Argyle Street Streetscape Presentation

Embed Size (px)

Citation preview

  • 8/22/2019 Argyle Street Streetscape Presentation

    1/22

    April 25, 2014

    RGYLE STREET

    ARGYLE STREETSTREETSC PE

    STREETSCAPE - S-1-323Pedestrian Access Advisory Commit tee

    BROA

    DWAY

    SHE

    RIDAN

    ARGYLE

    FOSTER

    CTAR

    EDL

    INE

    LAKESHO

    REDRIVE

  • 8/22/2019 Argyle Street Streetscape Presentation

    2/22

    BROADWAY

    ARGYLE

    WINTHROP

    CCTARR

    EDL

    N

    LINE

    KENMORE

    SHERIDAN

    Broadway - Winthrop:

    13 existing parking spotsWinthrop - Kenmore:

    25 exist ing parking spots

    Kenmore - Sheridan:

    20 existing parking spots

    EXISTING CONDITIONSEXISTING CONDITIONS

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    3/22

    EXISTING CONDITIONSEXISTING CONDITIONS

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    4/22

    BROADWAY

    ARGYLE

    WINTHROP

    CCTARR

    EDL

    N

    LINE

    KENMORE

    SHERIDAN

    NIGHT MARKET

    COMMUNITY EVENTSCOMMUNITY EVENTS

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    5/22

    EXISTING CROSS SECTIONEXISTING CROSS SECTION

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    6/22

    PROJECT GOALS

    1 Improve infrastructure by creating a cohesive and flexiblestreetscape plan within funding limitations

    2 Support existing Argyle St. merchants and their

    customers and bolster Argyle St. as a regional businessdestination

    3 Brand Argyle St. business district and develop communityidentification

    4 Implement streetscape and infrastructure elements thatincrease public safety and deter negative activity

    5 Provide a complete and shared street that benefits theflow of pedestrian, vehicular and bike traffic equally

    GOALSGOALS

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    7/22

    DESIGN ELEMENTS

    Speeds less than 15 mphBlurred lines between pedestrian and vehicular spacesRemoval of barrier curbs

    BENEFITS

    Kensington High Street in London showed a 43%decrease in casualties/injuries over a two yearperiod after converted to a Shared Street

    Increased safety through individual responsibility

    Expansion of Public Urban SpaceIncreased pedestrian and bicycle trafficDrivers are fourteen times more likely to give-way to

    pedestrians

    Promotes economic developmentFlexible for street fairs, markets, paradesPromotes safe and comfortable outdoor cafe space

    WHAT IS A SHARED STREET?

    Shared Space is more a way of thinking than it is a design concept. It is

    most readily recognized as a street space where all traffic control devices such

    as signals and stop signs, all markings such as crosswalks, and all signing have

    been removed. Curbing is removed to blur the lines between sidewalks and

    motorized travel way. The philosophy is that absence of all of those features

    forces all users of the space from pedestrians to drivers to negotiate

    passage through the space via eye contact and person to person negotiation.

    - Gary Toth, Aug. 17, 2009 http://www.pps.org/blog/shared-space

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    8/22

    SHARED STREET CASE STUDIESSHARED STREET CASE STUDIES

    New Road - Brighton, EnglandNew Road - Brighton, England Allen Street - Buffalo, New YorkAllen Street - Buffalo, New York King Street - Kitchener, OntarioKing Street - Kitchener, Ontario

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    9/22

    SHARED STREET CASE STUDIES:SHARED STREET CASE STUDIES: Bell Street, Seattle, WashingtonBell Street, Seattle, Washington

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    10/22

    PROPOSED PLAN - OVERALLPROPOSED PLAN - OVERALL

    EXISTINGROW

    EXISTINGROW

    66

    RIGHT-OF-WAY

    16

    PERMEABLE PAVERS

    16

    PERMEABLE PAVERS

    30

    UNIT PAVERS

    CLEAR

    PATH

    OPEN SPACE:

    SITE FURNISHINGS

    CAFES, TREE PITS

    OPEN SPACE:

    SITE FURNISHINGS

    CAFES, TREE PITS

    TRAVEL LANETRAVEL LANEPARKING PARKING CLEAR

    PATH

    7 MIN 0 - 9 0 - 910107 7 7 MIN

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    11/22

    PROPOSED PLAN - INFRASTRUCTURE ENLARGEMENTPROPOSED PLAN - INFRASTRUCTURE ENLARGEMENT

    ARGYLE STREET

    ALLEY

    ALLEY

    DRIVEWAY

    WIN

    THROPAVENUE

    KENM

    OREAVENUE

    CONCRETE GUTTER

    CONCRETE GUTTER

    PAVER TYPE B (PARKING LANE)

    PAVER TYPE B (PARKING LANE)

    DETECTIBLE WARNING PAVER (AT BACK OF PARKING LANE)

    DETECTIBLE WARNING PAVER (AT BACK OF PARKING LANE)

    PAVER TYPE A PEDESTRIAN CLEAR PATH

    PAVER TYPE A PEDESTRIAN CLEAR PATH

    ADA ACCESSIBLE WARNING TILE

    BOLLARDS SPACED 8 ON CENTER

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    12/22

    EXISTINGROW

    EXISTINGROW

    66

    RIGHT-OF-WAY

    16

    PERMEABLE PAVERS

    16

    PERMEABLE PAVERS

    30

    UNIT PAVERS

    CLEAR

    PATH

    OPEN SPACE:

    SITE FURNISHINGS

    CAFES, TREE PITS

    OPEN SPACE:

    SITE FURNISHINGS

    CAFES, TREE PITS

    TRAVEL LANETRAVEL LANEPARKING PARKING CLEAR

    PATH

    7 MIN 0 - 9 0 - 910107 7 7 MIN

    CROSSCROSSSECTIONSSECTIONS

    EXISTINGEXISTING

    PROPOSEDPROPOSED

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    13/22

    PROPOSED CROSS SECTIONSPROPOSED CROSS SECTIONS

    7

    66

    RIGHT-OF-WAY

    PERMEABLE

    PAVERS

    PERMEABLE

    PAVERS

    20

    UNIT PAVERS

    CLEAR

    PATH

    INFILTRATION

    PLANTER

    INFILTRATION

    PLANTER

    TRAVEL LANE PARKINGTRAVEL LANE CLEAR

    PATH

    7 MIN

    6 MIN

    VARIES VARIES1010 7 MIN

    7 MIN

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    14/22

    ADA GUIDELINES / RESEARCHADA GUIDELINES / RESEARCH

    Americans with Disabilities Act Accessibility Guidelines for

    Buildings and Facilities (ADAAG)

    Initial ADAAG requirement for detectable warnings athazardous vehicle areas, but with no definition of hazardous

    vehicular area

    In 2004, ADAAG was updated to remove references tohazardous vehicle areas and specific requirements for placements

    of detectable warnings (excluding transit platform boardingedges)

    Public Rights-ofway Accessibility Guidelines (PROWAG)

    2005 PROWAG draft updated requirements for dectable warnings:...where curb ramps, blended transitions, or landingsprovide a flush pedestrian connection to the street. Sidewalk

    crossings of residential driveways should not generally beprovided with detectable warnings, since the pedestrian

    right-of-way continues across most driveway aprons andoveruse of detectable warning surfaces should be avoided inthe interests of message clarity. However, where commercialdriveways are provided with traffic control devices orotherwise are permitted to operate like public streets,detectable warnings should be provided at the junction

    between the pedestrian route and the street.

    PROWAG has not been adobted by the Department of Justice yet.

    Coordinated with MOPD who:

    Reviewed the proposed Public Right of Way Guidelinesto determine if there is anything directly applicable to sharedstreets that is being proposed.

    Reviewed DOJ and Access Board websites for guidance

    on shared street issues

    Conducted legal research to determine if any applicablecaselaw exists regarding shared streets

    Reviewed Illinois Accessibility Code, 2010 ADAStandards and Chicago Building Code to determine whether

    existing regulations require truncated domes to indicate sharedstreet boundaries

    Conducted internet research to determine how otherjurisdictions (including other countries) use materials toprovide indication of shared street boundaries for people withdisabilities including people who are blind or have visualimpairments.

    Talked by telephone with MOPD representatives fromBoston and San Francisco regarding their experiences withshared streets to determine how they analyzed the problem.

    Reviewed reports from Seattle, San Francisco and otherjurisdictions to determine shared street designs.

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    15/22

  • 8/22/2019 Argyle Street Streetscape Presentation

    16/22

    BELL STREET - SEATTLE, WASHINGTONBELL STREET - SEATTLE, WASHINGTON

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    17/22

    PROPOSED PLAN - INFRASTRUCTURE ENLARGEMENTPROPOSED PLAN - INFRASTRUCTURE ENLARGEMENT

    ARGYLE STREET

    ALLE

    Y

    ALLEY

    DRIVEWAY

    WIN

    THROPAVENUE

    KENMOREAVENUE

    CONCRETE GUTTER

    CONCRETE GUTTER

    PAVER TYPE B (PARKING LANE)

    PAVER TYPE B (PARKING LANE)

    DETECTIBLE WARNING PAVER (AT BACK OF PARKING LANE)

    DETECTIBLE WARNING PAVER (AT BACK OF PARKING LANE)

    PAVER TYPE A PEDESTRIAN CLEAR PATH

    PAVER TYPE A PEDESTRIAN CLEAR PATH

    ADA ACCESSIBLE WARNING TILE

    BOLLARDS SPACED 8 ON CENTER

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    18/22

    EXISTINGROW

    EXISTINGROW

    66

    RIGHT-OF-WAY

    16

    PERMEABLE PAVERS

    16

    PERMEABLE PAVERS

    30

    UNIT PAVERS

    CLEAR

    PATH

    OPEN SPACE:

    SITE FURNISHINGS

    CAFES, TREE PITS

    OPEN SPACE:

    SITE FURNISHINGS

    CAFES, TREE PITS

    TRAVEL LANETRAVEL LANEPARKING PARKING CLEAR

    PATH

    7 MIN 0 - 9 0 - 910107 7 7 MIN

    CROSS SECTIONCROSS SECTION

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    19/22

    PAVER ELEMENTSPAVER ELEMENTS

    pavers from R.O.W. - R.O.W.pavers from R.O.W. - R.O.W. permeable paverspermeable pavers

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    20/22

    PROPOSED ELEMENTSPROPOSED ELEMENTS

    inltrat ion plantersinfiltrat ion planters

    davit light polesdavit light poles

    trees in gratestrees in grates bike racksbike racks trash receptaclestrash receptacles

    bollards based on funding availability)bollards (based on funding availability)

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

    O

    TOP

  • 8/22/2019 Argyle Street Streetscape Presentation

    21/22

    BROADWAY PEDESTRIAN REFUGE ISLANDBROADWAY PEDESTRIAN REFUGE ISLAND

    W.ARG

    EST.

    PARKINGLOT

    NORTHBR

    OADWAY

    INAMETCENTER

    W A RGYLE STW. ARGYLE ST.

    N

    H

    B

    W

    NORTHBR

    OADWAY

    S

    BUS

    ST

    W A RGYLE STW. ARGYLE ST.

    TAI NAMTAI NAM

    PARKING LOTPARKING LOT

    TAI NAMTAI NAMMARKET CENTERMARKET CENTER

    enhanced crosswalkenhanced crosswalk

    pedestrian refugepedestrian refuge

    vertical identiervertical identifier

    View looking westView looking south

    32

    6

    15

    Stud Mounted stainless ste el

    letters

    Solid Aluminum pole with

    colored bands and intermitent

    relief bands

    Concrete foundation

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting

  • 8/22/2019 Argyle Street Streetscape Presentation

    22/22

    THANK YOU FOR YOUR TIME

    Questions...Comments...

    Hannah Higgins CDOT Project Manager

    312-742-6401 [email protected]

    April 25, 2014 ARGYLE STREETSCAPEPedestrian Access Advisory Committe e Mee ting