BASS Asia Customer Forum, 26- 27 Nov 2013 Mandarin Oriental Kuala Lumpur, Malaysia. BASSnet Maintenance . Name: Oliver Roldan Mesina Title: Product Consultant. Business Applications and Solutions for Shipping. AGENDA. What is BASSnet™ Maintenance?. - PowerPoint PPT Presentation
Citation preview
BASSnet Maintenance Name: Oliver Roldan MesinaTitle: Product Consultant
B u s i n e s s A p p l i c a ti o n s a n d S o l u ti o n s f o r S h i p p i n g
BASS Asia Customer Forum, 26- 27 Nov 2013Mandarin Oriental Kuala Lumpur, Malaysia
AGENDA
Date Start Time
End time
Duration Details
11/26/2013TUESDAY
1100 1300 2 Hrs
Introduction to Maintenance Module (1100-1120H)Overview and walkthru of all sub modules in Maintenance Modules (1120-1300H)
1300 1400 1Hr Lunch Break
1400 1530 1H 30 Mins Cont of Maintenance & Materials Overview
1530 1545 15 Mins Refreshment Break
1545 1730 1H 45Mins
• Discussion and Feedback from Participants on any area of BNM.
• Discussion on Ideas for Improvement and also suggested changes
What is BASSnet™ Maintenance?
A system to facilitate maintenance processes onboard and across a fleet by establishing standard jobs that are required to maintain Components.
Manage materials used for maintenance jobs such as Spare Parts, Consumables, Tools etc.
Keeps track of jobs that have been performed on each Component.
Set up future job planning for Components.
Manage resource planning for jobs by carrying our resource forecasting.
Manage the beginning to end monitoring of Hull Inspections. Keep track of a list of job orders raised specifically for defective components across the fleet.
Track and monitor all components and parts under warranty and the end to end claim process.
MAINTENANCE COMPLETE PROCESS FLOW
Component
Routine Task
Claims
Defect Management
HULLInspections
Scheduled Jobs
CounterJobs
Calendar Jobs
Job Order
History
Material
Requisition
Scheduled Job
DocumentsMaterials
Create Job Order
Standard Instruction(Created from Office)
Job History
Component Resource
From Scratch / Manuals
Report Job Done
BASSnet™ Maintenance
The following illustrates the maintenance workflow and its relationships with other modules.
Risk Assessment
DEFECTS
Defect found
Create Defect Job via Defects sub module
Create Job Order via Job Order sub module
Defects record created in Defects module
Connect multiple Defect Job Order
If Component under ‘Guarantee ‘, link
available to Guarantee Claims sub module.
The Defects History displays a list of all Defects-Job records
moved to Job History.
Unplanned Maintenance
Manage Guarantee Claims process
Perform Maintenance or take corrective action
During Dry-Dock On board / Service Repair
Set up Routine Tasks
Update to History if everything OK
Types of routine tasks (Customisable)• Megger Tests• EO• Safety tasks
If Failure?
Select existing scheduled Jobs and
create Job order from them
Create New Job Order
Name the Task
Define Recurrence
Attach respective components
Define Job Description
Move to History
Routine Tasks
Report Job Done- Fill up details
Report Job Done for Job Order
ROUTINE TASK
CLAIMS
Breakdown of equipment
Equipment covered under warranty?
Create a Claim record using the Guarantee Claims sub module.
Status: NEW
Claim Accepted by CC?
Status: Accepted by Claims Coordinator.Claim will be sent to Shipyard for investigation.
Shipyard will update CC.
Status: Rejected by Yard/Supplier.
Claim to be solved by Ship's crew and closed
by CC.
Claim Accepted by Yard?
Status: Approved by Yard/Supplier.New parts will be sent by Yard to Vessel. Broken parts to be
sent back to Yard (if requested). Vessel User to update system regarding landed/arrived parts.
Status: Under Repair/Replace.Repairs or replacements are carried out onboard vessel.
Action: Repair breakdown with tools onboard and order
parts as needed.
Create Job Order in System with Job Class = Guarantee Claim.
Status: NEW
Claim to be settled and closed by CC. The CC will add defect to Monthly Report.
Status: Rejected by Claims Coordinator.
Status: ClosedDefects corrections completed. CC closed claim.
NO
NO
NO
YESYES
YES
YES
HULL INSPECTION
Set up New Hull Inspection
Update Hull Inspection report
Ensure required Registers have been set up:Register Setup - Maintenance
Enter the Overall Condition of the hull
noted during the Inspection
Note Observations from the Inspection – enter observations for each
Surface Area.
Attach Documents
relating to the inspection.
Hull Structure – hull profile
Assessment Category codes
Overall Condition codes
Assessment Scales codes
Hull Compartment codes
Move to HistoryNote: Inspected Date, Condition and
Observations must be entered before moving to history.
Use Hull Inspection Overview to track and monitor all aspects of a Hull
Inspection
Add Images
Scheduled Job On Hull Inspections
Report Job Done
Component(i) - component transfer workflow - use status/maintenance status explanation - filter feature - locate at SFI tree view feature - find grid – added 1 new column – document flag (clear all filters) - batch update feature - drag & drop at SFI structure (re-position) (ii) - remove sub component, option to "Keep this sub component as spare" - Sub component transfer - Sub component transfer process - Create sub component and Convert from spare part - Access right – transfer access right
Maintenance overview Maintenance job – “Require to replace sub component(s)Standard instruction Batch update (Length, & type) Schedule jobFind grid (package job and sub component indicator)Discussion (Schedule job/job order/job history/material)Estimate costNew design - Schedule Job/Job order wizard, Job Packaging – view all materialsJob History – By default will retrieve 1 year job historyJob order re-plan workflow CounterExport to excel for all the previous counter reading
Planner
Resource Forecast/Resource Time Sheet
Routine task- 2 templates link to multiple routine task type- Distribute task to other vessels- Description field (unlimited length)- Print report- Overview Defects- Save Image into picture file- Transfer to Project Claim ( To check should only filter job belong to that damage component) Hull Inspection – History tab (combine job history and hull inspection history) - Due date column
Material
- Overview – new design – improve performance- Access right base on category- Location diagnostic- Print label- Change distribution group- Propose category for free item- Report – material stock report (Grid view and grouping)- Report – material transaction (Grid view) – include vessel ref, and - Group by vessel