Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
“Genius is 1% inspiration, 99% perspiration”Thomas Alva Edison
However long the moon disappears, Someday it must shine again. -Nigerian Proverb-
Don't grieve. Anything you lose comes round in another form. -Rumi, Jalal ad-Din-
Adil Aydın KURTGeneral Manager
PRESIDENT “What can we do for a better future?” This is our starting point. We aimed at becoming a company
that will provide not only better services but the best. We are a progressive and quality focused
company that renews itself in accordance with expectations of need of the society and most
importantly global best practices.
At Zeberced Group, we always attach importance to progressive targets at all levels from our top
executives to other cadre of our employees. With this belief and determination, we have moved
forward without deviating from our aim.
The Zeberced Group will continue to partner like mind towards the development of our immediate
consistency; Nigeria and Africa as a whole.
We at Zeberced Group express our gratitude to all our business partners and sincerely look forward
to many successes with the support and cooperation of our teeming clients who continuously believe
in the Zeberced brand.
MISSION & VISION
MissionTo provide quality products and services; to make positive contribution to the development of economic and cultural relations between Nigeria and Turkey.Vision To become a leading conglomerate contributing to the enhancement of Social Economic Development of Nigeria and West Africa.
Heeding Calls by the Government of the Federal Republic of Nigeria for Foreign DirectInvestments, the Zeberced Group in 2007 has decided to invest in Nigeria in the fields of mining and construction.With our experiences gained over the years in Quarry business in Turkey, we built
our first Concrete and Asphalt Plants. In 2011 Zeberced Furniture was founded with a wide range of products from domestic and office to kitchen furniture; in addition to door production. Interior architecture, decoration and renovation services.Designed and developed by Zeberced in accordance with the economy and industrial needs of Nigeria, The Abuja Industrial Park will provide employment of a minimum 40000 people with 177 parcels in an area of 245 hectares of Land as well as social and technical facilities to be established in the first Industrial Park Project.In the construction sector, Zeberced Group started the construction of the embassy of theFederal Republic of Turkey and the ambassador’s Residence in 2011.These two important projects were not only delivered on schedule in April 2013 but had a touch of the ZebercedGroup class and quality. The Katampe Private Estate Project which is consists of 42 villas and 285 flats and is planned to be completed in 2015.This project will carry the insignia of Zeberced quality and class.
HISTORY
In addition to creating Employment Zeberced Group attaches corporate social responsibility as part of its agenda, we aid technology transfer through the establishments of training facilities. In this regard, we organise meeting, seminars and bring in experts to share their knowledge and ideas with our employees, thereby importing useful on the job training and education to our teeming employees.
SOCIAL RESPONSIBILITY
02
ZEBERCED LIMITED
QUARRYASPHALT PLANTBATCHING PLANT
ZEBERCED LIMITED operates in 3 different fields. It has quarry, asphalt, and concretebatching plants. It has 2 concrete batching plants in Kubwa and Katampe. Each of theseplants has a capacity of 120 m3/hour. The asphalt plant has an operating capacity of 240tons/h.
04
QUARRY
The daily capacity of the quarry, which is 30 km away from the city center and occupies
total area of 130 hectares, is 6,000 tons.
The quarry is comprised of 4 facilities, one of which has a capacity of 140 ton/hour
while the each of the other 3 has a capacity of 110 ton/hour, and has sufficient number
of construction equipments and tools. Products including all aggregate sizes from 0 to 1500 mm
are used in dam, bridge, road, building, and airport projects.
06
The quarry consists of 4 facilities one of which is 140 ton/hour and the other three are 110 ton/hour each is fed by 15 trucks, 6 excavators, 6 loaders, and 4 rock drillers. The quarry facilities have an annual capacity of 1.5 million tons.
The impact crushers are used in the facilities instead of cone crushers, thus producing cubical materials instead of conical ones. The aggregates produced in this way have very high quality and strength.
Capacity-Equipment-Quality
10
Capacity-Equipment Quality
Zeberced asphalt mixing plant can produce 240 tons per hour. Since we started producing, we have placed the top priority on R&D to measure and raise the quality of our products and we also have a state of the art laboratory in Abuja. We can meet any requirements with our road and infrastructure equipment.
Capacity-Equipment
14
Zeberced Group has two concrete plants; one in Kubwa, and the other in Katampe.These plants have a total of 240 m3/h production capacity.There are 25 mixers and 5 pumps that are 36, 45, and 51
meters long at the facilities to deliver products to the customers.It uses the stone dust, stone chips and granite that are produced in its own quarry, thus maintaining and enhancing the concrete quality standards.We have produced Class C60 concrete in the laboratory and Class C50 concrete to our customer.
Laboratory Test- Quality
Quality standard is very important for ready-mixed concrete. Zeberced preserves its quality standard by constantly collecting samples from the concrete it produces for sustainable quality. We do these in collaboration with suppliers (of cement and chemical additives.).
Furthermore, concrete quality can be measured by collecting samples from existing buildings by core sampling.
16
Importance of Ready Mixed Concrete
18
Currently, manually mixed concrete is widely used in Nigeria in concrete casting works. This affects both soundness and life of buildings to a significant extent. Zeberced aims to bring the quality of the buildings to international standards by extending the use of ready-mixed concrete. Ready-mixed concrete has numerous advantages compared with manually mixed concrete, some of which are as follows:
The advantages of ready-mixed concrete can be summarized as follows:- As it can be produced in a short time and in large amounts, it saves labour and time compared to manual casting.- Production made with computer control at a ready-mixed concrete plant instead of production made manually or with eyeball estimation keeps resistance of concrete under control.- Thanks to its high supporting strength, ready-mixed concrete decreases column and beam sections, increases beam openings, and helps creating earthquake-resistant and safe structures by decreasing the fixed load of the building.- More economic solutions may be reached for building designs with highly resistant types of ready-mixed concrete.- It enables fast work in big projects.
CONSTRUCTION
ZEBERCED CONSTRUCTION
After its success in the mining sector, Zeberced Group founded Zeberced Construction to operate in the construction sector. Zeberced Construction consists of two groups: Building and Infrastructure.
Building and Superstructure GroupThe goal of the Building and Superstructure Group is to introduce nature-friendly, safe, and modern settlements in Nigeria. Constructing shopping malls, business centers equipped with nanotechnology and power plants is among its short term goals.
Road and Infrastructure Group The goal of this group is to contribute to construction of viaducts, bridges, pipelines to be used in infrastructure as well as culverts, parking lots, landscapes, industrial zones and highways in developing Nigeria.
22
TURKISH EMBASSY ABUJA
R.O.T. Abuja Embassy and Embassy Residence Project- Smart building system- High-security building system- Total Construction Site: 8500 m²- Water Treatment and Recycling System- Central Cooling System- Construction Year 2011- 2013
28
KATAMPE PRIVATE HOUSING ESTATE
It is a mixed project consisting of villas and apartments. It aims to create a comfortable and high quality life with its security system and landscape.-Total Number of Apartments: 337-Total Number of Single Villas: 12-Total Number of Semi-attached villas: 25-Total Number of 3+1 Flats:40-Total Number of 2+1 Flats:80-Total Number of 1+1 Flats:180- Construction Year 2013- -2016
Park
ve Ayrı�tırma �stasyonu
E�itim
Tesisi
Atık Geri Dönü�üm
Banka ve Restoran Alanı
Park
Otel
Park
Fuar ve Sergi Alanı
Banka ve Restoran Alanı
Polis Merkezi
Deposu
Akaryakıt ve Banka ve Restoran Alanı
Helikopter
Polis Merkezi
Hizmet Destek Alanı
Alanı
Ofis
Su
Akaryakıt ve Dolum Tesis Alanı
Teknik Altyapı Alanı
Market
Park
Depo-Antrepo
Park
Kamu Hizm
et Alanı
Otel
Pisti
Dükkanlar
Park
Dini Tesis
�dari ve Sosyal Tesis Alanı
Park
Tır Servis AlanıDini Tesis
ParkPark
�stasyonuTren
Trafo A lanı
Enerji Üretim Tesis Alanı
Arıtma Tesisi
AlanıSpor Tesisi
Park
Alanı
Öngörülen
So�uk Hava Deposu
Alı�veri� Merkezi
Dolum Tesis Alanı
Alanı
Park
Güm
rük
(SPORTS FACILITY)
AREA)
(STATION
(SHOPP
�NG CENTER)
RESTAURAND AREA)(BANKS AND
(EDUCAT�O
N FAC�L�T
�ES
UT�L�T
�ES AREA)
(SUPPORT SERV
�CE AREA)
AREA)
(F�LL�NG
STAT�O
N AREA)
(WO
RSH�P
FAC�L�TY AREA)
(TRA�LER PARK
�NG AREA)
AFF�CE AREA)
TRA�N STAT
�ON)
(PROPO
SED(W
AREHOUSE AREA)
(CUSTOM
S
(BANKS AND (PUBL�C
(TRANSFORM
ER AREA)
(TECH N�CAL �NFRASTRUCTURE AREA)
HOUSE)
(BANKS AND RESTAURAND AREA)
FAC�L�TY AREA)
(HEL�PAD)
(WO
RSH�P
(HOTEL)
RESTAURAND AREA)
(WASTE TREATM
ENT FAC�L�T
�ES AREA)
(MARKET)
(F�LL�NG
STAT�O
N
(OFF
�CE)
(HOTEL)
(FA�R G
ROUND AREA)
HOUSE)
(STATION
(POW
ER STAT�O
N FAC�L�TY AREA)
(ADM�N�STRAT
�VE AND SOC�AL FAC
�L�T�ES AREA)
(RECYCL�NG STAT
�ON)
(SHOPS)
30-02
30-0130-01
30-05
30-01
30-05
24 m 36-01
36-02
30-04
30-03
30-02
45 m45 m
45m
45 m
30-04
45 m
30-04
22 m
10 m
30-0330-03
30-02
20-01
20-01
4 m
4 m
30-02
30-02
30-02
20-06
20-04
30-01
20-03
20-07
20-04
4 m
20-02
30-02
20-05
5000 m²
5000 m²
5000 m²
5000 m²
14663 m²
40209 m²
5000 m²
10000 m²
3887.50 m²
38598 m²
4887.50 m²
5000 m²
5000 m²
5000 m²
3550 m²
10000 m²
9662 m²
10000 m²
9663 m²
4887.50 m²
10000 m²
10000 m²
1000 m²
5000 m²
10000 m²
10000 m²
10000 m²
5000 m²
9517 m²
15528 m²
26505 m²
10000 m²
7495 m²
8594 m²
11568 m²
27954 m²
TR 1000 m²
TR 1000 m²
5000 m²
16028 m²
45000 m²
15000 m²
15000 m²
5335 m²
8571 m²
5000 m²
5000 m²
TR 1000 m²
23538 m²
39888 m²
30507 m²
20000 m²
20184 m²
5000 m²
5000 m²
5000 m²
5000 m²
10000 m²
5000 m²
5000 m²
5000 m²
4887.50 m²
TR 1000 m²
10000 m²
5000 m²
5000 m²
5000 m²
5000 m²
5000 m²
5000 m²
5000 m²
5000 m²
20000 m²
16391 m²
35928 m²
5000 m²
3550 m²
5000 m²
5000 m²
10000 m²
3550 m²
4887.50 m²
9663 m²
19487 m²
5000 m²
10000 m²
5000 m²
TR
5000 m²
5000 m²
5000 m²
5000 m²
TR
5000 m²
²m
0000
1²
m 00
001
4887.50 m²
10000 m²
5000 m²
5000 m²
10000 m²
5000 m²
5000 m²
10000 m²
9663 m²
4550 m²
18965 m²
1000 m²
10000 m²
10000 m²
10000 m²
10000 m²
10000 m²
15000 m²
10000 m²
5000 m²
5000 m²
5000 m²
5000 m²
5000 m²
5000 m²
5000 m²
5000 m²
15000 m²
5000 m²
²m
0005
²m
0005
5000 m²
5000 m²
5000 m²
29666 m²
8503 m²
5000 m²
32914 m²
10790 m²
31320 m²
30209 m²
10000 m²
3887.50 m²
5000 m²
4887.50 m²
5000 m²
5000 m²
5000 m²
5000 m²
5000 m²
5000 m²
4887.50 m²
²m
0005
²m
0005
²m
0005
²m
0005
4887.50 m²
10000 m²
5000 m²
10000 m²
TR 1000 m²
5000 m²
10000 m²
5000 m²
5000 m²
4887.50 m²
5000 m²
3887.50 m²
TR 1000 m²
5000 m²
5000 m²
10000 m²
4887.50 m²
5000 m²
4887.50 m²
5000 m²
5000 m²
20000 m²
5000 m²
3550 m²
10000 m² 5000 m
²5000 m
²
5000 m²
5000 m²
10000 m²
10000 m²
3550 m²
10000 m²
5000 m²
5000 m²
10000 m²
10000 m²
20302 m²
15063 m²
15000 m²
15000 m²
19888 m²
8503 m²
5000 m²
5000 m²
5000 m²
5000 m²
10000 m²
10000 m²
5000 m²
5000 m²
5000 m²
TR 1000 m²
4887.50 m²
4919 m²
4887.50 m²
5000 m²
5000 m²
35000 m²
11528 m²
29888 m²
31742 m²
5000 m²
3887.50 m²
30000 m²
2213 m²
5000 m²
5000 m²
4887.50 m²
4551 m²
TR 1000 m²
5000 m²
5000 m²
4550 m²
4741 m²
12631.05 m²
5000 m²
5000 m²
5000 m²
RAILWAY
RAILWAY
RAILWAY
RAILWAY
Organized Industrial Site Project, Abuja,Nigeria
Total Area 245 hectares
Total Parcel Number177
Total Commercial Parcel 29
Total Technical Parcel 17
Total Road Length10.6 km
Total FS Line 9.6 km
Total Storm Water LineCable 9.7 km
Total Water Line 10.4 km
Total Electrical Cable 8.6 km
Total Telecommunication cable29 km
Total Natural Gas Line24.1 km
38
ABUJA INDUSTRIAL PARK
Please find below the ABUJA INDUSTRIAL PARK Project parcelling and road, infrastructure line and the distribution details.The distribution of industrial parcels
Zeberced Group has started this enormous project to provide more appropriate and exceptional area for gathering diverse sectors from all over the world to Nigeria. To endorse sustainable growth of Nigeria, Abuja Industrial Park will carry an important industrial vision that will assist to focus on increasing domestic production. So, more than 40.000 estimated numbers of local people will be employed by the end of industrial park project. With 177 parcels area, the Park will bring a fresh and modern industrial culture and a great value to Abuja and Nigeria as well.
5 000 m2 119 pieces
10 000m2 41 pieces
15 000m2 8 pieces
20 000m2 4 pieces
30 000m2 5 pieces
1 353047m2 177 pieces
BR
EAK
DO
WN
OF
IND
UST
RIA
L P
LOTS
177 FACTORIES
40.000 PEOPLE DIRECTLY EMPLOYED
It is planned that ABUJA INDUSTRIAL PARK will host 177 factories, the city of Abuja will become a production center. In addition to these, new support services will be launched, numerous small-to medium- sized, workshops and new workplaces to supply the needs of these factories will be opened. It is planned that the factories to be opened, in addition to these factories, the technical schools will be established to educate yearly hundreds of unskilled workers to be skilful productive.
It is planned that the factories to be opened at ABUJA INDUSTRIAL PARK will employ almost 40,000 employees. The project will make a significant contribution to employment and the trained workforce in the region. ABUJA INDUSTRIAL PARK will also createa considerable amount of indirect employments in the region of hundreds of thousand jobs.
MADE IN NIGERIA PRODUCTS
Increasing exportsDecreasing import
With the products to be produced at ABUJA INDUSTRIAL PARK, the number of the products stamped with ‘Made in Nigeria’ will increase, thus boosting the national pride, and saving vital foreign exchange with resultant improvement of the economy.
42
PUBLIC AND SOCIAL FACILITIES
Administrative and urban furniture areas distribution details are below.
COMMERCIAL AREA (Mall, Hotel, Office, Market, Shop) (93 106m2) 1 piece
ADMINISTRATIVE AND SOCIAL FACILITY AREA (29 888m2) 1 piece
CUSTOMS AREA (16 391m2) 1 piece
FAIR & EXHIBITION AREA (35 000m2) 1 piece
BANK & RESTAURANT AREA (39 697m2) 3 pieces
SPORTS FACILITY AREA (26 505m2) 1 piece
EDUCATIONAL FACILITY AREA (27 957m2) 1 piece
DEPOT-WAREHOUSE-COLD STORE AREA (35 928m2) 1 piece
ARTICULATED LORRY/SERVICE PARK AREA (20 302m2) 1 piece
FUEL OIL & FILLING FACILITY AREA (24 599m2) 2 pieces
RELIGIOUS FACILITY AREA (19517m2) 2 pieces
PARK AREA (35 513m2) 10 pieces
POLICE STATION (10 076m2) 2 pieces
PUBLIC UTILITY AREA (7 495m2) 1 piece
HELIPORT (11 568m2) 1 piece
SPORTS FACILITY TRAINING CENTRE
ABUJA INDUSTRIAL PARK Site will be a fully equipped with the state of the art technology and facilities ranging from hotels to host guest paying business visits, ultra modern banking facilities for easy financial transaction, well trained and equipped private security personnel to ensure security round the clock. A modern conference center for meetings, seminar and syndication.
ADMINISTRATIVE AND URBAN FURNITURE AREAS
RESTAURANT EXHIBITION AREA
44
SECURITY CHURCH
MOSQUE
HOSPITAL
PARK SERVICE AREA
HOTELBANK
OFFICE
GAS STATION
POLICE STATIONCONFERENCE CENTER
COLD STORAGE
WAREHOUSE
46
In Abuja Industrial Park, the wastewater will be treated and recycled using a treatment facility, for the purpose of watering the green areas. In Abuja Industrial Park, recycling is a resource recovery practice that refers to the collection and re use of waste materials such as empty beverage containers. The materials from which the items are made can be reprocessed into new products.
WASTE RECYLING FACILITY
WASTE WATER TREATMENT FACILITY
48
ELECTRICITY & NATURAL GAS PROJECT
TECHNICAL INFRASTRUCTURAL FACILITIES
Technical Infrastructural Area Distribution
TREATMENT FACILITY AREA (38 598m²) 1 piece
TRANSFORMER AREA (40 507m²) 11 pieces
TRAIN STATION (18 965m²) 1 piece
WASTE RECYCLING & SORTING AREA (29 666m²) 1 piece
WATER DEPOT (4 887m²) 1 piece
POWER GENERATION PLANT AREA (50000m²) 1 piece
The facility will provide a power uninterruptedly. This ensures an uninterrupted power to the numerous industries. In addition a natural gas distribution network will be made available to all factories.
CHAIR - SOFA
Zeberced Furniture offers services such as interior architecture, decoration, and renovation in addition to furniture design and production.Furniture solutions are produced for many needs such as door, desk, table, chair, couch, sofa, kitchen closet, wardrobe, and office supplies in Zeberced Furniture workshop
consisting of joinery, furniture, and couch upholstery counters.
52