    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    External Works form

    A gravel bed, 100 mm thick 55.0 m3 2,200.68 121,037.1

    B concrete curb 0.8 m3 6,978.78 5,652.8

    C wall footing 8.3 m3 1,923.28 15,963.2

    D thickening to slab under chb wall 0.4 m3 4,382.10 1,752.8

    E footing 3.6 m3 5,778.00 20,800.8

    F column 4.0 m3 5,657.72 22,630.8

    G slab on grade, 0.15m thick 75.0 m3 3,500.87 262,565.5

    H ramp, 0.15m thick 2.2 m3 3,490.57 7,749.0

    Masonry

    I 6" chb wall, 201.3 m2 801.48 161,338.2

    Building

    J gravel bed, 0.10 m thick 80.1 m3 2,200.68 176,186.0

    K slab on grade, 5" thick 93.8 m3 3,807.43 357,137.1

    L wall footing 12.4 m3 1,923.28 23,848.64

    M footing 79.0 m3 13,100.86 1,034,967.8

    N column 7.9 m3 13,580.31 107,284.4

    O grade beam 15.4 m3 19,611.80 302,021.7

    P beam 3.1 m3 5,657.72 17,538.9

    Masonry

    Q 6" chb wall 1,213.0 m2 801.48 972,197.0

    To Collection 3,610,672.4

    D:\PROJ\242519111.xls.ms_office\boq.XLS Page-1

  • 5/20/2018 BOQ - Warehouse

    2/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    Structural steel

    Columns

    W12x65 (x9m, 868.2kg) 8.0 no

    W12x87 (x9m, 1162.kg) 4.0 no

    W14x109 (x11.3m, 1828kg) 2.0 no

    Beams

    W8x31 (x6m, 276kg) 10.0 no.

    W5x19 (x6m, 169.2kg) 10.0 no.

    W12X53 (6m, 472kg) 2.0 no.

    W12X53 (6.5m, 511.3kg) 2.0 no.

    W12X53 (5.5m, 432.6kg) 2.0 no.

    W12X53 (7m, 551kg) 2.0 no.

    W10X12 (6m, 106.8kg) 2.0 no.

    W10X12 (6.5m, 115.8kg) 2.0 no.

    W10X12 (5.5m, 98kg) 2.0 no.

    W10X12 (7m, 124.7kg) 2.0 no.

    Tapered beam, L=13.35m (B=0.3m, H=0.3/0.7m, 12.0 no.

    tw=0.025, tf=0.025; Wt=2745kg)

    Brace

    L30308LD (7.81m, 216.96kg) 12.0 no.

    L50505LD (10.07m, 308.3kg) 12.0 no.

    Monitor truss, (145.5 kg) 6.0 no

    Monitor side truss, 6m x 1.3m (95.4kg) 12.0 no

    To Collection

    Roofing

    D:\PROJ\242519111.xls.ms_office\boq.XLS Page-2

  • 5/20/2018 BOQ - Warehouse

    3/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    Roofing sheets,0.9m x 2m, g#26 78.0 pcs 2,092.23 163,193.9

    Roofing sheets,0.9m x 4.26m, g#26 262.1 pcs 2,092.23 548,331.6

    Ridge roll, 8' 14.0 pcs 607.50 8,505.0

    gutter, 8' 24.0 pcs 607.50 14,580.0

    flushing at monitor, 8' 28.0 pcs 607.50 17,010.0

    fluashing above gutter 28.0 pcs 607.50 17,010.0

    c purlins 2 x 8 in x 2mm thick x 6m 156.0 pcs 1,471.50 229,554.0

    fixing accessories 1.0 ls 49,909.23 49,909.2

    foam insulation, two-sided, 5 mm thick 860.0 m2 92.77 79,778.1

    To Collection 1,127,871.9

    DOORS AND WINDOWS

    D:\PROJ\242519111.xls.ms_office\boq.XLS Page-3

  • 5/20/2018 BOQ - Warehouse

    4/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    Doors

    Sliding metal door, including rail and guides and 1.0 no.

    other fixing accessories, two panel, overall size 7m x

    4.5m

    Door, 0.9m x 2.1m 1.0 no

    Door, 0.9m x 2.1m, 1 face weather resistant 1.0 no.

    Door, 0.7m x 2.1m, 1 face weather resistant 2.0 no.

    Sliding metal gate, 7.0 m length complete with guide 1.0 no.

    and fixing accessories

    Pedestrian gate, size 1.2m wide (provision) 1.0 no.

    Windows

    Steel casement window, size 6.4m x 1.2m 1.0 no.

    Steel casement window, size 5.1m x 1.2m 5.0 no.

    Fixed glass window, size 4.6x1.2 2.0 no.

    Finishes

    Internal Floor Finishes

    Toilet 2.8 m2 3,149.55 8,661.2

    Office, 12"x12" tiles 39.0 m2 842.60 32,861.5

    Working area, plain cement finish 708.0 m2 586.97 415,572.2

    Guardhouse, plain cement finish 4.0 m2 586.97 2,342.0

    Toilet at guard house 4.5 m2 3,149.55 14,172.9

    Internal wall finishes

    Toilet 19.4 m2 1,461.42 28,409.9

    Office 57.8 m2 586.97 33,926.6

    Working area, plain cement finish 1,092.0 m2 586.97 640,967.4

    To Collection 1,176,914.0

    Guardhouse, plain cement finish 21.6 m2 586.97 12,678.4

    Toilet at guard house 19.4 m2 1,461.42 28,409.9

    D:\PROJ\242519111.xls.ms_office\boq.XLS Page-4

  • 5/20/2018 BOQ - Warehouse

    5/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    Internal ceiling finishes

    Toilet 2.8 m2 314.96 866.1

    Office 39.0 m2 314.96 12,283.2

    Working area* (open) 750.0 m2

    Guardhouse 4.0 m2 314.96 1,256.6

    Toilet at guard house 4.5 m2 314.96 1,417.3

    External floor finishes

    External pavement 500.0 m2 448.94 224,471.2

    Entrance ramp 14.8 m2 448.94 6,639.8

    sidewalk beside building 18.0 m2 448.94 8,080.9

    Ramp to building 11.3 m2 448.94 5,050.6

    Sidewalk at fence 27.0 m2 448.94 12,121.4

    External finishes

    External finish to walls 1,520.4 m2 54.69 83,148.4

    To Collection 396,424.2

    SUMMARY

    Page 1 3,610,672.4

    D:\PROJ\242519111.xls.ms_office\boq.XLS Page-5

  • 5/20/2018 BOQ - Warehouse

    6/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    Page 2

    Page 3 1,127,871.9

    Page 4 1,176,914.0

    Page 5 396,424.2

    Total 6,311,882.5

    D:\PROJ\242519111.xls.ms_office\boq.XLS Page-6

  • 5/20/2018 BOQ - Warehouse

    7/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    External Works form

    A gravel bed, 100 mm thick 55.0 m3 2,200.68 121,037.1

    B concrete curb 0.8 m3 6,978.78 5,652.8

    C wall footing 8.3 m3 1,923.28 15,963.2

    D thickening to slab under chb wall 0.4 m3 4,382.10 1,752.8

    E footing 3.6 m3 5,778.00 20,800.8

    F column 4.0 m3 5,657.72 22,630.8

    G slab on grade, 0.15m thick 75.0 m3 3,500.87 262,565.5

    H ramp, 0.15m thick 2.2 m3 3,490.57 7,749.0

    Masonry

    I 6" chb wall, 201.3 m2 801.48 161,338.2

    Building

    J gravel bed, 0.10 m thick 80.1 m3 2,200.68 176,186.0

    K slab on grade, 5" thick 93.8 m3 3,807.43 357,137.1

    L wall footing 12.4 m3 1,923.28 23,848.64

    M footing 79.0 m3 13,100.86 1,034,967.8

    N column 7.9 m3 13,580.31 107,284.4

    O grade beam 15.4 m3 19,611.80 302,021.7

    P beam 3.1 m3 5,657.72 17,538.9

    Masonry

    Q 6" chb wall 1,213.0 m2 801.48 972,197.0

    To Summary 3,610,672.4

    D:\PROJ\242519111.xls.ms_office\boq (2).XLS Page-7

  • 5/20/2018 BOQ - Warehouse

    8/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    Structural steel

    Columns

    W12x65 (x9m, 868.2kg) 8.0 no 36,334.17 290,673.3

    W12x87 (x9m, 1162.kg) 4.0 no 48,629.70 194,518.8

    W14x109 (x11.3m, 1828kg) 2.0 no 76,501.80 153,003.6

    Beams

    W8x31 (x6m, 276kg) 10.0 no. 11,550.60 115,506.0

    W5x19 (x6m, 169.2kg) 10.0 no. 7,081.02 70,810.2

    W12X53 (6m, 472kg) 2.0 no. 19,753.20 39,506.4

    W12X53 (6.5m, 511.3kg) 2.0 no. 21,397.91 42,795.8

    W12X53 (5.5m, 432.6kg) 2.0 no. 22,289.31 44,578.6

    W12X53 (7m, 551kg) 2.0 no. 23,059.35 46,118.7

    W10X12 (6m, 106.8kg) 2.0 no. 4,469.58 8,939.1

    W10X12 (6.5m, 115.8kg) 2.0 no. 4,846.23 9,692.4

    W10X12 (5.5m, 98kg) 2.0 no. 4,101.30 8,202.6

    W10X12 (7m, 124.7kg) 2.0 no. 5,218.70 10,437.3

    Tapered beam, L=13.35m (B=0.3m, H=0.3/0.7m, 12.0 no. 114,878.25 1,378,539.0

    tw=0.025, tf=0.025; Wt=2745kg)

    Brace

    L30308LD (7.81m, 216.96kg) 12.0 no. 9,079.78 108,957.3

    L50505LD (10.07m, 308.3kg) 12.0 no. 12,902.36 154,828.2

    Monitor truss, (145.5 kg) 6.0 no 6,089.18 36,535.0

    Monitor side truss, 6m x 1.3m (95.4kg) 12.0 no 3,992.49 47,909.8

    To Summary 2,761,552.6

    Roofing

    D:\PROJ\242519111.xls.ms_office\boq (2).XLS Page-8

  • 5/20/2018 BOQ - Warehouse

    9/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    Roofing sheets,0.9m x 2m, g#26 78.0 pcs 2,092.23 163,193.9

    Roofing sheets,0.9m x 4.26m, g#26 262.1 pcs 2,092.23 548,331.6

    Ridge roll, 8' 14.0 pcs 607.50 8,505.0

    gutter, 8' 24.0 pcs 607.50 14,580.0

    flushing at monitor, 8' 28.0 pcs 607.50 17,010.0

    fluashing above gutter 28.0 pcs 607.50 17,010.0

    c purlins 2 x 8 in x 2mm thick x 6m 156.0 pcs 1,471.50 229,554.0

    fixing accessories 1.0 ls 49,909.23 49,909.2

    foam insulation, two-sided, 5 mm thick 860.0 m2 92.77 79,778.1

    To Summary 1,127,871.9

    DOORS AND WINDOWS

    D:\PROJ\242519111.xls.ms_office\boq (2).XLS Page-9

  • 5/20/2018 BOQ - Warehouse

    10/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    Doors

    Sliding metal door, including rail and guides and 1.0 no. 22,875.05 22,875.0

    other fixing accessories, two panel, overall size 7m x

    4.5m

    Door, 0.9m x 2.1m 1.0 no 1,372.50 1,372.5

    Door, 0.9m x 2.1m, 1 face weather resistant 1.0 no. 1,372.50 1,372.5

    Door, 0.7m x 2.1m, 1 face weather resistant 2.0 no. 1,067.50 2,135.0

    Sliding metal gate, 7.0 m length complete with guide 1.0 no. 10,675.02 10,675.0

    and fixing accessories

    Pedestrian gate, size 1.2m wide (provision) 1.0 no. 1,830.00 1,830.0

    Windows

    Steel casement window, size 6.4m x 1.2m 1.0 no. 5,577.15 5,577.1

    Steel casement window, size 5.1m x 1.2m 5.0 no. 4,444.30 22,221.4

    Fixed glass window, size 4.6x1.2 2.0 no. 4,008.58 8,017.1

    Finishes

    Internal Floor Finishes

    Toilet 2.8 m2 3,149.55 8,661.2

    Office, 12"x12" tiles 39.0 m2 842.60 32,861.5

    Working area, plain cement finish 708.0 m2 586.97 415,572.2

    Guardhouse, plain cement finish 4.0 m2 586.97 2,342.0

    Toilet at guard house 4.5 m2 3,149.55 14,172.9

    Internal wall finishes

    Toilet 19.4 m2 1,461.42 28,409.9

    Office 57.8 m2 586.97 33,926.6

    Working area, plain cement finish 1,092.0 m2 586.97 640,967.4

    To Summary 1,252,989.8

    Guardhouse, plain cement finish 21.6 m2 586.97 12,678.4

    Toilet at guard house 19.4 m2 1,461.42 28,409.9

    D:\PROJ\242519111.xls.ms_office\boq (2).XLS Page-10

  • 5/20/2018 BOQ - Warehouse

    11/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    Internal ceiling finishes

    Toilet 2.8 m2 314.96 866.1

    Office 39.0 m2 314.96 12,283.2

    Working area* (open) 750.0 m2

    Guardhouse 4.0 m2 314.96 1,256.6

    Toilet at guard house 4.5 m2 314.96 1,417.3

    External floor finishes

    External pavement 500.0 m2 448.94 224,471.2

    Entrance ramp 14.8 m2 448.94 6,639.8

    sidewalk beside building 18.0 m2 448.94 8,080.9

    Ramp to building 11.3 m2 448.94 5,050.6

    Sidewalk at fence 27.0 m2 448.94 12,121.4

    External finishes

    External finish to walls 1,520.4 m2 54.69 83,148.4

    To Summary 396,424.2

    SUMMARY

    Page 1 3,610,672.4

    D:\PROJ\242519111.xls.ms_office\boq (2).XLS Page-11

  • 5/20/2018 BOQ - Warehouse

    12/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    Page 2 2,761,552.6

    Page 3 1,127,871.9

    Page 4 1,252,989.8

    Page 5 396,424.2

    Total 9,149,511.0

    D:\PROJ\242519111.xls.ms_office\boq (2).XLS Page-12

  • 5/20/2018 BOQ - Warehouse

    13/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    External Works form

    A gravel bed, 100 mm thick 55.0 m3 2,200.68 121,037.1

    B concrete curb 0.8 m3 6,978.78 5,652.8

    C wall footing 8.3 m3 1,923.28 15,963.2

    D thickening to slab under chb wall 0.4 m3 4,382.10 1,752.8

    E footing 3.6 m3 5,778.00 20,800.8

    F column 4.0 m3 5,657.72 22,630.8

    G slab on grade, 0.15m thick 75.0 m3 3,500.87 262,565.5

    H ramp, 0.15m thick 2.2 m3 3,490.57 7,749.0

    Masonry

    I 6" chb wall, 201.3 m2 801.48 161,338.2

    Building

    J gravel bed, 0.10 m thick 80.1 m3 2,200.68 176,186.0

    K slab on grade, 5" thick 93.8 m3 3,807.43 357,137.1

    L wall footing 12.4 m3 1,923.28 23,848.64

    M footing 79.0 m3 13,100.86 1,034,967.8

    N column 7.9 m3 13,580.31 107,284.4

    O grade beam 15.4 m3 19,611.80 302,021.7

    P beam 3.1 m3 5,657.72 17,538.9

    Masonry

    Q 6" chb wall 1,213.0 m2 801.48 972,197.0

    To Summary 3,610,672.4

    D:\PROJ\242519111.xls.ms_office\B001.XLS Page-13

  • 5/20/2018 BOQ - Warehouse

    14/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    Structural steel

    Columns

    W12x65 (x9m, 868.2kg) 8.0 no 36,334.17 290,673.3

    W12x87 (x9m, 1162.kg) 4.0 no 48,629.70 194,518.8

    W14x109 (x11.3m, 1828kg) 2.0 no 76,501.80 153,003.6

    Beams

    W8x31 (x6m, 276kg) 10.0 no. 11,550.60 115,506.0

    W5x19 (x6m, 169.2kg) 10.0 no. 7,081.02 70,810.2

    W12X53 (6m, 472kg) 2.0 no. 19,753.20 39,506.4

    W12X53 (6.5m, 511.3kg) 2.0 no. 21,397.91 42,795.8

    W12X53 (5.5m, 432.6kg) 2.0 no. 22,289.31 44,578.6

    W12X53 (7m, 551kg) 2.0 no. 23,059.35 46,118.7

    W10X12 (6m, 106.8kg) 2.0 no. 4,469.58 8,939.1

    W10X12 (6.5m, 115.8kg) 2.0 no. 4,846.23 9,692.4

    W10X12 (5.5m, 98kg) 2.0 no. 4,101.30 8,202.6

    W10X12 (7m, 124.7kg) 2.0 no. 5,218.70 10,437.3

    Tapered beam, L=13.35m (B=0.3m, H=0.3/0.7m, 12.0 no. 114,878.25 1,378,539.0

    tw=0.025, tf=0.025; Wt=2745kg)

    Brace

    L30308LD (7.81m, 216.96kg) 12.0 no. 9,079.78 108,957.3

    L50505LD (10.07m, 308.3kg) 12.0 no. 12,902.36 154,828.2

    Monitor truss, (145.5 kg) 6.0 no 6,089.18 36,535.0

    Monitor side truss, 6m x 1.3m (95.4kg) 12.0 no 3,992.49 47,909.8

    To Summary 2,761,552.6

    Roofing

    D:\PROJ\242519111.xls.ms_office\B001.XLS Page-14

  • 5/20/2018 BOQ - Warehouse

    15/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    Roofing sheets,0.9m x 2m, g#26 78.0 pcs 2,092.23 163,193.9

    Roofing sheets,0.9m x 4.26m, g#26 262.1 pcs 2,092.23 548,331.6

    Ridge roll, 8' 14.0 pcs 607.50 8,505.0

    gutter, 8' 24.0 pcs 607.50 14,580.0

    flushing at monitor, 8' 28.0 pcs 607.50 17,010.0

    fluashing above gutter 28.0 pcs 607.50 17,010.0

    c purlins 2 x 8 in x 2mm thick x 6m 156.0 pcs 1,471.50 229,554.0

    fixing accessories 1.0 ls 49,909.23 49,909.2

    foam insulation, two-sided, 5 mm thick 860.0 m2 92.77 79,778.1

    To Summary 1,127,871.9

    DOORS AND WINDOWS

    D:\PROJ\242519111.xls.ms_office\B001.XLS Page-15

  • 5/20/2018 BOQ - Warehouse

    16/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    Doors

    Sliding metal door, including rail and guides and 1.0 no. 22,875.05 22,875.0

    other fixing accessories, two panel, overall size 7m x

    4.5m

    Door, 0.9m x 2.1m 1.0 no 1,372.50 1,372.5

    Door, 0.9m x 2.1m, 1 face weather resistant 1.0 no. 1,372.50 1,372.5

    Door, 0.7m x 2.1m, 1 face weather resistant 2.0 no. 1,067.50 2,135.0

    Sliding metal gate, 7.0 m length complete with guide 1.0 no. 10,675.02 10,675.0

    and fixing accessories

    Pedestrian gate, size 1.2m wide (provision) 1.0 no. 1,830.00 1,830.0

    Windows

    Steel casement window, size 6.4m x 1.2m 1.0 no. 5,577.15 5,577.1

    Steel casement window, size 5.1m x 1.2m 5.0 no. 4,444.30 22,221.4

    Fixed glass window, size 4.6x1.2 2.0 no. 4,008.58 8,017.1

    Finishes

    Internal Floor Finishes

    Toilet 2.8 m2 3,149.55 8,661.2

    Office, 12"x12" tiles 39.0 m2 842.60 32,861.5

    Working area, plain cement finish 708.0 m2 586.97 415,572.2

    Internal wall finishes

    Toilet 19.4 m2 1,461.42 28,409.9

    Office 57.8 m2 586.97 33,926.6

    Working area, plain cement finish 1,092.0 m2 586.97 640,967.4

    To Summary 1,236,474.9

    Internal ceiling finishes

    D:\PROJ\242519111.xls.ms_office\B001.XLS Page-16

  • 5/20/2018 BOQ - Warehouse

    17/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    Toilet 2.8 m2 314.96 866.1

    Office 39.0 m2 314.96 12,283.2

    Working area* (open) 750.0 m2

    External wall finishes

    External finish to walls 1,520.4 m2 54.69 83,148.4

    To Summary 96,297.7

    SUMMARY

    Page 1 3,610,672.4

    D:\PROJ\242519111.xls.ms_office\B001.XLS Page-17

  • 5/20/2018 BOQ - Warehouse

    18/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    PhP

    Page 2 2,761,552.6

    Page 3 1,127,871.9

    Page 4 1,236,474.9

    Page 5 96,297.7

    Total 8,832,869.6

    Building 11,777.16 8,832,869.6

    Services 4,063.50 3,047,625.0

    15,840.66 11,880,494.6

    DLS Cost Data rate adjustment factor

    Min 13,150.0 1.29 16,963.5

    Max 18,950.0 1.29 24,445.5

    D:\PROJ\242519111.xls.ms_office\B001.XLS Page-18

  • 5/20/2018 BOQ - Warehouse

    19/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    cement 3,168 pcs

    sand 175 m3

    gravel 150 m3

    6" chb 17,679 pcs

    10x6 steel bars 2,603 pcs

    12x6 steel bars 84 pcs

    16x6 steel bars 777 pcs

    16x7.5 steel bars 72 pcs

    Total 0

    D:\PROJ\242519111.xls.ms_office\bom.XLS Page-19

  • 5/20/2018 BOQ - Warehouse

    20/32

    ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT

    D:\PROJ\242519111.xls.ms_office\bom.XLS Page-20

  • 5/20/2018 BOQ - Warehouse

    21/32

    D:\PROJ\242519111.xls.ms_office\bom.XLS Page-21

  • 5/20/2018 BOQ - Warehouse

    22/32

    D:\PROJ\242519111.xls.ms_office\bom.XLS Page-22

  • 5/20/2018 BOQ - Warehouse

    23/32

    Project:

    PRICE ANALYSIS SHEET

    CODE DESCRIPTION UNIT QUANTITY WASTAGE U-RATE AMOU

    2

    Division 2

    ExternalWorks

    Grqavel bed QUANTITY CONSIDERED 1.00 m

    M A Garvel bed

    A Gravel m 1.00 1.05 1150.00 1,

    T

    E

    R

    I

    A

    L

    SUB-TOTAL 1,

    u/h

    L Labour 0.00 1.05 43.06

    A 0.00 1.05 43.06

    B 0.00 1.05 43.06

    O

    U

    R

    0.00 SUB-TOTAL

    E

    Q

    U

    I

    P

    SUB-TOTAL

    S

    U

    B

    C

    O

    N

    T

    SUB-TOTAL

    TOTAL DIRECT UNIT PRICE 1,

    REMARKS

    Total Quantity

    TOTAL ITEM VALUE. F 1,

    TRG ESTIMATING DEPARTMENT

    SBD-RPD ESTIMATING (AJA) 23 242519111.xls.ms_office 8/28/2

  • 5/20/2018 BOQ - Warehouse

    24/32

    Project:

    PRICE ANALYSIS SHEET

    CODE DESCRIPTION UNIT QUANTITY WASTAGE U-RATE AMOU

    TRG ESTIMATING DEPARTMENT

    3

    Division 3

    ConcreteWorks

    Reinforced concrete, AAA (1:2:3) QUANTITY CONSIDERED 1.00 m3

    M A Concrete curb

    A 0.08

    T Cement 10.5 bags 0.866 1.05 214.00 1

    E Sand 0.42 m 0.035 1.05 840.00

    R Gravel 0.84 m 0.07 1.05 1390.00 1

    I Steel 3.04 kg 36.85 1.05 45.20 1,7

    A Form plywood, 1/2", ord 0.4 m 4.85 1.05 191.48 9

    L Coco lumber 4.3733 bf 53.01 1.05 14.00 7

    SUB-TOTAL 3,8

    L

    A

    B

    O

    U

    R

    0.00 SUB-TOTAL 1,3

    E

    Q

    U

    I

    P

    SUB-TOTAL

    S

    U

    B

    C

    ON

    T

    SUB-TOTAL

    TOTAL DIRECT UNIT PRICE 5,1

    REMARKS

    Total Quantity

    SBD-RPD ESTIMATING (AJA) 24 242519111.xls.ms_office 8/28/20

  • 5/20/2018 BOQ - Warehouse

    25/32

    Project:

    PRICE ANALYSIS SHEET

    CODE DESCRIPTION UNIT QUANTITY WASTAGE U-RATE AMOUN

    TRG ESTIMATING DEPARTMENT

    TOTAL ITEM VALUE.

    F

    3Division 3

    Concrete

    Workswall footing QUANTITY CONSIDERED 1.00 m3

    B wall footing

    M 0.14

    A Cement 10.5 bags 1.418 1.05 214.00 3

    T Sand 0.42 m3 0.057 1.05 840.00

    E Gravel 0.84 m3 0.113 1.05 1390.00 1

    R Steel 3.6 kg 0.486 1.05 45.20

    I Form plywood, 1/2", ord 0.6 m 0.081 1.05 191.48

    A Coco lumber 4.8107 bf 35.63 1.05 14.00 5

    L

    SUB-TOTAL 1,0

    L

    A

    B

    O

    U

    R

    0.00 SUB-TOTAL 3

    E

    Q

    U

    I

    P

    SUB-TOTAL

    S

    U

    BC

    O

    N

    T

    SUB-TOTAL

    TOTAL DIRECT UNIT PRICE 1,4

    REMARKS

    Total Quantity

    TOTAL ITEM VALUE. FSBD-RPD ESTIMATING (AJA) 25 242519111.xls.ms_office 8/28/20

  • 5/20/2018 BOQ - Warehouse

    26/32

    Project:

    PRICE ANALYSIS SHEET

    CODE DESCRIPTION UNIT QUANTITY WASTAGE U-RATE AMOU

    TRG ESTIMATING DEPARTMENT

    3/2BDivision 3

    Concrete

    Worksthickening so slab on grade QUANTITY CONSIDERED 1.00 m

    C Thickened slab under chb wall

    M 0.07

    A Cement 10.5 bags 0.709 1.05 214.00 1

    T Sand 0.42 m3 0.028 1.05 840.00

    E Gravel 0.84 m3 0.06 1.05 1390.00

    R Steel 3.04 kg 45.04 1.05 45.20 2,1

    I Form plywood, 1/2", ord 0 m 0.00 1.05 191.48

    A Coco lumber bf 0.00 1.05 14.00

    L

    SUB-TOTAL 2,4

    L

    A

    B

    O

    U

    R

    0.00 SUB-TOTAL 8

    E

    Q

    U

    I

    P

    SUB-TOTAL

    S

    U

    B

    CO

    N

    T

    SUB-TOTAL

    TOTAL DIRECT UNIT PRICE 3,2

    REMARKS

    Total Quantity

    SBD-RPD ESTIMATING (AJA) 26 242519111.xls.ms_office 8/28/20

  • 5/20/2018 BOQ - Warehouse

    27/32

    Project:

    PRICE ANALYSIS SHEET

    CODE DESCRIPTION UNIT QUANTITY WASTAGE U-RATE AMOU

    TRG ESTIMATING DEPARTMENT

    TOTAL ITEM VALUE. F

    3/2BDivision 3

    Concrete

    Workscol footing QUANTITY CONSIDERED 1.00 m

    D col footing

    M 0.30

    A Cement 10.5 bags 3.150 1.05 214.00 7

    T Sand 0.42 m3 0.126 1.05 840.00 1

    E Gravel 0.84 m3 0.25 1.05 1390.00 3

    R Steel 7.12 kg 23.73 1.05 45.20 1,1

    I Form plywood, 1/2", ord 1.2 m 4.00 1.05 191.48 8A Coco lumber 11.373 bf 3.61 1.05 14.00

    L

    SUB-TOTAL 3,1

    L

    A

    B

    O

    U

    R

    0.00 SUB-TOTAL 1,1

    E

    Q

    U

    I

    P

    SUB-TOTAL

    S

    U

    B

    C

    O

    N

    T

    SUB-TOTAL

    TOTAL DIRECT UNIT PRICE 4,2

    REMARKS

    SBD-RPD ESTIMATING (AJA) 27 242519111.xls.ms_office 8/28/20

  • 5/20/2018 BOQ - Warehouse

    28/32

    Project:

    PRICE ANALYSIS SHEET

    CODE DESCRIPTION UNIT QUANTITY WASTAGE U-RATE A

    TRG ESTIMATING DEPARTMENT

    Total Quantity

    TOTAL ITEM VALUE. F

    SBD-RPD ESTIMATING (AJA) 28 242519111.xls.ms_office 8/2

  • 5/20/2018 BOQ - Warehouse

    29/32

    CODE: Date: Page No.:

    BUILDING: Prepared by:

    Checked by:

    Item Description unit L W H A / V Total

    external

    a grabel bed, 0.1m thick, m3 54.68

    1 58.00 0.60 0.1 3.4812 1.00 1.00 0.1 1.20

    1 20.00 25.00 0.1 50.00

    b conc curb m3 18.00 0.08 0.3 0.45

    forms 8.10

    c wall footing, m3 1 46.00 0.60 0.3 8.28

    wall footing, forms 27.60

    slab thickening under cmu wall, m3 1 9.00 0.30 0.15 0.41

    d conc footing, m3 12 1.00 1.00 0.3 3.60

    forms 14.40

    e conc column, m3 12 0.30 0.30 3.7 4.00

    forms 53.28

    f parking pavement 0.15m thick ,m3 1 20.00 25.00 0.15 75.00

    g ramp, m3 1 8.70 1.7 0.15 2.22

    6" chb wall, m2 1 54.40 3.7 201.28

    building

    a gravel bed, 0.1m thick (m3) 80.06

    under footing

    under wall footing, m3 1 92.00 0.55 0.1 5.06

    under col ftng

    under sog 1 25.00 30 0.1 75.00

    b sog 1 25.00 30 0.125 93.75

    c wall footing 1 92.00 0.45 0.30 12.42

    PROJECT NAME

  • 5/20/2018 BOQ - Warehouse

    30/32

    CODE: Date: Page No.:

    BUILDING: Prepared by:

    Checked by:

    Item Description unit L W H A / V Total

    PROJECT NAME

    d footing 39.36 195.39

    col footing 2 21.89 14.832 0.30 194.79

    ftg at office 2 1.00 1.00 0.3 0.60forms 2 65.60 0.3 39.36

    46.00 0.3 0.00

    e column 83.04 7.87

    column pedestal 12 0.40 0.4 2.80 5.38

    6 0.35 0.35 2.80 2.06

    col at office 1 0.30 0.3 4.80 0.43

    forms 53.76

    23.52

    5.76

    f grade beam 72.24 16.25

    2 23.60 0.35 0.45 7.43

    2 28.00 0.35 0.45 8.82

    forms 33.04

    39.20

    g beam 26.00 0.3 0.40 3.12

    forms 15.60

    total 508.26

    masonry

    6" cmu wall m2 1,212.67

    gl 1/a-e 23.80 7.4 176.12

    23.80 3.2 76.16

    23.80 1.9 45.22

    5.00 1.5 7.50

    gl a/1-6 28.50 7.4 210.90

    28.50 3.2 91.20

    28.50 1.5 42.75

  • 5/20/2018 BOQ - Warehouse

    31/32

    CODE: Date: Page No.:

    BUILDING: Prepared by:

    Checked by:

    Item Description unit L W H A / V Total

    PROJECT NAME

    gl e/1-6 28.50 7.4 210.90

    28.50 3.2 91.20

    28.50 1.5 42.75gl 6/a-e, level 1 1 23.80 7.4 176.12

    1 (6.70) 4.2 (28.14)

    2 (5.10) 1.5 (15.30)

    2 (4.60) 1.2 (11.04)

    level 2 1 23.80 3.2 76.16

    1 (6.40) 1.5 (9.60)

    3 (5.10) 1.5 (22.95)

    level 3 1 23.80 1.9 45.22

    1 5.00 1.5 7.50

    internal cmu wall 47.91

    1 13.00 3 39.00

    1 3.60 3 10.80

    1 (0.90) 2.1 (1.89)

    cmu wall at guard, cr incl. 23.55

    1 9.00 3 27.00

    1 (0.90) 2.1 (1.89)

    1 (0.70) 2.1 (1.47)

    1 (0.30) 0.3 (0.09)

  • 5/20/2018 BOQ - Warehouse

    32/32

    CODE: Date: Page No.:

    BUILDING: Prepared by:

    Checked by:

    Item Description unit L W H A / V Total