12

Berlin Train

Embed Size (px)

DESCRIPTION

algunas caracteristicas del tren en ingles

Citation preview

For Hamburg architects Gerkan, Marg & Partners, the determinant of the architecture was developed to emphasize the importance of the new Berlin Hauptbahnhof!ehrter Bahnhof as a crossing point within an increasingl" integrated #urope and highlight, at once, the e$isting path of train tracks in an urban conte$t through architectural means%&he station hall is framed b" two arched structures '( meters high wanting to highlight the scale of the place, the importance of the station as a crossing point between #urope and link the east and west%From its )*+,,,, s-uare meters .),,,, are destined to rail, occup"ing two levels and featuring )' platforms, )+,,,, s-uare meters are for shops and restaurants, office space +,,,,, in ++,, to bridge and railroad buildings functional uses% &he platforms e$tend over an area of/.,,,, s-uare meters and the garage area occupies about .+,,,, s-uare meters% 01ave Between two frames is the central station ship that houses the platforms of '/, meters in length, oriented in an eastwest, covered b" a large glass dome and light stretching along /.) meters%