10.07.2015 Parents day

Bayern bots

Embed Size (px)

Citation preview

Page 1: Bayern bots

10.07.2015

Parents day

Page 2: Bayern bots

2ITQ GmbH

1. Team

2. Methodology

3. Weekly development

Agenda

Page 3: Bayern bots

3ITQ GmbH

■ Bayern■ Utkan

■ Anthony

Team

Page 4: Bayern bots

4ITQ GmbH

Mission idea

Mission

System-integration

First exercise Second exercise

Third exerciseInitialphaseTesting & Parents

presentation

Week development

6th

7th

8th

9th

10th

Page 5: Bayern bots

5ITQ GmbH

Initial phase: Design pusher wheel Construction

First day

Page 6: Bayern bots

6ITQ GmbH

Programming Move wheel pushing Stop wheel pushing

Start second model

Second day

Page 7: Bayern bots

7ITQ GmbH

Start design line follower

Third day

Page 8: Bayern bots

8ITQ GmbH

Fourth day

Start Construction

Programming Line follower

Page 9: Bayern bots

9ITQ GmbH

Fifth day

Final robot Design Construction Programming

Page 10: Bayern bots

10ITQ GmbH

Points: 38

Evaluation system

Design 2

Functionality 4