1/22/2013 1 P-E Initiatives of Municipality of Aroroy BASIC FACTS AND FIGURES Income Class: 1st Class Population: 76,139 (NSO, 2010) No. of Barangays: 41 Land Area (in has): 44,040 has. Municipal Waters: 96,000 has. Length of Coastline: 144 km Major economic activity: Agricultural Fishing Mining Aroroy Baleno Balud Mandaon Masbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cataingan Cawayan Dimasalang Esperanza Palanas Pio V. Corpuz Placer Uson

BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

Embed Size (px)

Citation preview

Page 1: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

P-E Initiatives of Municipality of Aroroy

BASIC FACTS AND FIGURES

Income Class: 1st Class Population: 76,139 (NSO, 2010) No. of Barangays: 41 Land Area (in has): 44,040 has. Municipal Waters: 96,000 has. Length of Coastline: 144 km Major economic activity: Agricultural Fishing Mining

Aroroy

Baleno

Balud

Mandaon

Masbate City

Milagros

Mobo

San Pascual

Claveria

San Fernando

Batuan

Monreal

San Jacinto

Cataingan Cawayan

Dimasalang

Esperanza

Palanas

Pio V. Corpuz Placer

Uson

Page 2: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

VISION

A God-centered municipality filled with peace and prosperity where people live in unison with nature and environment, where knowledge and skills of all its constituents are developed to their fullest capability, and culture and identity remain unchanged in the course of rapid progress.

The Local Government of Aroroy will continue to pursue a unified, integrative and collaborative effort of all its offices and sectors for productivity improvement towards a more efficient and more humane delivery of basic services and effective infrastructure support development.

MISSION

Page 3: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

To alleviate poverty and promote economic growth in the municipality by implementing, evaluating & monitoring the formulated local poverty reduction action plan for the optimal use of available resources

GOAL

CBMS

Conducting  and  institutionalizing  Community  Based Monitoring  Survey  (CBMS),  Mapping  and  Encoding  is  a tedious  endeavour.  It  entails Manpower,  technical men, financial  resources  and  cooperation  of  the  barangay officials  and  the  community  as  well.  However,  with  the able  leadership  of  the Mayor,  Vice Mayors  and  the  full support  of  all  the  members  of  the  Sangguniang  Bayan members,  the  CBMS  was  accepted,  operationalized  and used  as  a  tool  primarily  in  validating  the  status  of  the community, planning, allocation of  resources, monitoring and  evaluating  the  outcome  of  the  different Millennium Development  programs.

Page 4: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

CBMS

However,  in  every  wholehearted  endeavour  and sacrifices  of  all  the  stakeholders  there  is  always  a reward.  It goes with the saying that “there  is  light at the end of a tunnel”. And the  light that shone  in the municipality of Aroroy made a very big difference. This difference should not have been realized  if we do not have the different important reports generated by the community  based monitoring  system  or  the  “CBMS” Mabuhay ang PEP‐CBMS Network!!! To show you the lights that made the big difference in the whole MUNICIPALITY OF AROROY …

THE GAINS OF CBMS

THE GAINS AFTER CBMS REPORT GENERATION I - ECOLOGICAL PROFILE II- LOCAL POVERTY REDUCTION ACTION PLAN III- KALAHI-CIDSS PROJECTS A. CYCLE I - DSWD GRANT – PHP 12,206,200.00 MUNICIPAL LOCAL COUNTERPART – PHP 1,984,359.33 BARANGAY LOCAL COUNTERPART - PHP 1,371,925.47 COMMUNITY COUTERPART - PHP 2,667,984.20 PROVINCIAL LOCAL COUNTERPART – PHP -0-

Page 5: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

THE GAINS OF CBMS

B. CYCLE 2 - DSWD GRANT – PHP 12,300,000.00 MUNICIPAL LOCAL COUNTERPART – PHP 1,999,069.75 BARANGAY LOCAL COUNTERPART - PHP 1,204,881.30 COMMUNITY COUTERPART - PHP 2,422,180.37 PROVINCIAL LOCAL COUNTERPART – PHP -0- C. CYCLE 3 - DSWD GRANT – PHP 12,300,000.00 MUNICIPAL LOCAL COUNTERPART – PHP 2,000,000.00 BARANGAY LOCAL COUNTERPART - PHP 953,705.20 COMMUNITY COUTERPART - PHP 728,330.12 PROVINCIAL LOCAL COUNTERPART – PHP 20,000.00

THE GAINS OF CBMS

ACTUAL COST SHARING FOR CYCLES 1-3

   CYCLE 1 CYCLE 2 CYCLE 3 TOTAL 

KC GRANT  12 206 200.00 12 300 000.00 12 300 000.00 36 806 200.00 

MLCC  1 984 359.33 1 999 069.75 2,000,000.00  5 983 429.08 

BLCC  1 371 925.47 1 204 881.30  953 705.20 3 530 511.97 

COMMUNITY  2 667 984.20 2 422 180.37 728 330.12 5 818 494.69 

PLGU  0.00  0.00  20 000.00 20 000.00 

   18 230 469.00 17 926 131.42 16 002 035.32 52 158 635.74 

Page 6: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

THE GAINS OF CBMS

BARANGAY  TOTAL SP COST  KC GRANT BARANGAYHEALTH STATIONS (7) 

AMOTAG   735,756.47  649,516.47 CALANAY   721,014.15  593,514.15 BALETE   705,490.40  640,990.40 MANAGA-NAGA   716,204.80  642,954.80 CABAS-AN   782,885.26  709,085.26 NABONGSORAN   728,632.30  646,612.30 MALUBI   673,553.27  622,671.27 

1 CL SCHOOL BUILDINGS (4) BALAWING   729,304.44  661,249.44 TIGBAO   717,125.10  614,917.10 MARIPOSA   704,143.42  636,070.42 MATALANG-TALANG   674,873.95  624,658.95 

MT-1 COMPLETED SUB-PROJECTS, 33 SPs

THE GAINS OF CBMS

DAY CARE CENTER (1) SYNDICATE  653,122.59  593,522.59 CRAB MEAT PROCESSING (1) / MANPOWER ENHANCEMENT (1) /

LIVELIHOOD PRODUCTIVITY (2) AND TRAINING CENTER (2) DAYHAGAN   730,427.50  665,821.45 CABANGCALAN   726,574.22  661,488.22 TINIGBAN   727,501.30  611,482.80 TINAGO   702,581.42  641,158.03 TALIB   704,421.30  614,571.30 PURO   702,581.63  649,542.63 

DEVELOPMENT OF WATER SYSTEM (5) MACABUG   524,948.75  487,288.75 SAN AGUSTIN   553,054.50  521,939.50 GUMAHANG   1,359,690.35  1,223,030.35 SAWANG   671,028.50  631,928.50 LANANG   683,825.30  617,518.30 

Page 7: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

THE GAINS OF CBMS

PATHWAY (2) / W/ FOOTBRIDGE (1) / W/ CULVERT (1) MATONGOG  412,161.40  377,521.40 BAGA-UMA  577,839.60  528,754.60 SAN ISIDRO  479,152.28  424,972.28 TALABAAN  515,581.65  473,721.65 

RD CONCRETING (3) / W/RCPC (1) / CONCRETE BRIDGE (1) MANAMOC   527,481.83  466,781.38 CAPSAY   552,478.48  488,491.20 PINANAAN   540,823.60  492,084.85 CONCEPCION   542,911.85  491,611.85 POBLACION   1,013,723.49  890,276.74

CONSTRUCTION OF DRAINAGE (1) AMBOLONG  956,591.40  896,455.15 TOTAL  22,747,486.50  20,492,204.08 

THE GAINS OF CBMS

7 DAY CARE CENTERS

6 SCHOOL BUILDINGS

21 WATER SYSTEM

2 BRGY HEALTH STATION

7 DUPLEX BUILDING

2 ELECTRIFICATION

11 FARM TO MARKET RD / ROAD CONCRETING PATHWAY / FOOTBRIDGE

3 PRODUCTIVITY CENTER / MULTI PURPOSE CENTER PUBLIC MARKET

KALAHI CIDSS KKB Cycles 1- 3 2003-2006

1 IRRIGATION CANAL

1 BARANGAY PORT

TOTAL: 62 SUBPROJECTS

TOTAL ACTUAL SP COST: P 52,158,635.00

Page 8: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

THE GAINS OF CBMS

7 DAY CARE CENTERS

2 BRGY HEALTH STATION TOTAL: 33 SUBPROJECTS

TOTAL ACTUAL SP COST: P 22,747,486.00

6 SCHOOL BUILDINGS

11 FARM TO MARKET RD / ROAD CONCRETING PATHWAY / FOOTBRIDGE

21 WATER SYSTEM

5 CONSTRUCTION OF DRAINAGE

MAKAMASANG TUGON I 2008-2009

3 PRODUCTIVITY CENTER / MULTI PURPOSE CENTER PUBLIC MARKET

THE GAINS OF CBMS

PODER 5 2010 TOTAL: 20 SUBPROJECTS

TOTAL ACTUAL SP COST: P 19,328,813.00 6 SCHOOL BUILDINGS

2 BRGY HEALTH STATION

7 DAY CARE CENTERS

Page 9: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

THE GAINS OF CBMS

PANTAWID PAMILYANG PILIPINO PROGRAM (4Ps) (CONDITIONAL CASH TRANSFER PROGRAM)  ORIGINAL BENEFICIARIES       ‐ 6,824  ADDITIONAL BENEFICIARIES    ‐ 360  TOTAL BENEFICIARIES – 7,184 FAMILIES

THE GAINS OF CBMS

ILO-IPEC ( FINANCIAL ASSISTANCE/GRANTS) •CHILD LABOR FAMILIES •HEALTH •EDUCATION •LIVELIHOOD •FAMILY AND LIFE DEVELOPMENT

UNICEF (TECHNICAL ASSISTANCE) •DEVELOPMENT ADMINISTRATION

HEALTH NUTRITION EDUCATION DEVELOPMENT PLANNING DISASTER RISK AND REDUCTION MANAGEMENT

BOTOMS-UP-PLANNING AND BUDGETING NAPC FINANCIAL ASSISTANCE ON DEVELOPMENT PROJECTS – PHP 28,500,000.00

Page 10: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

10 

THE GAINS OF CBMS

EXCISE TAX FROM THE UTILIZATION OF MINERAL WEALTH (GOLD MINING)…..COLLECTED SHARES FROM NATIONAL WEALTH

DATE OF NOTICE MDS CHECK

NUMBER AMOUNT IN

PESOS 

BASIC INFORMATION CONTAINED IN

THE NFCI 17 August 2012 0000563032 20,880,955 2nd and 3- quarters of CY

2011 02 July 2012 0000563006 10,964,207 1st quarter 2011 14 March 2012 0000562934 4,704,881  October of CY 2010 November 2011 

 

0000562836 5,750,410  4th quarter of CY 2009, and 4th quarter and the month of Octoberof CY 2010 

8 December 2010 0000562643 3,412,200  3rd quarter of CY 2009 23 September 2010 0005216616 2,007,913  CY 2009 12 May 2010 0001435274 425,425 

TOTAL 48,145,991 

THE GAINS OF CBMS

OBJECT OF EXPENDITURES  AMOUNT IN PHP 

A. ECONOMIC DEVELOPMENT 

1. Livelihood Projects   P 5,000,000.00 

2. Procurement of Delivery Van (Economic Enterprise)  850,000.00 

B. INFRASTRUCTURE SUPPORT  

1. Road Concreting at Slaughterhouse  800,000.00 

2. Construction of Drainage Canal (225 L.M.)  1,000,000.00 

3. One Stop Shop Livelihood Productivity Center   1,500,000.00 

4. Acquisition of Land (Dump Site)  1,000,000.00 

5. Road Opening of Farm to Market Road (Brgy. Balawing)  2,300,000.00 

6. Construction of Steel Gate with Paverblocks Laying at Municipal Hall  250,000.00 

7. Construction of Trench Canal & Side Cladding at TPMSC  200,000.00 

8. Repainting of TMSCC  400,000.00 

9. Reclamation of Fishport  2,580,955.00 

10. Barangay Development Support Infra Projects 

a. Mayor’s Office  2,000,000.00 

b. Vice Mayor’s Office  1,000,000.00 

c. Sangguniang Bayan Office  2,000,000.00 

TOTAL  P20,880,955.00 

PROGRAMS/PROJECTS/ACTIVITIES FUNDED FROM THE SHARES ON NATIONAL WEALTH

2nd and 3rd Quarter of 2011

Page 11: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

11 

THE GAINS OF CBMS PROGRAMS/PROJECTS/ACTIVITIES FUNDED FROM THE SHARES ON NATIONAL WEALTH

1st Quarter of 2011 OBJECT OF EXPENDITURES  AMOUNT IN PHP 

A. ECONOMIC DEVELOPMENT 

1. Livelihood Projects   P 1,900,000.00 

B. INFRASTRUCTURE SUPPORT  

1. Construction of OSCA Building (Final Phase)  1,000,000.00 

2. Construction of AMC Dormitory  750,000.00 

3. Construction of Slaughterhouse (Final Phase)  500,000.00 

4. Construction of One Stop Shop / Livelihood Center (Phase II)  1,500,000.00 

5. Construction of Cover on Existing Open Drainage Canal  500,000.00 

6. Fabrication and Installation of Street Signs (Augmentation)  214,207.00 

7. House Numbering in Centro Aroroy  300,000.00 

8. Installation of Street Lights  200,000.00 

9. Construction of Fish Port  2,000,000.00 

10. Special Projects 

a. Mayor’s Office  400,000.00 

b. Vice Mayor’s Office  300,000.00 

c. Sangguniang Bayan Office  800,000.00 

C. DEVELOPMENT ADMINISTRATION 

1. Updating of CLUP  400,000.00 

2. CBMS Survey / Encoding / Mapping  200,000.00 

TOTAL  P 10,964,207.00 

THE GAINS OF CBMS PROGRAMS/PROJECTS/ACTIVITIES FUNDED FROM THE SHARES ON NATIONAL WEALTH

3rd Quarter of 2010 SHARES FROM EXCISE TAX ON THE UTILIZATION OF MINERAL WEALTH FOR THE 3RD QUARTER OF 2010 

8,848,988.00 

LIVELIHOOD PROJECTS  2,654,696.40 

INFRASTRUCTURE DEVELOPMENT  6,194,291.60 

a. Concreting of Chavez Street (Hilltop)  2,900,000.00 

b. Electrification of Aroroy Municipal College  900,000.00 

c. Installation of Water System @ AMC Buildings  300,000.00 d. Fabrication and Installation of Slaughter Perimeter

Gate 100,000.00 

e. Rehabilitation of Sta. Maria Street  1,000,000.00 f. Construction of Slaughterhouse  440,000.00 g. Repainting of TPMRC Stage / Façade and Floors  394,291.60 h. Concreting of Road Leading to Cemetery  100,000.00 i. Construction of Men’s Comfort Room @ the Annex

Building 60,000.00 

III. INFRASTRUCTURE DEVELOPMENT  2,051,241.61 a. Augmentation Fund for the Construction of GSO

Building 900,000.00 

b. Augmentation Fund for the Construction of Drop-In Home 

800,000.00 

c. Construction of Perimeter Fence for the Proposed Slaughterhouse

351,241.61 

Page 12: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

12 

THE GAINS OF CBMS PROGRAMS/PROJECTS/ACTIVITIES FUNDED FROM THE SHARES ON NATIONAL WEALTH

3rd Quarter of 2009

PROGRAMS / PROJECTS AND ACTIVITIES 

(P/P/A’s) AMOUNT 

I. Livelihood Program  1,662,200.00 1. Livelihood Projects  1,000,000.00 2. Beneficiaries Enumeration  300,000.00 3. Project Monitoring  362,200.00 

II. Infrastructure Development  1,750,000.00 1. Extension of Fire Station  250,000.00 2. Concreting of Road Shoulders  400,000.00 3. Installation of CCTV Cameras  500,000.00 4. Development of Farm-to-Market Roads  600,000.00 

TOTAL  3,412,200.00 

  

BARANGAY  W/ TOILET BOWL (PCS.) CY: 2008 

CEMENTS(BAGS) 

STEEL BARS (PCS.) 

HALLOW  BLOCKS (PCS) 

1  BAGA‐UMA  15  30  30  1350 

2  AMBOLONG  15  30  30  1350 

3  TALABAAN  15  30  30  1350 

4  CALANAY  15  30  30    

5  BALAWING  15  30  30    

6  DAYHAGAN  15  30  30    

7  MARIPOSA  15  30  30    

8  SAN. ISIDRO  15  30  30    

9  SAWANG  15  30  30    

10  LANANG  15  30  30    

11  CONCEPCION  15  30  30    

12  TINAGO  15  30  30    

13  CABANGCALAN  15  30  30    

14  BANGON  15  30  30    

15  JABOYOAN  15  30  30    

TOTAL  225  450  450  4050 

  

BARANGAY 

W/ TOILET BOWL (PCS.) 

CY: 2010 CEMENTS (BAGS) 

STEEL BARS (PCS.) 

1  SYNDICATE  30  60  60 

2  MACABUG  15  20  30 

3  PINANAAN  23  46  46 

4  MATABA  30  60  60 

5  MANAMOC  16  32  32 

6  MANAGANAGA  15  30  30 

7  CAPSAY  18  36  36 

8  TALABAAN  12  24  24 

9  NABONGSORAN  10  20  20 

10  LUY‐A  15  30  30 

11  POBLACION  10  20  20 

12  SIWAYAN  1  2  2 

13  CABANGCALAN  1  2  2 

14  MATALANGTALANG  1  2  2 

15  TIGBAO  1  2  2 

16  LANANG  2  4  4 

17  PURO  2  4  4 

18  TINAGO  2  4  4 

19  BAGA‐UMA  2  4  4 

TOTAL  206  402  412 

SANITARY TOILET FACILITY DISTRIBUTION

Page 13: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

13 

  

BARANGAY 

W/ TOILET BOWL (PCS.) CY: 2009 

CEMENTS(BAGS) 

STEEL BARS (PCS.) 

1  GUMAHANG  30  60  60 

2  MALUBI  2  40  40 

3  POBLACION  30  60  60 

4  MATONGOG  30  60  60 

5  MATALANG‐TALANG  10  20  40 

6  TALIB  20  40  40 

7  CABAS‐AN  30  60  60 

8  SAN AGUSTIN  16  32  32 

9  AMOROY  14  28  28 

TOTAL  182  400  420 

BARANGAY 

W/ TOILET BOWL (PCS.) CY: 2010 (MSWDO) 

CEMENTS (BAGS) 

STEEL BARS (PCS.) 

TINIGBAN  1  2  2 

AMOBOLONG  2  4  4 

BAGA‐UMA  1  2  2 

POBLACION  1  2  2 

CONCEPCION  1  2  2 

CABANGCALAN  10  20  20 

TOTAL  16  32  32 

SANITARY TOILET FACILITY DISTRIBUTION

  

BARANGAY W/ TOILET BOWL (PCS.) 

CY: 2011 CEMENTS (BAGS) 

STEEL BARS (PCS.) 

1  MARIPOSA  1  2  2 

2  CAPSAY  15  30  30 

3  AMBOLONG  16  32  32 

4  TINIGBAN  15  30  30 

5  TALABAAN  15  30  30 

6  DON PABLO  15  30  30 

7  PURO  1  2  2 

8  PANIQUE  2  4  4 

9  TINAGO  24  48  48 

10  PANGLE  15  30  30 

11  SAWANG  15  30  30 

12  BALETE  15  30  30 

13  POBLACION  1  2  2 

14  MANAMOC  15  30  30 

TOTAL  165  330  330 

2012 STF DISTRIBUTED  1,050

TOTAL  1.894 1614 1644 4050 

SANITARY TOILET FACILITY DISTRIBUTION

Page 14: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

14 

MAJOR PROJECTS COMPLETED

Construction of Child Friendly School Building at AECS – 750,000.00, 2010

Construction / Expansion of New Municipal Building – 14M, 2010

Page 15: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

15 

MAJOR PROJECTS COMPLETED

Construction of Perimeter Fence at Children’s Playground, Lubigan – 750,000.00, 2010

Construction of 1 Classroom School Building, AECS – 750,000.00 2010

MAJOR PROJECTS COMPLETED

Construction of 2 Storey School Building at ANHS – 2.25M, 2011

Construction of GSO and MDRRMC Building – 4.5M, 2011

Page 16: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

16 

MAJOR PROJECTS COMPLETED

Construction of Library Hub, 1.5M, 2011

Road Concreting at Sitio Lubigan leading to Aroroy Municipal College– 2.9M, 2011

MAJOR PROJECTS COMPLETED

Construction of SK Hall, 1.2M, 2011

Construction of Lying-In Clinic – 2.1M, 2011

Page 17: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

17 

MAJOR PROJECTS COMPLETED

Rehabilitation of Sta. Maria St., 1M, 2011

Repair / Construction of Baga-uma Bridge – 1,545,058.00, 2011

MAJOR PROJECTS COMPLETED

Construction of Drainage Canal at G. Cordero St.,1.1M, 2011

Construction of Drainage Canal at Sta. Maria St. – 1M, 2011

Page 18: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

18 

MAJOR PROJECTS COMPLETED

Construction of 3 Classroom Bldg at AMC-Lubigan,900,000.00, 2011

Installation of CCTVs along the streets of Centro Aroroy – 500,000.00, 2011

MAJOR PROJECTS COMPLETED

Construction of AMC Admin Building,800,000.00, 2012

Construction of AMC Dormitory– 2.25M, 2012

Page 19: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

19 

MAJOR PROJECTS COMPLETED

Construction of Drop-In Home (Balay Pahandungan), 2.73M, 2012

Construction of Day Care Center at GK– 900,000.00, 2012

MAJOR PROJECTS COMPLETED

Construction of Drainage Canal at Centro Aroroy, 1M, 2012

Construction of Multi-Purpose Livelihood Center 4.55M, 2012

Page 20: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

20 

MAJOR PROJECTS COMPLETED

Construction of Drainage Canal at Don Pablo dela Rosa St., 637,145.00, 2012

Construction of Drainage Canal at San Jose St., 715,950.00, 2012

MAJOR PROJECTS COMPLETED

Covering the Existing Drainage Canals, 337,105.00, 2012

Concreting and Painting of Road Shoulders, 500,000.00, 2012

Page 21: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

21 

MAJOR PROJECTS COMPLETED

Paverblocks Laying at RHU, 323,500.00, 2012

Installation of Streetlights, 395,350.00, 2012

MAJOR PROJECTS COMPLETED

Repair of School Building at Jaboyoan ES, 491,700.00, 2012

Repair of School Building at AECS, 404,691.00, 2012

Page 22: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

22 

MAJOR PROJECTS COMPLETED

Construction of Gravitational Irrigation with Reservoir for Vegetable Production and Tilapia Hatchery, 190,400.00, 2010-2011

MAJOR PROJECTS COMPLETED

Provision of Farm Equipments, (3 units Rice Threshers, 2 units Water Pumps and 2 units Sprayers, 300,000.00, 2012

Page 23: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

23 

MAJOR PROJECTS COMPLETED

Provision of farm Equipments, (3 units Multi-Power Tiller, 1 unit Shredder Machine, 550,000.00, 2011

MAJOR PROJECTS COMPLETED

Assistance to Rural Improvement Club Assoc. for Meat Processing Project, 200,000.00, 2011

Page 24: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

24 

MAJOR PROJECTS COMPLETED

Provision of Post Harvest Facility 1 unit Small-Scale Palay Flat Bed Dryer To Cabangcalan Farmers 200,000.00, 2012

MAJOR PROJECTS COMPLETED

Hog Dispersal (1,029 heads), 2.8M, 2012

Page 25: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

25 

MAJOR PROJECTS COMPLETED

Assistance to Aroroy Coconut Planters Assoc. (Coco Coir Production), 700,000.00, 2009 - 2012

ON-GOING PROJECTS

Construction of OSCA Building , 2M, 2012

Construction of Slaughterhouse at Talabaan 2.44M, 2012

Page 26: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

26 

ON-GOING PROJECTS

Road Concreting leading to the Slaughterhouse, 532,980.00, 2012

Development of Government Site, 2.327M, 2012

ON-GOING PROJECTS

Development of Fish Port and Integrated Land Transport Terminal, 15M, 2012

Page 27: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

27 

PROPOSED PROJECTS for 2013

Development of Domestic Airport   Php 100,000,000.00 

Development of Municipal Fish Port and Integrated Land Transport Terminal  185,000,000.00 

Opening / Concreting of Farm to Market Roads 10,000,000.00 

Housing Projects and Site Development  5,000,000.00 

Construction of Amphitheater with Amenities  6,000,000.00 

Development of Municipal Cemetery  10,000,000.00 Construction of Grandstand  25,000,000.00 Construction of Municipal Museum  4,000,000.00 

Establishment of Other Economic Enterprise  2,000,000.00 

Municipal Park / Children’s’ Park  2,000,000.00 

Creek Dredging  5,000,000.00 

Construction of Waiting Shed @ Parking Area beside the Municipal Hall  3,000,000.00 

Covered Walkway at the Side Walks along Centro Aroroy  4,000,000.00 

Fabrication and Installation of Street Lights  5,000,000.00 Expansion of One Stop Shop Livelihood Center  3,500,000.00 Construction of Meat and Fish Processing Center  3,500,000.00 

PROPOSED PROJECTS for 2013

Page 28: BASIC FACTS AND FIGURES - pep-net. · PDF fileMasbate City Milagros Mobo San Pascual Claveria San Fernando Batuan Monreal San Jacinto Cawayan Cataingan Dimasalang Esperanza Palanas

1/22/2013 

28 

Development / Construction of Auction Center  5,000,000.00 Establishment of Meat and Poultry Processing Plant  1,500,000.00 Procurement of Irrigation Facilities, Farm Machineries and Equipment and Post Harvest facilities towards Agricultural Productivity  2,620,000.00 

Procurement of Slaughterhouse Equipments  1,000,000.00 Development of Garbage Dumpsite with Material Recovery / Composting Facility  3,000,000.00 Acquisition of Land for Dumpsite  2,000,000.00 

PROPOSED PROJECTS for 2013

Participatory Situational Analysis are adopted even for LGU projects Operation and Maintenance are established Bottoms up planning Other private sectors are adopting CBMS Project implementation are accepted and well participated by the community because it was planned, prioritized , deliberated and implemented by the community

GOOD PRACTICES ADOPTED