55
Site ID : ..... Site Name : ..... PO Number : ..... Item Number : ..... Area : ..... Check List GR BTS ACCEPTANCE TEST DOCUMENT No Item Check List Vendor Check List PMO I Cover Check List GR II Cover Doc ATP ( Foto Bangunan ) II I Doc. Acceptance Test Document ( ATP ) IV Doc. RFI Notice ( asli ) V BOQ Actual Measurement ( ttd Manager FOC PT.HS ) VI Doc. PO VI I Doc. Berita Acara Serah Terima Site VI II VSWR REPORT IX WALK TEST REPORT X FOTO DOCUMENTATION XI Doc. As Plan Drawing & As built Drawing

ATP Huawei 3G Rev1 Jan 2015.docx

  • Upload
    pr3m4n

  • View
    144

  • Download
    13

Embed Size (px)

DESCRIPTION

TELECOM

Citation preview

Site ID : .....Site Name : .....PO Number : .....Item Number : .....Area : .....

Check List GRBTS ACCEPTANCE TEST DOCUMENT

No ItemCheck List

VendorCheck List

PMOI Cover Check List GRII Cover Doc ATP ( Foto Bangunan )III Doc. Acceptance Test Document ( ATP )IV Doc. RFI Notice ( asli )V BOQ Actual Measurement ( ttd Manager FOC PT.HS )VI Doc. POVII Doc. Berita Acara Serah Terima SiteVIII VSWR REPORTIX WALK TEST REPORTX FOTO DOCUMENTATIONXI Doc. As Plan Drawing & As built Drawing

Jakarta, ……………………...2014

PT. Huawei Tech Investment PMO

SITE ACCEPTANCE DOCUMENT CHECKLIST

SITE ID / NAME : ..... / .....REGION / AREA : ..... / .....SITE TYPE : .....

Hereby stated description and item below refer to the documents attached have been approved for construction:

No. Table of ContentsChecked

RemarksHTI HS

1 BOQ

NodeB BOQ

2.1 NodeB ATP

Acceptance test

3.1 Installation Checklist

Indoor Installation Checklist

Outdoor Installation Checklist

4.1 Installation Checklist

Feeder System List

Fiber Optic list

4.2 BTS Commissioning Record

Network Parameter Checklist

4.3 Integration Test

Basic Service Checklist

4.4 Handover Test

4.5 24 Hours Stability Test

4.6 Alarm Query Test

4.7 Punch List Summary

5 VSWR Measurement

6 Site Documentation

7 Capture LMT

8 SIR Approve

PT. Huawei Services PT. Huawei Tech Investment

1 BOQ FOR NodeB

*Site BOQ will base on the actual materials that installed.

PT. Huawei Services PT. Huawei Tech Investment

Project Name : .....Customer : .....Site ID : .....Site Name : .....Site Type : .....Site Description : .....Date : .....

Type BTS 3900 BoQ

Material No. Code DescriptionBOQ

RemarkAs Plan

As Built

>> A1/1 BTS3900A WCDMA S1/1/1 (Band 1 2100M, CE U:128 D:128, DC -48V)BTS3900A 02113169 BTS3900 Cabinet (DC -48V) 0 0 ExistingBBU 02315848 BBU Box 0 0 Existing

WRFU 02319231MARP RFU V100R102,WD5MWFUB81,Multi-Carrier Transceiver Unit(EDHT 80W,Band1,RX1920-1980/TX2110-2170MHz),9U

3 3 New

WBBP 03020GSA WCDMA Base Band Processing & Interface Unit 1 1 New

WMPT 03020JQE WCDMA Main Processing & Transmission Unit (4E1 + 2FE), 1*1 1 1 New

UBRI 03052995 Universal Broadband Radio Interface 0 0 NA

04012542 Internal Cable Set, BTS3900, Single Cabinet Internal Cable Set 0 0 NA

>> B1/1 BTS3900A WCDMA S1/1/1 (Band 1 2100M, CE U:128 D:128, DC -48V)

Auxiliary Kit 02239275 3900 Series BTS Macro, Site Auxiliary Material Kit (G/U/L) 0 0 Existing

Auxiliary 04046100Single Cable, Shielding Straight Through Cable, 10m, MP8-IV, CC4P0.5P430U (S), MP8-IV, LSZH

0 0 NA

Auxiliary 04070012Signal Cable, Shielded Straight Through Cable, 10m, MP8-II, CC4P0.5GY(S), MP8-II, FTP

0 0 NA

Auxiliary 29040316Blank Label, DB0699, Huawei D Blank Cable Label, 40 Groups 40 Pcs, 4 Colum*10 Rows

0 0 NA

Auxiliary 29041060 Signal Cable Label 1 1 NewAuxiliary 29041061 Power Cable Label 1 1 New

>> >> BTS3900A WCDMA S1/1/1 (Band 1 2100M, CE U:128 D:128, DC -48V)

Trunk Cable 04120119Trunkcable,20m,120ohm,4E1,0.4mm,D26M(3ROW),120CC8P0.4P430U(S)

0 0 Existing

Jumper Cable

04130029 RF Cable,4.0m,7/16DIN50AM,COAX50-8.7/3.55B,DIN50SM-II 0 0 Existing

CPRI 2M 04050098Outsourcing Cable,SFP High Speed Transmission Cable,2.0m,SFP20M,CC2P0.32B,SFP20M,For Indoor

3 3 New

Feeder Kit 022367607/8" Aluminium Feeder Kit,Antenna Jumper Included,General Area

0 0 Existing

Feeder 7/8” 25070134Coaxial Cable,Smooth Copper Tube,50ohm,27.8mm,21.5mm,9.3mm,Black, 7/8" Aluminium Cable,With a package exempted from fumigating

0 0 Existing

Semi Rigid Semi Rigid Cable 6 6 New

Grounding Unit

21120291 Grounding Unit 0 0 Existing

Base Frame 21150604 HERT Cabinet Base 0 0 Existing

Blue 16mm 25030533 Wire, 450/750V, 227 IEC 02 (RV) 16mm^2, black, 85A 10 10 New

Black 16mm 25030535 Wire, 450/750V, 227 IEC 02 (RV) 16mm^2, blue, 85A 10 10 New

Grounding Cable

25030429 Wire,450/750V,60227 IEC 02(RV)16mm^2,yellow green,85A 10 10 New

NodeB ATP

REGION / AREA : ..... / .....

SITE ID : .....

SITE NAME : .....

SITE TYPE : .....

PT. Huawei Services PT. Huawei Tech Investment

2.1 Acceptance test

Test category Test item Test sub-item Test result

T01

Hardware

T01-01

Hardware Status Check

T01-0101

Power-on Check of the BBU□Pass □Fail □NA

T01-0102

Power-on Check of the RRU□Pass □Fail □NA

T01-0103

Power-on Check of Boards-BTS3900A

□Pass □Fail □NA

T01-0104

Power-on Check of Boards-BTS3900

□Pass □Fail □NA

T01-0105

Power-on Check of Heat Exchanger

□Pass □Fail □NA

T01-0106

Status Check of Boards□Pass □Fail □NA

T01-0107

Status Check of E1/T1 Ports of IuB Interface

□Pass □Fail □NA

T01-0108

Status Check of Optical Modules of CPRI Interface

□Pass □Fail □NA

T01-0109

Status Check of Local Ethernet Port

□Pass □Fail □NA

T01-0110

Status Check of Ethernet Ports of IuB interface

□Pass □Fail □NA

T02

Fiber Optic Feeder

T02-01

Fiber Optic Check

T01-0101

Check Fiber optic feeder length and overall insertion loss compliance to design using OTDR. Create PDF certification report for handover pack and .SOR file for reference.

□Pass □Fail □NA

T01-0102

Check insertion loss and reflectance of each network component/event using OTDR. Create PDF certification report for handover pack and .SOR file for reference.

□Pass □Fail □NA

T01-0103Check all LC feeder connectors are clean and free from dust, moisture, contamination and scratches and meet IEC-61300-3-35. Create consolidated certificate report of connector for handover pack.

□Pass □Fail □NA

T01-0104

Check BBU, RRU TX ports are clean and free from dust, moisture, contamination and scratches and meet IEC-61300-3-35. Create consolidated certificate report of connector for handover pack.

□Pass □Fail □NA

T02

Operation and Maintenance

T02-01

User Permission Management

T02-0101

Login Management□Pass □Fail □NA

T02-0102

Locking Local Maintenance Terminal

□Pass □Fail □NA

T02-0103

Configuration Privilege□Pass □Fail □NA

T02-02

Software Version Management

T02-0201

Querying NodeB Software Version

□Pass □Fail □NA

T02-0202

Querying Active NodeB Versions

□Pass □Fail □NA

T02-0203

Querying Board Version□Pass □Fail □NA

T02-0204

Downloading NodeB Software Package

□Pass □Fail □NA

T02-0205

Downloading BootRom Package

□Pass □Fail □NA

T02-0206

Synchronizing Software Version

□Pass □Fail □NA

T02-0207

Activating NodeB Software□Pass □Fail □NA

T02-0208

Activating BootRom Package

□Pass □Fail □NA

T02-0209

Upgrading the NodeB Through the M2000

□Pass □Fail □NA

T02-03

License File Management

T02-0301

Distributing a License File to the NodeB

□Pass □Fail □NA

T02-04

Equipment Management

T02-0401

System Restart□Pass □Fail □NA

T02-0402

Querying NodeB Type□Pass □Fail □NA

PT. Huawei Services PT. Huawei Tech Investment

T02-0403

RFU Reset□Pass □Fail □NA

T02-0404

Board Blocking and Unblocking

□Pass □Fail □NA

T02-0405

NodeB Time Management□Pass □Fail □NA

T02-0406

NodeB Time Zone Management

□Pass □Fail □NA

T02-0407

NodeB SNTP Management□Pass □Fail □NA

T02-0408

RFU TX Switch Management

□Pass □Fail □NA

T02-0409

Hot Plugin on CPRI Port□Pass □Fail □NA

T02-0410

Maintenance of the Power Supply System

□Pass □Fail □NA

T02-0411

Maintenance of the RRU Power System

□Pass □Fail □NA

T02-0412

Maintenance of the NodeB Clock

□Pass □Fail □NA

T02-0413

Querying NodeB Abnormal Status

□Pass □Fail □NA

T02-05

IuB Interface Management

T02-0501

E1/T1 Link Management□Pass □Fail □NA

T02-0502

IMA Group Management□Pass □Fail □NA

T02-0503

Ethernet Link Management□Pass □Fail □NA

PT. Huawei Services PT. Huawei Tech Investment

T02-0504

IP Transmission Layer Link Management

□Pass □Fail □NA

T02-0505

Standard Protocol Tracing at IuB Interface

□Pass □Fail □NA

T02-0206

Sector Management□Pass □Fail □NA

T02-0507

Local Cell Management□Pass □Fail □NA

T02-0508

Local Cell Operations□Pass □Fail □NA

T02-0509

CE Consumption of R99 AMR12.2K Service

□Pass □Fail □NA

T02-0510

CE Consumption of R99 VP Service

□Pass □Fail □NA

T02-0511

CE Consumption of R99 PS384K Service

□Pass □Fail □NA

T02-0512

CE Consumption of HSDPA Service

□Pass □Fail □NA

T02-06

Maintenance Channel Management

T02-0601

Local Maintenance through Local Ethernet Port

□Pass □Fail □NA

T02-0602

Remote Maintenance through Omch Channel

□Pass □Fail □NA

T02-0603

BootP Funcion□Pass □Fail □NA

T02-07

File management

T02-0701

Uploading Data configuration File

□Pass □Fail □NA

T02-0702

Dowloading Data Configuration File

□Pass □Fail □NA

PT. Huawei Services PT. Huawei Tech Investment

T02-08

Configuration Management

T02-0801

Checking NodeB Data Consistency

□Pass □Fail □NA

T02-0802

RTWP Measurement Monitoring

□Pass □Fail □NA

T02-0803

CPU/DSP Usage Monitoring

□Pass □Fail □NA

T02-0804

RFU Temperature Monitoring

□Pass □Fail □NA

T02-0805

Cell Service Resource Query

□Pass □Fail □NA

T02-0806

RFU Output Power Monitoring

□Pass □Fail □NA

T02-0807

Board Service Resource Query

□Pass □Fail □NA

T02-09

Alarm Management

T02-0901

Alarm Query□Pass □Fail □NA

T02-10

Typical Alarms

T02-1001

NE Startup□Pass □Fail □NA

T02-1002

NE Shutdown□Pass □Fail □NA

T02-1003

NodeB Software Download Start / Finish

□Pass □Fail □NA

T02-1004

Board Startup□Pass □Fail □NA

T02-1005

Board Fault Alarm□Pass □Fail □NA

T02-1006

E1/T1 Loss of Signal□Pass □Fail □NA

T02-1007

E1/T1 Remote Alarm Indication

□Pass □Fail □NA

PT. Huawei Services PT. Huawei Tech Investment

T02-1008

IMA/UNI Link Loss of Cell Delineation

□Pass □Fail □NA

T02-1009

CCP Fault□Pass □Fail □NA

T02-1010

Tx Branch Switch off Manually

□Pass □Fail □NA

T02-1011

RFU VSWR Abnormal□Pass □Fail □NA

T02-1012

NodeB Clock Source Abnormal

□Pass □Fail □NA

T02-1013

FE Interface Fault Alarm□Pass □Fail □NA

T02-1014

External Alarm□Pass □Fail □NA

T03

Synchronization

T03-01

Extracting Clock Signal from IuB Interface

T03-0101

Extracting Clock Signal from E1/T1 IuB Interface

□Pass □Fail □NA

T03-0102

Extracting Clock Signal from IP IuB Interface

□Pass □Fail □NA

T03-02

Free-Run

T03-0201

Free-Run□Pass □Fail □NA

T04

Antenna System

T04-01

AISG ALD Management

T04-0101

TMA Maintenance□Pass □Fail □NA

Conclusion: Totally 64 items included for acceptance test, in which ____passed, ____ failed, and ____ were not applicable.

PT. Huawei Services Representative PT. Huawei Tech Investment Representative

Signature:__________________ Signature:__________________

Date:______________________ Date:______________________

PT. Huawei Services PT. Huawei Tech Investment

3.1 Installation Checklist

Indoor Installation Checklist

SITE: ….. SITE CONFIG: _/_/_ DATE: DD/MM/YYYY

Equipment overall condition

Procedure Pass Fail N/A Remark Audit

1 Visually inspect the cabinets for any damage.

2 Check that the cabinet doors and locks operate correctly. (applicable for outdoor Equipment)

Remarks

Site Documentation

Procedure Pass Fail N/A Remark Audit

3Check that the equipment is installed according to the as plan site design package.

4 Check that the indoor cable ladder is installed according to the as plan side design package (applicable for Indoor Equipment)

Civil Works Check

Procedure Pass Fail N/A Remark Audit

5 Check that the cabinets have been securely fastened and are leveled correctly.

6Check that indoor cable ladder above the cabinet has been installed correctly (applicable for Indoor Equipment).

7 Check that the DDF are grounded to the main grounding bus bar.

Remarks

Equipment Specific Checks

Procedure Pass Fail N/A Remark Audit

8 Check that all equipment internal cables are correctly installed and labeled.

9 Check that the cabinet blanking panels have been installed.

PT. Huawei Services PT. Huawei Tech Investment

Cabinet External Cabling Check

Procedure Pass Fail N/A Remark Audit

10 Check each the equipment rack is grounded to the main grounding bus bar and labeled.

11 Check that the A-Bis and A PCM cables are connected to the correct position of DDF.

12Check that the alarm cabling has been connected from the BTS to the DDF

13 Check that the extension cabinet cables are correctly connected and labeled.

14Check fiber optic link length and qualify overall loss (dB) and individual loss of each network component/event using OTDR. Create PDF certification report for handover pack and .SOR file for reference.

15Check All fiber optic connectors are clean and free from dust, moisture, contamination and scratches. Create consolidated certificate report of connector endface standard IEC-61300-3-35 for handover pack.

16Check power level BBU Transmitter (TX) port before connection of feeder jumpers.

16 Check that the feeder jumper cables are tightened all the NodeB.

17Check that the external cabinet cabling has been cable tied to the cable ladder.

18 Check that the indoor feeder cable labeling is correct.

19 Check that the DC power cable is the correct size and is terminated correctly.

20 Check the transmission cables, DC Cables and feeder jumpers are be correctly labeled

21 Check that accessory equipment is installed correctly.

Remarks

Final Checks

Procedure Pass Fail N/A Remark Audit

20 Check that all installation and packing materials have been removed from the site.

Remarks

PT. Huawei Services PT. Huawei Tech Investment

Outdoor Installation Checklist

SITE: ….. SITE CONFIG: _/_/_ DATE: DD/MM/YYYY

Antennas

Procedure Pass Fail N/A Remark

21 Visually inspect the antennas and feeders for any installation damage.

22 Check that the correct type of antenna has been installed.

Remarks

Feeders

Procedure Pass Fail N/A Remark

23 Check that the bending radius of all feeders is greater than 20 x Ǿ.

24 Check that outdoor feeder labeling is correct at the top and the bottom of the tower.

25 Check that the top feeder grounding is correctly terminated.

Remarks

Connectors

Procedure Pass Fail N/A Remark

26 Check that all top feeder connectors are tight.

27 Check that all top feeders to jumper connections are tight.

28 Check that all top jumpers to antenna connections are tight.

Remarks

Weather sealing

Procedure Pass Fail N/A Remark

29 Check all top grounding kits are weather-sealed correctly.

30 Check all feeders to jumper connections are weather-sealed correctly.

31 Check all jumpers to antenna connections are weather-sealed correctly.

PT. Huawei Services PT. Huawei Tech Investment

Antenna Steelwork

Procedure Pass Fail N/A Remark

32 Check that the antenna supporting steelwork is correctly installed.

33 Check all antenna mounting clamps and brackets have been tightened.

Remarks

Antenna Installation Check

Procedure Pass Fail N/A Remark

34 Check that the antennas are mounted at the correct height.

35 Check that the direction of all antennas in all sectors is correct.

Remarks

Antenna Installation Date

Antenna Sector 1RXD12

Sector 2 Sector 3

Height

Direction

Down tilt M/E

Remarks

Outdoor Site Documentation

Procedure Pass Fail N/A Remark

36Check that the antenna layout is according to the site drawing.

37Check that the feeder cable ladder is installed as per the site drawing.

38Check that the feeder gland plate is installed as per the site drawing (applicable for Indoor Equipment)

Remarks

SITE: ….. SITE CONFIG: _/_/_ DATE: DD/MM/YYYY

Civil Works Inspection

Procedure Pass Fail N/A Remark

PT. Huawei Services PT. Huawei Tech Investment

39 Check that the feeder cable ladder is correctly

installed

40Check that the feeder grand plate has been correctly installed (applicable for Indoor Equipment).

Remarks

Feeder Grounding

Procedure Pass Fail N/A Remark

41 Check number/location of feeder grounding kits.

42 Check all bottom grounding are correctly terminated

43 Check all bottom grounding kits are weather sealed correctly.

Concluding Checks

Procedure Pass Fail N/A Remark

44 Check that all installation and packing materials have been removed from the site.

PT. Huawei Services PT. Huawei Tech Investment

4.1 Installation Checklist

Feeder System List

SITE: ….. SITE CONFIG: _/_/_ DATE: DD/MM/YYYY

VSWR TEST

No.RRU

BoardRRU Panel N port VSWR

Feeder Length(m)

Distance To Fault (DTF) Audit

1 RFU 0RFU _TXM

RFU _TXD

2 RFU 2RFU _TXM

RFU _TXD

3 RFU 4RFU _TXM

RFU _TXD

Notes:

1. VSWR value shall be referring to the specification manual from the supplier.2. Setting at site master for cable 7/8" (VF and cable loss shall refer to the specification manual from the supplier). 3. Setting at site master for cable 1-5/8" (VF and cable loss shall refer to the specification manual from the

supplier).4. VSWR ≤ 1.35. DTF test will be carried out according to the test procedure and test result included in the test documentation.

PT. Huawei Services PT. Huawei Tech Investment

4.2 BTS Commissioning Record

Network Parameter Checklist

SITE: ….. SITE CONFIG: _/_/_ DATE: DD/MM/YYYY

Cell parameter Plan Actual Remark

Sector 1

CI

Antenna direction (Azimuth)

Antenna Tilt (M+E) (Degree)

Sector 2

CI

Antenna direction(Azimuth)

Antenna Tilt (M+E) (Degree)

Sector 3

CI

Antenna direction(Azimuth)

Antenna Tilt (M+E)(Degree)

PT. Huawei Services PT. Huawei Tech Investment

4.3 Integration Test

Basic Service Checklist

SITE: ….. SITE CONFIG: _/_/_ DATE: DD/MM/YYYY

Basic Service Test

Cell No. Test Item Pass Fail Remark

Cell 1

Incoming Call (3G-3G)

Incoming Call (2G-3G)

Incoming Call (PSTN-3G)

Outgoing Call (3G-3G)

Outgoing Call (3G-2G)

Outgoing Call (3G-PSTN)

SMS Incoming

SMS Outgoing

HSDPA Browsing

HSDPA Downlink

Cell 2

Incoming Call (3G-3G)

Incoming Call (2G-3G)

Incoming Call (PSTN-3G)

Outgoing Call (3G-3G)

Outgoing Call (3G-2G)

Outgoing Call (3G-PSTN)

SMS Incoming

SMS Outgoing

HSDPA Browsing

HSDPA Downlink

Cell 3

Incoming Call (3G-3G)

Incoming Call (2G-3G)

Incoming Call (PSTN-3G)

Outgoing Call (3G-3G)

Outgoing Call (3G-2G)

Outgoing Call (3G-PSTN)

SMS Incoming

SMS Outgoing

HSDPA Browsing

HSDPA Downlink

PT. Huawei Services PT. Huawei Tech Investment

4.4 Handover Test

SITE: ….. SITE CONFIG: _/_/_ DATE: DD/MM/YYYY

Call Test

Origin

Cell

Target

Cell

Target Cell

Pass Fail Remark AuditARFCN/BCCH S-code/BSIC

CELL2

CELL3

CELL(2G)A

CELL1

CELL3

CELL(2G)B

CELL3

CELL1

CELL2

CELL(2G)C

CELL(2G)A CELL 1

CELL(2G)B CELL 2

CELL(2G)C CELL 3

Notes:

1. In the Target cell column, the parameter ARFCN &S-code is for 3G cell, the parameter BCCH &BSIC is for 2G cell.

2. Verify with the TOC if inter site neighbor relationship has been defined before test.3. GSM 2G cell mush add corresponding 3G neighbor cell.

PT. Huawei Services PT. Huawei Tech Investment

4.5 24 Hours Stability Test

Site Name: ….. Check Result:

OK--

This is to be confirmed that the BTS 3G has been running at least 24 hours without any related self fault.

Remarks

Notes: The 24 hours is to be done in TOC/NOC, which will be passed if NODEB is normal operation and no alarm.

PT. Huawei Services PT. Huawei Tech Investment

4.6 Alarm Query Test

Site Name: ….. Check Result:

OK--

1. This test will be done from OMC (Region TOC).2. This is to be confirmed that the BTS alarm is visible and there are no active alarms.

Remarks

Notes: if the site is no active alarms then write “OK, no active alarm”, otherwise record the alarm information in detail

PT. Huawei Services PT. Huawei Tech Investment

4.7 Punch List Summary

Site Name: ….. Check Result:

Note:Please record in detailed for testing items that unable to complete.

No. Items DescriptionRectified By

RemarkHTI HS

           

           

           

           

           

           

PT. Huawei Services PT. Huawei Tech Investment

NodeB Site BinderXL Rollout Project 2014

Site ID : …..Site Name : …..Site Type : …..BTS Type : …..Site Description: …..Proj Def : …..

CERTIFICATEof

Preliminary Acceptance It is agreed that, from to , the acceptance test

for site has been successfully held by both the PT. Huawei

Services and Huawei Tech Investment engineer.

It also had been proved by both parties that Huawei’s NodeB

equipments can fully satisfy the need of PT . XL AXIATA under the contract

and can be rightly put into full service.

PT. HUAWEI SERVICES PT. Huawei Tech Investment

Date Date

5 VSWR Measurement

1.0

1.1

1.2

1.3

1.4

1.5

1975 2000 2025 2050 2075 2100 2125 2150

Limit : 1.3

M1

V S W R3G_NGINGAS_SIDOARJO SECTOR 1 A

Model: S331D Serial #: 00914148Date: 04/27/2010 Time: 12:49:06Std: UMTS IV Uplink(Gener (_) Channel: N/AResolution: 517 CAL:ON(COAX) CW: ON

VS

WR

Frequency (1970.0 - 2170.0 MHz)

M1: 1.226 @ 1985.116 MHz

1.00

1.05

1.10

1.15

1.20

1.25

1.30

0 5 10 15 20 25 30 35 40 45

Limit : 1.05

M1 M2 M3 M4

D istance-to -fau lt3G_NGINGAS_SIDOARJO SECTOR 1 A

Model: S331D Serial #: 00914148 Prop.Vel:0.890Date: 04/27/2010 Time: 12:49:28 Ins.Loss:0.080dB/mStd: UMTS IV Uplink(Gener (_) Channel: N/AResolution: 517 CAL:ON(COAX) CW: ON

VS

WR

Distance (0.0 - 45.0 Meter)

M1: 1.009 @ .000 Meter M2: 1.016 @ 3.401 Meter M3: 1.04 @ 32.616 Meter M4: 1.09 @ 34.797 Meter

1.0

1.1

1.2

1.3

1.4

1.5

1975 2000 2025 2050 2075 2100 2125 2150

Limit : 1.3

M1

V S W R3G_NGINGAS_SIDOARJO SECTOR 1 B

Model: S331D Serial #: 00914148Date: 04/27/2010 Time: 12:51:07Std: UMTS IV Uplink(Gener (_) Channel: N/AResolution: 517 CAL:ON(COAX) CW: ON

VS

WR

Frequency (1970.0 - 2170.0 MHz)

M1: 1.286 @ 1991.318 MHz

1.00

1.05

1.10

1.15

1.20

1.25

1.30

0 5 10 15 20 25 30 35 40 45

Limit : 1.05

M1 M2 M3 M4

D istance-to -fau lt3G_NGINGAS_SIDOARJO SECTOR 1 B

Model: S331D Serial #: 00914148 Prop.Vel:0.890Date: 04/27/2010 Time: 12:51:23 Ins.Loss:0.080dB/mStd: UMTS IV Uplink(Gener (_) Channel: N/AResolution: 517 CAL:ON(COAX) CW: ON

VS

WR

Distance (0.0 - 45.0 Meter)

M1: 1.034 @ .000 Meter M2: 1.026 @ 3.314 Meter

M3: 1.026 @ 32.355 Meter M4: 1.07 @ 34.797 Meter

1.0

1.1

1.2

1.3

1.4

1.5

1975 2000 2025 2050 2075 2100 2125 2150

Limit : 1.3

M1

V S W R3G_NGINGAS_SIDOARJO SECTOR 2 A

Model: S331D Serial #: 00914148Date: Apr/27/2010 Time: 12:33:14Std: UMTS IV Uplink(Gener (_) Channel: N/AResolution: 517 CAL:ON(COAX) CW: ON

VS

WR

Frequency (1970.0 - 2170.0 MHz)

M1: 1.23 @ 1976.589 MHz

1.00

1.05

1.10

1.15

1.20

1.25

1.30

0 5 10 15 20 25 30 35 40 45

Limit : 1.05

M1 M2 M3 M4

D istance-to -fau lt3G_NGINGAS_SIDOARJO SECTOR 2 A

Model: S331D Serial #: 00914148 Prop.Vel:0.890Date: 04/27/2010 Time: 12:33:58 Ins.Loss:0.080dB/mStd: UMTS IV Uplink(Gener (_) Channel: N/AResolution: 517 CAL:ON(COAX) CW: ON

VS

WR

Distance (0.0 - 45.0 Meter)

M1: 1.011 @ .000 Meter M2: 1.041 @ 3.314 Meter

M3: 1.025 @ 32.529 Meter M4: 1.083 @ 34.797 Meter

1.0

1.1

1.2

1.3

1.4

1.5

1975 2000 2025 2050 2075 2100 2125 2150

Limit : 1.3

M1

V S W R3G_NGINGAS_SIDOARJO SECTOR 2 B

Model: S331D Serial #: 00914148Date: Apr/27/2010 Time: 12:36:15Std: UMTS IV Uplink(Gener (_) Channel: N/AResolution: 517 CAL:ON(COAX) CW: ON

VS

WR

Frequency (1970.0 - 2170.0 MHz)

M1: 1.236 @ 2117.674 MHz

1.00

1.05

1.10

1.15

1.20

1.25

1.30

0 5 10 15 20 25 30 35 40 45

Limit : 1.05

M1 M2 M3 M4

D istance-to -fau lt3G_NGINGAS_SIDOARJO SECTOR 2 B

Model: S331D Serial #: 00914148 Prop.Vel:0.890Date: 04/27/2010 Time: 12:35:45 Ins.Loss:0.080dB/mStd: UMTS IV Uplink(Gener (_) Channel: N/AResolution: 517 CAL:ON(COAX) CW: ON

VS

WR

Distance (0.0 - 45.0 Meter)

M1: 1.048 @ .000 Meter M2: 1.024 @ 3.401 Meter

M3: 1.046 @ 32.355 Meter M4: 1.056 @ 34.797 Meter

1.0

1.1

1.2

1.3

1.4

1.5

1975 2000 2025 2050 2075 2100 2125 2150

Limit : 1.3

M1

V S W R3G_NGINGAS_SIDOARJO SECTOR 3 A

Model: S331D Serial #: 00914148Date: 04/28/2010 Time: 12:51:16Std: UMTS IV Uplink(Gener (_) Channel: N/AResolution: 517 CAL:ON(COAX) CW: ON

VS

WR

Frequency (1970.0 - 2170.0 MHz)

M1: 1.21 @ 2052.658 MHz

1.00

1.05

1.10

1.15

1.20

1.25

1.30

0 5 10 15 20 25 30 35 40 45

Limit : 1.05

M1 M2 M3 M4

D istance-to -fau lt3G_NGINGAS_SIDOARJO SECTOR 3 A

Model: S331D Serial #: 00914148 Prop.Vel:0.890Date: 04/28/2010 Time: 12:50:51 Ins.Loss:0.080dB/mStd: UMTS IV Uplink(Gener (_) Channel: N/AResolution: 517 CAL:ON(COAX) CW: ON

VS

WR

Distance (0.0 - 45.0 Meter)

M1: 1.044 @ .000 Meter M2: 1.04 @ 3.401 Meter

M3: 1.022 @ 32.703 Meter M4: 1.062 @ 34.884 Meter

1.0

1.1

1.2

1.3

1.4

1.5

1975 2000 2025 2050 2075 2100 2125 2150

Limit : 1.3

M1

V S W R3G_NGINGAS_SIDOARJO SECTOR 3 B

Model: S331D Serial #: 00914148Date: 04/27/2010 Time: 12:30:30Std: UMTS IV Uplink(Gener (_) Channel: N/AResolution: 517 CAL:ON(COAX) CW: ON

VS

WR

Frequency (1970.0 - 2170.0 MHz)

M1: 1.255 @ 1989.092 MHz

1.00

1.05

1.10

1.15

1.20

1.25

1.30

0 5 10 15 20 25 30 35 40 45

Limit : 1.05

M1 M2 M3 M4

D istance-to -fau lt3G_NGINGAS_SIDOARJO SECTOR 3 B

Model: S331D Serial #: 00914148 Prop.Vel:0.890Date: 04/27/2010 Time: 12:30:06 Ins.Loss:0.080dB/mStd: UMTS IV Uplink(Gener (_) Channel: N/AResolution: 517 CAL:ON(COAX) CW: ON

VS

WR

Distance (0.0 - 45.0 Meter)

M1: 1.02 @ .000 Meter M2: 1.018 @ 3.314 Meter

M3: 1.055 @ 32.529 Meter M4: 1.058 @ 34.884 Meter

6 Site Documentation

REFER TO FILE List site picture ATP

DATA CAPTURE

1. RRU Physical Topology

2. Main Cabinet

3. Display VSWR

4. List Alarm

5. Display Locell

6. Display RRU Traffic Capability

7. Display Board Status

8. List NodeB Type

9. Display Cell Config

10.Display Software Version

11.Display License

12.Traffic