REKAPITULASIPERKIRAAN HARGA PEKERJAAN
Proyek / Bagpro : 0
No. Paket Kontrak : 27 (Dua Puluh Tujuh)
Nama Paket : Rehab/Pemel. Jalan Tanjung Bulan - Tanjung Mas, Kec. Buay Madang/Buay Madang Timur
Prop / Kab / Kodya :Sumatera Selatan / Ogan Komering Ulu Tim ur
Jumlah Harga
No. Divisi Uraian Pekerjaan
(Rupiah)
1 Umum
2 Drainase
3 Pekerjaan Tanah
4 Pelebaran Perkerasan dan Bahu Jalan
5 Perkerasan Non Aspal
6 Perkerasan Aspal
7 Struktur
8 Pengembalian Kondisi dan Pekerjaan M inor
9 Pekerjaan Harian
10 Pekerjaan Pemeliharaan Rutin
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan)
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A)
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)
(D) DIBULATKAN
Terbilang
Martapura, 2014
Penawar,
PT./CV. Xxxxxxxxxx
Tn./Ny. YyyyyyyyyyyyyyyyDirektur/tris
:
5/22/2018 Bestek Tanjung Bulan - Tanjung Mas
2/14
Proyek / Bagpro :
No. Paket Kontrak : 27 (Dua Puluh Tujuh)
Nama Paket : Rehab/Pemel. Jalan Tanjung Bulan - Tanjung Mas, Kec. Buay Madang/Buay Madang Timur
Prop / Kab / Kodya : Sumatera Selatan / Ogan Komering Ulu Timur
a b c d e f = (d x e)
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.0
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
2.1 Galian u/ Selokan Drainase & Saluran Air M3
-
2.2 Pasangan Batu dengan Mortar M -
2.3.(1) Gorong2 pipa beton bertulang 50 cm M1
-
2.3.(2) Gorong2 pipa beton bertulang 50
5/22/2018 Bestek Tanjung Bulan - Tanjung Mas
3/14
No. Mata
PembayaranUraian Satuan
Perkiraan
Kuantitas
Harga Satuan
(Rupiah)
Jumlah Harga-
Harga (Rupiah)
6.4 (2) Latasbusir Kelas A M2
-
6.4 (3) Latasbusir Kelas B M2
-
6.4 (4) Bitumen Asbuton Ton -
6.4 (5) Bitumen Bahan Peremaja Ton -
6.4 (6) Bahan Anti Pengelupasan (anti stripping agent) Liter -
6.6.1 Lapis Permukaan Penetrasi Macadam M3
-
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 7. STRUKTUR
7.1 (2) Beton mutu tinggi dengan fc=45 MPa(K-500) M3
-
7.1 (4) Beton mutu tinggi dengan fc=35 MPa(K-400) M3
-
7.1 (5) Beton mutu sedang dengan fc=30 MPa(K-350) M3
-
7.1 (6) Beton mutu sedang dengan fc= 25 MPa(K-300) M3
-
7.1 (7) Beton mutu sedang dengan fc= 20 MPa(K-250) M3
-
7.1 (8) Beton mutu rendah dengan fc= 15 MPa(K-175) M3 -
7.1 (9) Beton Siklop fc=15 MPa(K-175) M3
-
7.1 (10) Beton mutu rendah dengan fc= 10 MPa(K-125) M3
-
7.3 (1) Baja Tulangan BJ 24 Polos Kg -
7.3 (2) Baja Tulangan BJ 32 Polos Kg -
7.3 (3) Baja Tulangan BJ 32 Ulir Kg -
7.3 (4) Baja Tulangan BJ 39 Ulir Kg -
7.3 (5) Baja Tulangan BJ 48 Ulir Kg -
7.6 (1) Fondasi Cerucuk, Pengadaan dan Pemancangan M1
-
7.6 (4)a Pengadaan Tiang Pancang Baja ukuran: Diameter 400 mm
tebal 10 mm
Kg -
7.6 (4)b Pengadaan Tiang Pancang Baja ukuran: Diameter 600 mmtebal 12 mm Kg -
7.6 (4)c Pengadaan Tiang Pancang Baja ukuran: Diameter 1000 mm
tebal 16 mm
Kg -
7.6 (5) Pengadaan Tiang Pancang Beton Bertulang Pracetak
ukuran/diameter:
7.6 (5)a Pengadaan Tiang Pancang Beton Bertulang Pracetak
ukuran/diameter: 350 x 350mmM
1 -
7.6 (5)b Pengadaan Tiang Pancang Beton Bertulang Pracetak
ukuran/diameter: 400 x 400mmM
1 -
7.6 (5)c Pengadaan Tiang Pancang Beton Bertulang Pracetak
ukuran/diameter: 450 x 450mmM
1 -
7.6 (6) Pengadaan Tiang Pancang Beton Prategang Pracetak ukuran
/ diameter ......7.6 (6)a Pengadaan Tiang Pancang Beton Prategang Pracetak ukuran
/ diameter 350 mmM
1 -
7.6 (6)b Pengadaan Tiang Pancang Beton Prategang Pracetak ukuran
/ diameter 400 mmM
1 -
7.6 (6)c Pengadaan Tiang Pancang Beton Prategang Pracetak ukuran
/ diameter 450 mmM
1 -
7.6 (7) Pemancangan Tiang Pancang Kayu. ukuran .... M1
-
7.6 (10) Pemancangan Tiang Pancang Pipa Baja ukuran .... -
7.9 Pasangan Batu M3
-
7.10 (3) Bronjong M3
-
7.11 (1) Pengadaan Tiang Pancang Baja kg -
7.11 (2) Pipa Ex. Pipa Gas/ Minyak kg -
7.11 (3) Reel band Plat kembang kg -
7.11 (4) Baja struktur kg -
7.11 (5) Pemancangan T. Pancang Baja M' -
7.13. Sandaran (Railing) M1
-
7.14 Papan Nama Jembatan Buah -
7.15 (1) Pembongkaran Pasangan Batu M3
-
7.15 (2) Pembongkaran Beton M3
-
7 15 (7) 2
5/22/2018 Bestek Tanjung Bulan - Tanjung Mas
4/14
No. Mata
PembayaranUraian Satuan
Perkiraan
Kuantitas
Harga Satuan
(Rupiah)
Jumlah Harga-
Harga (Rupiah)
9.1 Mandor Jam -
9.2 Pekerja Biasa Jam -
9.3 Tukang Kayu, Tukang Batu, dsb Jam -
9.4 Dump Truck, kapasitas 3-4 m Jam -
9.5 Truk Bak Datar 3 - 4 ton Jam -
9.6 Truk Tangki 3000 - 4500 Liter Jam -9.7 Bulldozer 100 - 150 PK Jam -
9.8 Motor Grader min 100 PK Jam -
9.9 Loader Roda Karet 1.0 - 1.6 M3
Jam -
9.10 Loader Roda Berantai 75 - 100 PK Jam -
9.11 Alat Penggali (Excavator) 80 - 140 PK Jam -
9.12 Crane 10 - 15 Ton Jam -
9.13 Penggilas Roda Besi 6 - 9 Ton Jam -
9.14 Penggilas Bervibrasi 5 - 8 Ton Jam -
9.15 Pemadat Bervibrasi 1.5 - 3.0 PK Jam -
9.16 Penggilas Roda Karet 8 - 10 Ton Jam -
9.17 Kompresor 4000 - 6500 Ltr/mnt Jam -
9.18 Beton Pengaduk (Molen) 0.3 - 0.6 M3
Jam -
9.19 Pompa Air 70 - 100 mm Jam -
9.20 Jack Hammer Jam -
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1 (1) Pemeliharaan Rutin Perkerasan LS -
10.1 (2) Pemeliharaan Rutin Bahu Jalan LS -
10.1 (3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan
Timbunan
LS -
10.1 (4) Pemeliharaan Rutin Perlengkapan Jalan LS -
10.1 (5) Pemeliharaan Rutin Jembatan LS -
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
5/22/2018 Bestek Tanjung Bulan - Tanjung Mas
5/14
HARGA DASAR SATUAN UPAH
HARGA
No. U R A I A N KODE SATUAN SATUAN
( Rp.)
1. Pekerja L01 Jam
2. Tukang L02 Jam
3. M a n d o r L03 Jam
4. Operator L04 Jam
5. Pembantu Operator L05 Jam
6. Sopir / Driver L06 Jam
7. Pembantu Sopir / Driver L07 Jam
8. Mekanik L08 Jam
9. Pembantu Mekanik L09 Jam
10. Kepala Tukang L10 Jam
KETERANGAN
(Rp / Hari)
5/22/2018 Bestek Tanjung Bulan - Tanjung Mas
6/14
DAFTAR
HARGA DASAR SATUAN BAHAN
HARGA
No. U R A I A N KODE SATUAN SATUAN KETERANGAN
( Rp.)
1 Pasir Pasang M01a M3
Pasir Beton M01b M3
Pasir Halus M01c M3
Pasir Urug M01d M3
2 Batu Karang M02a M3
Batu Kali M02b M3
3 Agregat Kasar M03a M3
Agregat Halus M03b M3
4 F i l l e r M04a Kg
Bahan Pengisi (Filler) Tambahan M04b Kg
5 Batu Belah / Kerakal M05 M3
6 G r a v e l / Koral M06 M3
7 Bahan Tanah Timbunan M07a M3
Bahan Pilihan M07b M3
8 Aspal M08 KG
9 Kerosen / Minyak Tanah M09 LITER
10 Semen / PC (50kg) M10a Zak
Semen / PC (kg) M10b Kg11 Besi Beton M11 Kg
12 Kawat Beton M12 Kg
13 Kawat Bronjong M13 Kg
14 S i r t u M14 M3
15 Cat Marka (Non Thermoplas) M15a Kg
Cat Marka (Thermoplastic) M15b Kg
16 P a k u M16 Kg
17 Kayu Kelas II M17a M3
Kayu Kelas III M17b M3
Kayu Kelas IV M17c M3Kayu Perancah M17d M3
Kayu Acuan M17f M3
18 B e n s i n (Industri) M18 LITER
19 S o l a r (Industri) M19 LITER
20 Minyak Pelumas / Olie M20 LITER
21 Plastik Filter M21 M2
Pipa Galvanis Dia. 3.0" Batang
22 Pipa Porus M22 M'
23 Bahan Agr.Base Kelas A M23 M3
24 Bahan Agr.Base Kelas B M24a M3Bahan Agr.Base Kelas S M24b M3
25 Bahan Agr.Base Kelas C M25 M3
26 Geotextile M26 M2
27 Aspal Emulsi M27 Kg
28 Gebalan Rumput M28 M2
29 Thinner M29 LITER
5/22/2018 Bestek Tanjung Bulan - Tanjung Mas
7/14
44 Pipa Baja M44 Kg
45 Minyak Fluks M45 Liter
46 Bunker Oil M46 Liter
47 Asbuton Halus M47 Ton
48 Baja Prategang M48 Kg
49 PCI Girder L=17m M49a Buah
PCI Girder L=21m M49b Buah
PCI Girder L=26m M49c BuahPCI Girder L=32m M49d Buah
PCI Girder L=36m M49e Buah
PCI Girder L=41m M49f Buah
Beton K-300 M3
Beton K-175 M3
50 Cerucuk M50 M
Elastomer buah
51 Bahan pengawet: kreosot M51 Liter
52 Mata Kucing M52 buah
53 Anchorage M53 buah
54 Anti stripping agent M54 liter
55 Bahan Modifikasi M55 Kg
Beton K-500 M3
Beton K-400 M3
56 Ducting (Kabel prestress) M56a M'
Ducting (Strand prestress) M56b M'
Beton K-350 M3
57 Multipleks 12 mm M57 Lbr
58 Elastomer jenis 1 (300 x 350 x 36) M58a buahElastomer jenis 2 (350 x 400 x 39) M58b buah
Elastomer jenis 3 (400 x 450 x 45) M58c buah
59 Expansion Tipe Joint Asphaltic Plug M59a M
Expansion Join Tipe Rubber M59b M
Expansion Join Baja Siku M59c M
Expansion Joint Tipe Torma M59d M1
Marmer M76 Buah
60 Kerb Type A M60 Buah
61 Paving Block M61 Buah
62 Mini Timber Pile M62 Buah63 Strip Bearing M63 Buah
64 Joint Socket Pile 35x35 M64a Set
Joint Socket Pile 16x16x16 M64b Set
65 Mikro Pile 16x16x16 M65 M1
66 Matras Concrete M66 Buah
67 Assetilline M67 Botol
68 Oxygen M68 Botol
69 Batu Bara M69 Kg
70 Pipa Galvanis Dia 3" M70a M
Pipa Galvanis Dia 2" M70b MPipa Galvanis Dia 1,5" M70c M
Agregat Pecah Mesin 0-5 mm M91 M3
Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3
Agregat Pecah Mesin 20-30 mm M93 M3
71 Joint Sealent M71 Kg
72 Cat Anti Karat M72 Kg
5/22/2018 Bestek Tanjung Bulan - Tanjung Mas
8/14
Klem (Kuku Macan) 2" M82c Bh
83 Rol Seling 0,5" M83a Set
Rol Seling 1,0" M83b Set
Rol Seling 1,5" M83c Set
Rol Seling 2,0" M83d Set
Martapura, 2014
Penawar,
PT./CV. Xxxxxxxxxx
Tn./Ny. Yyyyyyyyyyyyyyyy
Direktur/tris
5/22/2018 Bestek Tanjung Bulan - Tanjung Mas
9/14
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
% TERHADAP TOTAL BIAYA PROYEK =Lembar 1.2-1
A. SEWA TANAH M2 2,500
B. PERALATAN
Periksa lembar 1.2-2 1
C. FASILITAS KONTRAKTOR
1 Base Camp M2 150
2 Kantor M2 60
3 Barak M2 60
4 Bengkel M2 100
5 Gudang, dan lain-lain M2 0
D. FASILITAS LABORATORIUM
1 Ruang Laboratorium (sesuai Gambar) M2 0
2 Soil & Aggregate Testing
Compaction Test Set 0
CBR Test Set 0
Specific Gravity Set 0
Atterberg Limits Set 0
Grain Size Analysis Set 0
Field Density Test by Sand Cone Methode Set 0
Moisture Content Set 0
Abrasion of Aggregate by Los Angeles Machine Bln 0
3 Bituminous Testing
Marshall Asphalt Test Set 0
Extraction Test, Centrifuge/Refflux Method Set 0
Specific Gravity for Coarse Aggregate Set 0
Specific Gravity for Fine Aggregate Set 0
Mix Air Viod Content (Accurate Method) Set 0
Core Drill Set 0
Metal Thermometer Set 0
Accessories and Tolls Set 0
Penetration Test Bln 0Softening Point Set 0
Refusal Density Compactor Set 0
4 Concrete Testing
Slump Cone Set 0
Cylinder/Cube Mould for Compressive Strength Set 0
Beam Mould for Flexural Strength (RIGID) Set 0
No. U R A I A N SATUAN VOL.HARGA SATUAN
(Rp.)
JUMLAH
HARGA (Rp.)
5/22/2018 Bestek Tanjung Bulan - Tanjung Mas
10/14
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
B. PERALATAN
1 ASPHALT MIXING PLANT E01 Unit -
2 ASPHALT FINISHER E02 Unit -
3 ASPHALT SPRAYER E03 Unit -
4 BULLDOZER 100-150 HP E04 Unit -
5 COMPRESSOR 4000-6500 L\M E05 Unit -
6 CONCRETE MIXER 0.3-0.6 M3 E06 Unit -
7 CRANE 10-15 TON E07 Unit -
8 DUMP TRUCK 3.5 TON E08 Unit 5.00
9 DUMP TRUCK 10 TON E09 Unit -
10 EXCAVATOR 80-140 HP E10 Unit -
11 FLAT BED TRUCK 3-4 M3 E11 Unit -
12 GENERATOR SET E12 Unit -
13 MOTOR GRADER >100 HP E13 Unit 1.00
14 TRACK LOADER 75-100 HP E14 Unit -
15 WHEEL LOADER 1.0-1.6 M3 E15 Unit 1.00
16 THREE WHEEL ROLLER 6-8 T E16 Unit -
17 TANDEM ROLLER 6-8 T. E17 Unit -
18 TIRE ROLLER 8-10 T. E18 Unit -19 VIBRATORY ROLLER 5-8 T. E19 Unit 1.00
20 CONCRETE VIBRATOR E20 Unit -
21 STONE CRUSHER E21 Unit -
22 WATER PUMP 70-100 mm E22 Unit -
23 WATER TANKER 3000-4500 L. E23 Unit 1.00
24 PEDESTRIAN ROLLER E24 Unit -
25 TAMPER E25 Unit -
26 JACK HAMMER E26 Unit -
27 FULVI MIXER E27 Unit -
28 CONCRETE PUMP E28 Unit -29 TRAILER 20 TON E29 Unit -
30 PILE DRIVER + HAMMER E30 Unit -
31 CRANE ON TRACK 35 TON E31 Unit -
32 WELDING SET E32 Unit -
33 BORE PILE MACHINE E33 Unit -
34 ASPHALT LIQUID MIXER E34 Unit -
35 TRONTON E35 Unit -
36 COLD MILLING MACHINE E36 Unit -
37 ROCK DRILL BREAKER E37 Unit -
38 COLD RECYCLER E38 Unit -39 HOT RECYCLER E39 Unit -
40 AGGREGAT (CHIP) SPREADER E40 Unit -
41 ASPHALT DISTRIBUTOR E41 Unit -
42 SLIP FORM PAVER E42 Unit -
43 CONCRETE PAN MIXER E43 Unit -
44 CONCRETE BREAKER E44 Unit -
No. SATUAN VOL.HARGA SATUAN
(Rp.)
JUMLAH
HARGA (Rp.)JENIS ALAT KODE ALAT
5/22/2018 Bestek Tanjung Bulan - Tanjung Mas
11/14
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK / BAGPRO :
NO. PAKET KONTRAK : 27 (Dua Puluh Tujuh)
NAMA PAKET :
PROP / KAB / KODYA : Sumatera Selatan / Ogan Komering Ulu Timur
ITEM PEMBAYARAN NO. : 3.2 (3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : TOTAL HARGA :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYE :
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L01 Jam 0.0709
2. Mandor L03 Jam 0.0142
B. BAHAN
1. M14 M3 1.2586
C. PERALATAN
1. Wheel Loader E15 Jam 0.0071
2. Dump Truck E08 Jam 0.5628
3. Motor Grader E13 Jam 0.0035
4. Tandem Roller E17 Jam 0.0089
5. Water Tanker E23 Jam 0.0141
6. Alat Bantu Ls 1.0000
7.
Analisa EI-521
JUMLAH HARGA TENAGA
JUMLAH HARGA BAHAN
JUMLAH HARGA PERALATAN
Timbunan Pilihan berbutir (S
Timbunan Pilihan berbutir (Sirtu/Batu
Pecah Campur)
Rehab/Pemel. Jalan Tanjung Bulan - Tanjung Mas, Kec. Buay Madang/Buay Madang
Timur
5/22/2018 Bestek Tanjung Bulan - Tanjung Mas
12/14
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK / BAGPRO :
NO. PAKET KONTRAK : 27 (Dua Puluh Tujuh)
NAMA PAKET :
PROP / KAB / KODYA : Sumatera Selatan / Ogan Komering Ulu Timur
ITEM PEMBAYARAN NO. : 3.3 PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penyiapan Badan Jalan TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
1. Pekerja L01 jam 0.0156
2. Mandor L03 jam 0.0039
B. BAHAN
C. PERALATAN
1. Motor Grader E13 jam 0.0039
2. Vibro Roller E19 jam 0.0005
3 Alat Bantu Ls 1.0000
JUMLAH HARGA PERALATAN
Rehab/Pemel. Jalan Tanjung Bulan - Tanjung Mas, Kec. Buay Madang/Buay Madang
Timur
JUMLAH HARGA BAHAN
JUMLAH HARGA TENAGA
Analisa EI-331
5/22/2018 Bestek Tanjung Bulan - Tanjung Mas
13/14
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA
1 ASPHALT MIXING PLANT E01 294.00 60.00 T/Jam2 ASPHALT FINISHER E02 72.40 10.00 Ton
3 ASPHALT SPRAYER E03 4.00 850.00 Liter
4 BULLDOZER 100-150 HP E04 155.00 - -
5 COMPRESSOR 4000-6500 L\M E05 75.00 5,000.00 CPM/(L/m)
6 CONCRETE MIXER 0.3-0.6 M3 E06 20.00 500.00 Liter
7 CRANE 10-15 TON E07 138.00 15.00 Ton
8 DUMP TRUCK 3.5 TON E08 100.00 3.50 Ton
9 DUMP TRUCK 10 TON E09 190.00 10.00 Ton
10 EXCAVATOR 80-140 HP E10 143.00 0.93 M3
11 FLAT BED TRUCK 3-4 M3 E11 100.00 4.00 ton
12 GENERATOR SET E12 180.00 135.00 KVA13 MOTOR GRADER >100 HP E13 135.00 10,800.00 -
14 TRACK LOADER 75-100 HP E14 70.00 0.80 M3
15 WHEEL LOADER 1.0-1.6 M3 E15 96.00 1.50 M3
16 THREE WHEEL ROLLER 6-8 T E16 55.00 8.00 Ton
17 TANDEM ROLLER 6-8 T. E17 82.00 8.10 Ton
18 TIRE ROLLER 8-10 T. E18 100.50 9.00 Ton
19 VIBRATORY ROLLER 5-8 T. E19 82.00 7.05 Ton
20 CONCRETE VIBRATOR E20 5.50 25.00 -
21 STONE CRUSHER E21 220.00 50.00 T/Jam
22 WATER PUMP 70-100 mm E22 6.00 - -
23 WATER TANKER 3000-4500 L. E23 100.00 4,000.00 Liter
24 PEDESTRIAN ROLLER E24 8.80 835.00 Ton
25 TAMPER E25 4.70 121.00 Ton
26 JACK HAMMER E26 - 1,330.00 -
-
No. URAIAN KODE HP KAP.
BIAYA SEWA
ALAT/JAM (di luar
PPN)
KET.
. , . -
28 CONCRETE PUMP E28 100.00 8.00 M3
29 TRAILER 20 TON E29 290.00 20.00 Ton
30 PILE DRIVER + HAMMER E30 25.00 2.50 Ton
31 CRANE ON TRACK 35 TON E31 125.00 35.00 Ton
32 WELDING SET E32 40.00 250.00 Amp
33 BORE PILE MACHINE E33 150.00 2,000.00 Meter34 ASPHALT LIQUID MIXER E34 5.00 1,000.00 Liter
35 TRONTON E35 150.00 15.00 Ton
36 COLD MILLING E36 248.00 1,000.00 m
37 ROCK DRILL BREAKER E37 3.00 - -
38 COLD RECYCLER E38 900.00 2.20 M
39 HOT RECYCLER E39 400.00 3.00 M
40 AGGREGAT (CHIP) SPREADER E40 115.00 3.50 M
41 ASPHALT DISTRIBUTOR E41 115.00 4,000.00 Liter
42 SLIP FORM PAVER E42 105.00 2.50 M
43 CONCRETE PAN MIXER E43 134.00 600.00 Liter
44 CONCRETE BREAKER E44 290.00 20.00 m3/jam45 ASPAHLT TANKER E45 190.00 6,000.00 liter
46 CEMENT TANKER E46 190.00 4,000.00 liter
47 CONDRETE MIXER (350) E47 20.00 350.00 liter
48 VIBRATING RAMMER E48 4.20 80.00 KG
49 TRUK MIXER (AGITATOR) E49 220.00 5.00 M3
50 BORE PILE MACHINE E50 125.00 60.00 CM
51 CRANE ON TRACK 75-100 TON E51 200.00 75.00 Ton