Tuesday, June 13th, 2017 - Biogas Liquefaction workshop Final Programme Location: Samsø Energy Academy, Strandengen 1, 8305 Samsø 10.45- 11.00 Welcome by Marcel Meijer, Mayor of Samsø 11.00- 11.10 Presentation of expert panel: PlanEnergi, Samsø Technical Department, Samsø Rederi, Samsø Harbours, Kosan Crisplant 11.10-11.30 Knud Tybirk, Samsø Biogas IVS: Field to Ferry case presentation, including the Liquefaction challenge 11.30-11.45 Kosan Crisplant: The LNG bunkering solution in Hou used for the ferry Princess Isabella 11.50-12.20 CryoPur: Experiences and proposed solution for the Samsø Case plus Q&A 12.30-13.30 Lunch sandwich from Dokken 13.40-14.10 StirLNG/Pentair: Experiences and proposed solution for the Samsø Case incl. Q&A 14.20-14.50 Nærenergi/Cryobox experiences and proposed solution for the Samsø Case incl. Q&A 15.00-15.30 Coffee break 15.30-16.00 Wärtsila: experiences and proposed solution for the Samsø Case plus Q&A 16.00-16.30 General discussion of scope and scale for liquefaction 16.30-16.45 Wrapping up and conclusion 19.00 Dinner at Restaurant Dokken, hosted by Samsø Municipality

BIOGAS LIQUEFACTION CHALLENGE - golng.eu to ferry_LBM.pdf · 12.30-13.30 Lunch sandwich from Dokken 13.40-14.10 StirLNG/Pentair: Experiences and proposed solution for the Samsø Case

Embed Size (px)

Citation preview

Tuesday, June 13th, 2017 - Biogas Liquefaction workshop Final Programme Location: Samsø Energy Academy, Strandengen 1, 8305 Samsø 10.45- 11.00 Welcome by Marcel Meijer, Mayor of Samsø 11.00- 11.10 Presentation of expert panel: PlanEnergi, Samsø Technical Department, Samsø Rederi, Samsø Harbours, Kosan Crisplant 11.10-11.30 Knud Tybirk, Samsø Biogas IVS: Field to Ferry case presentation, including the Liquefaction challenge 11.30-11.45 Kosan Crisplant: The LNG bunkering solution in Hou used for the ferry Princess Isabella 11.50-12.20 CryoPur: Experiences and proposed solution for the Samsø Case plus Q&A 12.30-13.30 Lunch sandwich from Dokken 13.40-14.10 StirLNG/Pentair: Experiences and proposed solution for the Samsø Case incl. Q&A 14.20-14.50 Nærenergi/Cryobox experiences and proposed solution for the Samsø Case incl. Q&A 15.00-15.30 Coffee break 15.30-16.00 Wärtsila: experiences and proposed solution for the Samsø Case plus Q&A 16.00-16.30 General discussion of scope and scale for liquefaction 16.30-16.45 Wrapping up and conclusion 19.00 Dinner at Restaurant Dokken, hosted by Samsø Municipality

BIOGAS LIQUEFACTION – THE SAMSØ CASE

CHALLENGE

Knud Tybirk, Uffe Vinther Kristensen, Søren Stensgård

Samsø Kommune/Samsø Biogas IVS [email protected]

The Samsø Case

• From fossil based

• To Renewable Energy Island

• Towards Island Free of Fossil Fuels

• The new value chain: Biogas from Field to Ferry

• International cooperation

• Circular bioeconomy transition

• Decision on the gas customer

Samsø - The island of gathering

• 3700 inhabitants, 7x30 kms

• Independent municipality administratively

• Agriculture, Vegetables,

• potatoes, onions, cabbage

• Tourism, Green energy

• ‘The Samsø Way’

Renewable Energy Island since 2007 • Co-operative ownership: ‘The Samsoe Way’

Open Space in 2012: where to go?? • Samsoe 2.0: Free of fossil fuels • Including ferrys • Save energy • Develop partnerships • Etc.

‘The Samsoe Way’

Connections and

cooperation

LNG ferry 2015 LBM 2018

New harbour in 2014

Biogas from the fields to the ferry

• Biogas impossible without a ferry as customer

• Municipal decision in 2013:

– We make our own shipping company!

• New ferry since 2015

• Now we need the biogas

EUDP Feasibility

Waste for resources Digestate for grass

Green line Slurry, straw, grass, agr. wastes

Digestate for all crops

Double loop – Circular Economy

Biogas Input: 1/3 Slurry 1/3 industrial sewage water 1/3 societal wastes and Agr. wastes

The Samsoe Case

• Biogas 2020 value chain implementation

– Circular economy

• GO-LNG technical & economic feasibility

– Business concept

Production phase 1: 3,6 mio Nm3 Biogas Phase 2: 6 Mio Nm3 Biogas

PRINSESSE ISABELLA

Why this workshop?

• We have a potential customer, but also a challenge at Samsø!!

– Low european market price for LNG

– Low subsidies/feed-in tariff for gas for transport in Denmark

• 2 reasons:

• Is Liquid Biomethane commercially competitive and technically ready?

– Risk elimination for investors - For procurement

– you will answer some uncertainties today

• International Awareness

– Could ‘Field to Ferry’ become a future solution for coastal communities??

– Business concept for Baltic Sea Region

IMO NOx Tier III requirements

0.10% sulphur limit for SECAs

www.golng.eu

www.biogas2020.se

‘Amongs the blind, the one-eyed is the king ’

Status June 2017

• Municipal decision on biogas localisation

• Environmental Impact assessment – approval ultimo 2017

• Samsø Biogas Start-up, March 2017

– Business plan scenarios, alternatives – CBG, LBG

– Investor dialoque, crowd funding

– Investment decision

– Detailed planning, permits

– Construction, production in 2019.

• And we kneed you inputs for the decisions to be made!

Thank you for your attention!

• And welcome to Samsoe!

[email protected]

Start / End Theme Location

8.30 Scope of the day and evaluation of the workshop input from previous day. Samsø

municipality

9.00 Presentation of the preliminary Business models for Samsø and BSR region

9.30. Technical and economic input from seminar incorporated

10.00 Coffee break

10.30 – 12.00 Further detailing and discussion of Business Model Canvas and next steps

12.30 Lunch and departure for ferry (dep. 13.15 for Jutland)

13.15 END DAY 3 Samsø

Wednesday, 14th June 2017 –

WP3 & WP6: Business plan workshop (continued)