    2002 Eurocontrol - Cap Gemini Ernst & Young - All rights reserved January 15, 2002 1

    Final version validated January 11 2002

    CDMLimited Business Case

    Barcelona Airport

    EUROCONTROL EXPERIMENTAL CENTRE

    Brtigny sur Orge

  • 7/22/2019 Apron Incidents

    2/13

    EUROCONTROL

    Experimental

    Centre

    2002 Eurocontrol - Cap Gemini Ernst & Young - All rights reserved January 15, 2002 2

    The purpose of this document is to present the results of initialBusiness Case simulations conducted with Barcelona CDM participants

    This is a final report for the "Limited CDM Business Case" work conducted for

    Eurocontrol between November 2001 and January 2002.

    This document is an "dynamic" PowerPoint presentation of the data and results gathered

    in the Excel file OpportunityChartBCase.The Excel spreadsheet is a simulation sheet,

    where all data can be modified.

    Therefore, results shown in this presentations should not be seen as final and validated

    figures, but rather as a "snapshot" of one simulation established together with the

    participants in the course of this work - other simulations should be conducted by the

    stakeholders themselves to validate the results.

    The package (PowerPoint presentation + Excel spreadsheet) was presented in Barcelona

    on January 11, 2002, to each group of participants involved :

    Airlines:

    Spanair

    Iberia

    Barcelona Airport

    Eduardo Goi

    This package, updated after the Jan 11 meetings, was left with each participant listed

    above, for their own use.

    This work involved the following Eurocontrol participants: Werner Gttlinger

    Peter Eriksen

    For CGEY:

    Jrme Halgand

    Marie-Hlne Martin

    and, as experts: Jean-Pierre Florent

    Olivier Delain

    Fadi Fakhoury

    TowerHandlers

    Eurohandling

    Newco

    Fuel

    CLH

  • 7/22/2019 Apron Incidents

    3/13

    EUROCONTROL

    Experimental

    Centre

    2002 Eurocontrol - Cap Gemini Ernst & Young - All rights reserved January 15, 2002 3

    What it is / What we did What it is not / What we did not do

    A list of all improvement opportunitiesidentified on the basis of the CDMBarcelona experiment, at this stage of theproject.

    A calculation methodology for eachquantifiable opportunity in the Barcelonaexperiment.

    An evaluation of each quantifiableopportunity, with generally conservativeestimates.

    An aggregation of opportunities bycategory of stakeholder.

    A reference for building a CDM Business

    Case at other sites, for otherstakeholders.

    It is not an exhaustive quantification ofevery improvement opportunities: someopportunities remain non-quantified eitherbecause a quantification would not makesense, or because the opportunity forBarcelona is not significant.

    This work is not based on real accounting

    figures provided by stakeholders. We filledthe variables from various data gatheredthrough top-down interviews and bottom-up workshops, or in the literature.

    It does not include implementation costsof CDM.

    Not a generic Business Case directlyapplicable as it is to other scopes.

    The objective of the Business Case is to give CDM stakeholders atool to evaluate gains and set an ambition

    The methodo logy for bu i ld ing the CDM Business Case can be app l ied to any oth er group o flocal stakeholders.

    However, the l ist of opp ortu nit ies, the hypo thesis, the variables and the data used wil l bespeci f ic to each s i tua t ion

  • 7/22/2019 Apron Incidents

    4/13

    EUROCONTROL

    Experimental

    Centre

    2002 Eurocontrol - Cap Gemini Ernst & Young - All rights reserved January 15, 2002 4

    Important general assumptions

    The airport does not operate at full capacity: with CDM improvement of

    operations, it would be able to accommodate more rotations.

    This is true for Barcelona airport

    For most other airports, declared capacity is below maximum capacity

    Airlines can gain passengers through better punctuality :

    airlines operating with CDM are more likely to be punctual than others, especially if their

    hub airport is "CDM-operated". Therefore, they can hope to gain market shares from

    other airlineson the same routes.

    If all airlines are operating with CDM, and therefore all improve their punctuality, air

    transportation in general will be more attractive to travellers. Air will then gain marketshare over other means of transportation (rail, road, sea). In that situation, we can

    assume that the market share of each airline remains the same, with a total market of

    air transportation increasing.

    The Business Case only evaluates gains deriving from CDM applications...

    some of them are planned to be implemented in Barcelona

    others are known as not being of interest in Barcelona, but kept in the Business Case

    nevertheless as opening points for other areas of experimentation.

    The Business Case does not include any cost of implementing CDM.

  • 7/22/2019 Apron Incidents

    5/13

    EUROCONTROL

    Experimental

    Centre

    2002 Eurocontrol - Cap Gemini Ernst & Young - All rights reserved January 15, 2002 5

    CDM Business Case framework for Airlines

    Revenue inc rease Cost reduct ion

    Other gains Capi tal expend i tures

    Increase the num ber of

    rotat ions

    Gain passengers throug h

    loyalty

    Reduce loss of revenue due to

    rebooking on Other Air l ines (

    missed connect ion)

    Better value for m oney (Service

    by handl ing agents)

    Faci l i tate decision - makin g

    Reduce compensat ions to

    Passengers (miss ed connection)

    Reduce fuel consum pt ion

    for taxi ing/ in-f l ight

    Reduce over staff ing costs

    (Includ ed in Air l ines punc tual i ty)

    Reduce parking fees

    Improve uti l isat ion rate of Aircraft

    (More rotat ions)

    Reduce time aircraft is out

    of use due to truck/ACaccidents on apron

    (Col l ision)

    Flexibi l i ty in ATC slot management

    Opportunity chart 10Opportunity chart 6

    Opportunity chart 1

    Opportunity chart 6

    Opportunity chart 2

    Opportunity chart 10

    Opportunity chart 11

    Not quantified

    Not quantified

    Not quantified

    Not quantified

    Reduce cal ls to Fire Brigade Opportunity chart 7

    Promote fairness

    Promote co-operation between

    ATC and Air l ines around Air l ines

    prio rities (TOBT)

    Not quantified

    Not quantified

    Opportunity chart 17

    CDM

    CDM

  • 7/22/2019 Apron Incidents

    6/13

    EUROCONTROL

    Experimental

    Centre

    2002 Eurocontrol - Cap Gemini Ernst & Young - All rights reserved January 15, 2002 6

    Focus on Punctuality for Airlines :Estimation of opportunities for time savings

    turn around operations (closer management of

    handling and boarding processes) = difference

    between standard and minimum turnaround

    including fu el ler- only Spanair

    time between doors closed and taxi out

    duration of taxi out

    better adherence to CTOT for delayed flights

    (through slot shifting & swapping)

    duration of taxi in

    0 minutes 10 minutes

    2 minutes 6 minutes

    2 minutes 5 minutes

    2 minutes 3 minutes

    2 minutes 5 minutes

    NA NA

    MIN MAX

    6 minutes 23 minutes

    Hypothesis: those time savings can not all

    be obtained simultaneously.

    We will therefore apply a ratio of 50% 3 minutes 11 minutes

    Opportunity chart 3

    Opportunity chart 17

    Opportunity chart 5

    Opportunity chart 16

  • 7/22/2019 Apron Incidents

    7/13

    EUROCONTROL

    Experimental

    Centre

    2002 Eurocontrol - Cap Gemini Ernst & Young - All rights reserved January 15, 2002 7

    CDM Business Case framework for Handlers

    Revenue inc rease Cost reduct ion

    Other gains Capi tal exp endi tures

    Custom er satisfact ion (air l ines)

    Reduce penalt ies for late

    arr ival at aircraft

    Faci l i tate decision - makin g

    Optimise use of resources

    through reduction of missed

    appointments

    Reduce fuel consu mpt ion and

    maintenance of vehicles

    Reduce over staff ing co sts (Push

    Back Tractor)

    Equipm ent uti l isat ion rate

    (Stairs,

    Buses

    Push Back tractor

    Trolleys)

    Route and task planning

    Opportunity chart 15

    Opportunity chart 13

    Opportunity chart 14

    Not quantified

    Not quantified

    Not quantified

    Not quantified

    Not quantifiedOpportunity chart 12

    Opportunity chart 14

    Not quantified

    CDM

    Opportunity chart 18

    Increase produc tivi ty Opportunity chart 19

  • 7/22/2019 Apron Incidents

    8/13

    EUROCONTROL

    Experimental

    Centre

    2002 Eurocontrol - Cap Gemini Ernst & Young - All rights reserved January 15, 2002 8

    CDM Business Case framework for Airport and Tower

    Revenue inc rease Cost reduct ion

    Other gains Capi tal expend i tures

    Improve uti l isat ion rate of

    contact stand

    Corporate Image enhancement

    Faci l itate TWR work by autom at isat ion of

    pre-departure sequence

    Faci l i tate decision - making

    Cost related to missed con nection

    late at nigh t

    Optimise investm ents l inked to

    groun d traff ic

    -e.g. reduced need for engines-

    on waiting areas if better

    accuracy of departure time.

    Opt imise safety resources ut i l isat ion

    Improve uti l isat ion of runways

    (more mov ements)

    Avoid cur at ive situat ions throu gh earl iercomm unicat ion of arrival t ime

    Opportunity chart 9

    Opportunity chart 5

    Not quantified

    Not quantified

    Not quantified

    Not quantified

    Not quantified

    Not quantified

    Not quantified

    Opportunity chart 8

    Reduce the num ber of operators

    for f ingersOpportunity chart 4

    Optimise the activi t ies of the

    Follow me operatorsNot quantified

    Avoid cong est ion of radio frequency Not quantified

    CDM

    Added value on ATC services Not quantified

  • 7/22/2019 Apron Incidents

    9/13

    EUROCONTROL

    Experimental

    Centre

    2002 Eurocontrol - Cap Gemini Ernst & Young - All rights reserved

    Business case summary (Airlines)

    Total MIN : 37 M - Total MAX : 85 M

    Airlines

    1%

    53%

    12%

    0%

    29%

    0%

    5%

    Collisions

    Gained passengers

    Reduce cost ofmisconnection

    Fire Brigade

    Punctuality for Airlines

    Fueller delays (Spanair)

    One more rotation

  • 7/22/2019 Apron Incidents

    10/13

    EUROCONTROL

    Experimental

    Centre

    2002 Eurocontrol - Cap Gemini Ernst & Young - All rights reserved

    Business case summary (Handlers)

    Total MIN : 379 000 - Total MAX : 1 007 000

    Handlers

    29%

    1%22%

    0%

    6%

    42%

    Number of Buses

    Number of stairs

    Number of Push back

    tractors

    Last minute changesof stand & gate

    Fueller productivity

    Handlers productivity

  • 7/22/2019 Apron Incidents

    11/13

    EUROCONTROL

    Experimental

    Centre

    2002 Eurocontrol - Cap Gemini Ernst & Young - All rights reserved

    Business case summary (Airport)

    Total MIN : 418 000 - Total MAX : 1 435 360

    Airport

    8%

    54%20%

    18%

    Finger Operators

    Contact stand utilisation

    through adherance to

    TOBT

    Contact stand utilisation

    through better planning

    One more movement

    O ll CDM b i b fi 3

  • 7/22/2019 Apron Incidents

    12/13

    EUROCONTROL

    Experimental

    Centre

    2002 Eurocontrol - Cap Gemini Ernst & Young - All rights reserved January 15, 2002 12

    Overall CDM business case benefits over 3 years,for Barcelona stakeholders

    Airlines

    Handlers

    Airport

    Those resul ts are year ly recurrent gains that can be obtained o ver a three yearper iod.

    A common h ypo thesis wo uld b e : 15% the f i rst year, 60% the second y ear, ful l

    result ach ievable the third y ear.

    I t should b e noted that some of th ose gains are mo re theoret ical (e.g : addi t ionalrotat ions) wh i le other gains are easier to reach ( e.g : reduc e cost du e to miss ed

    connect ions)

    Total MIN : 37 M - Total MAX : 85 M

    Total MIN : 379 000- Total MAX : 1 007 000

    Total MIN : 418 000- Total MAX : 1 435 360

  • 7/22/2019 Apron Incidents

    13/13

    EUROCONTROL

    Experimental

    Centre

    2002 Eurocontrol - Cap Gemini Ernst & Young - All rights reserved January 15, 2002 13

    The BCase will be a

    major tool to market

    CDM

    This is a good

    approach to start

    improving the way

    our companies work

    I like this kind of

    meeting

    Business Case

    brainstorming was very

    useful, it arises new

    thinking, new vision.

    Business case brings a new

    approach to CDM.

    The methodology helps going

    ahead with CDM process

    improvement and not only on

    financial aspects.

    Conclusion : The Business Case process rises high interestamongst Barcelona stakeholders

    Verbatim

    The CDM Bus iness Case pro ject supp l ies on request a too l that a l lows you to genera te yourpart icu lar potent ia l benefi ts throug h a CDM imp lementat ion.

    Just u se i t !

    We can finally see

    figures (even if they

    are not necessarily

    realistic yet)

    This reinforces our

    energy for

    implementation

    Good to have different

    stakeholders in one

    room!

    It helps making

    decisions to implement

    CDM, and bringsarguments to the

    management

    But who will do

    it?

    It is still fuzzy...