ArchivetempBDCOM S3224B Switch Hardware Installation Guide

Embed Size (px)

Citation preview

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    1/17

     

    BDCOM S3224B SwitchHardware Installation Guide

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    2/17

      Content

    Table of Content

    Chapter 1 Information of BDCOM S3224B Switch .................... ....................... ...................... .................... ...................... .... 1 

    1.1 Standard configuration ................... ....................... ...................... ...................... ................... ...................... ........... 1 

    1.2 BDCOM S3224B Switch System Properties Parameters......................................................................................2 

    1.3 Extended Ethernet Interface Card Module ...................... ...................... ...................... .................... ..................... . 3 

    Chapter 2 Preparing for installation .................... ..................... ...................... ..................... ..................... ..................... ........ 4 

    2.1 Safety notice..........................................................................................................................................................4 

    2.1.1 Ensure safety as the following principals ..................... ....................... ....................... ................... ............ 4 

    2.1.2 Safety warnings.........................................................................................................................................4 

    2.1.3 Safety principal of operation with electricity .................... ...................... ....................... ..................... ........ 4 

    2.1.4 Preventing electrostatic discharge damage ..................... ...................... ...................... ..................... ........ 5 2.2 General site requirements.....................................................................................................................................6 

    2.2.1 Site environment .................... ...................... ...................... ...................... .................... ..................... ........ 6 

    2.2.2 Preventive site configuration ...................... ....................... ....................... ....................... .................. ........ 6 

    2.2.3 Configuring Equipment rack......................................................................................................................6 

    2.2.4 Power supply condition ................... ...................... ...................... ...................... ..................... ................... 7 

    Chapter 3 Installing switch....................................................................................................................................................8 

    3.1 Installation tools and devices.................................................................................................................................8 

    3.2 Switch Case Installation .................... ...................... ....................... ....................... ................... ..................... ........ 8 

    3.2.1 Install on the desk .................... ...................... ...................... ...................... ..................... ...................... .... 8 

    3.2.2 Install on the mounting .................... ...................... ...................... ...................... ..................... ................... 8 3.3 Connecting Console port.......................................................................................................................................9 

    3.3.1 Console port connection.......................... ...................... ...................... ...................... .................... .......... 10 

    3.4 Connecting Fast Ethernet Interface............... ...................... ...................... ...................... ................... ................. 10 

    Chapter 4 Hardware Troubleshooting................................... ..................... ...................... .................... ...................... ......... 12 

    4.1 Trouble analyzing ...................... ...................... ....................... ...................... .................... ...................... ............. 12 

    4.1.1 Power and cooling system breakdown............... ...................... ...................... ...................... ................... 12 

    4.1.2 Ports, cables and connections breakdown................... ...................... ....................... .................... .......... 12 

    4.2 LEDs............ ...................... ..................... ...................... ..................... ..................... ..................... ...................... .. 12 

    Chapter 5 Switch maintenance.................. ...................... ....................... ...................... ................... ...................... ............. 14 

    5.1 Open the chassis.......... ...................... ...................... ...................... ...................... .................... ..................... ...... 14 5.2 Close the chassis ................... ...................... ...................... ...................... ..................... ..................... ................. 15 

    - I -

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    3/17

      BDCOM S3224B Switch Hardware Installation Guide

    Chapter 1 Information of BDCOM S3224B Switch

    This section explains the parameters of BDCOM S3224B switch.

    1.1 Standard configuration

    BDCOM S3224B Switch standard ports consists of two parts: 24 fast ethernet interfaceand 1 console interface. Refer to the following table:

    Features of standard ports:

    Port name Features

    Fast ethernetinterface

    Speed: 10/100M auto-sense, cable: MDI/MDIX, UTP (RJ45) interface withLINK/ACT, 100 Mbps indicator.

    Console interface Speed:9600bps,RJ45 interface

    In addition,there are two extended Ethernet slots in front of the S3224B switch, a

    grounding bar in the rear and a power supply plug and a power switch (ON and OFF)plug.

    The front-panel of BDCOM S3224B Switch is shown below:

    Figure 1-1 The front-panel of BDCOM S3224B Switch

    Components of BDCOM S3224B Switch front-panel:

    NO. Name Description

    1 PWR  Switch on and indicator lights.

    2 SYS Indicator lights when the system is turning on. Indicator

    blinks when the systems is functioning. 3 CONSOLE Implement Switch Local management.

    4 24 10/100Base-T Interfaces Implement 10/100M Ethernet signal transformation

    5Indicator embedded on the

    left side of each port Indicator lights when the linking is normal.

    Indicator blinks when data is being sent or received.

    6Indicator embedded on the

    right side of each port Indicator lights when the port is in 100M.

    Indicator dies out when the port is in 10M.

    7 Extended Ethernet SLOT1 Available for 1-port fast or Gigabit Ethernet card module

    8 Extended Ethernet SLOT2 Available for 1-port fast or Gigabit Ethernet card module.

    - 1 -

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    4/17

      BDCOM S3224B Switch Hardware Installation Guide

    The rear-panel of BDCOM S3224B switch is shown as below: 

    Figure 1-2 The rear-panel of BDCOM S3224B switch

    Components of BDCOM S3224B Switch rear-panel:

    NO. Name Description

    1 Grounding bar Please ground as need

    2 AC Connector  AC100~240V

    1.2 BDCOM S3224B Switch System Properties Parameters

    Table of BDCOM S3224B Switch property parameters:

    Standard

    IEEE 802.1d Spanning Tree Protocol

    IEEE 802.1p Class of Service

    IEEE 802.1q tagged VLAN

    IEEE 802.3x Flow control

    IEEE 802.3ad Link aggregation 

    IP Route

    Protocol

    RFC 1058 RIP

    RFC 1723 RIP v2

    RFC 1583 OSPF v2

    Protocol

    Network

    Management

    Standard

    RFC 1157 SNMP v1/v2

    RFC 1213 MIB II

    RFC 1757 RMON 1,2,3,9

    CPU  200 MHz Power PC 

    Mem ry 

    EPROM:512K Bytes;

    Flash Memory:8M Bytes; 

    SDRAM:64Mbytes; 

    Standard

    Components 

    24 10/100Base-T ports

    1 Console port

    2 Extended Ethernet interface plugs

    Hardware

    Features

    Cards module10/100Base-TX;100Base-FX; 

    10/100/1000Base-T;GBIC

    - 2 -

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    5/17

      BDCOM S3224B Switch Hardware Installation Guide

    Dimension  442mm×316mm×44mm

    Temperature/H

    umidity for

    working 0℃~60℃;10%~85% without air conditioning

    Temperature/H

    umidity for

    storage -40℃~80℃;5%~95% without air conditioning

    Power supply

    Input voltage :  AC100 ~ 240V , Input

    frequency:47~63Hz

    Input current:1A/230V

    Power

    consumption

    MAX:30W

    1.3 Extended Ethernet Interface Card Module

    BDCOM S3224B Switch plug extended Ethernet interface module is shown as below:

    The table below lists modules available for BDCOM S3224B switch:

    (Note:The following modules are for SLOT1 and SLOT2): 

    NO. Module name Label

    1 1-port 100Base-TX module LS-1FE-TX

    2 1-port 100Base-FX(SM) module LS-1FE-FX(SM)

    3 1-port 100Base-FX(MM) module LS-1FE-FX(MM)

    4 1-port 1000Base-T module LS-1GE-TX

    5 1-port GBIC module LS-1GBIC

    For details of each interface module, refer to interface module handware manual.

    - 3 -

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    6/17

      BDCOM S3224B Switch Hardware Installation Guide

    Chapter 2 Preparing for installation

    The following discusses the considering cases of switch installation, includes twosections:

    Please continue to read "switch Installation" after reading this section.

    2.1 Safety notice

    2.1.1 Ensure safety as the following principals

    (1) Keep the chassis ares clear and dust-free during and after installation; 

    (2) Put the cover in a safe place;

    (3) Put the tools away from walk areas where you and others could fall over them; 

    (4) Do not wear loose clothing that could get caught in the chassis. Fasten your tieor scarf and roll up your sleeves.

    (5) If the working environment could cause damage to your eyes, wear protectionglasses;

    (6) Do not do anything that causes damage to human or device.

    2.1.2 Safety warnings

    Please follow the instructions below. Any mal-operation could cause damage tohuman;

    (1) Read the installing instruction carefully before operating the system;

    (2) Only qualified mechanics are allowed to install or replace the switch;

    (3) Before working on a chassis or working near power supplies,unplug the power

    cord on AC units; disconnect the power at the circuit breaker on DC units.

    (4) Unplug AC plug and disconnect DC connection before working on the case ornear the power supply.

    (5) Ultimate configuration of this product must follow all applicable national laws

    and regulations. 

    2.1.3 Safety principal of operation with electricity

    Follow these guidelines when working on equipment powered by electricity.

    - 4 -

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    7/17

      BDCOM S3224B Switch Hardware Installation Guide

    (1) Before working on equipment that is connecting to power lines , remove jewelry(including rings, necklaces, and watches).Metal objects will heat up whenconnect to the power and ground and can cause serious burns or can weld themetal objects to the terminals.

    (2) Before working on a chassis or working near power suppliees,unplug the powercord on AC units,disconnect the power at the circuit breaker on DC units.

    (3) Do not touch the power supply when the power cord is connected .

    (4) Incorrect connection of this or connected equipment to a general purpose outletcould result in a hazardous situation.

    (5) Read the installation instructions carefully before you connect the system to itspower source.

    Notes: 

    1) Look carefully for possible hazards in your working area, such as moist floors,ungrounded powerextension cable ,frayed ppower cord.

    2) Locate the emergency power off switch for the room in which you are working .Then ,if anelecrtical accident occurs , you can act quickly to turn off the power.

    3) Power off the switch and unplug the power cord before doing the following:

    Installing or removing the chassis

    Working near power supply

    4) Do not work alone if potentially hazardous condition exists.

    5) Never assume that power is disconnected from a circuit.Always check.

    6) If an accident occurs ,proceed as folllows:

    Turn OFF power to the system

    Use caution

    Determine if the victim needs rescue breathing or external cardiac compressions; then takeappropriate action.

    If possible, send another person to get medical aids. Otherwise ,assess the condition of thevictim and then call for help.

    2.1.4 Preventing electrostatic discharge damage

    Electrostatic discharge can damage equipment and impair electricall circuitry .It occurswhen electronic components are improperly handled and can result in complete orintermittent failures.

     Always follow electrostatic discharge prevention procedures when removing andreplacing components.Ensure that the chassis is electrically connected to earthgrouond .Wear an ESD-preventive wrist strap, ensuring that it makes good skincontact .Conect the clip to an unpainted surface of the chassis frame to safely channel

    - 5 -

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    8/17

      BDCOM S3224B Switch Hardware Installation Guide

    unwanted ESD voltages to ground.To properly guard against ESD damage andshoaks,the wrist strap and cord must be used effectively. If no wrist strap is available,ground yourself by touching the metal part of the chassis.

    2.2 General site requirements

    This section describes the requirements your site must meet for safe installation andoperation of your system .Ensure that your site is properly prepared before beginninginstallation.

    2.2.1 Site environment

    The switch can be placed on a desktop or mounted in a rack.The location of thechassis and the layout of your equipment rack or wiring room are extremely importantfor for proper system operation.Placing euipment too close togather ,inadiquate

    ventilation,and inaccessible panels can make system maintinace or cause systemmalfunctions and shutdown.

    When planning your site layout and equipment loations, remamber the precautionsdescribed in the next section ,"Preventive Site Configuration" .If you are experiencingshutdowns or unusually high errors with your exsting equipment, this precautions mighthelp you isolate the cause of failures and prevent future problemss.

    2.2.2 Preventive site configuration

    The following precautions will help you plan an acceptable operating environment foryou switch and help you avoid environmentally-cauesd equipment failures:

    (1) Ensure that the room in which you operate your system has adequate aircirculation .Electrical euqipment generates heat .Ambient air temperature mightnot be able to cool equipment to acceptable opoerating temperatures withoutadequate circiulation.

    (2) Always follow the EDS-prevention procedures to avoid damage toequipment .Damage from static discharge can cause immediate or intermittentequipment failure.

    (3) The chaissis is designed to allow cooling air to flow effectively inside it .Anopen chassis allows allows air leaks, which might interrupt and redirect the flow

    of cooling air from internal components.

    2.2.3 Configuring Equipment rack

    The following information will help you plan an acceptable equipment rackconfiguration.

    (1) The equipment in the rack will heat when working.So enclosed racks must haveadequate ventilation.The equipment should not be put too close to each other toensure the racks are not overheat.

    - 6 -

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    9/17

      BDCOM S3224B Switch Hardware Installation Guide

    (2) When mounting a chassis in an open rack ensure that the rack frame does notlock the intake or or the exhaust ports.So check the position of the chassis whenit is seated all the way into the rack.

    (3) Ensure that you provide adequate ventilation for equipment at the bottom of

    rack.

    (4) Baffles can help to isolate exhaust air from intake air, which also helps to drawcooling air through the chassis .The best placement of the chassis on the airflawin the rack ,which and be found by experimenting with different arrangement.

    2.2.4 Power supply condition

    Check the power at you site to ensure that you are reaieving "claen" power. Install apower conditioner if necessary. Ensure that a fuse or circuit breaker no larger than240V,10A interminal is used on the phase conductors.

    Warning: 

    If the power system does not connect to the earth properly , the variables of input power is big or existexcess pulse,it will add error ratio of communication equipment ,even to damage the hardware system.

    - 7 -

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    10/17

      BDCOM S3224B Switch Hardware Installation Guide

    Chapter 3 Installing switch

    This section explains the detail of BDCOM S3224B Switch installation: 

    Warning:

    Only qualified mechanics are allowed to install or replace the device. 

    3.1 Installation tools and devices

    Tools and devices needed for BDCOM S3224B switch are optional device. Users haveto buy according to their needs.The following tools and device are typical for BDCOM

    S3224B Switch:

    screw driver

    static ring

    screws

    ethernet Cable

    other Ethernet terminal devices

    console terminal

    3.2 Switch Case Installation

    Switches can be place on the table, mounting or other surfaces. To install your networkcorrectly, follow the steps in this section. The content includes:

    3.2.1 Install on the desk

    BDCOM S3224BM Switch can be placed on a smooth and safe desk.

    Note:

    Do not press on the switch.Any pressure more than 4.5kg may cause damage to switch.

    3.2.2 Install on the mounting

    Switches are mounted on the mounting with brackets.Fixed the mounting and theswitches face the front.Operate follows:

    - 8 -

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    11/17

      BDCOM S3224B Switch Hardware Installation Guide

    Mount the switch after the brackets are fixed. Refer to the following illustration: 

    3.3 Connecting Console port

    There is a console port on BDCOM S3224Bswitch. This section explains the featuresand usage of the port.

    Speed: 1200 bps-115200bps, standard RJ 45 plug. Use dedicated cable to connect theport to PC parallel port. Use terminal software (such as Windows super terminal) toconfigure and monitor operations. Cable is provided with host. Terminal parallelcommunication parameters can be set as: baud rate 9600bps, 8-bit data, 1 stop bit, noparity bit.

    Console port uses RJ-45 connectors shown as follows. There are 8pin RJ-45connectors.

    BDCOM S3224B switch console port and computer connection: 

    Console port pins are as follows:

    - 9 -

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    12/17

      BDCOM S3224B Switch Hardware Installation Guide

    Pin No. Description Name Note

    1 Carrier detect CD No connect

    2 Received data RXD Input

    3 Data set ready DSR No connect

    4 Transmitted data TXD Output

    5 request to send RTS No connect

    6 clear to send CTS No connect

    7 Data terminal ready DTR No connect

    8 signal ground SG GND

    3.3.1 Console port connection

    This cable is used to connect BDCOM S3224B switch console port to external terminal.One end is RJ45 8-pin plug. The other end is 9 –hole (DB9) plugs. RJ45 connecterplugs into BDCOM S3224B switch console port. Use DB9 according to the terminalparallel port. The side of the cable is shown as follows. The product No. of this cable isRLC0301. 

    3.4 Connecting Fast Ethernet Interface

    BDCOM S3224Bswitch provides 24 10/100Base-TX ports. Each port is embedded with2 LEDs to indicate the statues of Link/ACT and 10/100M. Use switchUTP to connect toother Ethernet terminals. UTP no. and console no. are the same. Refer to the following

    chart. 

     All of the 24 10/100Base-TX ports of BDCOM S3224Bswitch supportauto-MDIX.Choose the connection which best fits the connection between BDCOM S3224Bswitchand Ethernet terminal.

    (5) 10/100Base-TX port and other Ethernet terminal connection is shown as follows: 

    - 10 -

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    13/17

      BDCOM S3224B Switch Hardware Installation Guide

    (6) UTP port explaination is shown as follows: 

    Pin NO. Description  Name  Note 

    1  Data transmission positive  TPTXD+  Output 

    2  Data transmission negative  TPTXD-  Output 

    3  Data receive positive  TPRXD+ Input 

    6  Data receive negative  TPRXD-  Input 

    Figure 3-1 Parallel connection UTP5

    Note:

    Cable connection and colors follow the regulations in EIA/TIA 568A.

    Figure 3-2 Cross connection UTP5

    Note:

    Cable colors follow the regulation in EIA/TIA 568A. 

    - 11 -

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    14/17

      BDCOM S3224B Switch Hardware Installation Guide

    Chapter 4 Hardware Troubleshooting

    4.1 Trouble analyzing

    The key to troubleshooting is to separate trouble from the system. By analyzing whatsystem should do and what system is doing, troubleshooting becomes easy. Think ofthe following systems while analyzing troubles:

    (1) Power and cooling system—Power and cooling fan;

    (2) Ports, cables and connections—ports on the front panel of the switch and cablesconnected to the ports.

    4.1.1 Power and cooling system breakdown

    Examine the following conditions to separate troubles:

    (1) The power is “ON”. Make sure the cooling fan is working normally. If cooling fanis not working normally, check the fan;

    (2) Examine the environment. The switch cannot be overheated. Make sue theinhale and exhale hole of the switch is clean. Refer to “General Requirement forWorking Environment”. The temperature of the switch working environment is0-40 (32℃ -104

    ºF).

    (3) If switch is not working and “PWR” indicator is not light, check the power supply.

    4.1.2 Ports, cables and connections breakdown

    To separate problems, check the follow status:

    (1) If switch port is unable to link, check the connection. Make sue the connection isnormal;

    (2) If the power is “ON”, check the power supply and power cord;

    (3) If the system is working but the console port is not, make sue the console portconfigurations are as follows: 9600 baud rate, 8-bit data bit, no parity bit, 1 stopbit and no flow control.

    4.2 LEDs

    LEDs indicates what switches are doing. BDCOM S3224B switch LED and functionsare as follows:

    NO. Name Description Note

    1 PWR Power indicator lights Switch on and indicator lights.

    - 12 -

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    15/17

      BDCOM S3224B Switch Hardware Installation Guide

    2 SYS System IndicatorIndicator lights when the system is turning on.

    Indicator blinks when the system is functioning.

    3

    Indicator embedded on

    the left side of each

    port.

    Indicator lights when link status is normal.

    Indicator blinks when data is being sent or

    received.

    4

    Indicator embedded on

    the right side of each

    port.

    Indicator lights when the port is in 100M data

    transfer mode. Indicator dies out when the port is

    in 10M data transfer mode.

    - 13 -

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    16/17

      BDCOM S3224B Switch Hardware Installation Guide

    Chapter 5 Switch maintenance

    Warning:

    1) Ensure static electricity emission of your body before openning the chassis.Please read “SafetyNotices” before any operating in appendixB after closing the switch.. 

    2) Please unlatch power pin when operate near or on the Switch. 

    5.1 Open the chassis

    This section introduces how to open the chassis and the tools needed and operating

    methods. 

    Warning:

    Do not touch the power supply to avoid any hurting when the power cord is connected. 

    It maybe need some tools which are not provided as the standard equipment with theSwitch, as the folllowing: 

    cross screw-driver; 

    Electrostatic discharge-pretective wrist strap. 

    Opening the Switch top as the following steps: 

    (1) Close the power switch(press the switch to OFF side);

    (2) Disconnect all cables from the rear panel of the Sitch;

    (3) Drive off the screw on fixed top by screw-driver as figure 1 ;

    Note:

    The chassis is consist of the top and bottom.

    (4) Holding the chassis with both hands ,position it as shown in the following figure.

    (5) When the top is off,set it aside and it shows the layout of system cards

    Note:

    - 14 -

  • 8/18/2019 .ArchivetempBDCOM S3224B Switch Hardware Installation Guide

    17/17

      BDCOM S3224B Switch Hardware Installation Guide

    Put down the top steady avoiding any demage after lifting it , otherwise it will be very difficult to installlater.

    5.2 Close the chassis

    This section introduce the procession of locating the top and closing chassis .Pleaseact as the following procession:

    (1) As the following picture 1 , put the top and bottom well according to their place;

    (2)  Attach the edges of the top and the bottom according to the picture 1; 

    (3) When the two sections are together, slide the top setion into the slots on thefront panel of the bottom to make sure the following: 

    The top section fits into the bottom section .The bottom section fits into the front of the topsection.

    Each side of the top and bottom sectionfits together.

    (4) Replace and tighten the top screws by the screw-driver as picture 2; 

    (5) Reset the chassis of the Switch on a desktop or in a rack; 

    (6) Connect all cables after completing all work. 

    - 15 -