4

B2designguggenheimhelsinki.org/stageonegallery/pdfs/GH-2044447253...+10.00 +0.60 +12.00 +22.00 +8.00 +5.00 wc ahu ahu ahu ahu natural ventilation natural ventilation natural ventilation

Embed Size (px)

Citation preview

Page 1: B2designguggenheimhelsinki.org/stageonegallery/pdfs/GH-2044447253...+10.00 +0.60 +12.00 +22.00 +8.00 +5.00 wc ahu ahu ahu ahu natural ventilation natural ventilation natural ventilation
Page 2: B2designguggenheimhelsinki.org/stageonegallery/pdfs/GH-2044447253...+10.00 +0.60 +12.00 +22.00 +8.00 +5.00 wc ahu ahu ahu ahu natural ventilation natural ventilation natural ventilation

2.6

2.6

1.9

2.32.5

3.1

2.5

2.5

2.9

3.3

3.7

2.8

2.8

2.8

2.8

3.1

AA

BB

CC DD EE

FF FF FF

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

3.1

6.3

6.3

6.3

6.3

6.3

6.3

-0.3

-0.3

A1.1

A1.2

A1.3

A1.4

A2.1

A2.2

A2.3

A3

A4.1

A4.2

A5.1

A5.2

A5.3

A5.4

A5.5

A5.6

A5.7

A5.8

A5.9

A5.10

A5.11

B1.1

B1.2

B2.1

B2.4

B2.3

B2.2

B3.1B3.2

B3.3

B4.1

B4.2

B5.1

B5.2

C

D1

D2.1D2.2

D3.1D3.2

E1.1

E1.2

E1.3

E2.1

E2.2

E2.3

E3.1

E3.2

E3.3

F1.1F1.2

F1.3

F1.4

F3.3

F3.4

F3.1

F3.2

F4.1

F4.2

F4.3F4.4

F5.1

F3.1

F6.2

F6.3

F6.4

F6.5

F6.6

F7

LEVEL + 1

LEVEL + 1

LEVEL - 1

U5

L6.1

L6.2

H1

H2 - H4

H5

U3

G1

G2

G3

G4

G5

G6

G7

G8

G9

U2.10

H3

G5.1

G5.2

G1.1

G1.2

G2.1

G2.2

G2.3

G4.1

G4.2

G4.3

G4.4

G6.1

G6.2

G1.3

G2.4

G3.1

G3.2

H3

L1

L2

L3

L4.2

L4.1

L5

O1

O2

O3

O4

U4

U1.1

U1.2

U1.3

U1.4

U2.1U2.2

U2.4

U2.5

U2.6

U2.7

U2.8 U2.9

U2.11

F

A

A

B

B

C

C

D

E

D

E

F

G

H

H

G

LEVEL + 1

Exhibition Exhibition Galleries west wingnischenischenischesmal gemwinter gardenbig gemeast wingpassagepassagetechnical passage/exhibition cabinet

Programs and Events Entrance Flexible Performance/Conference Hall Flexible Performance/Conference Hall Green Room Control Room/Projection Booth Simultaneous Translation Booth Technican Office Movable Stage PlatformSeating, Stage, and Equipment Storage Dressing Rooms inclMultifunction Classroom/Laboratory Storage Multifunction Classroom/Laboratory

Multi-purpose Zone Project Space and / or Atrium

Visitor Services 1EntranceVisitor Screening/Bag Check Coat Check/Lockers Ticketing and Information Deak Storage

Retail Museum and Design Store Museum and Design Store Museum and Design Store Museum and Design Store _Offices Museum and Design Store _Stockroom

Dining Cafe/ Bar Receiving Catering Prep/Staging Area Formal Restaurant Catering Prep/Staging Area Receiving Kitchen Trash Room Storage Offices

Offices Administrative Offices Curatorial, Exhibition Design, Publications, Archivist Offices Education Offices Marketing and Development Offices Conference Rooms Shared Work Room/Copy Room/File Storage

Collections Storage and Management Art Storage Shipping/Receiving Crate Storage Uncrating/Staging Shared Art Prep/Conservation Studio and Equipment Storage Registrar, Conservation, Exhib. Design & Tech Offices

Maintenance and Operations Security Office/Control Room Custodial Office 20 1 staffIT Server, Workroom, and Staff Offices Supply, Equipment, and Seasonal Furniture Storage Landscape and Grounds Maintenance Equipment Staff Lunch Room/Lounge Locker Rooms

A

A1.1A1.2A1.3A1.4A2.1A2.2A2.3A3A4.1A4.2A5.1-A5.11

BB1.1B1.2B2.1B2.2B2.3B2.4B3.1B3.2-B3.3B4.1-B4.2B5.1B5.1

C

DD1D2.1D2.2D3.1D3.2

EE1.1E1.2E1.3E2.1-E2.3E3.1-E3.3

FF1.1F1.2F1.3-F1.4F3.1-F3.2F3.3F3.4F4.1-F4.4F5F6.1-F6.7F7

GG1.1-G1.3G2.1-G2.4G3.1-G3.2G4.1-G4.4G5.1-G5.2G6.1-G6.2

HH1H2H3H4H5H6

LL1L2L3L4.1L4.2L5L6.1-L6.2

Page 3: B2designguggenheimhelsinki.org/stageonegallery/pdfs/GH-2044447253...+10.00 +0.60 +12.00 +22.00 +8.00 +5.00 wc ahu ahu ahu ahu natural ventilation natural ventilation natural ventilation
Page 4: B2designguggenheimhelsinki.org/stageonegallery/pdfs/GH-2044447253...+10.00 +0.60 +12.00 +22.00 +8.00 +5.00 wc ahu ahu ahu ahu natural ventilation natural ventilation natural ventilation

+10.00

+0.60

+12.00

+22.00

+8.00

+5.00

WC

AHU AHU AHUAHU

NATURAL VENTILATION

NATURAL VENTILATION

NATURAL VENTILATION

NATURAL VENTILATION

TOILET WINTER GARDEN

NATURAL VENTILATION

1 HEATING / COOLING1A HEATING COOLING TABS SYSTEM

(THERMO ACTIVE BUILDING SYSTEM)

2 VENTILATION2A MAIN DISTRIBUTION IN 2D SECONDARY DISTRIBUTION OUT2B MAIN DISTRIBUTION OUT 2E AIR TREATMENT UNITS2C SECONDARY DISTRIBUTION IN 2F INPUT OUTPUT FOR AHU

3 RENEWABLE PRODUCTION OF COOLING AND HEATING COUPLEDWITH POSSIBLE USE OF SEA WATER

3A THERMAL POWER STATION 13B THERMAL POWER STATION 2

4 PHOTOVOLTAIC SYSTEM4A PRODUCTION ELECTRIC ENERGY VIA PHOTOVOLTAIC PANELS4B DISTRIBUTION NET ELECTRIC ENERGY

5 RAIN WATER RECOVERY5A RAIN WATER RECOVERY5B RAIN WATER DISTRIBUTION TO TOILETS AND

TO GARDEN/WINTERGARDEN IRRIGATION SYSTEMRENEWABLE PRODUCTIONOF COOLING AND HEATINGCOUPLED WITH SEA WATER

PHOTOVOLTAIC SYSTEM PHOTOVOLTAIC SYSTEM

RENEWABLE PRODUCTIONOF COOLING AND HEATINGCOUPLED WITH SEA WATER

WATERRECOVERYSYSTEM

WATERRECOVERYSYSTEM

2A1A 2B3A

2C

2D 2D

2C 2D

4A

2C

2D

2C

2D

4B 5B

2C

2D

2C

2D

5B

2C

2D

2C

2D

2C

2D

5A 1A3B

2C

2D

2C

2D

2C 2C

2C

2D

2D

2F

2F

2F 2F

2F2F

4A

2C 2C 2C2C 2C 2C2D

2D

2D 2D

2D

4B

1A2A

2B

+10.00

+0.60

+12.00

+22.00

+8.00

+5.00

WC

AHU AHU AHUAHU

NATURAL VENTILATION

NATURAL VENTILATION

NATURAL VENTILATION

NATURAL VENTILATION

TOILET WINTER GARDEN

NATURAL VENTILATION

1 HEATING / COOLING1A HEATING COOLING TABS SYSTEM

(THERMO ACTIVE BUILDING SYSTEM)

2 VENTILATION2A MAIN DISTRIBUTION IN 2D SECONDARY DISTRIBUTION OUT2B MAIN DISTRIBUTION OUT 2E AIR TREATMENT UNITS2C SECONDARY DISTRIBUTION IN 2F INPUT OUTPUT FOR AHU

3 RENEWABLE PRODUCTION OF COOLING AND HEATING COUPLEDWITH POSSIBLE USE OF SEA WATER

3A THERMAL POWER STATION 13B THERMAL POWER STATION 2

4 PHOTOVOLTAIC SYSTEM4A PRODUCTION ELECTRIC ENERGY VIA PHOTOVOLTAIC PANELS4B DISTRIBUTION NET ELECTRIC ENERGY

5 RAIN WATER RECOVERY5A RAIN WATER RECOVERY5B RAIN WATER DISTRIBUTION TO TOILETS AND

TO GARDEN/WINTERGARDEN IRRIGATION SYSTEMRENEWABLE PRODUCTIONOF COOLING AND HEATINGCOUPLED WITH SEA WATER

PHOTOVOLTAIC SYSTEM PHOTOVOLTAIC SYSTEM

RENEWABLE PRODUCTIONOF COOLING AND HEATINGCOUPLED WITH SEA WATER

WATERRECOVERYSYSTEM

WATERRECOVERYSYSTEM

2A1A 2B3A

2C

2D 2D

2C 2D

4A

2C

2D

2C

2D

4B 5B

2C

2D

2C

2D

5B

2C

2D

2C

2D

2C

2D

5A 1A3B

2C

2D

2C

2D

2C 2C

2C

2D

2D

2F

2F

2F 2F

2F2F

4A

2C 2C 2C2C 2C 2C2D

2D

2D 2D

2D

4B

1A2A

2B

+10.00

+0.60

+12.00

+22.00

+8.00

+5.00

WC

AHU AHU AHUAHU

NATURAL VENTILATION

NATURAL VENTILATION

NATURAL VENTILATION

NATURAL VENTILATION

TOILET WINTER GARDEN

NATURAL VENTILATION

1 HEATING / COOLING1A HEATING COOLING TABS SYSTEM

(THERMO ACTIVE BUILDING SYSTEM)

2 VENTILATION2A MAIN DISTRIBUTION IN 2D SECONDARY DISTRIBUTION OUT2B MAIN DISTRIBUTION OUT 2E AIR TREATMENT UNITS2C SECONDARY DISTRIBUTION IN 2F INPUT OUTPUT FOR AHU

3 RENEWABLE PRODUCTION OF COOLING AND HEATING COUPLEDWITH POSSIBLE USE OF SEA WATER

3A THERMAL POWER STATION 13B THERMAL POWER STATION 2

4 PHOTOVOLTAIC SYSTEM4A PRODUCTION ELECTRIC ENERGY VIA PHOTOVOLTAIC PANELS4B DISTRIBUTION NET ELECTRIC ENERGY

5 RAIN WATER RECOVERY5A RAIN WATER RECOVERY5B RAIN WATER DISTRIBUTION TO TOILETS AND

TO GARDEN/WINTERGARDEN IRRIGATION SYSTEMRENEWABLE PRODUCTIONOF COOLING AND HEATINGCOUPLED WITH SEA WATER

PHOTOVOLTAIC SYSTEM PHOTOVOLTAIC SYSTEM

RENEWABLE PRODUCTIONOF COOLING AND HEATINGCOUPLED WITH SEA WATER

WATERRECOVERYSYSTEM

WATERRECOVERYSYSTEM

2A1A 2B3A

2C

2D 2D

2C 2D

4A

2C

2D

2C

2D

4B 5B

2C

2D

2C

2D

5B

2C

2D

2C

2D

2C

2D

5A 1A3B

2C

2D

2C

2D

2C 2C

2C

2D

2D

2F

2F

2F 2F

2F2F

4A

2C 2C 2C2C 2C 2C2D

2D

2D 2D

2D

4B

1A2A

2B

% € 100.000.000,00

0 PREPARATION 0,3% € 250.000,00

0 PREPARATION 0,3% € 250.000,00

1 STRUCTURE 20,0% € 20.000.000,00

1A FOUNDATIONS 4,0% € 4.000.000,00

1B STRUCTURE 16,0% € 16.000.000,00

2 ARCHITECTURE 33,8% € 33.800.000,00

2A ROOF 7,5% € 7.500.000,00

2B FACADE 6,4% € 6.400.000,00

2C INTERIOR WALLS 7,2% € 7.200.000,00

2D FLOORS 5,6% € 5.600.000,00

2E STAIRCASES 0,3% € 300.000,00

2F CEILINGS 6,8% € 6.800.000,00

3 INSTALLATIONS 32,2% € 32.150.000,00

3A HVAC + SANITAIR 15,0% € 15.000.000,00

3B ELECTROTECHNICAL 17,0% € 17.000.000,00

3C LIFT AND TRANSPORT 0,2% € 150.000,00

4 FURNITURE_VARIOUS 5,7% € 5.700.000,00

4A FURNITURE_VARIOUS 5,7% € 5.700.000,00

5 GARDEN-LANDSCAPING 6,1% € 6.100.000,00

5A WINTER GARDEN 0,5% € 500.000,00

5A GARDENS 1,2% € 1.200.000,00

5A LANDSCAPING 4,4% € 4.400.000,00

6 ADDITIONAL COSTS 2,0% € 2.000.000,00

6A ADDITIONAL COSTS 2,0% € 2.000.000,00

TOTAL CONSTRUCTION COSTS € 100.000.000,00

CONSTRUCTION COSTS ESTIMATION

07/09/14 GH cost distribution

1 ......................................................................francesca torzo architetto

2015 JUN WINNER ANNOUNCED

JUL PRELIMINARY PROJECT

AUG

SEP

OCT CLIENT APPROVAL

NOV DEFINITIVE DESIGN_STEP 1

DEC

2016 JAN

FEB CLIENT APPROVAL

MAR PERMIT TO BUILD

APR DEFINITIVE DESIGN_STEP2

MAY

JUN

JUL CLIENT APPROVAL

AUG

SEP PREPARATION TENDER

OCT

NOV

DEC

2017 JAN

FEB PUBBLICATION TENDER

MAR

APR

MAY

JUN SELECTION CONTRACTOR

JUL IMPLEMENTATIONS CONTRACTOR

AUG FINALIZE PROTOTYPES

SEP

OCT

NOV

DEC

2018 JAN START BUILDING SITE

….

2019

2020

2021 JAN END BUILDING SITE

BUILDING SITE TECHNICAL MONITORING STRUCTURES FOLLOW UP IMPLEMENTATION PLAN BUILDING SITE MEETINGS MONITORING AND CONTROL EXECUTION MONITORING AND CONTROL BUDGET

STRUCTURES CONCEPT AND PREDIMENSIONING INSTALLATION CONCEPT AND PREDIMENSIONING STRATIGRAPHIES AND FINISHING CONCEPT GLOBAL COST PREVIEW

PLANNING AND ENVIRONMENT APPLICATIONS FIRE REGULATION APPLICATIONS CONSULTING AND MEETING FOR PERMITS GLOBAL DEFINITIVE COST PREVIEW

DESIGN IN DETAIL COORDINATION ALL EXPERTISE ADMINISTRATIVE PROVISIONS TECHNICAL SPECIFICATIONS GLOBAL DETAILED COST PREVIEW

PLANNING SCHEME

EXECUTION DRAWINGS REVIEW TENDER PROCEDURE TENDER CONTRACTOR PROTOTYPE DEVELOPMENT