0 K

Wh/

M

onth

)

Lar

ge In

dust

ry

1000

KW

60%

L.F

. (4

3800

0 K

Wh/

M

onth

)

Hea

vy In

dust

ry

1000

0KW

60%

L.F

. (4

3800

00 K

Wh/

M

onth

)

Hea

vy In

dust

ry

(33K

V) 2

0000

KW

60

%L

.F. (

8760

000

KW

h/ M

onth

)

Rai

lway

Tr

actio

n 12

500K

W

(250

0000

0 K

Wh/

Mon

th)

1.A

ndhr

a Pr

ades

h

01-

04-2

007

415.

40

414.

33

380.

30

418.

60

407.

68

410.

03

2.A

ssam

04-

08-2

006

285.

67 U

45

0.33

37

0.20

36

9.07

35

8.05

254.

00 R

3.B

ihar

0

1-11

-200

649

0.38

52

5.72

49

7.84

48

4.56

53

1.89

at 2

5KV

525.

89 a

t 132

KV

4.C

hhat

tishg

arh

0

1-10

-200

630

4.52

41

3.35

42

3.47

42

3.47

45

2.40

47

7.22

at 1

32K

V

5.G

ujar

at

01-

04-2

007

438.

62

468.

36

495.

00

534.

70

534.

50

549.

12 a

t 132

KV

6.H

arya

na

0

1-11

-200

647

8.00

49

9.90

45

7.00

45

7.00

44

5.00

48

1.29

at 1

1KV

7.H

imac

hal P

rade

sh

01-

04-2

007

386.

33

406.

56

340.

12

325.

99

323.

60

8.Ja

mm

u &

Kas

hmir

0

1-04

-200

722

2.00

22

2.00

25

6.09

25

6.09

25

0.20

9.Jh

arkh

and

0

1-01

-200

440

5.62

40

5.62

41

2.95

41

2.95

39

2.95

51

6.50

at 2

5KV

477.

69 a

t 132

KV

10.

Kar

nata

ka

0

1-11

-200

641

8.40

D52

1.47

D49

0.28

D50

1.07

D49

9.57

D48

5.88

397.

96 O

477.

57 O

471.

71 O

48

2.50

O

480.

99 O

11.

Ker

ala

*

01-

04-2

006

390.

50

390.

50

385.

02

385.

02

360.

29 a

t 110

KV

12.

Mad

hya

Prad

esh

1

6-04

-200

738

5.62

U54

0.40

48

0.83

48

0.83

46

8.01

46

0.00

at 1

32/2

20K

V

348.

80 R

478.

00

13.

Mah

aras

htra

01-

05-2

007

344.

42

517.

28

424.

98 B

424.

98 B

-41

0.85

456.

47 O

456.

47 O

14.

Meg

hala

ya

01-

10-2

004

383.

33

408.

67

253.

92

253.

53

--

15.

Oris

sa

0

1-04

-200

732

2.40

33

5.81

36

1.51

36

1.46

36

1.46

41

3.48

at 2

5/33

KV

16.

Punj

ab

0

1-04

-200

637

4.70

41

3.20

41

3.20

41

3.20

40

0.92

44

7.00

at 1

32K

V

17.

Raj

asth

an

01-

01-2

005

421.

28

459.

68

463.

83

463.

83

460.

65

451.

00

18.

Tam

il N

adu

0

1-04

-200

745

8.85

48

6.57

45

2.11

46

2.61

45

2.11

52

6.47

19.

Utta

r Pra

desh

10-

05-2

007

452.

33 U

452.

33 U

404.

18 U

404.

18 U

418.

29 U

461.

11 B

elow

132

KV

385.

83 R

385.

83 R

344.

91 R

344.

91 R

356.

90 R

444.

44 1

32K

V a

nd a

bove

20.

Utta

ranc

hal

0

1-04

-200

630

5.09

30

5.09

28

2.10

28

2.10

27

5.68

“Failing to plan is planning to fail.”

Page 188: Annual Report 07 08

179

Central electricity authority Annual Report 2007-08

S.

No.

N

ame

of U

tility

Tari

ff e

ffec

tive

from

Smal

l Ind

ustr

y 10

KW

(

1500

K

Wh/

Mon

th)

Med

ium

In

dust

ry 5

0KW

(750

0 K

Wh/

M

onth

)

Lar

ge In

dust

ry

1000

KW

60%

L.F

. (4

3800

0 K

Wh/

M

onth

)

Hea

vy In

dust

ry

1000

0KW

60%

L.F

. (4

3800

00 K

Wh/

M

onth

)

Hea

vy In

dust

ry

(33K

V) 2

0000

KW

60

%L

.F. (

8760

000

KW

h/ M

onth

)

Rai

lway

Tr

actio

n 12

500K

W

(250

0000

0 K

Wh/

Mon

th)

21.

Wes

t Ben

gal

0

1-04

-200

737

9.78

U47

0.78

U47

0.81

47

0.81

44

7.14

45

3.79

at 2

5KV

364.

71 R

450.

20 R

424.

39 a

t 132

KV

22.

Aru

nach

al P

rade

sh

01-

02-2

000

345.

00

353.

33

393.

86

394.

89

--

23.

Goa

0

1-04

-200

225

7.00

29

7.00

34

2.29

34

2.29

34

2.29

-

24.

Man

ipur

0

3-09

-200

228

7.20

38

1.80

33

6.09

33

6.09

33

6.09

-

25.

Miz

oram

(Dis

tt.H

Q &

sub.

Div

n.

Are

a)

25-

07-2

005

208.

33

208.

33

71.3

5 71

.35

71.3

5 -

Oth

er A

reas

26.

Nag

alan

d

01-

04-2

006

280.

00

296.

33

314.

68

314.

97

--

27.

Sikk

im

01-

04-2

006

414.

00 U

288.

18

312.

30

312.

30

--

300.

00 R

28.

Trip

ura

0

1-07

-200

630

0.00

33

6.67

-

--

-

29.

A &

N Is

land

s

01-

07-2

003

316.

67

327.

33

--

--

30.

Cha

ndig

arh

0

1-08

-200

535

0.33

38

7.00

36

0.70

36

0.70

35

0.21

-

31.

Dad

ra &

Nag

ar H

avel

i

01-

10-2

006

230.

00

253.

40

299.

97

301.

00

--

32.

Dam

an &

Diu

0

1-10

-200

625

0.00

28

2.34

27

9.97

28

1.00

-

-

33.

Del

hi

B

YPL

/BR

PL/N

DPL

01-

10-2

006

560.

00

560.

00

560.

30

560.

30

547.

32

517.

26 a

t 11K

V

34.

Del

hi

N

DM

C

01-

04-2

006

431.

00

431.

00

--

-57

6.00

35.

Laks

hadw

eep

0

1-09

-200

433

0.00

33

0.00

-

--

-

36.

Pond

iche

rry

1

6-04

-200

224

7.52

25

7.50

32

0.15

33

2.72

-

-

37.

Torr

ent P

ower

Ltd

. (A

hmed

abad

)

01-

04-2

007

396.

73

446.

40

411.

62

411.

62

--

38.

Kol

kata

( CES

C )

0

1-04

-200

739

3.17

48

5.04

44

2.18

44

2.18

41

1.25

37

3.38

39.

D.V

.C.

(A) B

ihar

Are

a

01-

09-2

000

--

373.

79

373.

79

359.

95

460.

96 a

t 33K

V

(B) W

est B

enga

l Are

a-

-39

8.45

39

8.45

38

3.45

44

2.07

at 1

32K

V

40.

Dur

gapu

r Pro

ject

s Ltd

.

01-

04-2

007

267.

71

297.

12

308.

31

308.

31

306.

01

379.

41 a

t 25K

V

41.

Mum

bai

( B.E

.S.T

)

0

1-04

-200

774

9.18

87

1.52

63

1.72

63

1.72

-

-

Mum

bai

(R

elia

nce

Ener

gy)

2

4-04

-200

761

4.50

77

8.21

67

5.79

67

5.79

-

-

Mum

bai

( TA

TA'S

)

01-

05-2

007

581.

58

785.

55

625.

42

625.

42

-47

0.57

33/

22/1

1/6.

6KV

B -

BM

R/P

MR

Are

as C

- C

ontin

uous

Sup

ply

Are

as D

- B

anga

lore

Met

ro A

rea

E - A

reas

und

er o

ther

loca

l bod

ies F

-Are

as u

nder

Vill

age

Panc

haya

ts G

- G

ener

al

H -

Urb

an fe

eder

s I

- Cat

egor

y 1

Zone

A

reas

J

- C

ateg

ory

2 Zo

ne A

reas

U -

Urb

an

R -

Rur

al

M-W

ithou

t TO

D m

eter

W

-With

TO

D m

eter

^ T

OD

tarif

f fro

m 1

7:00

hrs

to 2

3:00

hrs

for D

urga

pur P

roje

cts L

td.,

* In

Ker

ala,

Ker

ala

Stat

e El

ectri

city

Reg

ulat

ory

Com

mis

sion

has

app

rove

d co

ntin

uatio

n of

the

exi

stin

g ta

riffs

(effe

ctiv

e fr

om 0

1.10

.200

2) a

nd o

ther

cha

rges

by

the

Ker

ala

Stat

e El

ectri

city

Boa

rd.

Tarif

fs n

otifi

ed h

ave

varr

ying

par

amet

ers f

or ta

riff i

n re

spec

t of v

ario

us c

ateg

orie

s of c

onsu

mer

s.The

abo

ve c

ompa

risio

n is

for c

erta

in a

ssum

ed lo

ads a

nd e

lect

ricity

con

sum

ptio

n le

vels

in a

mon

th.

The

stat

emen

t has

bee

n pr

epar

ed o

n th

e ba

sis o

f Ele

ctric

ity T

ariff

as r

epor

ted

to F

.S.&

A D

ivis

ion,

CEA

upt

o 31

-03-

2008

.

(3/3

)

“Let our advance worrying become advance thinking and planning.”

Page 189: Annual Report 07 08

Central electricity authority Annual Report 2007-08

180

Annexure-9C [Item 9.5]

1/7COST OF ENERGY GENERATION DURING 2000-01 TO 2005-06

(As on 01.03.2007)

Generating Station/ Utility

Energy Source Installed Capacity

Name of the State Cost in Paise/KWh

(MW) 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06

CENTRAL SECTOR

BHAKRA BEAS MANAGEMENT BOARD

Bhakra + Ganguwal + Kotla

HYDRO 1745.30 HARYANA 9.55 10.47 8.95 8.95 15.16 11.04

Dehar Power House HYDRO 990.00 HARYANA 20.40 21.72 21.95 24.15 23.69 24.65

Pong Power Plant HYDRO 264.00 HARYANA 7.01 7.83 13.54 10.66 14.46 7.28

DAMODAR VALLEY CORPORATION

Bokaro COAL 630.00 JHARKHAND 199.05 176.76 174.24 188.24 230.67 213.95

Durgapur COAL 350.00 WEST BENGAL 241.47 269.01 254.67 191.73 226.24 219.02

Chandrapura COAL 750.00 JHARKHAND 295.16 228.00 361.04 235.73 176.72 181.87

Mejia COAL 840.00 WEST BENGAL 229.93 234.11 202.16 172.08 177.21 181.83

Gas Turbine Station HSD/NAPHTHA 90.00 JHARKHAND 1481.39 1579.55 2391.00 2375.25

Maithon HYDRO 60.00 JHARKHAND 77.57 198.23 65.89 83.14 141.45 147.40

Panchet HYDRO 80.00 JHARKHAND 88.66 213.35 78.67 64.22 85.30 137.21

Tilaiya HYDRO 4.00 JHARKHAND 309.17 324.96 187.73 407.30 339.69 1688.78

NATIONAL HYDRO ELECTRIC POWER COR. LTD.

Bairasiul HYDRO 180.00 HIMACHAL PRADESH 63.00 75.00 61.00 75.00 75.00 59.00

Loktak HYDRO 90.00 MANIPUR 65.00 64.59 76.00 87.00 70.00 85.00

Salal HYDRO 690.00 J&K 39.00 34.00 38.00 52.00 40.00 37.00

Tanakpur HYDRO 94.20 UTTARANCHAL 114.00 134.00 148.00 105.00 84.00 93.00

Chamera - I HYDRO 540.00 HIMACHAL PRADESH 129.00 118.02 92.00 113.00 96.00 73.00

Uri HYDRO 480.00 J&K 229.00 200.00 142.00 143.00 125.00 112.00

Rangit HYDRO 60.00 SIKKIM 234.00 215.00 152.00 152.00 119.00 132.00

Chamera - II HYDRO 300.00 HIMACHAL PRADESH 371.00 167.00 135.00

Dhauliganga HYDRO 280.00 UTTARANCHAL 188.00

NATIONAL THERMAL POWER CORPORATION LIMITED *

Singrauli COAL 2000.00 UTTAR PRADESH 97.00 95.00 104.00 98.00 110.00 118.00

Rihand COAL 1500.00 UTTAR PRADESH 141.00 127.00 117.00 124.00 126.00 144.00

FGUTPS COAL 840.00 UTTAR PRADESH 195.00 172.00 176.00 171.00 189.00 179.00

NCTPS-Dadri coal COAL 840.00 UTTAR PRADESH 217.00 213.00 204.00 213.00 215.00 223.00

Tanda COAL 440.00 UTTAR PRADESH 464.00 90.00 299.00 199.00 222.00 260.00

Auraiya GAS 663.36 UTTAR PRADESH 174.00 164.00 167.00 195.00 207.00 274.00

Dadri GAS 829.78 UTTAR PRADESH 183.00 194.00 193.00 215.00 237.00 281.00

Anta GAS 419.33 RAJASTHAN 133.00 136.00 160.00 172.00 182.00 241.00

Faridabad GAS 431.59 HARYANA 221.00 164.00 184.00 178.00 179.00 228.00

Korba COAL 2100.00 CHHATISGARH 69.00 73.00 75.00 76.00 81.00 91.00

Vindhyachal COAL 2260.00 MADHYA PRADESH 130.00 113.00 108.00 119.00 128.00 133.00

Kawas GAS 656.20 GUJARAT 310.00 320.00 320.00 338.00 534.00 431.00

Gandhar GAS 657.39 GUJARAT 334.00 222.00 252.00 261.00 230.00 225.00

Ramagundam COAL 2600.00 ANDHRA PRADESH 122.00 122.00 124.00 120.00 120.00 136.00

Simhadri COAL 1000.00 ANDHRA PRADESH 163.00 140.00 148.00 163.00

Farakka COAL 1600.00 WEST BENGAL 172.00 169.00 168.00 163.00 161.00 176.00

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

Page 190: Annual Report 07 08

181

Central electricity authority Annual Report 2007-08

Generating Station/ Utility

Energy Source Installed Capacity

Name of the State Cost in Paise/KWh

(MW) 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06

Kahalgaon COAL 840.00 BIHAR 192.00 204.00 190.00 179.00 186.00 184.00

Talcher COAL 3000.00 ORISSA 172.00 144.00 128.00 117.00 113.00 132.00

Talcher TPS COAL 460.00 ORISSA 132.00 139.00 96.00 106.00 116.00 124.00

Rajiv Gandhi (Kayamkulam)

NAPHTHA 359.58 KERALA 506.00 382.00 380.00 364.00 675.00 941.00

NEYVELI LIGNITE CORPORATION LTD.

Thermal Station I LIGNITE 600.00 TAMIL NADU 142.83 152.02 166.02 163.10 165.64 150.58

Thermal Station I Expansion

LIGNITE 420.00 TAMIL NADU 200.10 128.19

Thermal Station I I Stage I

LIGNITE 630.00 TAMIL NADU 84.72 92.01 104.31 105.30 110.99 119.18

Thermal Station I I Stage I I

LIGNITE 840.00 TAMIL NADU 127.53 122.07 135.96 124.54 139.61 141.55

NORTH EASTERN ELECT. POWER COR. LTD.

Kopili Hydro Electric Project

HYDRO 275.00 ASSAM 62.00 85.00 59.00 54.00 48.00 47.00

Doyang HYDRO 75.00 NAGALAND 439.00 437.45 607.00 369.00 218.00 286.00

Ranganadi HYDRO 405.00 ARUNACHAL PRADESH

411.34 827.00 171.00 87.00 93.00

Assam Gas Based GAS & STEAM 291.00 ASSAM 249.00 249.11 337.00 276.00 180.00 178.00

Agartala GAS 84.00 TRIPURA 209.00 171.38 176.00 171.00 148.00 163.00

NUCLEAR POWER CORP. OF INDIA

Kakrapar (Unit-1 & 2) NEUCLEAR 440.00 GUJARAT 216.19 272.00 272.00 272.00 272.00 272.00

Tarapur (Unit-1 & 2) NEUCLEAR 320.00 MAHARASTRA 82.36 111.60 111.60 111.60 111.60 111.60

Tarapur (Unit-3 & 4)* NEUCLEAR 1080.00 MAHARASTRA 265.48 - - - - -

Narora (Unit-1 & 2) NEUCLEAR 440.00 UTTAR PRADESH 164.27 252.56 252.56 252.56 252.56 252.56

Rajasthan (Unit-2, 3 & 4) NEUCLEAR 650.00 RAJASTHAN - - - 283.87 279.79 279.79

Madras (Unit-1 & 2) NEUCLEAR 340.00 TAMIL NADU 128.78 210.51 210.15 210.15 210.15 210.15

Kaiga (Unit-1 & 2) NEUCLEAR 440.00 KARNATAKA 295.00 310.00 325.00 340.00 350.00 279.50

Rajasthan (Unit- 3) NEUCLEAR 200.00 RAJASTHAN 278.00 296.00 314.00 - - -

Note:The Notified Tariff is subject to price variation of Fuel and Heavy Water, *Provisional

SATLUJ JAL VIDYUT NIGAM LTD.

Satluj Jal Vidyut Nigam Ltd.

HYDRO 1500.00 HP 75.00 136.00 172.00

STATE SECTOR

ANDHRA PRADESH GAS POWER CORP. LTD.

Gas Turbo Power Station Stage - I

NATURAL GAS 100.00 A. P. 120.00 114.00 161.00 173.00 195.00 179.00

Gas Turbo Power Station Stage - II

GAS & NAPHTHA

172.00 A. P. 228.00 132.00 155.00 139.00 179.00 174.00

A. P. GENERA. COR. LTD. **

COAL/HYDRO 6519.26 A. P. 148.90 161.38 172.03 182.33 158.87 145.10

ASSAM POWER GENE. CORPORATION LTD.

Bongaigaon T.P.S COAL 240.00 ASSAM 553.00 847.00 - - - -

CTPS OIL(LSFO/LSHS)

60.00 ASSAM - - - - - -

Namrup T.P.S GAS 81.50 ASSAM 126.00 128.00 143.00 143.00 154.00 119.00

Lakwa T.P.S GAS 120.00 ASSAM 138.00 125.00 137.00 153.00 187.00 164.00

BIHAR STATE ELECTRICITY BOARD

Barauni T P S (Provisional)

COAL 320.00 BIHAR 399.54 388.33 394.62 264.18 - -

2/7

“A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

Page 191: Annual Report 07 08

Central electricity authority Annual Report 2007-08

182

Generating Station/ Utility

Energy Source Installed Capacity

Name of the State Cost in Paise/KWh

(MW) 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06

Muzaffarpur T P S (Provisional)

COAL 220.00 BIHAR 385.75 378.91 421.65 698.75 - -

Kosi H P S (Provisional) HYDRO 18.00 BIHAR 652.26 314.04 566.19 648.34 - -

CHHATTISGARH STATE ELECY. BOARD

Korba-East COAL 440.00 CHHATTISGARH 79.00 83.00 86.00 97.00 85.00 97.00

Korba-West COAL 840.00 CHHATTISGARH 58.00 65.00 86.00 77.00 26.00 77.00

HBHPS Machadoli Bango HYDRO 120.00 CHHATTISGARH 17.00 15.00 22.00 25.00 26.00 28.00

HEP-General HYDRO 5.00 CHHATTISGARH NA NA NA NA 60.00 64.00

HARYANA POWER GENERA. COR. LTD

Panipat COAL 660.00 HARYANA 200.05 198.66 228.29 218.12 238.86 256.78

Faridabad COAL 165.00 HARYANA 268.05 263.99 257.55 287.88 296.21 358.13

Western Yamuna Canal HYDRO 48.00 HARYANA 123.33 77.54 82.80 85.12 64.24 85.87

Kakroi MICRO HYDEL 0.30 HARYANA 806.69 890.59 929.84 1617.93 1434.02 10.25

INDRAPRASTHA POWER GEN. CO. LTD.

I. P. STN. COAL 247.50 DELHI NA NA NA 315.00 320.00 311.00

R P H COAL 135.00 DELHI NA NA NA 256.00 265.00 288.00

G T P S GAS 282.00 DELHI NA NA NA 188.00 196.00 179.00

JHARKHAND STATE ELECTRICITY BOARD

Patratu T. P. S. COAL 840.00 JHARKHAND 244.77 225.94 232.93 263.16 335.30 311.00

S. R. H. P. , Sikidiri HYDRO 130.00 JHARKHAND 54.17 76.54 40.44 46.62 47.00 115.00

KARNATAKA POWER CORPO. LTD.

Sharavathy HYDRO 1035.00 KARNATAKA 12.94 24.99 30.42 19.38 14.14 11.83

Linganamakki HYDRO 55.00 KARNATAKA 12.94 24.99 30.42 19.38 14.14 86.51

Bhadra HYDRO 39.20 KARNATAKA 12.94 24.99 30.42 19.38 14.14 48.79

Nagjhari HYDRO 855.00 KARNATAKA 22.48 36.81 49.72 49.05 42.04 33.93

Supa HYDRO 100.00 KARNATAKA 22.48 36.81 49.72 49.05 42.04 33.93

Ghataprabha HYDRO 32.00 KARNATAKA 101.41 101.56 92.76 95.98 57.08 47.39

Varahi HYDRO 230.00 KARNATAKA 60.34 54.03 62.41 63.33 51.33 54.62

Mani Dam Power House HYDRO 9.00 KARNATAKA 60.34 54.03 62.41 63.33 51.33 54.62

Kalmala HYDRO 0.40 KARNATAKA 234.43 157.48 310.38 278.32 173.61 146.38

Sirwar HYDRO 1.00 KARNATAKA 234.43 157.48 310.38 278.32 173.61 146.38

Ganekal HYDRO 0.35 KARNATAKA 234.43 157.48 310.38 278.32 173.61 146.38

Mallapur HYDRO 9.00 KARNATAKA 234.43 157.48 310.38 278.32 173.61 146.38

Kappadgudda Wind Farm HYDRO KARNATAKA 294.44 157.48 310.38 187.35 181.87 190.37

Kadra HYDRO 150.00 KARNATAKA 216.33 179.79 196.51 235.85 203.83 143.68

Kodasalli HYDRO 120.00 KARNATAKA 216.33 179.79 196.51 165.30 156.20 107.57

BRBC Power House HYDRO KARNATAKA 12.94 24.99 30.42 862.11 167.78 75.77

Gerusoppa Power House HYDRO 240.00 KARNATAKA 808.97 187.61 193.56 188.17 131.25 108.22

Almatti Dam Power House

HYDRO 290.00 KARNATAKA 3845.23 141.35 90.63

KERALA STATE ELECTRICITY BOARD **

2050.13 KERALA 352.00 352.00 420.00 457.00 384.00 352.00

LAKSHADWEEP, U. T., KAVARATTI **

DIESEL 9.97 LAKSHADWEEP 777.00 822.00 886.00 937.00 888.00 1055.00

3/7

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

Page 192: Annual Report 07 08

183

Central electricity authority Annual Report 2007-08

Generating Station/ Utility

Energy Source Installed Capacity

Name of the State Cost in Paise/KWh

(MW) 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06

ATPS Chachai Coal 240.00 MADHY PRADESH 134.00 139.00 142.00 181.00 214.00 176.00

STPS Sarni Coal 1142.50 MADHY PRADESH 139.00 119.00 119.00 154.00 144.00 153.00

SGTPS Birsinghpur Coal 840.00 MADHY PRADESH 178.00 235.00 177.00 166.00 166.00 168.00

Gandhi Sagar Hydro 115.00 MADHY PRADESH 37.00 43.00 99.00 29.00 27.00 19.00

Pench Hydro 160.00 MADHY PRADESH 59.00 143.00 26.00 18.00 36.00 21.00

Rajghat Hydro 45.00 MADHY PRADESH 423.00 369.00 290.00 129.00 317.00 83.00

Bargi Hydro 90.00 MADHY PRADESH 29.00 54.00 17.00 13.00 104.00 28.00

Tons Hydro MADHY PRADESH 139.00 128.00 80.00 64.00 137.00 83.00

Sipara Hydro MADHY PRADESH 320.00 251.00 306.00 103.00

Devlond Hydro MADHY PRADESH 794.00 519.00 249.00 344.00 131.00

Birsingh pur Hydro 20.00 MADHY PRADESH 212.00 302.00 214.00 79.00 131.00 75.00

J Sagar Hydro MADHY PRADESH 51.00 53.00 240.00 30.00 22.00 -

R P Sagar Hydro MADHY PRADESH 35.00 249.00 24.00 17.00 -

MEGHALAYA STATE ELECY. BOARD

MeSEB HYDRO 185.20 MEGHALAYA 86.02 88.62 106.96 97.55 82.29 96.62

NAGALAND, DEPT. OF POWER

Diesel Standby Generator Set

DIESEL 0.70 NAGALAND 592.00 592.00 596.00 596.00 596.00 596.00

Dzuza MHP HYDRO 1.50 NAGALAND 198.00 198.00 198.00 198.00 198.00 198.00

Kithuri MHP HYDRO 0.06 NAGALAND 200.00 200.00 200.00

Duilumroi MHP HYDRO 0.54 NAGALAND 211.00 211.00 211.00 211.00 211.00 211.00

Gekhu-Ghakhubu MHP HYDRO 0.06 NAGALAND 199.00 199.00 199.00

Tsutha MHP HYDRO 0.70 NAGALAND 200.00 200.00 200.00 200.00 200.00 200.00

Duilumroi-II HYDRO 0.20 NAGALAND 211.00 211.00 211.00 211.00 211.00 211.00

Telangsao MHP HYDRO 0.60 NAGALAND 0.00 202.00 202.00

Likimro HEP HYDRO 24.00 NAGALAND 175.00 175.00 175.00 175.00

Biomass Gasifier GASIFIER 0.16 NAGALAND 120.00 120.00 120.00 - - -

ORISSA HYDRO POWER CORPORATION LTD.

Hirakud Power System HYDRO 331.50 ORISSA 48.57 43.98 66.87 48.57 64.72 64.72

Rengali H. E. Project HYDRO 250.00 ORISSA 26.84 32.31 41.53 26.84 40.94 40.94

Upper Indravati H. E. Project

HYDRO 600.00 ORISSA 51.55 36.18 129.42 51.55 57.23 57.23

Upper Kolab H. E. Project HYDRO 320.00 ORISSA 35.28 32.78 44.31 35.28 39.14 39.14

Balimela H. E. Project HYDRO 360.00 ORISSA 25.86 33.00 58.94 25.86 39.37 39.37

ORISSA POWER GENERATION CORP. LTD.

Ib, Banharpali COAL 420.00 ORISSA 101.65 107.47 104.88 92.02 86.53 90.19

PONDICHERRY POWER COR. LTD.

Karaikal GAS 32.50 PONDICHERRY 167.00 164.00 160.00 155.00 157.00 202.00

PORT BLAIR, A. & N. ADM.

SPCL Power Plant, Bambooflat

DIESEL 20.00 PORT BLAIR - - 382.00 586.00 653.00 785.00

4/7

“It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

Page 193: Annual Report 07 08

Central electricity authority Annual Report 2007-08

184 “The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

Generating Station/ Utility

Energy Source Installed Capacity

Name of the State Cost in Paise/KWh

(MW) 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06

Pragati Power Corp. Ltd. GAS 330.00 DELHI NA NA 228.00 164.00 163.00 183.00

PUNJAB STATE ELECTRICITY BOARD

Ranjit Sagar Dam HYDRO 600.00 PUNJAB 602.43 636.27 439.57 545.69 291.48

Mukerian Hydel HYDRO 207.00 PUNJAB 83.26 59.65 83.68 57.72 66.34 42.93

U.B.D.C.Pathankot HYDRO 91.35 PUNJAB 126.36 103.52 81.90 73.44 86.42 49.12

Shanan Power House Joginder Nagar

HYDRO 110.00 PUNJAB 26.06 19.97 21.95 16.93 19.59 20.81

Anandpur Sahib HYDRO 134.00 PUNJAB 76.69 67.94 44.19 39.59 81.00 43.86

Micro Hydel HYDRO 3.90 PUNJAB 465.58 371.48 363.57 327.30 663.61 243.92

GGSSTP Ropar COAL 1260.00 PUNJAB 187.83 186.87 190.97 182.13 184.91 200.09

GNDTP Bathinda COAL 440.00 PUNJAB 203.98 225.47 226.91 217.35 247.46 255.87

GHTP Lehra Mohabat COAL 420.00 PUNJAB 268.20 255.36 246.98 231.35 245.24 249.14

SIKKIM, ENERGY & POWER DEPTT.

L L H P HYDRO 12.00 SIKKIM 81.37 129.64 105.59 53.12 63.98 129.77

J P H HYDRO 2.10 SIKKIM 565.75 1315.79 1585.16 204.40 180.32 947.21

Rimbi - I HYDRO 0.60 SIKKIM - - 69.49 126.52 374.05 589.58

Rongnichu -II HYDRO 2.50 SIKKIM 306.12 583.33 - 390.70 131.50 430.27

Chaten HYDRO 0.10 SIKKIM 5033.33 - - - - -

Meyong HYDRO 4.00 SIKKIM 94.93 662.65 55.31 39.94 99.21 108.55

Rimbi - II HYDRO 1.00 SIKKIM 63.93 64.52 73.29 151.77 106.22 -

Upper - Rongnichu HYDRO 8.00 SIKKIM 185.64 86.74 154.00 123.29 69.72 311.72

Kalez HYDRO 2.00 SIKKIM 218.67 313.84 145.82 - 85.01 386.11

D P H DIESEL 4.00 SIKKIM 133.33 709.68 1161.29 770.83 500.00 2500.00

TAMIL NADU ELECTRICITY BOARD

Thermal COAL 2970.00 TAMIL NADU 187.18 198.61 186.61 196.51 212.22 220.58

Hydro HYDRO 2131.40 TAMIL NADU 23.58 35.21 60.62 130.19 41.97 43.43

Gas GAS/NAPTHA 423.88 TAMIL NADU 712.02 272.55 346.26 278.54 253.01 253.38

Wind WIND 19.36 TAMIL NADU 275.00 290.00 301.11 316.00 320.75 1610.54

TRIPURA STATE ELECTRICITY COR. LTD.

Gumti H. E. Project HYDRO 15.00 TRIPURA 44.25 42.96 42.45 44.44 43.74 59.74

Baramura G. T. Project Gas Thermal 21.00 TRIPURA 152.52 151.45 149.56 153.31 142.74 137.96

Rokhia G. T. Project Gas Thermal 69.00 TRIPURA 277.07 295.92 205.93 207.91 165.42 215.31

UTTAR PRADESH R. V. U. N. LTD.

Anpara A COAL 630.00 UTTAR PRADESH 97.03 107.58 100.70 102.93 119.97 132.55

Anpara B COAL 1000.00 UTTAR PRADESH 160.23 142.30 120.75 123.07 124.24 151.30

Obra A COAL 550.00 UTTAR PRADESH 188.49 262.13 222.70 269.55 404.62 326.69

Obra B COAL 1000.00 UTTAR PRADESH 115.25 146.39 127.57 138.12 165.19 165.19

Panki COAL 220.00 UTTAR PRADESH 219.70 231.58 245.62 230.30 280.65 329.70

Harduganj B COAL 210.00 UTTAR PRADESH 307.29 346.76 358.60 373.06 448.17 448.17

Harduganj C COAL 230.00 UTTAR PRADESH 372.92 485.88 389.75 407.96 432.16 781.00

Paricha COAL 220.00 UTTAR PRADESH 320.28 251.37 263.48 323.07 292.13 391.47

5/7

Page 194: Annual Report 07 08

185

Central electricity authority Annual Report 2007-08

“Honesty is the first chapter in the book of wisdom.”

Generating Station/ Utility

Energy Source Installed Capacity

Name of the State Cost in Paise/KWh

(MW) 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06

UTTARANCHAL JAL VIDYUT NIGAM LIMITED

Chibro UPCL HYDRO 240.00 UTTARANCHAL 55.00 55.00 37.00 37.00 25.15

HPSEB 30.00 30.00 30.00 30.00 37.00

Khodri UPCL HYDRO 120.00 UTTARANCHAL 55.00 55.00 37.00 37.00 31.10

HPSEB 30.00 30.00 30.00 30.00 37.00

Dhakrani UPCL HYDRO 33.75 UTTARANCHAL 55.00 55.00 37.00 37.00 37.19

HPSEB 30.00 30.00 30.00 30.00 37.00

Dhalipur UPCL HYDRO 51.00 UTTARANCHAL 55.00 55.00 37.00 37.00 32.42

HPSEB 30.00 30.00 30.00 30.00 37.00

Kulhal UPCL HYDRO 30 .00 UTTARANCHAL 55.00 55.00 37.00 37.00 29.03

HPSEB 30.00 30.00 30.00 30.00 37.00

Ramganga HYDRO 198 .00 UTTARANCHAL 55.00 55.00 37.00 37.00 34.48

Khatima HYDRO 41.40 UTTARANCHAL 55.00 55.00 37.00 37.00 23.21

Tiloth HYDRO 90.00 UTTARANCHAL 55.00 55.00 37.00 37.00 38.69

Chilla HYDRO 144.00 UTTARANCHAL 55.00 55.00 37.00 37.00 25.95

Pathri HYDRO 20.40 UTTARANCHAL 37.00 37.00 37.00 37.00 37.00

Mohammadpur HYDRO 9.30 UTTARANCHAL 37.00 37.00 37.00 37.00 37.00

Galogi HYDRO 3 .00 UTTARANCHAL 1.70 1.70 1.70 1.70 1.70

Small Hydro Projects HYDRO - UTTARANCHAL 1.70 1.70 1.70 1.70 1.70

WEST BENGAL POWER DEVLOP. COR. LTD

Kolaghat Coal/Oil 1260.00 WEST BENGAL 161.00 166.00 166.00 167.00 175.00 169.00

Bakreswar Coal/Oil 630.00 WEST BENGAL 342.00 161.00 182.00 211.00 221.00 198.00

Bandel Coal/Oil 450.00 WEST BENGAL 159.00 152.00 177.00 181.00 201.00

Santaldih Coal/Oil 480.00 WEST BENGAL 227.00 204.00 204.00 224.00 232.00

WEST BENGAL STATE ELECY. BOARD

Jaldhaka H E P HYDRO 35.00 WEST BENGAL 62.24 51.21 49.71

Ramam H E P HYDRO 51.00 WEST BENGAL 163.42 150.96 142.57

Teesta Canal Fallas HYDRO 67.50 WEST BENGAL 1679.22 1369.11 1048.62

Internal Combustion THERMAL 118.00 WEST BENGAL 4344.83 798.72 935.02

PRIVATE SECTOR

CESC LTD., KOLKATA

Budge Budge COAL 100.00 KOLKATA 238.00 229.00 226.00 210.00 185.00 163.00

Southern COAL 135.00 KOLKATA 189.00 184.00 184.00 177.00 183.00 192.00

Titagarh COAL 240.00 KOLKATA 120.00 129.00 139.00 139.00 167.00 171.00

New cossipore COAL 100.00 KOLKATA 230.00 256.00 268.00 255.00 301.00 319.00

Mulajore COAL - KOLKATA 399.00 457.00 530.00 689.00

D L F POWER LIMITED

Adamtilla GAS 9.00 ASSAM 235.14 221.14 261.20 191.10 179.54 239.55

Banaskandi GAS 15.50 ASSAM 255.08 241.15 228.58 182.53 180.23 188.97

Rajrappa COAL 11.00 JHARKHAND 522.72 473.61 367.25 303.73 282.53 311.49

Gidi COAL 11.00 JHARKHAND 495.36 438.95 409.54 312.53 271.93 312.28

Madhuband COAL 11.00 JHARKHAND 832.69 461.14 465.58 342.84

6/7

Page 195: Annual Report 07 08

Central electricity authority Annual Report 2007-08

186 “Ambition should be made of sterner stuff.”

Generating Station/ Utility

Energy Source Installed Capacity

Name of the State Cost in Paise/KWh

(MW) 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06

G M R Energy Ltd. NAPTHA 220.00 KARNATAKA - 404.00 445.00 446.00 526.00 707.00

G M R POWER CORPORATION PVT. LTD.

G M R Power Corporation Limited

LSHS 200.00 TAMIL NADU 393.00 387.00 433.00 442.00 496.00 616.00

GUJ. PAGUTHAN ENERGY COR. PVT. LTD.

Paguthan CCPP Gas/Naphtha 655.00 GUJARAT 375.95 811.67 423.53 258.10 208.19 187.69

HINDALCO INDUSTRIES LTD, RENUSAGAR POWER DIVISION

Captive Power Plant COAL 749.62 UTTAR PRADESH 91.45 96.85 116.73 121.67 119.67 137.03

HIRAKUD POWER (HINDALCO)

Unit 1 COAL 167.50 ORISSA 126.00 122.00 127.00 139.00 126.00 138.00

Unit 2 COAL 100.00 ORISSA - - - - - 63.00

JAIPRAKASH HYDRO POWER LIMITED

Baspa II H E P HYDRO 300.00 HIMACHAL PRADESH 236.00 236.00 183.00

J S W ENERGY LTD.

JSWEL Coal/Furnace Gas 260.00 GUJARAT 221.59 234.04 219.28 208.44 216.04 214.20

LVS POWER LTD.

LVS Power Limited LSHS 36.80 A. P. - 219.06 252.35 301.74 - -

MALANA POWER COMPANY LTD.

Malana H E P HYDRO 86.00 HIMACHAL PRADESH 347.00 300.00 298.00 282.00 264.00

MADURAI POWER CORPO. PVT LTD.

Madurai LSHS 105.00 TAMIL NADU 350.00 403.00 433.00 488.00 566.00

RELIANCE ENERGY LTD.

Samalkot Power Station GAS 220.00 ANDHRA PRADESH 168.57 158.67 182.59 185.93

SAMALPATTI POWER COMPA. PVT. LTD.

Samalpatti LSHS 105.66 TAMIL NADU 369.32 414.80 454.55 507.35 563.01 704.04

THE TATA POWER COMPANY LIMITED

Trombay Generating, Chembur

COAL/GAS/LSHS

1330.00 MAHARASTRA 213.00 191.00 212.00 193.00 181.00 245.00

Jojobera, Jamshedpur COAL 427.50 JHARKHAND 84.00 81.00 77.00 73.00 86.00 91.00

Belgaum LSFO 81.30 KARNATAKA - 258.00 285.00 295.00 329.00 430.00

TORRENT P0WER LTD. **

COAL/GAS 430.00 GUJARAT - 219.00 225.00 193.00 217.44 232.67

Note :-

1. *NTPC have not furnished cost of generation , hence tariff for Sale of Power from NTPC stations is given. 2. Cost of Generation for Nuclear Power Corp. Ltd. Is not available so tariff for sale of Power from various Atomic Power Stations of NPCIL is given. 3. ** Project wise break up not given by the concerned authorities.

7/7

Page 196: Annual Report 07 08

187

Central electricity authority Annual Report 2007-08

“The one exclusive sign of thorough knowledge is the power of teaching.”

Annexure-9D (Item-9.5)

1/10

COST OF GENERATION OF POWER FOR THE YEAR 2006-07Name of the Utility/Power Station Energy Source- Coal/

Gas/ Naptha/ LSHS/ Diesel/ Hydro

State where the unit is located

Installed Capacity

Cost of Generation/

Unit(MW) (Paise/Kwh)

CENTRAL SECTORBHAKRA BEAS MANAGEMENT BOARD Bhakra Complex(Bhakra Plant.+Gang.+Kotla P. House)

HYDRO PUNJAB/HIMACHAL PRADESH

1480.30 13.50

Dehar Power House HYDRO 990.00 38.37Pong Power Plant HYDRO 396.00 8.78DAMODAR VALLEY CORPORATIONBokaro Thermal Power Station THERMAL-C JHARKHAND 630.00 194.00Durgapur Thermal Power Station THERMAL-C WEST BENGAL 350.00 210.14Chandrapura Thermal Power Station THERMAL-C JHARKHAND 750.00 174.11Mejia Thermal Power Station THERMAL-C WEST BENGAL 840.00 199.45Maithon Hydel Station HYDRO JHARKHAND 60.00 81.41Panchet Hydel Station HYDRO JHARKHAND 80.00 81.92Tilaiya Hydel Power Station HYDRO JHARKHAND 4.00 205.75NATIONAL HYDRO ELECTRIC POWER COR. LTD. Bairasiul HYDRO HIMACHAL PRADESH 180.00 69.71Salal I & II HYDRO J. & K. 690.00 27.05Tanakpur HYDRO UTTARAKHAND 94.20 96.77Chamera - I HYDRO HIMACHAL PRADESH 540.00 59.06Uri I HYDRO J. & K. 480.00 62.94Chamera - II HYDRO HIMACHAL PRADESH 300.00 148.77Dhauligang HYDRO UTTARAKHAND 280.00 119.07Loktak HYDRO MANIPUR 90.00 104.74Rangit HYDRO SIKKIM 60.00 230.02NATIONAL THERMAL CORPORATION LIMITED * Singrauli (U 1-7) THERMAL-C UTTAR PRADESH 2000.00 118.00Korba (U 1-6) THERMAL-C CHHATISGARH 2100.00 96.00Ramagundam (U 1-7) THERMAL-C ANDHRA PRADESH 2600.00 144.00Farakka (U 1-5) THERMAL-C WEST BENGAL 1600.00 167.00Vindhyachal (U 1-9) THERMAL-C MADHYA PRADESH 2760.00 144.00Rihand (U 1-4) THERMAL-C UTTAR PRADESH 2000.00 148.00FGUTPS (U 1-5) THERMAL-C UTTAR PRADESH 1050.00 184.00NCTPS-Dadri coal (U 1-4) THERMAL-C UTTAR PRADESH 840.00 225.00Kahalgaon (U 1-4) THERMAL-C BIHAR 840.00 194.00Talcher (U 1-6) THERMAL-C ORISSA 3000.00 122.00

Page 197: Annual Report 07 08

Central electricity authority Annual Report 2007-08

188 “Children are our most valuable natural resource.”

Name of the Utility/Power Station Energy Source- Coal/ Gas/ Naptha/ LSHS/

Diesel/ Hydro

State where the unit is located

Installed Capacity

Cost of Generation/

Unit(MW) (Paise/Kwh)

Tanda (U 1-4) THERMAL-C UTTAR PRADESH 440.00 248.00Simhadri (U 1-2) THERMAL-C ANDHRA PRADESH 1000.00 161.00Anta (U 1-3) & ST-1 THERMAL-G RAJASTHAN 419.00 230.00Auraiya (U 1-4), ST-1 & ST-2 THERMAL-G UTTAR PRADESH 663.00 278.00Dadri (U 1-4), ST-1 & ST-2 THERMAL-G UTTAR PRADESH 830.00 288.00Kawas (U I-B,I-A, II-B, II-A, ST-1 & ST-2) THERMAL-G GUJARAT 656.00 554.00Gandhar (U 1-3), ST THERMAL-G GUJARAT 657.00 268.00Rajiv Gandhi (Kayamkulam) (U 1-2), ST THERMAL-N KERALA 360.00 760.00Faridabad (U 1-4), ST THERMAL-G HARYANA 432.00 225.00Badarpur (U 1-4) THERMAL-C DELHI 705.00 265.00NEYVELI LIGNITE CORPORATION LTD.Thermal Station I THERMAL-LIG TAMIL NADU 600.00 153.31Thermal Station I Expansion THERMAL-LIG TAMIL NADU 420.00 139.26Thermal Station I I Stage I THERMAL-LIG TAMIL NADU 630.00 142.77Thermal Station I I Stage I I THERMAL-LIG TAMIL NADU 840.00 137.07NORTH EASTERN ELECTRIC POWER COR. LTD.Kopili Hydro Electric Project HYDRO ASSAM 275.00 65.70Doyang Hydro Electric Project (DHEP) HYDRO NAGALAND 75.00 260.20Ranganadi Hydro Electric Project (RHEP) HYDRO ARUNACHAL

PRADESH405.00 121.29

Assam Gas Based Power Project (AGBPP) THERMAL-G ASSAM 291.00 181.92Agartala Gas Generation Power Project THERMAL-G TRIPURA 84.00 166.95SATLUJ JAL VIDYUT NIGAM LTD.Nathpa Jhakri Power Corporation Limited HYDRO HIMACHAL PRADESH 1500.00 109.00TEHRI HYDRO DEVELOPMENT CORPORATIONTehri St. -I HYDRO UTTARAKHAND 1000.00 350.54NARMADA HYDROELECTRIC DEV. COR. LTD.Indira Sagar Project HYDRO MADHYA PRADESH 1000 88.44NUCLEAR POWER CORP. OF INDIATAPS 1 TO 4 NEUCLEAR MAHARASHTRA 1400.00 192.00Rajasthan (Unit-2, 3 & 4) NEUCLEAR RAJASTHAN 640.00 177.00Madras (Unit-1 & 2) NEUCLEAR TAMIL NADU 440.00 139.00Narora (Unit-1 & 2) NEUCLEAR UTTAR PRADESH 440.00 178.00Kakrapar (Unit-1 & 2) NEUCLEAR GUJARAT 440.00 145.00Kaiga (Unit-1 & 2) NEUCLEAR KARNATAKA 440.00 208.00NORTHERN REGION HARYANA POWER GEN. CORP. LTD.Panipat Thermal Power Station (4x110) THERMAL-C HARYANA 440.00 286.12Panipat Thermal Power Station (2x210) THERMAL-C HARYANA 420.00 257.90

2/10

Page 198: Annual Report 07 08

189

Central electricity authority Annual Report 2007-08

“The farther backward you can look, the farther forward you are likely to see.”

Name of the Utility/Power Station Energy Source- Coal/ Gas/ Naptha/ LSHS/

Diesel/ Hydro

State where the unit is located

Installed Capacity

Cost of Generation/

Unit(MW) (Paise/Kwh)

Panipat Thermal Power Station (2x250) THERMAL-C HARYANA 500.00 247.30Faridabad Thermal Power Station THERMAL-C HARYANA 165.00 482.64Western Yamuna Canal , H. E. Hydel Project

HYDRO HARYANA 62.40 99.86

HIMACHAL PRADESH STATE ELECTRICITY BOARD Giri Power House HYDRO HIMACHAL PRADESH 60.00 47.00Andhra Power House HYDRO HIMACHAL PRADESH 16.95 75.00Gumma Power House HYDRO HIMACHAL PRADESH 3.00 222.00Bhaba/Sanja Power House HYDRO HIMACHAL PRADESH 120.00 32.00Nogil Power House HYDRO HIMACHAL PRADESH 2.25 159.00Ghanvi Power House HYDRO HIMACHAL PRADESH 22.50 215.00Bassi Power House HYDRO HIMACHAL PRADESH 60.00 26.00Binwa Power House HYDRO HIMACHAL PRADESH 6.00 105.00Gaj Power House HYDRO HIMACHAL PRADESH 10.50 111.00Baner Power House HYDRO HIMACHAL PRADESH 12.00 108.00Chaba Power House HYDRO HIMACHAL PRADESH 1.38 123.00Rukti Power House HYDRO HIMACHAL PRADESH 1.50 460.00Rongtong Power House HYDRO HIMACHAL PRADESH 2.00 563.00Chaba Power House HYDRO HIMACHAL PRADESH 0.30 298.00Sal-II Power House HYDRO HIMACHAL PRADESH 2.00 203.00Killar Power House HYDRO HIMACHAL PRADESH 0.30 420.00Holi Power House HYDRO HIMACHAL PRADESH 3.00 136.00Thirot Power House HYDRO HIMACHAL PRADESH 4.50 326.00Larji Power House HYDRO HIMACHAL PRADESH 126.00 468.00INDRAPRASTHA POWER GEN. CO. LTD.Rajghat Power House THERMAL-C DELHI 135.00 308.48Indraprastha Power Station THERMAL-C DELHI 247.50 362.48I. P. Gas Turbinen Power Station THERMAL-G DELHI 282.00 229.22PRAGATI POWER CORP. LTD.Pragati Power Station THERMAL-NG DELHI 330.00 105.65PUNJAB STATE ELECTRICITY BOARD G.N.D.T.P. Bathinda THERMAL-C PUNJAB 440.00 252.60G.G.S.S.T.P Ropar THERMAL-C PUNJAB 1260.00 202.98G.H.T.P Lehra Mohabat THERMAL-C PUNJAB 420.00 228.50Shan Hydro Electric Project(UHL) HYDRO HIMACHAL PRADESH 110.00 25.87U.B.D.C.Pathankot HYDRO PUNJAB 91.35 64.18Anandpur Sahib HYDRO PUNJAB 134.00 46.60Mukerian Hydel HYDRO PUNJAB 207.00 43.86Micro Hydel(Nidampur+ Dodhar+Thuhi+Rohti)

HYDRO PUNJAB 4.90 234.16

Ranjit Sagar Dam (R.S.D). HYDRO PUNJAB 600.00 311.33

3/10

Page 199: Annual Report 07 08

Central electricity authority Annual Report 2007-08

190

Name of the Utility/Power Station Energy Source- Coal/ Gas/ Naptha/ LSHS/

Diesel/ Hydro

State where the unit is located

Installed Capacity

Cost of Generation/

Unit(MW) (Paise/Kwh)

L. Bank & R. Bank HYDRO PUNJAB 684.0 13.34Beas & Extn. HYDRO HIMACHAL PRADESH 573.00 45.34RAJASTHAN RAJYA VIDYUT PRASA. N. Ltd.Rana Pratap Sagar Power Station HYDRO RAJASTHAN 172.00 102.00Jawahar Sagar Power Station HYDRO RAJASTHAN 99.00 109.00RAJASTHAN RAJYA VIDYUT UTPADAN N. Ltd.Kota Supper Thermal Power Station THERMAL-C RAJASTHAN 1045.00 184.60Suratgarh Supper Thermal Power Station THERMAL-C RAJASTHAN 1250.00 235.75Ramgarh Gas Thermal Power Station THERMAL-G RAJASTHAN 110.50 337.18Mahi Hydel Power Statioin HYDRO RAJASTHAN 140.00 48.43Mini Micro Hydel Power Station HYDRO RAJASTHAN 23.85 257.27UTTARAKHAND JAL VIDYUT NIGAM LIMITED Chibro HYDRO UTTARAKHAND 240.00 24.52Ramganga HYDRO UTTARAKHAND 198 .00 60.39Chilla HYDRO UTTARAKHAND 144.00 19.32Khodri HYDRO UTTARAKHAND 120 .00 24.54Tiloth HYDRO UTTARAKHAND 90.00 26.61Dhalipur HYDRO UTTARAKHAND 51.00 27.52Khatima HYDRO UTTARAKHAND 41.40 28.42Dhakrani HYDRO UTTARAKHAND 33.75 36.31Kulhal HYDRO UTTARAKHAND 30 .00 26.84U. P. JAL VIDYUT NIGAM LIMITED Fipri HYDRO UTTAR PRADESH 300.00 27.32Obra HYDRO UTTAR PRADESH 99.00 24.69Matatila/Sheetla HYDRO UTTAR PRADESH 30.00 20.43Muzaffar Nagar HYDRO UTTAR PRADESH 15.50 89.32Khara/E/C HYDRO UTTAR PRADESH 78.00 89.74UTTAR PRADESH R. V. U. N. LTD. Anpara A (Unit 1-3) THERMAL-C UTTAR PRADESH 630.00 133.15Anpara B (Unit 1-2) THERMAL-C UTTAR PRADESH 1000.00 156.01Obra A (Unit 1-5) & (Unit 6-8) THERMAL-C UTTAR PRADESH 550.00 321.38Obra B (Unit 9-13) THERMAL-C UTTAR PRADESH 1000.00 193.92Panki (Unit 3-4) THERMAL-C UTTAR PRADESH 220.00 335.71Harduganj B & C (Unit 1-4) & (Unit 5-7) THERMAL-C UTTAR PRADESH 440.00 423.49Paricha (Unit 1-2) THERMAL-C UTTAR PRADESH 220.00 326.19WESTERN REGIONCHHATTISGARH STATE ELECY. BOARD Korba-East THERMAL-C CHHATTISGARH 440.00 94.84Korba-West THERMAL-C CHHATTISGARH 840.00 87.28HEP Machadoli Bango HYDRO CHHATTISGARH 120.00 39.35

4/10

“Failing to plan is planning to fail.”

Page 200: Annual Report 07 08

191

Central electricity authority Annual Report 2007-08

Name of the Utility/Power Station Energy Source- Coal/ Gas/ Naptha/ LSHS/

Diesel/ Hydro

State where the unit is located

Installed Capacity

Cost of Generation/

Unit(MW) (Paise/Kwh)

HEP-Gangrel HYDRO CHHATTISGARH 10.00 61.81HEP Sikasar HYDRO CHHATTISGARH 70.00 61.05GUJARAT STATE ELECTRICITY CORP. LTD.Ukai TPS (Unit-1-5) THERMAL-C GUJARAT 850.00 184.00Gandhinagar TPS (Unit-1-4) THERMAL-C GUJARAT 660.00 259.00Gandhinagar 5 THERMAL-C GUJARAT 210.00 200.00Wanakbori TPS (Unit-1-6) THERMAL-C GUJARAT 1260.00 193.00Wanakbori 7 THERMAL-C GUJARAT 210.00 181.00Sikka TPS (Unit-1-2) THERMAL-C GUJARAT 240.00 255.00Kutch Lignite TPS (Unit-1-3) THERMAL-C GUJARAT 215.00 216.00Dhuvaran (Unit-1-6) THERMAL-C GUJARAT 534.00 390.00Dhuvaran THERMAL-G GUJARAT 107.00 506.00Utran GBPS (GT-1 to 3 & STG) THERMAL-G GUJARAT 135.00 228.00Ukai Hydro (Unit-1-4) & Ukai Hydro-LBC HYDRO GUJARAT 305.00 16.00Kadana (Unit-1-4) & Panam Hydro (Unit-1-2)

HYDRO GUJARAT 242.00 87.00

M.P.P.G.C.L., JABALPUR Amar Kantak TPH (PH I & II) THERMAL-C MADHYA PRADESH 290.00 159.17Satpura TPH Sarni (PH I, II & III) THERMAL-C MADHYA PRADESH 1142.50 165.18Sanjay Gandhi TPH Birsinghpur (PH I & II)

THERMAL-C MADHYA PRADESH 840.00 164.02

Rani Avanti Bai HPS Bargi HYDRO MADHYA PRADESH 90.00 18.87Pench HPS HYDRO MADHYA PRADESH 160.00 27.05Gandhi Sagar HYDRO MADHYA PRADESH 115.00 25.13Tons (Tons+Bansagar II+Bansagar III) HYDRO MADHYA PRADESH 405.00 68.49Rajghat HYDRO MADHYA PRADESH 45.00 106.79Sanjay Gandhi HPS, Birsingh pur HYDRO MADHYA PRADESH 20.00 98.07Madhikhera HYDRO MADHYA PRADESH 40.00 0.00Jhinna HPS, Jhinna HYDRO MADHYA PRADESH 20.00 183.93SARDAR SAROVAR NARMADA NIGAM LTD.Sardar Sarovar Project HYDRO GUJARAT 1450.00 163.05SOUTHERN REGIONANDHRA PRADESH GAS POWER CORP. LTD.Gas Turbo Power Station Stage - I THERMAL-G ANDHRA PRADESH 100.00 133.00Gas Turbo Power Station Stage - II THERMAL-G ANDHRA PRADESH 172.00 152.00ANDHRA PRADESH POWER GEN.CORP. LTD. Total (A. P. Power Gen. Corp. Ltd.) TH/HY ANDHRA PRADESH 6980.26 137.77KARNATAKA POWER CORPO. LTD.Sharavathy ( U 1-10) HYDRO KARNATAKA 891.00 13.15Linganamakki ( U 1-2) HYDRO KARNATAKA 55.00 101.19

5/10

“Let our advance worrying become advance thinking and planning.”

Page 201: Annual Report 07 08

Central electricity authority Annual Report 2007-08

192

Name of the Utility/Power Station Energy Source- Coal/ Gas/ Naptha/ LSHS/

Diesel/ Hydro

State where the unit is located

Installed Capacity

Cost of Generation/

Unit(MW) (Paise/Kwh)

Bhadra ( U 1-5) HYDRO KARNATAKA 39.20 101.56Nagjhari ( U 1-6) HYDRO KARNATAKA 855.00 27.32Supa ( U 1-2) HYDRO KARNATAKA 100.00 27.32Ghataprabha ( U 1-2) HYDRO KARNATAKA 32.00 64.73Varahi ( U 1-2) HYDRO KARNATAKA 230.00 60.12Mani Dam Power House ( U 1-2) HYDRO KARNATAKA 9.00 60.12Kalmala HYDRO KARNATAKA 0.40 221.44Sirwar HYDRO KARNATAKA 1.00 221.44Ganekal HYDRO KARNATAKA 0.35 221.44Mallapur ( U 1-2) HYDRO KARNATAKA 9.00 221.44Kappadgudda Wind Farm HYDRO KARNATAKA 4.55 215.09Kadra ( U 1-3) HYDRO KARNATAKA 150.00 122.08Kodasalli ( U 1-3) HYDRO KARNATAKA 120.00 93.08BRBC Power House(Installed Capacity included in Bhadra)

HYDRO KARNATAKA 93.28

Gerusoppa Power House ( U 1-4) HYDRO KARNATAKA 240.00 113.07Almatti Dam Power House ( U 1-6) HYDRO KARNATAKA 290.00 90.42MGHE, Jogfalls ( U 1-8) HYDRO KARNATAKA 120.00 35.33Sivasamundrum ( U 1-10) HYDRO KARNATAKA 42.00 46.43Munirabad ( U 1-3) HYDRO KARNATAKA 17.20 32.01Shimshapura ( U 1-2) HYDRO KARNATAKA 17.00 46.43Raichur T.P.S. Stage-I & II ( U 1-7) THERMAL-C KARNATAKA 1470.00 214.83D G Plant Yelahanka ( U 1-6) THERMAL-DG KARNATAKA 127.92 696.43PUDUCHERRY POWER CORPORATION LTD.Karaikal Combined Cycle Gas Power Plant THERMAL-G PUDUCHERRY 32.50 185.00TAMIL NADU ELECTRICITY BOARDEnnore THERMAL-C TAMIL NADU 450.00 380.16Mettur THERMAL-C TAMIL NADU 840.00 186.67Tuticorin THERMAL-C TAMIL NADU 1050.00 207.90North Chennai THERMAL-C TAMIL NADU 630.00 219.81Kovilkalappal THERMAL-G TAMIL NADU 107.88 162.60Valuthur THERMAL-G TAMIL NADU 95.00 194.21Kuttalam THERMAL-G TAMIL NADU 101.00 250.87Wind WIND TAMIL NADU 19.36 1163.39Pykara HYDRO TAMIL NADU 69.95 46.00Pykara Micro HYDRO TAMIL NADU 2.00 64.27Moyar HYDRO TAMIL NADU 36.00 25.61Maravakandy HYDRO TAMIL NADU 0.75 166.18Kundah I HYDRO TAMIL NADU 60.00 19.72Kundah II HYDRO TAMIL NADU 175.00 17.44Kundah III HYDRO TAMIL NADU 180.00 28.95Kundah IV HYDRO TAMIL NADU 100.00 38.89

6/10

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

Page 202: Annual Report 07 08

193

Central electricity authority Annual Report 2007-08

Name of the Utility/Power Station Energy Source- Coal/ Gas/ Naptha/ LSHS/

Diesel/ Hydro

State where the unit is located

Installed Capacity

Cost of Generation/

Unit(MW) (Paise/Kwh)

Kundah V HYDRO TAMIL NADU 40.00 52.40Parson Valley HYDRO TAMIL NADU 30.00 391.25Mettur Dam HYDRO TAMIL NADU 40.00 65.94Mettur Tunnel HYDRO TAMIL NADU 200.00 3.16Barriage I to IV HYDRO TAMIL NADU 120.00 73.12Bavani Sagar RBC HYDRO TAMIL NADU 8.00 149.37Lower Bhavani Sagar HYDRO TAMIL NADU 8.00 159.63Poonachi Micro HYDRO TAMIL NADU 1.00 503.81Sathanoor HYDRO TAMIL NADU 7.50 1144.05Mukurthy HYDRO TAMIL NADU 0.70 90.84Thirumurthy Dam HYDRO TAMIL NADU 1.95 844.12Periyar HYDRO TAMIL NADU 140.00 32.14Vaigai HYDRO TAMIL NADU 6.00 45.49Suruliyar HYDRO TAMIL NADU 35.00 64.59Papanasam HYDRO TAMIL NADU 28.00 35.77Servalar HYDRO TAMIL NADU 20.00 88.53Sarkarpathy HYDRO TAMIL NADU 30.00 8.97Aliyar HYDRO TAMIL NADU 60.00 18.64Sholayar I HYDRO TAMIL NADU 70.00 6.30Sholayar II HYDRO TAMIL NADU 25.00 16.59Kodayar I HYDRO TAMIL NADU 60.00 36.65Kodayar II HYDRO TAMIL NADU 40.00 52.61Lower Aliyar HYDRO TAMIL NADU 2.50 755.02Pykara Ultimate HYDRO TAMIL NADU 150.00 215.84Bhavani Kattalai HYDRO TAMIL NADU 30.00 5.06EASTERN REGIONBIHAR STATE HYDROELECTRIC POWER COR. Sone Westrn Link Canal H. E. Project, Dehri-On-Sone

HYDRO BIHAR 6.60 253.00

Sone Eastern Link Canal H.E. Project, Barun (Aurangabad)

HYDRO BIHAR 3.30 253.00

Eastern Gandak Canal H. E. PROJECT, Valmikinagar

HYDRO BIHAR 15.00 307.00

Kosi Hydel Power Station Katalya, Birpur (Supaul)

HYDRO BIHAR 19.20 52.00

GOVT. OF SIKKIM, ENERGY & POWER DEPTT. L L H P (Lower Lagyap) HYDRO SIKKIM 12.00 111.54Rimbi - I HYDRO SIKKIM 0.60 1063.89Rongnichu -II HYDRO SIKKIM 2.50 570.98Meyong HYDRO SIKKIM 4.00 87.73Kalez HYDRO SIKKIM 2.00 242.31

7/10

“A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

Page 203: Annual Report 07 08

Central electricity authority Annual Report 2007-08

194

Name of the Utility/Power Station Energy Source- Coal/ Gas/ Naptha/ LSHS/

Diesel/ Hydro

State where the unit is located

Installed Capacity

Cost of Generation/

Unit(MW) (Paise/Kwh)

ORISSA HYDRO POWER CORP. LTD.Hirakud Power System HYDRO ORISSA 347.50 75.50Rengali H. E. Project HYDRO ORISSA 250.00 47.48Upper Indravati H. E. Project HYDRO ORISSA 600.00 36.11Upper Kolab H. E. Project HYDRO ORISSA 320.00 26.86Balimela H. E. Project HYDRO ORISSA 360.00 21.05ORISSA POWER GENERATION CORP. LTD.Ib Thermal Power Station, Banarpali THERMAL-C ORISSA 420.00 90.02WEST BENGAL POWER DEVLOP. CORP. LTD.Kolaghat Thermal Power Station (U 1-6) THERMAL-C WEST BENGAL 1260.00 168.49Bakreswar Thermal Power Station (U 1-3) THERMAL-C WEST BENGAL 630.00 172.66Bandel Thermal Power Station (U 1-5) THERMAL-C WEST BENGAL 450.00 221.92Santaldih Thermal Power Station (U 1-4) THERMAL-C WEST BENGAL 480.00 208.97WEST BENGAL STATE ELECY. DIS.COM. LTD. Jaldhaka H E P HYDRO WEST BENGAL 35.00 91.53Ramam H E P HYDRO WEST BENGAL 51.00 87.31Other Hydel HYDRO WEST BENGAL 14.20 403.17NORTH EASTERN REGIONARUNACHAL PRADESH HYDRO ARUNACHAL

PRADESH34.24 118.88

ASSAM POWER GEN. CORPORATION LTD.Namrup T.P.S THERMAL-G ASSAM 119.50 109.82Lakuwa T.P.S THERMAL-G ASSAM 120.00 139.23MEGHALAYA STATE ELECY. BOARDMeSEB Hydel Power Station HYDRO MEGHALAYA 185.20 132.40NAGALAND DEPTT. OF POWER D. G. Set Kma (As Standby) THERMAL-DG NAGALAND 0.70 592.00Likimro HEP HYDRO NAGALAND 24.00 212.00Dzuza MHP HYDRO NAGALAND 1.50 198.00Duilumroi -I HYDRO NAGALAND 0.54 211.00Duilumroi-II HYDRO NAGALAND 0.20 211.00Telangsao MHP HYDRO NAGALAND 0.60 215.00TRIPURA STATE ELECTRICITY BOARDRohit Gas Thermal Project THERMAL-G TRIPURA 74.00 178.89Baramura Gas Thermal Project THERMAL-G TRIPURA 21.00 135.87Gumti Hydel Project HYDRO TRIPURA 15.00 30.22PRIVATED L F POWER LIMITED Adamtilla THERMAL-G ASSAM 9.00 288.09Banskandi THERMAL-G ASSAM 15.50 207.20

8/10

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

Page 204: Annual Report 07 08

195

Central electricity authority Annual Report 2007-08

Name of the Utility/Power Station Energy Source- Coal/ Gas/ Naptha/ LSHS/

Diesel/ Hydro

State where the unit is located

Installed Capacity

Cost of Generation/

Unit(MW) (Paise/Kwh)

Rajrappa THERMAL-C JHARKHAND 11.00 391.32Gidi THERMAL-C JHARKHAND 11.00 413.75Madhuband THERMAL-C JHARKHAND 11.00 779.79DURGAPUR PROJECTS LIMITEDDurgapur Projects Power Station THERMAL-C WEST BENGAL 401.00 195.00ESSAR POWER LIMITED, HAZIRAEssar Power Limited, Hazira THERMAL-G GUJARAT 515.00 217.00G M R ENERGY LIMITEDG M R Energy Ltd. THERMAL-N KARNATAKA 220.00 819.00G M R POWER CORPORATION PVT. LTD. G M R Power Corporation Limited THERMAL-L TAMILNADU 200.00 626.00GUJARAT INDUSTRIES POWER COM. LTD.145MW Power Plant (Station-I) THERMAL-G GUJARAT 145.00 136.00160MW Power Plant(Station-II) THERMAL-G GUJARAT 160.00 222.00Surat Lignite Power Plant(SLPP) THERMAL-L GUJARAT 250.00 187.00GUJ. PAGUTHAN ENERGY COR. PVT. LTD.Paguthan CCPP THERMAL-G GUJARAT 654.73 218.69G V K INDUSTRIES LIMITED Jegurupadu Combined Cycle Power Plant THERMAL-G ANDHRA PRADESH 216.82 201.00HINDALCO INDUSTRIES LIMITEDHirakud Power THERMAL-C ORISSA 267.50 89.50HINDALCO INDUSTRIES LIMITED Renusagar Power Division (Captive Power Plant)

THERMAL-C UTTAR PRADESH 741.70 138.08

JAIPRAKASH HYDRO-POWER LIMITEDVishnuprayag HEP HYDRO UTTARAKHAND 400.00 143.00JAIPRAKASH POWER VENTURES LIMITEDBaspa II HEP HYDRO HIMACHAL PRADESH 300.00 161.00J S W ENERGY LTD. (JINDAL TH. POWER. CO. LTD.)JSWEL(Coal & furnace gas) THERMAL-C KARNATAKA 260.00 232.00MADURAI POWER CORP. PVT LTD. (BALAJI)Madurai Power Corporation Pvt. Ltd. THERMAL-L TAMIL NADU 105.00 632.00MALANA POWER COMPANY LTD.Malana H E P HYDRO H. P. 86.00 141.54RELIANCE ENERGY LTD.Dahanu Thermal Power Station (DTPS) THERMAL-C MAHARASHTRA 500.00 196.00REL-Goa THERMAL-N GOA 48.00 736.00

9/10

“It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

Page 205: Annual Report 07 08

Central electricity authority Annual Report 2007-08

196 “The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

Name of the Utility/Power Station Energy Source- Coal/ Gas/ Naptha/ LSHS/

Diesel/ Hydro

State where the unit is located

Installed Capacity

Cost of Generation/

Unit(MW) (Paise/Kwh)

RELIANCE ENERGY LTD.

Samalkot Power Station THERMAL-G ANDHRA PRADESH 220.00 939.77

SAMALPATTI POWER COMPANY PVT. LTD.

Samalpatti Power Company Pvt. Ltd. THERMAL-L TAMIL NADU 105.66 695.43

TATA POWER COMPANY LIMITED

Thermal Power Station Trombay Gene. Station, Chembur

THERMAL-C MAHARASHTRA 1330.00 273.00

Jojobera Power Plant, Jamshedpur THERMAL-C JHARKHAND 427.50 80.00

DG Based Power Plant, Belgaum THERMAL-DG KARNATAKA 81.30 505.00

TORRENT P0WER LTD. **

Sabarmati Power House THERMAL-C GUJARAT 400.00

CCPP-Vetwa THERMAL-G GUJARAT 100.00

Total (Torrent Power Ltd.) 500.00 237.00 Note :- 1. C = Coal; CA = Captive; DG = Diesel Generator; G = Gas; L = LSHS; LIG = Lignite; MIC = Micro; N = Nathpa; NG =Natural

Gas 2. * = NTPC have not furnished cost of generation. Hence tariff for sale of power from NTPC station is given. 3. ** = Torrent Power Ltd. have not furnished the project wise break up.

10/10

Page 206: Annual Report 07 08

197

Central electricity authority Annual Report 2007-08

“Honesty is the first chapter in the book of wisdom.”

Annexure-9E(Item 9.17)

STATUS OF POWER SECTOR REFORMS(As on 31.03.2008)

S. No. MOU/MOA Signed with GOI/MOP

Unbundling / Corporatisation

Constitution of SERC

Joint ERC constituted

1 Andhra Pradesh Yes Yes2 Arunachal Pradesh @ No No3 Assam Yes Yes4 Bihar No Yes5. Chhattisgarh No Yes6. Delhi Yes Yes7 Goa *** @ No Yes*8. Gujarat Yes Yes9 Haryana Yes Yes10 Himachal Pradesh No Yes11 Jammu & Kashmir @ No Yes12 Jharkhand No Yes13 Karnataka Yes Yes14 Kerala No Yes15 Madhya Pradesh Yes Yes16 Maharashtra Yes Yes17 Manipur @ No - Yes**18 Meghalaya No Yes*19 Mizoram @ No - Yes**20 Nagaland @ No No21 Orissa Yes Yes22 Punjab No Yes23 Rajasthan Yes Yes24 Sikkim @ No Yes25 Tamil Nadu No Yes26 Tripura @ Yes Yes27 Uttar Pradesh Yes Yes28 Uttrakhand Yes Yes29. West Bengal Yes Yes

29 Nos. 14Nos. 25 Nos. 1 No.

* Non-functional ** Joint ERC *** On the request of Government of Goa it has been decided to include the State in JERC for UTs (other than Delhi).

The nomenclature of JERC for UTs is being changed to include Goa also. @ State has ‘Electricity/Energy Department’ NOTE : A separate JERC has been notified by the Central Government for Union Territories (except Delhi) It is yet to

be functional

Page 207: Annual Report 07 08

Central electricity authority Annual Report 2007-08

198 “Ambition should be made of sterner stuff.”

Annexure-10A[Item 10.2]

1/5

All INDIA/SECTOR-WISE/ORGANISATION-WISE GENERATION TARGET/ACTUAL GENERATION FOR THE YEAR 2007-08

THERMAL SECTOR/ORGANISATION PLF % TARGET (MU) ACTUAL (MU)CENTRAL SECTOR N.T.P.C. 90.43 200121 200898.32NEYVELI CORP. 79.79 15816 17450.73D.V.C. 62.73 16290 14795.91N.E.E.P.C.O 2310 2388.93RGPPL 2912 4829.53TOTAL CENTRAL SECTOR 86.74 237449 240363.42STATE SECTOR HPGC 78.22 10617 10704.48IPGPCL 57.23 5750 5581.83J&KPDC 0 0PSEB 87.63 15641 16451.5RRVUNL 90.45 20364 20262.47UPRVUNL 56.28 22887 21195.93CSEB 80.74 10810 10053.53GMDCL 45.96 700 1009.25GSECL 76.32 29327 28028.56GSEGL 1148 1114.14MAHAGENCO 76.1 51662 47683.65MPPGCL 67.38 16786 14534.47APGENCO 86.65 25256 23631.21APGPCL 1562 1141.75KPCL 84.18 11755 11083.7KSEB 103 375.97LAKSH 25 28.7PPCL 260 276.03TNEB 81.9 23881 22786.09A&N ADM 60 80.75BSEB 4.58 315 128.74DPL 42.39 2740 1536.04JSEB 9.43 1360 695.72OPGC 82.22 3320 3033.31SIKKIM 0 0.15

Page 208: Annual Report 07 08

199

Central electricity authority Annual Report 2007-08

“The one exclusive sign of thorough knowledge is the power of teaching.”

SECTOR/ORGANISATION PLF % TARGET (MU)

ACTUAL (MU)

TVNL 48.75 2310 1798.45VPGCL 0.56 477 10.82WBPDC 67.93 16625 16935.64ASEB 20.37 1366 1028.2MIZORAM 0 2.65MPDC 7 0TRIPURA 490 587.36TOTAL STATE SECTOR 71.89 277604 261781.09PRIVATE SECTOR PVT.UTILITY BSES 101.21 4146 4445.23CESC 87.78 7560 7980.22TATA PCL 85.85 10170 10009.08TORRENT POWER (AECO) 99.97 3560 3980.04TOTAL PRIVATE SECTOR UTILITY 90.79 25436 26414.57PRIVATE IPPs ABAN POWR 834 857.27BELLARY 20 70.94BSES(C) 115 347.42BSES(P) 900 1136.48DLF ASSAM 175 94.46DPSCLTD 0 166.17ESSAR 1900 1900.09GAUTAMI 1811 0GIPCL 2953 3020.88GTE CORP 4586 4061.64GVKP&IL 1000 1310.46JINDAL 1000 1419.98JPL 554 552.86KONA 762 0KONDAPALI 1400 2213.43LVS POWER 0 0MADURAI P 565 491.28PENNA 377 355.4PPNPGCL 1100 2128.08REL 341 327.84RPG 59 35.48SAMALPATI 574 518.94

2/5

Page 209: Annual Report 07 08

Central electricity authority Annual Report 2007-08

200 “Children are our most valuable natural resource.”

SECTOR/ORGANISATION PLF % TARGET (MU)

ACTUAL (MU)

SPGL 1000 1481.23ST-CMSECP 1774 1806.42SUR.CH.PL 100 112.48TANIR BAV 200 521.03TATA PCL (B) 100 235.9TATA PCL (J) 2375 2136.21TOR. POW. (SUGEN) 2535 0VASAVI 1101 1136.53VEMAGIRI 480 66.44TOTAL PRIVATE SECTOR IPP 30691 28505.34PRIVATE IPPS IMPORT GIPCL 314 1138.13ICCL 300 319.22NALCO 400 293.44TOTAL PRIVATE SECTOR IMPORT 1014 1750.79TOTAL IPP & IMPORT 31705 30256.13TOTAL PRIVATE SECTOR 90.79 57141 56670.7

NUCLEAR SECTOR/ORGANISATION PLF % TARGET

(MU)ACTUAL

(MU)KAIGA 42.89 3423 2495.22KAKRAPARA 52.78 2198 2039.75M.A.P.P. 45.24 2292 1748.58N.A.P.S. 17.34 1173 670.01R.A.P.S. 38.16 4384 2480.34TARAPUR 59.7 9243 7341.81TOTAL NUCLEAR 46.39 22713 16775.71

HYDRO SECTOR/ORGANISATION TARGET

(MU)ACTUAL

(MU)CENTRAL SECTOR BBMB 10150 10955.1DVC 320 450.1NEEPCO. 3000 3092.29NHDC 3058 3424.78NHPC 14089 14812.7

3/5

Page 210: Annual Report 07 08

201

Central electricity authority Annual Report 2007-08

“The farther backward you can look, the farther forward you are likely to see.”

SECTOR/ORGANISATION TARGET (MU)

ACTUAL (MU)

SJVNL 6400 6406.72THDC 2773 2667.98TOTAL CENTRAL SECTOR 39790 41809.67STATE SECTOR HPGC 275 269.22HPSEB 1887 1806.88J&KPDC 1066 878.38PSEB 3840 4606.17

SECTOR/ORGANISATION TARGET (MU)

ACTUAL (MU)

RRVUNL 1190 1399.94UJVNL 3403 3478.94UPJVNL 1470 927.35CSEB 353 262.06GSECL 966 1240.09MAHAGENCO 3861 4641.07MPPGCL 2788 2747.66NVDA 14 0SSNNL 4390 4436.43APGENCO 8163 9921.59KPCL 11327 13797.77KSEB 6749 8341.84TNEB 4491 6463.71VVNL 625 767.81A&N ADM 8 7.8BSHPC 71 53.45JSEB 150 208.65OHPC 5664 7894.79SIKKIM 46 49.77WBSEB 344 756.32APGPCL 396 496.4ARUNACHAL 21 12.22MEGEB 571 665.81NAGALAND 120 102.86TRIPURA 50 36.06

TOTAL STATE SECTOR 64299 76271.04

4/5

Page 211: Annual Report 07 08

Central electricity authority Annual Report 2007-08

202

PRIVATE SECTORPRIVATE UTILITY

SECTOR/ORGANISATION TARGET (MU)

ACTUAL (MU)

BHANDARDHARA 96 129.51BHIRA 923 356.92BHIRA PSS 0 587.63BHIVPURI 290 290.03GUNTUR 0 0KHOPOLI 297 258.17TAWA 40 0TOTAL PVT SEC. UTILITY 1646 1622.26PVT.IPPs BASPA 1213 1280.68CHAYADEVI 54 52.2HARANGI 24 33.88KUTHUNGAL 60 62.58MADHAVAMANTRI 23 16.86

SECTOR/ORGANISATION TARGET (MU)

ACTUAL (MU)

MALANA 350 335.85MANDAGERE 5 8.49MANIYAR 35 38.74NARAYANPUR 40 51.21NERIA 24 19.71SHAHPUR 22 19.31SHIVPURA 90 76.64VISHNU PRAYAG 1775 1870.66TOTAL PRIVATE SECTOR IPPs 3715 3866.81TOTAL PRIVATE SECTOR 5361 5489.07

5/5

“Failing to plan is planning to fail.”

Page 212: Annual Report 07 08

203

Central electricity authority Annual Report 2007-08

Annexure-10B [Item 10.4]

1/7

ALL INDIA INSTALLED GENERATING CAPACITY OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTHERN REGION INCLUDING

ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES(IN MW)

State Owner ship Sector

Modewise breakup Grand TotalThermal Total

ThermalNuclear Hydro

(Renewable)RES **

(MNRE)Coal Gas Diesel

Delhi State 320.00 612.40 0.00 932.40 0.00 0.00 0.00 932.40Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 1920.50 204.30 0.00 2124.80 47.08 585.06 0.00 2756.94Sub-Total 2240.50 816.70 0.00 3057.20 47.08 585.06 0.00 3689.34

Haryana State 2202.50 0.00 3.92 2206.42 0.00 884.24 62.70 3153.36Private 0.00 0.00 0.00 0.00 0.00 0.00 6.00 6.00Central 375.57 532.04 0.00 907.61 76.16 447.16 0.00 1430.93Sub-Total 2578.07 532.04 3.92 3114.03 76.16 1331.40 68.70 4590.29

Himachal State 0.00 0.00 0.13 0.13 0.00 393.60 146.62 540.35Private 0.00 0.00 0.00 0.00 0.00 386.00 0.00 386.00Central 95.41 60.89 0.00 156.30 14.08 761.24 0.00 931.62Sub-Total 95.41 60.89 0.13 156.43 14.08 1540.84 146.62 1857.97

Jammu &Kashmir

State 0.00 175.00 8.94 183.94 0.00 330.00 111.83 625.77Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 198.59 127.09 0.00 325.68 68.00 689.50 0.00 1083.18Sub-Total 198.59 302.09 8.94 509.62 68.00 1019.50 111.83 1708.95

Punjab State 2380.00 0.00 0.00 2380.00 0.00 2319.82 123.90 4823.72Private 0.00 0.00 0.00 0.00 0.00 0.00 37.57 37.57Central 546.21 259.72 0.00 805.93 151.04 711.75 0.00 1668.72Sub-Total 2926.21 259.72 0.00 3185.93 151.04 3031.57 161.47 6530.01

Rajasthan State 2545.00 443.80 0.00 2988.80 0.00 987.84 30.25 4006.89Private 0.00 0.00 0.00 0.00 0.00 0.00 512.75 512.75Central 567.49 217.74 0.00 785.23 469.00 468.98 0.00 1723.21Sub-Total 3112.49 661.54 0.00 3774.03 469.00 1456.82 543.00 6242.85

Uttar Pradesh

State 4380.00 0.00 0.00 4380.00 0.00 527.40 25.10 4932.50Private 0.00 0.00 0.00 0.00 0.00 0.00 148.88 148.88Central 2373.31 541.16 0.00 2914.47 203.72 1078.09 0.00 4196.28Sub-Total 6753.31 541.16 0.00 7294.47 203.72 1605.49 173.98 9277.66

Uttranchal State 0.00 0.00 0.00 0.00 0.00 1248.25 82.62 1330.87Private 0.00 0.00 0.00 0.00 0.00 400.00 0.05 400.05Central 232.80 68.25 0.00 301.05 16.28 307.48 0.00 624.81Sub-Total 232.80 68.25 0.00 301.05 16.28 1955.73 82.67 2355.73

Chandigarh State 0.00 0.00 2.00 2.00 0.00 0.00 0.00 2.00Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 26.51 15.07 0.00 41.58 4.84 47.04 0.00 93.46Sub-Total 26.51 15.07 2.00 43.58 4.84 47.04 0.00 95.46Central-Unallocated

713.61 285.73 0.00 999.34 129.80 401.70 0.00 1530.84

Total State 11827.50 1231.20 14.99 13073.69 0.00 6691.15 583.02 20347.86

NorthernRegion

Private 0.00 0.00 0.00 0.00 0.00 786.00 705.25 1491.25Central 7050.00 2311.99 0.00 9361.99 1180.00 5498.00 0.00 16039.99Grand Total 18877.50 3543.19 14.99 22435.68 1180.00 12975.15 1288.27 37879.10

“Let our advance worrying become advance thinking and planning.”

Page 213: Annual Report 07 08

Central electricity authority Annual Report 2007-08

204

INSTALLED CAPACITY OF POWER UTILITIES IN THE STATES/UTS LOCATED IN WESTERN REGION INCLUDING ALLOCATED

SHARES IN JOINT & CENTRAL SECTOR UTILITIES(IN MW)

State OwnershipSector

Modewise breakup Grand TotalThermal Total

ThermalNuclear Hydro

(Renew-able)

RES **( MNRE )Coal Gas Diesel

Goa State 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.05

Private 0.00 48.00 0.00 48.00 0.00 0.00 30.00 78.00

Central 274.18 0.00 0.00 274.18 0.00 0.00 0.00 274.18

Sub-Total 274.18 48.00 0.00 322.18 0.00 0.00 30.05 352.23

Daman & Diu

State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central 12.99 4.13 0.00 17.12 1.98 0.00 0.00 19.10

Sub-Total 12.99 4.13 0.00 17.12 1.98 0.00 0.00 19.10

Gujarat State * 4369.00 518.72 17.28 4905.00 0.00 772.00 24.3 5701.30

Private 640.00 1430.00 0.20 2070.20 0.00 0.00 833.8 2904.00

Central 1204.29 417.40 0.00 1621.69 825.00 0.00 0 2446.69

Sub-Total 6213.29 2366.12 17.48 8596.89 825.00 772.00 858.10 11051.99

Madhya Pradesh

State 2657.50 0.00 0.00 2657.50 0.00 1703.67 51.76 4412.93

Private 0.00 0.00 0.00 0.00 0.00 0.00 71.05 71.05

Central 1402.10 252.91 0.00 1655.01 92.88 1520.00 0.00 3267.89

Sub-Total 4059.60 252.91 0.00 4312.51 92.88 3223.67 122.81 7751.87

Chhatisgarh State 1780.00 0.00 0.00 1780.00 0.00 120.00 18.05 1918.05

Private 750.00 0.00 0.00 750.00 0.00 0.00 146.30 896.30

Central 288.90 0.00 0.00 288.90 0.00 0.00 0.00 288.90

Sub-Total 2818.90 0.00 0.00 2818.90 0.00 120.00 164.35 3103.25

Maharastra State 6546.00 912.00 0.00 7458.00 0.00 2638.83 219.73 10316.56

Private 1650.00 180.00 0.00 1830.00 0.00 444.00 1735.90 4009.90

Central 1787.00 2617.28 0.00 4404.28 852.06 0.00 0.00 5256.34

Sub-Total 9983.00 3709.28 0.00 13692.28 852.06 3082.83 1955.63 19582.80

Dadra & NagarHaveli

State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central 15.19 26.61 0.00 41.80 1.98 0.00 0.00 43.78

Sub-Total 15.19 26.61 0.00 41.80 1.98 0.00 0.00 43.78

Central - Unallocated

875.35 193.67 0.00 1069.02 66.10 0.00 0.00 1135.12

Total State 15352.50 1430.72 17.28 16800.50 0.00 5234.50 313.89 22348.89

westernRegion

Private 3040.00 1658.00 0.20 4698.20 0.00 444.00 2817.05 7959.25

Central 5860.00 3512.00 0.00 9372.00 1840.00 1520.00 0.00 12732.00

Grand Total 24252.50 6600.72 17.48 30870.70 1840.00 7198.50 3130.94 43040.14

2/7

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

Page 214: Annual Report 07 08

205

Central electricity authority Annual Report 2007-08

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/ UTS LOCATED IN SOUTHERN REGION INCLUDING ALLOCATED

SHARES IN JOINT & CENTRAL SECTOR UTILITIES(IN MW)

State OwnershipSector

Modewise breakup Grand Total

Thermal TotalThermal

Nuclear Hydro(Renewa-

ble)

RES **( MNRE )

Coal Gas Diesel

AndhraPradesh

State 3342.50 272.30 0.00 3614.80 0.00 3533.93 185.96 7334.69

Private 0.00 1603.40 36.80 1640.20 0.00 0.00 477.13 2117.33

Central 2377.38 0.00 0.00 2377.38 37.41 0.00 0.00 2414.79

Sub-Total 5719.88 1875.70 36.80 7632.38 37.41 3533.93 663.09 11866.81

Karnataka State 1970.00 0.00 127.92 2097.92 0.00 3288.20 471.49 5857.61

Private 260.00 220.00 106.50 586.50 0.00 0.00 1169.24 1755.74

Central 1072.67 0.00 0.00 1072.67 190.90 0.00 0.00 1263.57

Sub-Total 3302.67 220.00 234.42 3757.09 190.90 3288.20 1640.73 8876.92

Kerala State 0.00 0.00 234.60 234.60 0.00 1769.10 100.12 2103.82

Private 0.00 174.00 21.84 195.84 0.00 0.00 0.02 195.86

Central 765.38 350.00 0.00 1115.38 80.09 0.00 0.00 1195.47

Sub-Total 765.38 524.00 256.44 1545.82 80.09 1769.10 100.14 3495.15

Tamil Nadu State 2970.00 431.00 0.00 3401.00 0.00 2093.95 110.20 5605.15

Private 250.00 503.10 411.66 1164.76 0.00 0.00 3836.30 5001.06

Central 2299.81 0.00 0.00 2299.81 657.39 0.00 0.00 2957.20

Sub-Total 5519.81 934.10 411.66 6865.57 657.39 2093.95 3946.50 13563.41

NLC State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central 100.17 0.00 0.00 100.17 0.00 0.00 0.00 100.17

Sub-Total 100.17 0.00 0.00 100.17 0.00 0.00 0.00 100.17

Pondicherry State 0.00 32.50 0.00 32.50 0.00 0.00 0.00 32.50

Private 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.02

Central 207.01 0.00 0.00 207.01 17.09 0.00 0.00 224.10

Sub-Total 207.01 32.50 0.00 239.51 17.09 0.00 0.02 256.62

Central - Unallocated

1067.58 0.00 0.00 1067.58 117.12 0.00 0.00 1184.70

Total State 8282.50 735.80 362.52 9380.82 0.00 10685.18 867.77 20933.77

SouthernRegion

Private 510.00 2500.50 576.80 3587.30 0.00 0.00 5482.71 9070.01

Central 7890.00 350.00 0.00 8240.00 1100.00 0.00 0.00 9340.00

Grand Total 16682.50 3586.30 939.32 21208.12 1100.00 10685.18 6350.48 39343.78

3/7

“A person without a sense of humor is like a wagon without springs-jolted by every pebble in the road.”

Page 215: Annual Report 07 08

Central electricity authority Annual Report 2007-08

206

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN EASTERN REGION INCLUDING ALLOCATED

SHARES IN JOINT & CENTRAL SECTOR UTILITIES(IN MW)

State OwnershipSector

Modewise breakup Grand TotalThermal Total

ThermalNuclear Hydro

(Renewa ble)

RES **( MNRE )Coal Gas Diesel

Bihar State 540.00 0.00 0.00 540.00 0.00 0.00 50.40 590.40

Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central 1306.59 0.00 0.00 1306.59 0.00 73.00 0.00 1379.59

Sub-Total 1846.59 0.00 0.00 1846.59 0.00 73.00 50.40 1969.99

Jharkhand State 1260.00 0.00 0.00 1260.00 0.00 130.00 4.05 1394.05

Private 360.00 0.00 0.00 360.00 0.00 0.00 0.00 360.00

Central 352.52 0.00 0.00 352.52 0.00 46.00 0.00 398.52

Sub-Total 1972.52 0.00 0.00 1972.52 0.00 176.00 4.05 2152.57

West Bengal

State 4275.00 100.00 12.06 4387.06 0.00 1022.00 99.50 5508.56

Private 1081.38 0.00 0.14 1081.52 0.00 0.00 0.05 1081.57

Central 701.56 0.00 0.00 701.56 0.00 140.00 0.00 841.56

Sub-Total 6057.94 100.00 12.20 6170.14 0.00 1162.00 99.55 7431.69

DVC State 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central 3100.00 90.00 0.00 3190.00 0.00 196.00 0.00 3386.00

Sub-Total 3100.00 90.00 0.00 3190.00 0.00 196.00 0.00 3386.00

Orissa State 420.00 0.00 0.00 420.00 0.00 2067.93 7.30 2495.23

Private 0.00 0.00 0.00 0.00 0.00 0.00 3.20 3.20

Central 1445.23 0.00 0.00 1445.23 0.00 107.00 0.00 1552.23

Sub-Total 1865.23 0.00 0.00 1865.23 0.00 2174.93 10.50 4050.66

Sikkim State 0.00 0.00 5.00 5.00 0.00 0.00 39.11 44.11

Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Central 71.98 0.00 0.00 71.98 0.00 75.00 0.00 146.98

Sub-Total 71.98 0.00 5.00 76.98 0.00 75.00 39.11 191.09

Central - Unallocated

1232.12 0.00 0.00 1232.12 0.00 77.00 0.00

Total State 6495.00 100.00 17.06 6612.06 0.00 3219.93 200.36 10032.35

EasternRegion

Private 1441.38 0.00 0.14 1441.52 0.00 0.00 3.25 1444.77

Central 8210.00 90.00 0.00 8300.00 0.00 714.00 0.00 9014.00

Grand Total 16146.38 190.00 17.20 16353.58 0.00 3933.93 203.61 20491.12

4/7

“In order to live free and happily you must sacrifice boredom. It is not always an easy sacrifice.”

Page 216: Annual Report 07 08

207

Central electricity authority Annual Report 2007-08

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTH-EASTERN REGION INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES

(IN MW)

State Ownership Modewise breakup Grand TotalSector Thermal Total

ThermalNuclear Hydro

(Renew- able)

RES **( MNRE)Coal Gas Diesel

Assam State 90.00 209.00 20.69 319.69 0.00 100.00 2.11 421.80Private 0.00 24.50 0.00 24.50 0.00 0.00 0.00 24.50Central 0.00 178.00 0.00 178.00 0.00 331.00 0.00 509.00Sub-Total 90.00 411.50 20.69 522.19 0.00 431.00 2.11 955.30State 0.00 0.00 15.88 15.88 0.00 0.00 45.24 61.12

Arunachal Pradesh

Private 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.02Central 0.00 21.00 0.00 21.00 0.00 98.00 0.00 119.00Sub-Total 0.00 21.00 15.88 36.88 0.00 98.00 45.26 180.14

Meghalaya State 0.00 0.00 2.05 2.05 0.00 156.00 31.03 189.08Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 0.00 26.00 0.00 26.00 0.00 73.00 0.00 99.00Sub-Total 0.00 26.00 2.05 28.05 0.00 229.00 31.03 288.08

Tripura State 0.00 127.50 4.85 132.35 0.00 0.00 16.01 148.36Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 0.00 33.00 0.00 33.00 0.00 62.00 0.00 95.00Sub-Total 0.00 160.50 4.85 165.35 0.00 62.00 16.01 243.36

Manipur State 0.00 0.00 45.41 45.41 0.00 0.00 5.45 50.86Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 0.00 26.00 0.00 26.00 0.00 81.00 0.00 107.00Sub-Total 0.00 26.00 45.41 71.41 0.00 81.00 5.45 157.86

Nagaland State 0.00 0.00 2.00 2.00 0.00 0.00 28.67 30.67Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 0.00 19.00 0.00 19.00 0.00 53.00 0.00 72.00Sub-Total 0.00 19.00 2.00 21.00 0.00 53.00 28.67 102.67

Mizoram State 0.00 0.00 51.86 51.86 0.00 0.00 17.47 69.33Private 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Central 0.00 16.00 0.00 16.00 0.00 34.00 0.00 50.00Sub-Total 0.00 16.00 51.86 67.86 0.00 34.00 17.47 119.33Central - Unallocated

0.00 56.00 0.00 56.00 0.00 128.00 0.00 184.00

Total State 90.00 336.50 142.74 569.24 0.00 256.00 145.98 971.22North- EasternRegion

Private 0.00 24.50 0.00 24.50 0.00 0.00 0.02 24.52Central 0.00 375.00 0.00 375.00 0.00 860.00 0.00 1235.00

Grand Total 90.00 736.00 142.74 968.74 0.00 1116.00 146.00 2230.74

5/7

“It is always the best policy to tell the truth, unless, of course, you are an exceptionally good liar.”

Page 217: Annual Report 07 08

Central electricity authority Annual Report 2007-08

208 “The doorstep to the temple of wisdom is the knowledge of our own ignorance.”

INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE ISLANDS

(IN MW)

State OwnershipSector

Modewise breakup Grand Total

Thermal TotalThermal

Nuclear Hydro(Renew-

able)

RES **(MNRE)

Coal Gas Diesel

Andaman &Nicobar

State 0.00 0.00 40.05 40.05 0.00 0.00 5.25 45.30

Private 0.00 0.00 20.00 20.00 0.00 0.00 0.10 20.10

Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Sub-Total 0.00 0.00 60.05 60.05 0.00 0.00 5.35 65.40

Lakshadweep State 0.00 0.00 9.97 9.97 0.00 0.00 0.00 9.97

Private 0.00 0.00 0.00 0.00 0.00 0.00 0.76 0.76

Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Sub-Total 0.00 0.00 9.97 9.97 0.00 0.00 0.76 10.73

State 0.00 0.00 50.02 50.02 0.00 0.00 5.25 55.27

Islands Private 0.00 0.00 20.00 20.00 0.00 0.00 0.86 20.86

Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Grand Total

0.00 0.00 70.02 70.02 0.00 0.00 6.11 76.13

6/7

Page 218: Annual Report 07 08

209

Central electricity authority Annual Report 2007-08

“Honesty is the first chapter in the book of wisdom.”

ALL INDIA INSTALLED GENERATING CAPACITY IN THE REGIONS OF MAIN LAND AND ISLANDS

(IN MW)

Region OwnershipSector

Modewise breakup Grand TotalThermal Total

ThermalNuclear Hydro

(Renew-able)

RES **( MNRE )Coal Gas Diesel

NorthernRegion

State 11827.50 1231.20 14.99 13073.69 0.00 6691.15 583.02 20347.86Private 0.00 0.00 0.00 0.00 0.00 786.00 705.25 1491.25Central 7050.00 2311.99 0.00 9361.99 1180.00 5498.00 0.00 16039.99Sub Total 18877.50 3543.19 14.99 22435.68 1180.00 12975.15 1288.27 37879.10

WesternRegion

State 15352.50 1430.72 17.28 16800.50 0.00 5234.50 313.89 22348.89Private 3040.00 1658.00 0.20 4698.20 0.00 444.00 2817.05 7959.25Central 5860.00 3512.00 0.00 9372.00 1840.00 1520.00 0.00 12732.00Sub Total 24252.50 6600.72 17.48 30870.70 1840.00 7198.50 3130.94 43040.14

SouthernRegion

State 8282.50 735.80 362.52 9380.82 0.00 10685.18 867.77 20933.77Private 510.00 2500.50 576.80 3587.30 0.00 0.00 5482.71 9070.01Central 7890.00 350.00 0.00 8240.00 1100.00 0.00 0.00 9340.00Sub Total 16682.50 3586.30 939.32 21208.12 1100.00 10685.18 6350.48 39343.78

EasternRegion

State 6495.00 100.00 17.06 6612.06 0.00 3219.93 200.36 10032.35Private 1441.38 0.00 0.14 1441.52 0.00 0.00 3.25 1444.77Central 8210.00 90.00 0.00 8300.00 0.00 714.00 0.00 9014.00Sub Total 16146.38 190.00 17.20 16353.58 0.00 3933.93 203.61 20491.12

North EasternRegion

State 90.00 336.50 142.74 569.24 0.00 256.00 145.98 971.22Private 0.00 24.50 0.00 24.50 0.00 0.00 0.02 24.52Central 0.00 375.00 0.00 375.00 0.00 860.00 0.00 1235.00Sub Total 90.00 736.00 142.74 968.74 0.00 1116.00 146.00 2230.74

Islands State 0.00 0.00 50.02 50.02 0.00 0.00 5.25 55.27Private 0.00 0.00 20.00 20.00 0.00 0.00 0.86 20.86Central 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Sub Total 0.00 0.00 70.02 70.02 0.00 0.00 6.11 76.13

ALL INDIA

State 42047.50 3834.22 604.61 46486.33 0.00 26086.76 2116.27 74689.36Private 4991.38 4183.00 597.14 9771.52 0.00 1230.00 9009.14 20010.66Central 29010.00 6638.99 0.00 35648.99 4120.00 8592.00 0.00 48360.99Total 76048.88 14656.21 1201.75 91906.84 4120.00 35908.76 11125.41 143061.01

Renewable Energy Sources (RES) includes SHP, BG, BP, U&I,Solar and Wind EnergyAbbreviation:----SHP=Small Hydro Project, BG=Biomass Gasifier, BP=Biomass Power, U&I=Urban & Industrial Waste Power, RES=Renewable Energy Sources Note : (i) The SHP capacity of 1168 MW which was covered under the conventional Hydro capacity has been transferred to RES.

60.51 MWof captive capacity has been deducted from total SHP capacity under RES. Similarily wind capacity of 177.67 MW covered under captive capacity has also been deducted from wind power capacity under RES.

ii) The Shares of Sipat TPS(NTPC) are proposed shares, still to be approved. iii) (**) Based on data as on 31.12.2008 as furnished by MNRE. (iv) Figures at second place of decimal may not tally due to rounding off by computer

7/7

Page 219: Annual Report 07 08

Central electricity authority Annual Report 2007-08

210 “Ambition should be made of sterner stuff.”

Annexure-11A [Item 11.3]

1/2

50000 MW H.E. INITIATIVE LOW TARIFF HE SCHEMES UNDER SURVEY & INVESTIGATION

As on 31.03.2008Sl. No.

NAME OF SCHEME

STATE RIVER TYPE BASIN AGENCY Install- ed

Capaci- ty

(MW)

Original Schedule for DPR

Revised Schedule for DPR

Status/Remarks

CENTRAL SECTOR

(A). For Implementation

NIL

(B). For Preparation of DPR only

NIL

STATE SECTOR

1 Nongkolait MEGH. Umangi ROR Barak MeSEB 120 6/07 6/08 Survey & Investigation in progress

2 Nongnaw MEGH. Umangi ROR Barak MeSEB 50 3/08 3/09 Survey & Investigation in progress

3 Rangmaw MEGH. Umangi ROR Barak MeSEB 65 3/08 3/09 Survey & Investigation in progress

4 Selim MEGH. Barak STO Barak MeSEB 170 3/09 12/08 S&I in Progress

TOTAL STATE SECTOR 405

IPP

5 Umduna MEGH. Barak ROR Barak Eta Star Infrastructure Ltd

57 3/09 6/09 MOA signed in Dec'07. S&I in progress

6 Tato-II Ar.P Siyom ROR Siang Reliance Energy Ltd.

700 3/08 10/08 S&I in progress.

7 Hirong Ar.P Siyom ROR Siang Jai Prakash Associates Ltd.

500 3/08 3/09 S&I in progress.

8 Hutong Ar.P Lohit STO Lohit Mountain Falls Ltd.

3000 3'09 11/09 State Govt. wants ROR instead of Storage scheme. Scheme split in two projects viz. Hutang-I (588 MW) & Hutong-II (1250 MW). Hutong-II (1250 MW) allotted to Mountain Falls Ltd. in Nov.'06 / S&I in progress.

9 Kalai Ar.P Lohit STO Lohit Mountain Falls Ltd.

2600 3'09 11/09 State Govt. wants ROR instead of Storage scheme. Scheme split in two projects viz. Kalai-I (1450 MW) & Kalai-II (1200MW). Kalai-I (1450 MW) allotted to Mountain Falls Ltd. in Nov.'06 / S&I in progress.

Page 220: Annual Report 07 08

211

Central electricity authority Annual Report 2007-08

“The one exclusive sign of thorough knowledge is the power of teaching.”

10 Naying Ar.P Siyom ROR Siang D.S. Constructions Ltd.

1000 3/09 11/08 S&I in progress.

11 Demwe Ar.P Lohit ROR Lohit Athena Energy Ventures Pvt. Ltd.

3000 3/09 3/09 S&I in progress.

TOTAL IPP 10857 TOTAL INSTALLED CAPACITY (MW) 11262

D. Low Tariff HE Schems Work held up (NER)12 Naba Ar.P Subansiri ROR Subansiri - 1000 - - MOEF Problem due to stay

by Hon'ble supreme Court for projects upstream of Lower Subansiri.

13 Niare Ar.P Subansiri ROR Subansiri - 800 - - MOEF Problem due to stay by Hon'ble supreme Court for projects upstream of Lower Subansiri.

14 Oju-II Ar.P Subansiri ROR Subansiri - 1000 - - MOEF Problem due to stay by Hon'ble supreme Court for projects upstream of Lower Subansiri.

15 Oju-I Ar.P Subansiri ROR Subansiri - 700 - - MOEF Problem due to stay by Hon'ble supreme Court for projects upstream of Lower Subansiri.

16 Kameng-II (Bhareli-II)

Ar.P Kameng ROR Kameng Mountain Falls (India) Ltd.

600 - - Consent for Implementation. MOEF site clearance awaited. ( Pakhe wild life sanctuary)

17 Kameng-I (Bhareli-I)

Ar.P Kameng ROR Kameng NEEPCO 1120 - - Stage-I estimates cleared in March’05. Consent for implementation. MOEF site clearance awaited. (Pakhe wild life sanctuary)

18 Kameng Dam

Ar.P Kameng - Kameng KSK Electricity India Ltd.

600 - - MOEF issues involved. Review of submergence issues of Seppa town .

19 Kapaklayak Ar.P Kameng ROR Kameng Yet to be decided

160 Yet to be alloted

20 Etalin Ar.P Dibang ROR Dibang Yet to be decided

4000 Alloted for Implementation in the meeting held on 4-5 July, 2006. MOU signed with State Govt. in Sept'06 Government of Arunachal Pradesh have withdrawn the project in Nov.'07 from NTPC on account of non payment of upfront charges

21 Attunli Ar. P Dibang ROR Dibang Yet to be decided

500 Allotted for Implementation in the meeting held on 4-5 July 2006. MOU signed with state Govt. in Sept'06, Government of Arunachal Pradesh have withdrawn the project in Nov.'07 from NTPC on account of non payment of upfront charges.

TOTAL 10480Grand Total 21742

2/2

Page 221: Annual Report 07 08

Central electricity authority Annual Report 2007-08

212 “Children are our most valuable natural resource.”

Annexure 11 B[Item 11.5]

HYDRO-ELECTRIC SCHEMES IDENTIFIED FOR BENEFITS DURING 11TH PLAN IN NORTH EASTERN REGION

Sl No PLANT NAME STATE AGENCY

Installed Capacity

(MW)

Benefits during

11th Plan(MW)

Year of Commis- sioning.

1 TEESTA III Sikkim Teesta Urja 1200 1200 2011-12

2 CHUJACHEN Sikkim GATI 99 99 2009-10

3 TEESTA V Sikkim NHPC 510 510 2007-08

4 KAMENG Ar. Pradesh NEEPCO 600 600 2011-12

5 SUBANSIRI LOWER Ar. Pradesh NHPC 2000 2000 2011-12

6 MYNTDU St-I Meghalaya MeSEB 84 84 2009-10

7 NEW UMTRU Meghalaya MeSEB 40 40 2011-12

Total 4533 4533

Page 222: Annual Report 07 08

213

Central electricity authority Annual Report 2007-08

“The farther backward you can look, the farther forward you are likely to see.”

Annexure-11C[Item 11.8]

DETAILS OF NEW THERMAL POWER PROJECTS IN NORTH EASTERN STATES

Sl. No

Name of Scheme Capacity(MW)

Brief status Problems/Bottlenecks

1 ASSAM

Margherita TPP by M/s NEEPCO

480 Feasibility of setting up the project is being examined by M/s NEEPCO

Subject to availability of coal from the Makum coalfield from ECL

2. MEGHALAYA

a. West Khasi Hill TPP by M/s NEEPCO

240 Feasibility of setting up the project is being examined by M/s NEEPCO

Subject to availability of coal from the Langrin coalfield from ECL

b. Garo Hills TPP by M/s NEEPCO

720 Feasibility of setting up the project is being examined by M/s NEEPCO

Subject to availability of coal from the Simsang coalfield from ECL

3. TRIPURA

Monarchak CCGT by M/s NEEPCO

104 M/s NEEPCO had submitted the revised DPR for the project. Comments on the same has been sent to MOP. NEEPCO has since submitted on 31..3.08 updated DPR incorporating clarification on CEA comments. The same is under examination

-

Total 1544

Page 223: Annual Report 07 08

Central electricity authority Annual Report 2007-08

214

Annexure-12A (Item No. 12.3)

1/3

TOURS/TRAININGS ABROAD OF CEA OFFICERS DURING THE YEAR 2007-08

S. No. Name S/Shri Designation Name of the Programme Venue Duration

1. V.S Verma Member(Planning)

To attend familiarizarization Programme-Mapping of Thermal Power Stations Using Ebsllon Software.

Attended

Inter- Governmental Inception Meeting to deliberate on modalities for carrying out SARRC

Regional Energy Trade Study at Male on May 12-13,2008 at Male.

Germany

Maldives

6.8.2007 to 9.8.2007

11.5.2008 to14.5.2008

2. V. Ramakrishna, Member (PS) To Attend 8th Meeting of Indo- Nepal Power Exchange Committee at Kathmandu

Nepal

Bhutan

Bhutan

6.6.2007 to 9.6.2007

18.4.2007 to 19.4.2007

17.5.2007 to 18.5.2007

3. Gurdial Singh Member(H) To attend 22nd Tala Hydro Project Authority meeting at Tala HEP

4. Gurdial Singh Member(H) To attend 24th Tala Hydro Project Authority meeting at Tala HEP

5. Rohitash Dahiya Member(Thermal)

To attend familiarizarization Programme-Mapping of Thermal Power Stations Using Ebsllon Software.

Germany 13.8.2007 to 16.8.2007

6. Tapan Chatterjee Chief Engineer - do - - do - 21-4-2007to 28-5-2007

7. Alok Gupta Chief Engineer Advanced training on PSAF Power System Network Analysis Software of M/s. CYME International T&D

Canada 20-11-2007 to 29-11-20078. Prakash Mhaske Director

9. Sandesh Kumar Sharma

Director

10. Amit Ghosh Dy.Director

11. R.C.Nakul, Chief Engineer IGEN- Familiarization cum study tour to develop the expertise in power plants optimization & energy efficiency

Germany

25-6-2007 to6-7-2007

12. Ms Anita Gahlot Dy.Director

13. I.K.Nijhawan Dy.Director

14. Praveen Gupta Dy. Director

15. Rajesh Kumar Asstt. Director

“Failing to plan is planning to fail.”

Page 224: Annual Report 07 08

215

Central electricity authority Annual Report 2007-08

16. A.S.Bakshi Chief Engineer

IGEN- Familiarization cum study tour to develop the expertise in power plants optimization & energy efficiency

Germany 6-8-07 to 17-8-07 17. Amarjeet Singh Director

18. Ms. Naghma Furquan,

Asstt. Director

19. K.K.Puri Asstt. Director

20. Chandra Shekhar Director IGEN- Familiarization cum study tour to develop the expertise in power plants optimization & energy efficiency

Germany5-8-07 to 18-8-0721. V.K. Anand Dy. Director

22. A.K. Gupta Chief Engineer 1. Carbon Capture Sequestrations2. Inspection of Turbine rotar

NorwayChina

20-6-07 to23-6-0729-1-08 to 5-2-08

23. N.S. Mondal, Dy. Director Study tour under IGEN Programme

Germany 23-6-07 to 8-7-2007

24. P.S. Aggarwal Chief Engineer Overview of Design of DElectro-mechanical equipments of Myntdu (Leshka) HEP(2x42 MW) Meghalaya

Germany/ Austria

18-2-08 to 25-2-08

25. B. Tiwary Director

26. B. Poddar Director Site selection & preparation of DPR of Punatsangchhu HEP St.II

Bhutan 21-5-07 to 26-5-07

27. P.C. Kureel Dy. Director Ist Francis Runner Inspection of Myntdu(Leshka)HEP (2x42 MW ), Meghalaya at works of M/s. VA Tech.

Spain 17-12-07 to 21-12-07

28. R.K. Jayaswal Asstt. Director Commissioning of TALA HEP Bhutan 6-4-07 to 12-4-07

29. A.K. Arya Asstt. Director Site selection & preparation of DPR of Punatsangchhu HEP St.II

Bhutan 21-5-07 to 26-5-07

30. A.K. Arya Asstt. Director 2nd Francis Runner Inspection of Myntdu(Leshka) HEP (2x42 MW ), Meghalaya at works of M/s. VA Tech

Spain 24-3-08 to 27-3-08

31. Y.P. Taneja Chief Engineer To participate in 18th TCC meeting of THPA

Bhutan 17-4-07 to 20-4-07

32. Y.P. Taneja Chief Engineer To participate in 24th THPA meeting

Bhutan 16-5--07 to 19-5--07

33. B.S. Mandiratta Asstt. Director Commissioning of computerized central system of Tala HEP

Bhutan 6-4-07 to 12-4-07

34. R.K. Rustagi Director To witness of testing of 2nd Spare Runner for Tala HEP,

Canada 17-2-08 to 23-2-08

2/3

“Let our advance worrying become advance thinking and planning.”

Page 225: Annual Report 07 08

Central electricity authority Annual Report 2007-08

216

35. M. Subramanaian Chief Engineer To visit Tala & Chukha HEPs and discussions with Secretary, Ministry of Trade & Industry, Royal Govt. of Bhutan as a member of Govt. of Bhutan

Bhutan 31-8-07 to 5-9-07

36. S.D. Dubey Director Presentation on DPR of Punatsangchhuu St. IHEP Bhutan to Royal Govt. of Bhutan

Bhutan 2-4-07 to 5-4-07

37. N.C. Goel Chief Engineer Site selection & preparation of DPR of Punatsangchhu HEP St-II

Bhutan 2-4-07 to 5-4-07

38. S.D. Dubey Director Site selection & preparation of DPR of Punatsangchhu HEP St-II

Bhutan 2-4-07 to 5-4-07

39. P.K. Shukla, Dy. Director Site selection & preparation of DPR of Punatsangchhu HEP St-II

Bhutan 21-5-07 to 26-5-07

40. M.M. Rawal Director Presentation on DPR of Punatsangchhuu St. I HEP Bhutan to Royal Govt. of Bhutan

Bhutan 2-4-07 to 5-4-07

41. Suresh Chander Chief Engineer To participate in Capacity Building Workshop and Sixth Annual Conference on Carbon Capture & Sequestration.

USA 7-5-07 to 11-5-07

42. Sanjay Sharma Dy. Director To attend meeting of technical group of Carbon Sequestration Leadership forum and Workshop on Capacity Building for Carbon Capture and Sequestration (CCS)

Saudi Arabia 27-1-08 to 30-1-08

3/3

“If you employed study, thinking. and planning time daily, you could develop and use the power that can change the course of your destiny.”

Page 226: Annual Report 07 08

20007-08

ANNUAL REPORT2007-08

Government of IndiaMinistry of Power

Central Electricity Authority

De

sig

n &

Prin

ted

at: C

ha

nd

u P

ress

Ph

.: 2

25

26

93

6