ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
External Works form
A gravel bed, 100 mm thick 55.0 m3 2,200.68 121,037.1
B concrete curb 0.8 m3 6,978.78 5,652.8
C wall footing 8.3 m3 1,923.28 15,963.2
D thickening to slab under chb wall 0.4 m3 4,382.10 1,752.8
E footing 3.6 m3 5,778.00 20,800.8
F column 4.0 m3 5,657.72 22,630.8
G slab on grade, 0.15m thick 75.0 m3 3,500.87 262,565.5
H ramp, 0.15m thick 2.2 m3 3,490.57 7,749.0
Masonry
I 6" chb wall, 201.3 m2 801.48 161,338.2
Building
J gravel bed, 0.10 m thick 80.1 m3 2,200.68 176,186.0
K slab on grade, 5" thick 93.8 m3 3,807.43 357,137.1
L wall footing 12.4 m3 1,923.28 23,848.64
M footing 79.0 m3 13,100.86 1,034,967.8
N column 7.9 m3 13,580.31 107,284.4
O grade beam 15.4 m3 19,611.80 302,021.7
P beam 3.1 m3 5,657.72 17,538.9
Masonry
Q 6" chb wall 1,213.0 m2 801.48 972,197.0
To Collection 3,610,672.4
D:\PROJ\242519111.xls.ms_office\boq.XLS Page-1
5/20/2018 BOQ - Warehouse
2/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
Structural steel
Columns
W12x65 (x9m, 868.2kg) 8.0 no
W12x87 (x9m, 1162.kg) 4.0 no
W14x109 (x11.3m, 1828kg) 2.0 no
Beams
W8x31 (x6m, 276kg) 10.0 no.
W5x19 (x6m, 169.2kg) 10.0 no.
W12X53 (6m, 472kg) 2.0 no.
W12X53 (6.5m, 511.3kg) 2.0 no.
W12X53 (5.5m, 432.6kg) 2.0 no.
W12X53 (7m, 551kg) 2.0 no.
W10X12 (6m, 106.8kg) 2.0 no.
W10X12 (6.5m, 115.8kg) 2.0 no.
W10X12 (5.5m, 98kg) 2.0 no.
W10X12 (7m, 124.7kg) 2.0 no.
Tapered beam, L=13.35m (B=0.3m, H=0.3/0.7m, 12.0 no.
tw=0.025, tf=0.025; Wt=2745kg)
Brace
L30308LD (7.81m, 216.96kg) 12.0 no.
L50505LD (10.07m, 308.3kg) 12.0 no.
Monitor truss, (145.5 kg) 6.0 no
Monitor side truss, 6m x 1.3m (95.4kg) 12.0 no
To Collection
Roofing
D:\PROJ\242519111.xls.ms_office\boq.XLS Page-2
5/20/2018 BOQ - Warehouse
3/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
Roofing sheets,0.9m x 2m, g#26 78.0 pcs 2,092.23 163,193.9
Roofing sheets,0.9m x 4.26m, g#26 262.1 pcs 2,092.23 548,331.6
Ridge roll, 8' 14.0 pcs 607.50 8,505.0
gutter, 8' 24.0 pcs 607.50 14,580.0
flushing at monitor, 8' 28.0 pcs 607.50 17,010.0
fluashing above gutter 28.0 pcs 607.50 17,010.0
c purlins 2 x 8 in x 2mm thick x 6m 156.0 pcs 1,471.50 229,554.0
fixing accessories 1.0 ls 49,909.23 49,909.2
foam insulation, two-sided, 5 mm thick 860.0 m2 92.77 79,778.1
To Collection 1,127,871.9
DOORS AND WINDOWS
D:\PROJ\242519111.xls.ms_office\boq.XLS Page-3
5/20/2018 BOQ - Warehouse
4/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
Doors
Sliding metal door, including rail and guides and 1.0 no.
other fixing accessories, two panel, overall size 7m x
4.5m
Door, 0.9m x 2.1m 1.0 no
Door, 0.9m x 2.1m, 1 face weather resistant 1.0 no.
Door, 0.7m x 2.1m, 1 face weather resistant 2.0 no.
Sliding metal gate, 7.0 m length complete with guide 1.0 no.
and fixing accessories
Pedestrian gate, size 1.2m wide (provision) 1.0 no.
Windows
Steel casement window, size 6.4m x 1.2m 1.0 no.
Steel casement window, size 5.1m x 1.2m 5.0 no.
Fixed glass window, size 4.6x1.2 2.0 no.
Finishes
Internal Floor Finishes
Toilet 2.8 m2 3,149.55 8,661.2
Office, 12"x12" tiles 39.0 m2 842.60 32,861.5
Working area, plain cement finish 708.0 m2 586.97 415,572.2
Guardhouse, plain cement finish 4.0 m2 586.97 2,342.0
Toilet at guard house 4.5 m2 3,149.55 14,172.9
Internal wall finishes
Toilet 19.4 m2 1,461.42 28,409.9
Office 57.8 m2 586.97 33,926.6
Working area, plain cement finish 1,092.0 m2 586.97 640,967.4
To Collection 1,176,914.0
Guardhouse, plain cement finish 21.6 m2 586.97 12,678.4
Toilet at guard house 19.4 m2 1,461.42 28,409.9
D:\PROJ\242519111.xls.ms_office\boq.XLS Page-4
5/20/2018 BOQ - Warehouse
5/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
Internal ceiling finishes
Toilet 2.8 m2 314.96 866.1
Office 39.0 m2 314.96 12,283.2
Working area* (open) 750.0 m2
Guardhouse 4.0 m2 314.96 1,256.6
Toilet at guard house 4.5 m2 314.96 1,417.3
External floor finishes
External pavement 500.0 m2 448.94 224,471.2
Entrance ramp 14.8 m2 448.94 6,639.8
sidewalk beside building 18.0 m2 448.94 8,080.9
Ramp to building 11.3 m2 448.94 5,050.6
Sidewalk at fence 27.0 m2 448.94 12,121.4
External finishes
External finish to walls 1,520.4 m2 54.69 83,148.4
To Collection 396,424.2
SUMMARY
Page 1 3,610,672.4
D:\PROJ\242519111.xls.ms_office\boq.XLS Page-5
5/20/2018 BOQ - Warehouse
6/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
Page 2
Page 3 1,127,871.9
Page 4 1,176,914.0
Page 5 396,424.2
Total 6,311,882.5
D:\PROJ\242519111.xls.ms_office\boq.XLS Page-6
5/20/2018 BOQ - Warehouse
7/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
External Works form
A gravel bed, 100 mm thick 55.0 m3 2,200.68 121,037.1
B concrete curb 0.8 m3 6,978.78 5,652.8
C wall footing 8.3 m3 1,923.28 15,963.2
D thickening to slab under chb wall 0.4 m3 4,382.10 1,752.8
E footing 3.6 m3 5,778.00 20,800.8
F column 4.0 m3 5,657.72 22,630.8
G slab on grade, 0.15m thick 75.0 m3 3,500.87 262,565.5
H ramp, 0.15m thick 2.2 m3 3,490.57 7,749.0
Masonry
I 6" chb wall, 201.3 m2 801.48 161,338.2
Building
J gravel bed, 0.10 m thick 80.1 m3 2,200.68 176,186.0
K slab on grade, 5" thick 93.8 m3 3,807.43 357,137.1
L wall footing 12.4 m3 1,923.28 23,848.64
M footing 79.0 m3 13,100.86 1,034,967.8
N column 7.9 m3 13,580.31 107,284.4
O grade beam 15.4 m3 19,611.80 302,021.7
P beam 3.1 m3 5,657.72 17,538.9
Masonry
Q 6" chb wall 1,213.0 m2 801.48 972,197.0
To Summary 3,610,672.4
D:\PROJ\242519111.xls.ms_office\boq (2).XLS Page-7
5/20/2018 BOQ - Warehouse
8/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
Structural steel
Columns
W12x65 (x9m, 868.2kg) 8.0 no 36,334.17 290,673.3
W12x87 (x9m, 1162.kg) 4.0 no 48,629.70 194,518.8
W14x109 (x11.3m, 1828kg) 2.0 no 76,501.80 153,003.6
Beams
W8x31 (x6m, 276kg) 10.0 no. 11,550.60 115,506.0
W5x19 (x6m, 169.2kg) 10.0 no. 7,081.02 70,810.2
W12X53 (6m, 472kg) 2.0 no. 19,753.20 39,506.4
W12X53 (6.5m, 511.3kg) 2.0 no. 21,397.91 42,795.8
W12X53 (5.5m, 432.6kg) 2.0 no. 22,289.31 44,578.6
W12X53 (7m, 551kg) 2.0 no. 23,059.35 46,118.7
W10X12 (6m, 106.8kg) 2.0 no. 4,469.58 8,939.1
W10X12 (6.5m, 115.8kg) 2.0 no. 4,846.23 9,692.4
W10X12 (5.5m, 98kg) 2.0 no. 4,101.30 8,202.6
W10X12 (7m, 124.7kg) 2.0 no. 5,218.70 10,437.3
Tapered beam, L=13.35m (B=0.3m, H=0.3/0.7m, 12.0 no. 114,878.25 1,378,539.0
tw=0.025, tf=0.025; Wt=2745kg)
Brace
L30308LD (7.81m, 216.96kg) 12.0 no. 9,079.78 108,957.3
L50505LD (10.07m, 308.3kg) 12.0 no. 12,902.36 154,828.2
Monitor truss, (145.5 kg) 6.0 no 6,089.18 36,535.0
Monitor side truss, 6m x 1.3m (95.4kg) 12.0 no 3,992.49 47,909.8
To Summary 2,761,552.6
Roofing
D:\PROJ\242519111.xls.ms_office\boq (2).XLS Page-8
5/20/2018 BOQ - Warehouse
9/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
Roofing sheets,0.9m x 2m, g#26 78.0 pcs 2,092.23 163,193.9
Roofing sheets,0.9m x 4.26m, g#26 262.1 pcs 2,092.23 548,331.6
Ridge roll, 8' 14.0 pcs 607.50 8,505.0
gutter, 8' 24.0 pcs 607.50 14,580.0
flushing at monitor, 8' 28.0 pcs 607.50 17,010.0
fluashing above gutter 28.0 pcs 607.50 17,010.0
c purlins 2 x 8 in x 2mm thick x 6m 156.0 pcs 1,471.50 229,554.0
fixing accessories 1.0 ls 49,909.23 49,909.2
foam insulation, two-sided, 5 mm thick 860.0 m2 92.77 79,778.1
To Summary 1,127,871.9
DOORS AND WINDOWS
D:\PROJ\242519111.xls.ms_office\boq (2).XLS Page-9
5/20/2018 BOQ - Warehouse
10/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
Doors
Sliding metal door, including rail and guides and 1.0 no. 22,875.05 22,875.0
other fixing accessories, two panel, overall size 7m x
4.5m
Door, 0.9m x 2.1m 1.0 no 1,372.50 1,372.5
Door, 0.9m x 2.1m, 1 face weather resistant 1.0 no. 1,372.50 1,372.5
Door, 0.7m x 2.1m, 1 face weather resistant 2.0 no. 1,067.50 2,135.0
Sliding metal gate, 7.0 m length complete with guide 1.0 no. 10,675.02 10,675.0
and fixing accessories
Pedestrian gate, size 1.2m wide (provision) 1.0 no. 1,830.00 1,830.0
Windows
Steel casement window, size 6.4m x 1.2m 1.0 no. 5,577.15 5,577.1
Steel casement window, size 5.1m x 1.2m 5.0 no. 4,444.30 22,221.4
Fixed glass window, size 4.6x1.2 2.0 no. 4,008.58 8,017.1
Finishes
Internal Floor Finishes
Toilet 2.8 m2 3,149.55 8,661.2
Office, 12"x12" tiles 39.0 m2 842.60 32,861.5
Working area, plain cement finish 708.0 m2 586.97 415,572.2
Guardhouse, plain cement finish 4.0 m2 586.97 2,342.0
Toilet at guard house 4.5 m2 3,149.55 14,172.9
Internal wall finishes
Toilet 19.4 m2 1,461.42 28,409.9
Office 57.8 m2 586.97 33,926.6
Working area, plain cement finish 1,092.0 m2 586.97 640,967.4
To Summary 1,252,989.8
Guardhouse, plain cement finish 21.6 m2 586.97 12,678.4
Toilet at guard house 19.4 m2 1,461.42 28,409.9
D:\PROJ\242519111.xls.ms_office\boq (2).XLS Page-10
5/20/2018 BOQ - Warehouse
11/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
Internal ceiling finishes
Toilet 2.8 m2 314.96 866.1
Office 39.0 m2 314.96 12,283.2
Working area* (open) 750.0 m2
Guardhouse 4.0 m2 314.96 1,256.6
Toilet at guard house 4.5 m2 314.96 1,417.3
External floor finishes
External pavement 500.0 m2 448.94 224,471.2
Entrance ramp 14.8 m2 448.94 6,639.8
sidewalk beside building 18.0 m2 448.94 8,080.9
Ramp to building 11.3 m2 448.94 5,050.6
Sidewalk at fence 27.0 m2 448.94 12,121.4
External finishes
External finish to walls 1,520.4 m2 54.69 83,148.4
To Summary 396,424.2
SUMMARY
Page 1 3,610,672.4
D:\PROJ\242519111.xls.ms_office\boq (2).XLS Page-11
5/20/2018 BOQ - Warehouse
12/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
Page 2 2,761,552.6
Page 3 1,127,871.9
Page 4 1,252,989.8
Page 5 396,424.2
Total 9,149,511.0
D:\PROJ\242519111.xls.ms_office\boq (2).XLS Page-12
5/20/2018 BOQ - Warehouse
13/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
External Works form
A gravel bed, 100 mm thick 55.0 m3 2,200.68 121,037.1
B concrete curb 0.8 m3 6,978.78 5,652.8
C wall footing 8.3 m3 1,923.28 15,963.2
D thickening to slab under chb wall 0.4 m3 4,382.10 1,752.8
E footing 3.6 m3 5,778.00 20,800.8
F column 4.0 m3 5,657.72 22,630.8
G slab on grade, 0.15m thick 75.0 m3 3,500.87 262,565.5
H ramp, 0.15m thick 2.2 m3 3,490.57 7,749.0
Masonry
I 6" chb wall, 201.3 m2 801.48 161,338.2
Building
J gravel bed, 0.10 m thick 80.1 m3 2,200.68 176,186.0
K slab on grade, 5" thick 93.8 m3 3,807.43 357,137.1
L wall footing 12.4 m3 1,923.28 23,848.64
M footing 79.0 m3 13,100.86 1,034,967.8
N column 7.9 m3 13,580.31 107,284.4
O grade beam 15.4 m3 19,611.80 302,021.7
P beam 3.1 m3 5,657.72 17,538.9
Masonry
Q 6" chb wall 1,213.0 m2 801.48 972,197.0
To Summary 3,610,672.4
D:\PROJ\242519111.xls.ms_office\B001.XLS Page-13
5/20/2018 BOQ - Warehouse
14/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
Structural steel
Columns
W12x65 (x9m, 868.2kg) 8.0 no 36,334.17 290,673.3
W12x87 (x9m, 1162.kg) 4.0 no 48,629.70 194,518.8
W14x109 (x11.3m, 1828kg) 2.0 no 76,501.80 153,003.6
Beams
W8x31 (x6m, 276kg) 10.0 no. 11,550.60 115,506.0
W5x19 (x6m, 169.2kg) 10.0 no. 7,081.02 70,810.2
W12X53 (6m, 472kg) 2.0 no. 19,753.20 39,506.4
W12X53 (6.5m, 511.3kg) 2.0 no. 21,397.91 42,795.8
W12X53 (5.5m, 432.6kg) 2.0 no. 22,289.31 44,578.6
W12X53 (7m, 551kg) 2.0 no. 23,059.35 46,118.7
W10X12 (6m, 106.8kg) 2.0 no. 4,469.58 8,939.1
W10X12 (6.5m, 115.8kg) 2.0 no. 4,846.23 9,692.4
W10X12 (5.5m, 98kg) 2.0 no. 4,101.30 8,202.6
W10X12 (7m, 124.7kg) 2.0 no. 5,218.70 10,437.3
Tapered beam, L=13.35m (B=0.3m, H=0.3/0.7m, 12.0 no. 114,878.25 1,378,539.0
tw=0.025, tf=0.025; Wt=2745kg)
Brace
L30308LD (7.81m, 216.96kg) 12.0 no. 9,079.78 108,957.3
L50505LD (10.07m, 308.3kg) 12.0 no. 12,902.36 154,828.2
Monitor truss, (145.5 kg) 6.0 no 6,089.18 36,535.0
Monitor side truss, 6m x 1.3m (95.4kg) 12.0 no 3,992.49 47,909.8
To Summary 2,761,552.6
Roofing
D:\PROJ\242519111.xls.ms_office\B001.XLS Page-14
5/20/2018 BOQ - Warehouse
15/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
Roofing sheets,0.9m x 2m, g#26 78.0 pcs 2,092.23 163,193.9
Roofing sheets,0.9m x 4.26m, g#26 262.1 pcs 2,092.23 548,331.6
Ridge roll, 8' 14.0 pcs 607.50 8,505.0
gutter, 8' 24.0 pcs 607.50 14,580.0
flushing at monitor, 8' 28.0 pcs 607.50 17,010.0
fluashing above gutter 28.0 pcs 607.50 17,010.0
c purlins 2 x 8 in x 2mm thick x 6m 156.0 pcs 1,471.50 229,554.0
fixing accessories 1.0 ls 49,909.23 49,909.2
foam insulation, two-sided, 5 mm thick 860.0 m2 92.77 79,778.1
To Summary 1,127,871.9
DOORS AND WINDOWS
D:\PROJ\242519111.xls.ms_office\B001.XLS Page-15
5/20/2018 BOQ - Warehouse
16/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
Doors
Sliding metal door, including rail and guides and 1.0 no. 22,875.05 22,875.0
other fixing accessories, two panel, overall size 7m x
4.5m
Door, 0.9m x 2.1m 1.0 no 1,372.50 1,372.5
Door, 0.9m x 2.1m, 1 face weather resistant 1.0 no. 1,372.50 1,372.5
Door, 0.7m x 2.1m, 1 face weather resistant 2.0 no. 1,067.50 2,135.0
Sliding metal gate, 7.0 m length complete with guide 1.0 no. 10,675.02 10,675.0
and fixing accessories
Pedestrian gate, size 1.2m wide (provision) 1.0 no. 1,830.00 1,830.0
Windows
Steel casement window, size 6.4m x 1.2m 1.0 no. 5,577.15 5,577.1
Steel casement window, size 5.1m x 1.2m 5.0 no. 4,444.30 22,221.4
Fixed glass window, size 4.6x1.2 2.0 no. 4,008.58 8,017.1
Finishes
Internal Floor Finishes
Toilet 2.8 m2 3,149.55 8,661.2
Office, 12"x12" tiles 39.0 m2 842.60 32,861.5
Working area, plain cement finish 708.0 m2 586.97 415,572.2
Internal wall finishes
Toilet 19.4 m2 1,461.42 28,409.9
Office 57.8 m2 586.97 33,926.6
Working area, plain cement finish 1,092.0 m2 586.97 640,967.4
To Summary 1,236,474.9
Internal ceiling finishes
D:\PROJ\242519111.xls.ms_office\B001.XLS Page-16
5/20/2018 BOQ - Warehouse
17/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
Toilet 2.8 m2 314.96 866.1
Office 39.0 m2 314.96 12,283.2
Working area* (open) 750.0 m2
External wall finishes
External finish to walls 1,520.4 m2 54.69 83,148.4
To Summary 96,297.7
SUMMARY
Page 1 3,610,672.4
D:\PROJ\242519111.xls.ms_office\B001.XLS Page-17
5/20/2018 BOQ - Warehouse
18/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
PhP
Page 2 2,761,552.6
Page 3 1,127,871.9
Page 4 1,236,474.9
Page 5 96,297.7
Total 8,832,869.6
Building 11,777.16 8,832,869.6
Services 4,063.50 3,047,625.0
15,840.66 11,880,494.6
DLS Cost Data rate adjustment factor
Min 13,150.0 1.29 16,963.5
Max 18,950.0 1.29 24,445.5
D:\PROJ\242519111.xls.ms_office\B001.XLS Page-18
5/20/2018 BOQ - Warehouse
19/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
cement 3,168 pcs
sand 175 m3
gravel 150 m3
6" chb 17,679 pcs
10x6 steel bars 2,603 pcs
12x6 steel bars 84 pcs
16x6 steel bars 777 pcs
16x7.5 steel bars 72 pcs
Total 0
D:\PROJ\242519111.xls.ms_office\bom.XLS Page-19
5/20/2018 BOQ - Warehouse
20/32
ITEM D E S C R I P T I O N QTY UNIT RATE AMOUNT
D:\PROJ\242519111.xls.ms_office\bom.XLS Page-20
5/20/2018 BOQ - Warehouse
21/32
D:\PROJ\242519111.xls.ms_office\bom.XLS Page-21
5/20/2018 BOQ - Warehouse
22/32
D:\PROJ\242519111.xls.ms_office\bom.XLS Page-22
5/20/2018 BOQ - Warehouse
23/32
Project:
PRICE ANALYSIS SHEET
CODE DESCRIPTION UNIT QUANTITY WASTAGE U-RATE AMOU
2
Division 2
ExternalWorks
Grqavel bed QUANTITY CONSIDERED 1.00 m
M A Garvel bed
A Gravel m 1.00 1.05 1150.00 1,
T
E
R
I
A
L
SUB-TOTAL 1,
u/h
L Labour 0.00 1.05 43.06
A 0.00 1.05 43.06
B 0.00 1.05 43.06
O
U
R
0.00 SUB-TOTAL
E
Q
U
I
P
SUB-TOTAL
S
U
B
C
O
N
T
SUB-TOTAL
TOTAL DIRECT UNIT PRICE 1,
REMARKS
Total Quantity
TOTAL ITEM VALUE. F 1,
TRG ESTIMATING DEPARTMENT
SBD-RPD ESTIMATING (AJA) 23 242519111.xls.ms_office 8/28/2
5/20/2018 BOQ - Warehouse
24/32
Project:
PRICE ANALYSIS SHEET
CODE DESCRIPTION UNIT QUANTITY WASTAGE U-RATE AMOU
TRG ESTIMATING DEPARTMENT
3
Division 3
ConcreteWorks
Reinforced concrete, AAA (1:2:3) QUANTITY CONSIDERED 1.00 m3
M A Concrete curb
A 0.08
T Cement 10.5 bags 0.866 1.05 214.00 1
E Sand 0.42 m 0.035 1.05 840.00
R Gravel 0.84 m 0.07 1.05 1390.00 1
I Steel 3.04 kg 36.85 1.05 45.20 1,7
A Form plywood, 1/2", ord 0.4 m 4.85 1.05 191.48 9
L Coco lumber 4.3733 bf 53.01 1.05 14.00 7
SUB-TOTAL 3,8
L
A
B
O
U
R
0.00 SUB-TOTAL 1,3
E
Q
U
I
P
SUB-TOTAL
S
U
B
C
ON
T
SUB-TOTAL
TOTAL DIRECT UNIT PRICE 5,1
REMARKS
Total Quantity
SBD-RPD ESTIMATING (AJA) 24 242519111.xls.ms_office 8/28/20
5/20/2018 BOQ - Warehouse
25/32
Project:
PRICE ANALYSIS SHEET
CODE DESCRIPTION UNIT QUANTITY WASTAGE U-RATE AMOUN
TRG ESTIMATING DEPARTMENT
TOTAL ITEM VALUE.
F
3Division 3
Concrete
Workswall footing QUANTITY CONSIDERED 1.00 m3
B wall footing
M 0.14
A Cement 10.5 bags 1.418 1.05 214.00 3
T Sand 0.42 m3 0.057 1.05 840.00
E Gravel 0.84 m3 0.113 1.05 1390.00 1
R Steel 3.6 kg 0.486 1.05 45.20
I Form plywood, 1/2", ord 0.6 m 0.081 1.05 191.48
A Coco lumber 4.8107 bf 35.63 1.05 14.00 5
L
SUB-TOTAL 1,0
L
A
B
O
U
R
0.00 SUB-TOTAL 3
E
Q
U
I
P
SUB-TOTAL
S
U
BC
O
N
T
SUB-TOTAL
TOTAL DIRECT UNIT PRICE 1,4
REMARKS
Total Quantity
TOTAL ITEM VALUE. FSBD-RPD ESTIMATING (AJA) 25 242519111.xls.ms_office 8/28/20
5/20/2018 BOQ - Warehouse
26/32
Project:
PRICE ANALYSIS SHEET
CODE DESCRIPTION UNIT QUANTITY WASTAGE U-RATE AMOU
TRG ESTIMATING DEPARTMENT
3/2BDivision 3
Concrete
Worksthickening so slab on grade QUANTITY CONSIDERED 1.00 m
C Thickened slab under chb wall
M 0.07
A Cement 10.5 bags 0.709 1.05 214.00 1
T Sand 0.42 m3 0.028 1.05 840.00
E Gravel 0.84 m3 0.06 1.05 1390.00
R Steel 3.04 kg 45.04 1.05 45.20 2,1
I Form plywood, 1/2", ord 0 m 0.00 1.05 191.48
A Coco lumber bf 0.00 1.05 14.00
L
SUB-TOTAL 2,4
L
A
B
O
U
R
0.00 SUB-TOTAL 8
E
Q
U
I
P
SUB-TOTAL
S
U
B
CO
N
T
SUB-TOTAL
TOTAL DIRECT UNIT PRICE 3,2
REMARKS
Total Quantity
SBD-RPD ESTIMATING (AJA) 26 242519111.xls.ms_office 8/28/20
5/20/2018 BOQ - Warehouse
27/32
Project:
PRICE ANALYSIS SHEET
CODE DESCRIPTION UNIT QUANTITY WASTAGE U-RATE AMOU
TRG ESTIMATING DEPARTMENT
TOTAL ITEM VALUE. F
3/2BDivision 3
Concrete
Workscol footing QUANTITY CONSIDERED 1.00 m
D col footing
M 0.30
A Cement 10.5 bags 3.150 1.05 214.00 7
T Sand 0.42 m3 0.126 1.05 840.00 1
E Gravel 0.84 m3 0.25 1.05 1390.00 3
R Steel 7.12 kg 23.73 1.05 45.20 1,1
I Form plywood, 1/2", ord 1.2 m 4.00 1.05 191.48 8A Coco lumber 11.373 bf 3.61 1.05 14.00
L
SUB-TOTAL 3,1
L
A
B
O
U
R
0.00 SUB-TOTAL 1,1
E
Q
U
I
P
SUB-TOTAL
S
U
B
C
O
N
T
SUB-TOTAL
TOTAL DIRECT UNIT PRICE 4,2
REMARKS
SBD-RPD ESTIMATING (AJA) 27 242519111.xls.ms_office 8/28/20
5/20/2018 BOQ - Warehouse
28/32
Project:
PRICE ANALYSIS SHEET
CODE DESCRIPTION UNIT QUANTITY WASTAGE U-RATE A
TRG ESTIMATING DEPARTMENT
Total Quantity
TOTAL ITEM VALUE. F
SBD-RPD ESTIMATING (AJA) 28 242519111.xls.ms_office 8/2
5/20/2018 BOQ - Warehouse
29/32
CODE: Date: Page No.:
BUILDING: Prepared by:
Checked by:
Item Description unit L W H A / V Total
external
a grabel bed, 0.1m thick, m3 54.68
1 58.00 0.60 0.1 3.4812 1.00 1.00 0.1 1.20
1 20.00 25.00 0.1 50.00
b conc curb m3 18.00 0.08 0.3 0.45
forms 8.10
c wall footing, m3 1 46.00 0.60 0.3 8.28
wall footing, forms 27.60
slab thickening under cmu wall, m3 1 9.00 0.30 0.15 0.41
d conc footing, m3 12 1.00 1.00 0.3 3.60
forms 14.40
e conc column, m3 12 0.30 0.30 3.7 4.00
forms 53.28
f parking pavement 0.15m thick ,m3 1 20.00 25.00 0.15 75.00
g ramp, m3 1 8.70 1.7 0.15 2.22
6" chb wall, m2 1 54.40 3.7 201.28
building
a gravel bed, 0.1m thick (m3) 80.06
under footing
under wall footing, m3 1 92.00 0.55 0.1 5.06
under col ftng
under sog 1 25.00 30 0.1 75.00
b sog 1 25.00 30 0.125 93.75
c wall footing 1 92.00 0.45 0.30 12.42
PROJECT NAME
5/20/2018 BOQ - Warehouse
30/32
CODE: Date: Page No.:
BUILDING: Prepared by:
Checked by:
Item Description unit L W H A / V Total
PROJECT NAME
d footing 39.36 195.39
col footing 2 21.89 14.832 0.30 194.79
ftg at office 2 1.00 1.00 0.3 0.60forms 2 65.60 0.3 39.36
46.00 0.3 0.00
e column 83.04 7.87
column pedestal 12 0.40 0.4 2.80 5.38
6 0.35 0.35 2.80 2.06
col at office 1 0.30 0.3 4.80 0.43
forms 53.76
23.52
5.76
f grade beam 72.24 16.25
2 23.60 0.35 0.45 7.43
2 28.00 0.35 0.45 8.82
forms 33.04
39.20
g beam 26.00 0.3 0.40 3.12
forms 15.60
total 508.26
masonry
6" cmu wall m2 1,212.67
gl 1/a-e 23.80 7.4 176.12
23.80 3.2 76.16
23.80 1.9 45.22
5.00 1.5 7.50
gl a/1-6 28.50 7.4 210.90
28.50 3.2 91.20
28.50 1.5 42.75
5/20/2018 BOQ - Warehouse
31/32
CODE: Date: Page No.:
BUILDING: Prepared by:
Checked by:
Item Description unit L W H A / V Total
PROJECT NAME
gl e/1-6 28.50 7.4 210.90
28.50 3.2 91.20
28.50 1.5 42.75gl 6/a-e, level 1 1 23.80 7.4 176.12
1 (6.70) 4.2 (28.14)
2 (5.10) 1.5 (15.30)
2 (4.60) 1.2 (11.04)
level 2 1 23.80 3.2 76.16
1 (6.40) 1.5 (9.60)
3 (5.10) 1.5 (22.95)
level 3 1 23.80 1.9 45.22
1 5.00 1.5 7.50
internal cmu wall 47.91
1 13.00 3 39.00
1 3.60 3 10.80
1 (0.90) 2.1 (1.89)
cmu wall at guard, cr incl. 23.55
1 9.00 3 27.00
1 (0.90) 2.1 (1.89)
1 (0.70) 2.1 (1.47)
1 (0.30) 0.3 (0.09)
5/20/2018 BOQ - Warehouse
32/32
CODE: Date: Page No.:
BUILDING: Prepared by:
Checked by:
Item Description unit L W H A / V Total
PROJECT NAME