    4100ES Fire Alarm System Technician Training

    Assessment Overview ..................................................................................................... 4

    Technician Workflows ..................................................................................................... 5

    Assessment 1-1: Angels Awaiting Wings Installation/Commissioning ......................... 6

    Assessment 1-1: Task Checklist ..................................................................................... 9

    Assessment 1-2: Angels Awaiting Wings Service/Break-Fix ..................................... 10

    Assessment 1-2: Task Checklist ................................................................................... 12

    Assessment 2-1: Patriot Palace Installation/Commissioning ..................................... 13

    Assessment 2-1: Task Checklist ................................................................................... 16

    Assessment 2-2: Patriot Palace Service/Break-Fix .................................................... 17

    Assessment 2-2: Task Checklist ................................................................................... 19

    Assessment 3-1: Skyway Motors Installation/Commissioning .................................... 20

    Assessment 3-1: Task Checklist ................................................................................... 23

    Assessment 3-2: Skyway Motors Service/Break-Fix .................................................. 24

    Assessment 3-2: Task Checklist ................................................................................... 26

    Assessment 3-3:Palace Project Service/Break-Fix ..................................................... 27

    Assessment 3-3: Task Checklist ................................................................................... 28

    Assessment 4-1:Ruwais Burooj 1 Installation/Commissioning .................................... 29

    Assessment 4-1: Task Checklist ................................................................................... 30

    Assessment 5-1: Jeffery P. Malone Memorial Hospital Installation/Commissioning ... 31

    Assessment 5-1: Task Checklist ................................................................................... 32

    Assessment 5-2: Jeffery P. Malone Memorial Hospital ................................................. 33

    Assessment 5-2 Task Checklist .................................................................................... 34

    Assessment 6: Michael J. Pinder Regional Airport Service/Break-Fix........................ 35Assessment 7-1: Service Gateway................................................................................ 36

    4100ES Technician Core Competency Score Sheet ..................................................... 38

    4100ES Technician Core Competency Score Sheet (Continued)................................. 39

    4100ES Technician Core Competency Score Sheet (Continued) .................................40

  • 7/26/2019 Asessment Book - ME

    4/41

    4100ES Fire Alarm System Technician Training

    Assessment OverviewThe Purpose of this Handbook

    This handbook contains your formal assessments for this course. During eachassessment, you have the opportunity to demonstrate core competencies that proveyour capabilities working on a 4100ES Fire Alarm System.

    Grading

    Grading is done on a Competency Score Sheet (contained at the end of this book).

    The Competency Score Sheet lists critical skills necessary to pass this course.The sheet also specifies the opportunities throughout the course where you candemonstrate your ability to perform these skills (e.g., Assessments 2-2 and 4-1).

    You have more than one assessment opportunity to demonstrate some competencies.You may only have a single opportunity to demonstrate other competencies.

    Note: You are not assessed on any competency that you have not had time to practice. Once you have demonstrated the ability to perform a competency, your instructor

    initials a box on your Competency Score Sheet to indicate this accomplishment.

    You must demonstrate your ability to complete ALL core competencies to become aCertified Technician on the 4100ES Fire Alarm System.

    At the end of each assessment contained in this handbook there is a supplementalworksheet that contains the following three columns:

    1. Task The action you perform to complete an objective. For exampleDownload CFIG

    2. Milestone Your goal. For example, Successfully Downloaded CFIG

    3. Customer(s) Each assessment task you perform directly benefits one or morecustomers. These customers include other technicians and/or inspectors back atyour District Office, Authorities Having Jurisdiction (AHJs), your Customer

    which could include their IT department, and/or their Contractors.These customers are the groups who will assess you back in the Real Worldwith questions such as:

    Did you perform satisfactory work?

    Was the work done correctly? Was it done right the first time?

  • 7/26/2019 Asessment Book - ME

    5/41

    4100ES Fire Alarm System Technician Training

    Technician Workflows

  • 7/26/2019 Asessment Book - ME

    6/41

    4100ES Fire Alarm System Technician Training

    Assessment 1-1: Angels Awaiting Wings

    Installation/Commissioning

    Time Limit

    You have 40 Minutesto complete this Assessment.

    Scenario

    You are a Commissioning Technician assigned to install a 4100ES Fire Alarm Systemat the Angels Awaiting WingsAssisted Living Facility in Dubai. You are supplied withthe following document.

    Instructions

    Based on this information and knowledge that you have gained during your practiceexercises:

    1. Perform the required installation and programming tasks.

    2. Call the instructor to your workstation for grading when you are finished.

    IMPORTANT: Double-check your work! You will not be able to make changes toyour job once the instructor begins to grade your work.

    Angels Awaiting Wings 4100ES Job

    Project number: 112772

    Order number: 2979

    Job Number: 111U001A

    Location: Al Khaleej Street, Dubai

    Customer: Angels Awaiting Wings Assisted LivingFacility

    Contractor: Dave and Daughters

    Customer Contact: Joe MagnetMaintenance Supervisor

  • 7/26/2019 Asessment Book - ME

    7/41

    4100ES Fire Alarm System Technician Training

    Equipment being installed: 4100ES FACP, 3 Smoke Sensors, 2 NAC

    Circuits (1 Horn Circuit and 1 VisualCircuit)

    Location of Main Panel: Wall in Lobby

    AC Breaker Location: Utility Room behind receptionist

    Secondary Power Supply: Shall have sufficient capacity tooperate the system under quiescent load

    for a minimum of 24 hours and, at theend of that period, shall be capable of

    operating all alarm notification

    appliances used for evacuation or to

    direct aid to the location of an

    emergency for five minutes.

    Panel Operation: General Alarm operation Any alarmwill activate all NAC circuits. A

    single key press will acknowledge all

    alarm conditions. Horns will turn OFF

    on Silence, but Synchronized Visuals

    will remain ON until the Alarm

    Condition has been cleared and the

    system has been reset.

    Other Requirements: Installation, pictures, as well as

    Inspection and Testing reports shall bestored at the panel in non-volatile

    compact flash memory. (ROC document is

    located in your Job Aids folder)

    Specific Job Information: Labels

    PHOTO SENSORS

    M1-2 Lobby Area

    M1-3 Day Room

    M1-8 Hall

    Heat Sensor

  • 7/26/2019 Asessment Book - ME

    8/41

    4100ES Fire Alarm System Technician Training

    AUDIBLE

    SIG4 HORNSOther Information: Time shall be displayed in 24 hr. format

  • 7/26/2019 Asessment Book - ME

    9/41

    4100ES Fire Alarm System Technician Training

    Assessment 1-1: Task Checklist

    Task Milestone Customer(s)

    1. Complete information in the

    Panel tabInformation accurate and complete

    Break/Fix TechnicianIs this informationaccurate?

    2. Download CFIG Successfully downloaded CFIGMultipleDoes the Panel function

    properly?

    3. Create and populate folders

    in Mass StorageFolders created and populated

    Technicians/InspectorsAre these folders clearlylabeled so I can readilyaccess them?

    4. Complete information in the

    Hardware tab

    Information accurate and complete

    Break/Fix TechniciansIs this informationaccurate and in the

    proper location for whenI do my job?

    5. Program IDNet

    ContractorIs this informationaccurate and in theproper location forwhen I do my job?

    6. Program NACs

    ContractorIs this informationaccurate and in theproper location forwhen I do my job?

    7. Customer achieves

    occupancy at the agreed

    upon time

    The job was completed on time

    MultipleDid the technicianfulfill their obligations ontime?

  • 7/26/2019 Asessment Book - ME

    10/41

    4100ES Fire Alarm System Technician Training

    Assessment 1-2: Angels Awaiting Wings

    Service/Break-Fix

    Time Limit

    You have 20 Minutesto complete this Assessment.

    Scenario

    Two years have elapsed since the commissioning of the Angels Awaiting WingsAssisted Living Facility in Dubai. You are a Break/Fix Technician assigned to thiscustomer site. Your District Office supplies you with the following document.

    Instructions

    Based on this information and knowledge you have gained during your practiceexercises and the previous assessment:

    1. Perform the required installation and programming tasks.

    Note: For the instructors convenience throughout this course, please save yourjob file with a later revision (e.g., 111U001A becomes111U002A).

    2. Call the instructor to your workstation for grading when you are finished.

    IMPORTANT: Double-check your work! You will not be able to make changes toyour job once the instructor begins to grade your work.

    Angels Awaiting Wings Job

    Call was received: 9:00AM Wednesday

    Project number: 112772

    Order number: 2979

    Job number: 111U001A

    Location: Al Khaleej Street, Dubai.

    Customer: Angels Awaiting Wings Assisted LivingFacility

  • 7/26/2019 Asessment Book - ME

    11/41

    4100ES Fire Alarm System Technician Training

    Original Equipment 4100ES FACP, 3 Smoke Sensors, 2 NAC

    Installation: circuits (1 Horn Circuit and 1 Visual

    Circuit)

    Customer Requested A System Trouble must be acknowledged

    Software Change(s): every 12 hours.

    Time and Date format changed to 12 hr.

    Login required to change the Time and

    Date. This login requires a new user

    added with a Passcode of 17272.

    Customer have requested for Single Hard

    Reset while activating the System Reset

    Switch from the panel

    All horns shall play temporal code

    Customer Requested Add a Smoke Sensor at the Building 2

    Hardware Change(s): Nurse Station M1-6 Photo Smoke Sensor

    Perform the necessary changes build and save the job and call your instructor.

  • 7/26/2019 Asessment Book - ME

    12/41

    4100ES Fire Alarm System Technician Training

    Assessment 1-2: Task Checklist

    Task Milestone Customers

    1. Configure Access Levels

    Information accurate and complete

    CustomerIs this informationaccurate and in theproper location?

    2. Configure Passcodes

    3. Configure System Options

    4. Configure IDNet

    5. Install Smoke Sensor M1-6 Smoke Sensor installedCustomerIs the smoke sensoroperational?

    6. Complete the work on time The work was completed on timeCustomerWas the job completedon time?

  • 7/26/2019 Asessment Book - ME

    13/41

    4100ES Fire Alarm System Technician Training

    Assessment 2-1: Patriot Palace Installation/Commissioning

    Time Limit

    You have 2 Hoursto complete this Assessment.

    Scenario

    You are a Commissioning Technician assigned a job to Install a 4100ES Fire Alarm

    System in newly constructed New England Pharmaceuticals,a three story officebuilding in Abu Dhabi. The customer has opted to include an InfoAlarm Display as wellas audio components in the existing panel. They have requested a new MessageLibrary to increase their 4100ES Audio capabilities. Perform installation andprogramming tasks based on the information provided.

    Call the instructor to your workstation when you are finished.

    IMPORTANT: Double-check your work! You will not be able to make changes to

    your job once the instructor begins the grading process.Instructions

    Save job file PRAC5Bas 112U001Aand then update the job with information providedin this assessment.

    Patriot Palace Job

    Project number: 020979

    Order number: 7929

    Job Number: 112U001A

    Location: Abu Dhabi

    Customer: New England Pharmaceuticals

    Contractor: Brogan BrothersEquipment Being Installed: Add a 35W Audio Amplifier and InfoAlarm

    to Bay 1 of the Transponder

    Location of Main Panel: Main Entrance

  • 7/26/2019 Asessment Book - ME

    14/41

    4100ES Fire Alarm System Technician Training

    AC Breaker Location: Room 102

    Secondary Power Supply: Shall have sufficient capacity tooperate the system under quiescent load

    for a minimum of 24 hours and, at the

    end of that period, shall be capable of

    operating all alarm notification

    appliances used for evacuation or to

    direct aid to the location of an

    emergency for five minutes.

    Panel Operation: All speaker circuits shall operateGeneral Alarm, OFF on Silence. The

    Second Floor speakers shall be

    controlled by the first circuit of the

    75W Audio Amplifier and the Third Floor

    speakers shall be controlled by the

    second circuit of the 75W Audio

    Amplifier.

    The Annunciator Display Card (located in

    Slot 7 of the main can) shall have the

    4th switch programmed to turn ON the

    Second Floor speakers to Audio Channel

    1. The corresponding LED must be

    programmed to annunciate the ON state of

    the speaker circuit. The fifth switch

    shall be programmed to turn ON the Third

    Floor speakers to Audio Channel 1. The

    corresponding LED must be programmed to

    annunciate the ON state of the speaker

    circuit.

    Update the Audio Message File

    (File supplied by instructor)

    Other Requirements: Install Mode shall be preserved whendownloading CFIG as the Monitor and

    control modules have yet to be

    installed.

    The Contractor has requested training

    th I t ll M d f t ll

  • 7/26/2019 Asessment Book - ME

    15/41

    4100ES Fire Alarm System Technician Training

    Specific Job Information: AUDIBLESecond Floor Speakers

    Third Floor Speakers

    Other Information: The time shall be displayed in 24hr.format

  • 7/26/2019 Asessment Book - ME

    16/41

    4100ES Fire Alarm System Technician Training

    Assessment 2-1: Task Checklist

    Task Milestone Customer

    1. Add an InfoAlarm*

    Properly Install andProgram each hardwarecomponent

    CustomerWas the hardware properlyinstalled?

    2. Add an Audio Amplifier*

    3. Add a New Audio Chipset (instructor

    supplied)

    Perform a Download of anAudio File

    CustomerAre the Audio Messages what Iasked for?

    4. Add to Existing Annunciator

    ProgrammingAdded AnnunciatorProgramming

    CustomerCan I easily control my newspeakers?

    5. Use Install Mode to Clear Multiple

    Panel TroublesPanel left with singletrouble

    Technician(s)/ContractorsDoes this make my job easier?

    6. Train Contractor on how to use

    Install Mode** Trained Contractor

    Contractor

    Did the Technician explain InstallMode to me so I can utilize thisfeature?

    7. Enable the Customer to achieve

    occupancy at the agreed upon time.The job was completed ontime.

    CustomerDid the technician fulfill theirobligations on time?

  • 7/26/2019 Asessment Book - ME

    17/41

    4100ES Fire Alarm System Technician Training

    Assessment 2-2: Patriot Palace

    Service/Break-FixTime Limit

    You have 1 Hourto complete this Assessment.

    Scenario

    Two years have elapsed since the commissioning of the New England Pharmaceuticalsoffice building. You are a Break/Fix Technician assigned to this customer site. Theowner of this office complex has contacted your District Office to report the FACP isreporting multiple troubles. You obtain the latest file on record for Patriot Place fromyour dispatch.

    Instructions

    Based on this information and knowledge you have gained during your practiceexercises and the previous assessment:

    Leave the Room for a Brief Break

    1. Restore the Instructor provided 222x002Ajob file. (Do not download the job to yourpanel.)

    2. Perform the required troubleshooting to resolve all troubles.

    3. Call the instructor to your workstation for grading when you are finished.

    Patriot Place Job

    Call was received: 9:00AM Wednesday

    Project number: 020979

    Order number: 7929

    Job number: 222U002A

    Location: Abu Dhabi

  • 7/26/2019 Asessment Book - ME

    18/41

    4100ES Fire Alarm System Technician Training

    Equipment being installed: None at this time

    Customer RequestedSoftware Change(s): The Wrong Floor Annunciates when a

    call is placed from the Remote

    Firefighter Phone.

    The 3rd Floor Speaker Switch does

    not work.

    Customer RequestedHardware Change(s): None at this time

  • 7/26/2019 Asessment Book - ME

    19/41

    4100ES Fire Alarm System Technician Training

    Assessment 2-2: Task Checklist

    Task Milestone Customer

    1. Troubleshoot and correct

    deficiency

    Student finds, corrects, and reportsdeficiencies

    Customer

    Did the Technician find and fix theproblems on my FireAlarm System?

    2. Troubleshoot and correct

    deficiency

    3. Troubleshoot and correct

    deficiency

    4. Troubleshoot and correct

    deficiency

    5. Complete the work on time The work was completed on time

    CustomerWas the work donein the specifiedtime?

  • 7/26/2019 Asessment Book - ME

    20/41

    4100ES Fire Alarm System Technician Training

    Assessment 3-1: Skyway Motors Installation/Commissioning

    Time Limit

    You have 1 Hour and 15 Minutesto complete this Assessment.

    Scenario

    Part of your commissioning assignment for the Skyway Motors High-Rise job is to meet

    the customers request to add a bank of elevators to their 4100ES Fire Alarm System.You are also asked to add an Audio WalkTest Group.

    Call the instructor to your workstation when you are finished.

    IMPORTANT: Double-check your work! You will not be able to make changes toyour job once the instructor grades your work.

    InstructionsOpen job file PRAC7Aand save as 113U001Aand then update the job with information

    provided in this assessment.

    Skyway Motors Job

    Project number: 032952

    Order number: 6151

    Job Number: 113U001A

    Location: 1121 Skyway Motors, Dubai

    Customer: Scott Anderson

    Contractor: Daigneault Do it All Construction

  • 7/26/2019 Asessment Book - ME

    21/41

    4100ES Fire Alarm System Technician Training

    Equipment Being Installed: An 8-Point Relay Card 4100-3206 tocontrol Primary, Alternate, and Shunt

    Trip for the elevator located in

    Building 2.

    The Relay Card will be located in the

    Main Fire Panel, Bay 2, Block F.

    The following will be building 2

    Elevator Lobby Detectors. Edit the

    labels accordingly

    M1-2 Smoke Detector First Floor Lobby

    M1-3 Smoke Detector Second Floor Lobby

    M1-6 Smoke Detector Third Floor Lobby

    M1-5 Heat Detector Machine Room

    Panel Operation:

    An alarm reported from the Second orThird Floor Lobby detector is to

    activate the Primary Elevator Capture

    Relay and turn ON the Annunciator LED

    labeled Elevator Primary.

    An alarm reported from the Firstfloor Lobby Detector is to activate

    the Alternate Elevator Capture Relay

    and turn ON the Annunciator LEDlabeled Elevator Alternate.

    An alarm reported from the MachineRoom detectoris to activate the

    Shunt Trip Relay and turn ON the

    Annunciator LED labeled Elevator

    Shunt Trip.

    An Annunciator Switch shall beprogrammed to bypass the elevator

    operation for Building 2.

    An LED shall be programmed toannunciate the bypass and a Trouble

    shall be reported at the Main Panel

  • 7/26/2019 Asessment Book - ME

    22/41

    4100ES Fire Alarm System Technician Training

    Other Requirements: Program an Audio WalkTest Group fortesting Building 1 devices (to enable

    customer to perform future maintenance/

    testing).

    Specific Job Information: Building 1 Devices shall be:

    M1-1 Pull Station

    M1-6 Smoke Sensor

    Building 1 Speakers shall be:

    2ND and 3RD Floor Speakers

    Program a Switch and LED(labeled as Elevator Bypass )on the INFOALARM Displayto Bypass this elevator operation.

  • 7/26/2019 Asessment Book - ME

    23/41

    4100ES Fire Alarm System Technician Training

    Assessment 3-1: Task Checklist

    Task Milestone Customer

    1. Add a 4-Point Flat Relay

    Card

    Elevator is operationalCustomerDoes my elevator

    function properly?

    2. Program the Annunciator Successfully programmed AnnunciatorCustomerCan I operate myelevator?

    3. Add an Elevator Bypass

    SwitchElevator Bypass Switch operational

    MultipleCan I Bypass ElevatorOperation to do my

    job?

    4. Program and Test

    an Audio WalkTest GroupAble to Program and Test an AudioWalkTest Group

    TechnicianCan I now use theAudio WalkTestFeature?

    5. Meet with Authority Having

    Jurisdiction*Satisfy AHJs request(s)

    AHJDoes this work meetmy requirements?

    6. Enable the Customer to

    achieve occupancy at the

    agreed upon time.

    The job was completed on time

    CustomerWas I able to getoccupancy on time?

    * After you complete the other tasks, let your instructor know you are ready for ameeting with the AHJ.

  • 7/26/2019 Asessment Book - ME

    24/41

    4100ES Fire Alarm System Technician Training

    Assessment 3-2: Skyway Motors Service/Break-Fix

    Time Limit

    You have 30 Minutesto complete this Assessment.

    Before You Begin

    Restore Instructor provided job file 223U002A (do not download this job to your panel).

    Scenario

    Two years later you are dispatched to the Skyway Motors high-rise for a report of a

    Bypass Switch not working on Elevator Bank 2 Located on Box 2 Bay 2 set of switches.You plan to troubleshoot this issue to determine if it is a problem that you areresponsible for. If so, you must make on-site repairs necessary to restore the BypassSwitch functionality.

    Call the instructor to your workstation when you are finished with this assessment.

    IMPORTANT: Double-check your work! You will not be able to make changes toyour job once the instructor grades your work.

    Call was received: 8:00AM Thursday

    Project number: 032952

    Order number: 6151

    Job number: 223U002A

    Location: Skyway Motors, DubaiCustomer: Scott Anderson

    Equipment being installed: None at this time

    Customer RequestedSoftware Change(s): N t thi ti

  • 7/26/2019 Asessment Book - ME

    25/41

    4100ES Fire Alarm System Technician Training

  • 7/26/2019 Asessment Book - ME

    26/41

    4100ES Fire Alarm System Technician Training

    Assessment 3-2: Task Checklist

    Task Milestone Customer

    1. TroubleshootDetermine the root cause of theproblem and then if needed, restoreNormal Functionality

    CustomerIs my ElevatorBypass Switch backto normal?

    2. Answer Customer

    Question at end of first

    Section.

    Successfully answer customer questionafter troubleshooting FACP

    Customer

    Did the Techniciansufficiently answermy question?

    3. Complete the Work in a

    Timely MannerThe work was completed in a timelymanner

    CustomerWas this work donequickly?

  • 7/26/2019 Asessment Book - ME

    27/41

    4100ES Fire Alarm System Technician Training

    Assessment 3-3:Palace Project

    Service/Break-FixTime LimitYou have 30 Minutesto complete this Assessment.

    Scenario

    Your office calls you (while in the middle of your Skyway Motors job). They request that

    you drop everything and immediately travel to Presidential Sheik Palace. The reportstates that a gentleman was smoking a big cigar in the Lobby Area in Building 1. Anobservant elevator attendant saw a large amount of smoke around the smoke sensor,but was surprised when the Fire Alarm System did not go into Alarm.

    Instructions

    Restore Instructor provided job file 223U003A (do not download this job to your panel).

    Call the instructor to your workstation when you are finished.

    IMPORTANT: Double-check your work! You will not be able to make changes toyour job once the instructor grades your work.

    Call was received: 8:10AM Thursday

    Project number: 012345

    Order number: 6151

    Job number: 223U003A

    Location: AbuDhabi, U.A.E

    Customer: State Government

    Equipment being installed: None at this time

    Customer RequestedSoftware Change(s): None at this time

    Customer RequestedHardware Change(s): N t thi ti

  • 7/26/2019 Asessment Book - ME

    28/41

    4100ES Fire Alarm System Technician Training

    Assessment 3-3: Task Checklist

    Task Milestone Customer

    1. Explain to the customer why

    the Fire Alarm System did

    not go into alarm

    Satisfy the customer with your answerCustomerDo I understandwhy this happened?

    2. Complete this Service

    Interaction in a TimelyManner

    Completed in a timely manner

    CustomerWas I satisfied withthe results of thisService Interaction?

    When you are finished with this Assessment,return to Assessment 3-2 for completion.

  • 7/26/2019 Asessment Book - ME

    29/41

    4100ES Fire Alarm System Technician Training

    Assessment 4-1:Ruwais Burooj 1

    Installation/CommissioningTime Limit

    You have 2 Hoursto complete this Assessment.

    Scenario

    Longtime customer Burooj1 is adding a staff accommodation to their facility. Due totheir location in Ruwais where sandstorms are prevalent, they are specificallyrequesting that Weather Alert audio messages override Fire Alarm Audio.

    Instructions

    1. Open job file PRAC11Aand save it as 114U001A.

    2. Create the appropriate Ladder Logic to meet your customer requirements.

    3. Call the instructor to your workstation when you are finished.

    4. For this exercise you are mentoring a new technician. Be prepared to explain allaspects of this service call.

    IMPORTANT: Double-check your work! You will not be able to make changes toyour job once the instructor grades your work.

  • 7/26/2019 Asessment Book - ME

    30/41

    4100ES Fire Alarm System Technician Training

    Assessment 4-1: Task Checklist

    Task Milestone Customer

    1. Program Weather Alert to

    override a Fire Alarm

    Message

    Meet customer requirement

    CustomerDoes the WeatherAlert Override the

    Fire AlarmMessage?

    2. Explain programming to a

    new Technician that you are

    mentoring

    Explain Ladder Logic

    New TechnicianDo I understandthis ladder logic?

    3. Enable the Customer to

    achieve occupancy at the

    agreed upon time.

    The job was completed on time

    CustomerWas the job

    completed on time?

    S S

  • 7/26/2019 Asessment Book - ME

    31/41

    4100ES Fire Alarm System Technician Training

    Assessment 5-1: Jeffery P. Malone Memorial Hospital Installation/Commissioning

    Time Limit

    You have 1 Hourto complete this Assessment.

    ScenarioYou just finished installing a complete Fire Alarm System featuring 4100ES Panels atthe Jeffery P. Malone Memorial Hospital. Your District procedure is for you to generateand print a TrueAlarm Service Report and save it to your Offices drive. Aftergenerating this report, Gordon, one of your districts inspectors, looks over yourshoulder and begins asking questions.

    Call the instructor to your workstation when you are finished generating the report.

    IMPORTANT: Double-check your work! You will not be able to make changes toyour job once the instructor grades your work.

    4100ES Fi Al S t T h i i T i i

  • 7/26/2019 Asessment Book - ME

    32/41

    4100ES Fire Alarm System Technician Training

    Assessment 5-1: Task Checklist

    Task Milestone Customer

    1. Generate a TrueAlarm

    Service Report

    Was able to generate an TrueAlarm

    Service Report

    District OfficeDid the Technicianfollow our setprocedures?

    2. Answer Inspector QuestionsAppropriately answered Inspector

    questions

    Inspector

    Do I understandbasic TrueAlarmConcepts afterspeaking with thisTechnician?

    3. Enable the Customer to

    achieve occupancy at the

    agreed upon time.

    The job was completed on time

    CustomerWas the jobcompleted on time?

    4100ES Fire Alarm System Technician Training

  • 7/26/2019 Asessment Book - ME

    33/41

    4100ES Fire Alarm System Technician Training

    Assessment 5-2: Jeffery P. Malone Memorial Hospital

    Time Limit

    You have 40 Minutesto complete this Assessment.

    Scenario

    Your task is to program the second floor smoke evacuation equation. This equationshould override the energy management programming and have the second floorpositively pressurized and the first and third floors negatively pressurized when an

    alarm is reported from the second floor.

    Instructions

    1. Open the job file PRAC7Aand save it as 225U002A.

    2. Add an 8 point relay card on Bay 2 and label as following

    Relay 1 labeled - 1STFLOOR SUPPLY

    Relay 2 labeled - 1ST FLOOR EXHAUST Relay 3 labeled - 2ND FLOOR SUPPLY

    Relay 4 labeled - 2ND FLOOR EXHAUST

    Relay 5 labeled - 3RD FLOOR SUPPLY

    Relay 6 labeled - 3RD FLOOR EXHAUST

    3. Write the equation necessary to override the energy management programming

    (which cycles the supply and exhaust fans ON and OFF every 15 minutes betweenthe hours of 8AM and 5PM at a Priority 9,9) when an alarm is reported from thesecond floor.

    Your equation must negatively pressurize the second floor and positively pressurizethe first and third floors when an alarm is reported on the second floor.

    4. Call the instructor to your workstation when you are finished.

    IMPORTANT: Double-check your work! You will not be able to make changes toyour job once the instructor grades your work.

    4100ES Fire Alarm System Technician Training

  • 7/26/2019 Asessment Book - ME

    34/41

    4100ES Fire Alarm System Technician Training

    Assessment 5-2 Task Checklist

    Task Milestone Customer

    1. Add and Program the Relay

    Card into the Programmer

    The card was configured into the

    Programmer

    CustomerIs this informationaccurate and in theproper location?

    2. Create the Custom Control

    Equation

    The equation was created and the

    system was validated

    CustomerDoes my systemfunction as

    planned?

    3. Enable the Customer to

    achieve occupancy at the

    agreed upon time.

    The job was completed on time

    CustomerWas the jobcompleted on time?

    4100ES Fire Alarm System Technician Training

  • 7/26/2019 Asessment Book - ME

    35/41

    4100ES Fire Alarm System Technician Training

    Assessment 6: Michael J. Pinder Regional Airport Service/Break-Fix

    Time Limit

    You have 30 Minutes complete this Assessment.

    Scenario

    You and your team member are Break/Fix Technicians assigned to a call at the MichaelJ. Pinder Regional Airport. You had a request to disable a point within Terminal 2. Thecustomer has also requested information on Alarm Verification Tallies. This feature wasconfigured a year ago when the Fire Alarm System was commissioned and the

    customer is curious if the feature has been activated.

    Instructions

    1. Disable the AHU Relay in Terminal 2 (located a mile away from your location in the

    Airports main hub).

    2. Generate the appropriate report and discuss the results with your customer.

    Call the instructor to your workstation when you are finished.IMPORTANT: Double-check your work! You will not be able to make changes to

    your job once the instructor grades your work.

    4100ES Fire Alarm System Technician Training

  • 7/26/2019 Asessment Book - ME

    36/41

    4100ES Fire Alarm System Technician Training

    Assessment 7-1: Service Gateway

    1. How many user accounts can be active at a single time on the Service Gateway?

    A. 1

    B. 2

    C. 3

    D. 4

    2. True or False A Service Gateway session must always be initiated at the ServiceGateway computer. ___________

    3. The Service Gateway Feature is compatible with:A. Only 4100ES Panels

    B. Only 4100ES and 4100U Panels

    C. Any Simplex Fire Alarm Panel with Command Line Prompt capabilities

    D. Only Legacy Panels with Command Line Prompt capabilities

    4. This Command initiates a Service Gateway Session from a Remote Device:A. Gatepass

    B. Host

    C. Terminal

    D. Show

    5. Describe a customer site where you could use Service Gateway software toincrease your productivity. (If you do not have an applicable current customer site,describe a future opportunity where the software would be useful):

    6. Explain a customer site where you either would not or could not use ServiceGateway software. Why?

    4100ES Fire Alarm System Technician Training

  • 7/26/2019 Asessment Book - ME

    37/41

    4100ES Fire Alarm System Technician Training

    4100ES Fire Alarm System Technician Training

  • 7/26/2019 Asessment Book - ME

    38/41

    y g

    Tyco Fire Protection Products

    Office Park Building #56, Dubai Internet City / Dubai / United Arab Emirates

    4100ES Technician Core Competency Score Sheet

    Student Name ______________________ District Office ________________________

    Instructor: For each Required Core Competency, add you initials to appropriate Assessment Checkbox and initial the Complete box for each when student proves competency

    Required Core CompetencyAssessment Locations

    1-1 1-2 2-1 2-2 3-1 3-2 3-3 4-1 4-2 5-1 5-2 6-1 6-2 7-1 Complete

    1. Perform a CFIG Download

    2. Test System Operation AgainstCustomer Specification AfterMaking Program Changes

    3. Add and Configure Cards in theProgrammer*

    4. Add and Program anIDNet Device*

    5. Program Control Points(NACs and Relays)

    6. Program Access Levels for4100ES Features

    7. Program Passcodes for EndUsers

    8. Program System Options

    9. Address System Components

    10. Import an Audio Chipset

    11. Use and Explain the InstallMode Feature to a Contractor

    12. Program an AnnunciatorUsing High Level Modes

    * Definitions used for the competencies in this course:Configure:Hardware programming (e.g., Class A vs. B NACs on a Power Supply, Adding Mezzanine Cards)Program: Programming device or system functionality (Editing Point Lists, writing SMPL, modifying point and device types

    4100ES Fire Alarm System Technician Training

  • 7/26/2019 Asessment Book - ME

    39/41

    y g

    Tyco Fire Protection Products

    Office Park Building #56, Dubai Internet City / Dubai / United Arab Emirates

    4100ES Technician Core Competency Score Sheet (Continued)Required Core Competency

    Assessment Locations

    1-1 1-2 2-1 2-2 3-1 3-2 3-3 4-1 4-2 5-1 5-2 6-1 6-2 7-1 Complete

    13. Program an AnnunciatorUsing Low Level Modes14. Interpret and Explain SystemOperation to an End User

    15. Restore a Job File

    16. Troubleshoot aCard Missing/Failed Trouble byRuling Out Five Probable CausesBefore Replacing the Card

    17. Troubleshoot ProgrammingIssues Using Features

    Built-In to the Programmer

    18. Troubleshoot a Field WiringIssue

    19. Restore System to a PreviousWorking Version

    20. Execute a Programming Planusing a Wizard

    21. Create and Explain a DBCompare Report

    22. Create and Utilize User PointLists, when Necessary

    23. Utilize System Point Lists,when Appropriate

    4100ES Fire Alarm System Technician Training

  • 7/26/2019 Asessment Book - ME

    40/41

    Tyco Fire Protection Products

    Office Park Building #56, Dubai Internet City / Dubai / United Arab Emirates

    4100ES Technician Core Competency Score Sheet(Continued)

    Required Core CompetencyAssessment Locations

    1-1 1-2 2-1 2-2 3-1 3-2 3-3 4-1 4-2 5-1 5-2 6-1 6-2 7-1 Complete

    24.Create a Ladder LogicDiagram from a Job Specification

    25. Explain expected system

    operation using a Ladder LogicDiagram

    26. Implement Programming Planin Custom Control Editor

    27. Generate and Explain aTrueAlarm Service Report to anEnd User

    28. Use Control Priorities in

    Custom Control Programming30. Use Terminal Modecommands to Verify SystemOperation

    31. Explain When and Why theService Gateway would be Used

    This student has demonstrated all Core 4100ES Competencies and has achieved 4100ES Certification

    ________________________________________ __________________________Instructor Signature Date

    4100ES Fire Alarm System Technician Training

  • 7/26/2019 Asessment Book - ME

    41/41

    Tyco Fire Protection Products

    Office Park Building #56, Dubai Internet City / Dubai / United Arab Emirates