VARIATION ORDER NO.1 ITEM DESCRIPTION REF. UNIT QTY RATE OMISSION GRAVITY GROUTED RUBBLE WALL Piling Works Notes: __________________________ A Item - B BQ 3/B/1/B m 4,647 1.76 C BQ 3/B/1/C m 4,647 1.65 D BQ 3/B/1/D No 929 2.20 Carried to Collection : The works in this section comprises the installation of 900 Nos 100mm diameter bakau piles. Piling shall commence from general formation level. Prices for driving shall include for moving of pile frame about the site, arising or lowering them , providing all necessary staging and redriving of heaved piles. Allow the provision of all necessary piling equipment plants, tools and ancillary equipment and for their transportation to the site, handling, assembling, moving about on the site as required and removal off the site after completion of the work and for 'any idle standing time. This item shall also include any excavation filling earth to make Supply only 100mm Diameter bakau piles 5.00m length Handle, transport, pitch and drive 100mm diameter bakau piles Cut-off and remove surplus length of 100mm diameter bakau piles

BQ V.O for Gabion Wall

  • Upload
    look

  • View
    451

  • Download
    13

Embed Size (px)

DESCRIPTION

Bills of quantitiesvariation order for gabion wall

Citation preview

Page 1: BQ V.O for Gabion Wall

VARIATION ORDER NO.1

ITEM DESCRIPTION REF. UNIT QTY RATE

OMISSION

GRAVITY GROUTED RUBBLE WALL

Piling Works

Notes:

__________________________

A

Item -

B Supply only 100mm Diameter bakau piles 5.00m length BQ 3/B/1/B m 4,647 1.76

CBQ 3/B/1/C m 4,647 1.65

DBQ 3/B/1/D No 929 2.20

Carried to Collection :

The works in this section comprises the installation of 900 Nos 100mm diameter bakau piles.

Piling shall commence from general formation level. Prices for driving shall include for moving of pile frame about the site, arising or lowering them , providing all necessary staging and redriving of heaved piles.

Allow the provision of all necessary piling equipment plants, tools and ancillary equipment and for their transportation to the site, handling, assembling, moving about on the site as required and removal off the site after completion of the work and for 'any idle standing time. This item shall also include any excavation filling earth to make up levels, all to the satisfaction and approval from the S.O

Handle, transport, pitch and drive 100mm diameter bakau piles

Cut-off and remove surplus length of 100mm diameter bakau piles

Page 2: BQ V.O for Gabion Wall

VARIATION ORDER NO.1

ITEM DESCRIPTION REF. UNIT QTY RATE

VO 1/1

Page 3: BQ V.O for Gabion Wall

VARIATION ORDER NO.1

ITEM DESCRIPTION REF. UNIT QTY RATE

Brought Forward :

A Trench for concrete base not exceeding 1.50m deep BQ 3/B/2/A m3 314 10.00

B Ditto exceeding 1.50m and not exceeding 3.00m deep BQ 3/B/3/B m3 167 12.00

Lean concrete Grade 10 as described:-

CBQ 3/B/2/B m2 209 8.40

Vibrated reinforced concrete Grade 25 as described:-

D 250mm Thick base to received stone filling BQ 3/B/2/C m2 209 43.40

E A layer of BRC A10 in concrete base BQ 3/B/2/D m2 209 16.98

Use and waste of sawn formwork as described :-

FBQ 3/B/3/J m 282 6.60

________________________

G

BQ 3/B/2/F m3 276 181.50

Sundries

H

BQ 3/B/2/G No. 219 16.50

TOTAL OMISSION :

OMISSION (CONT'D)

GRAVITY GROUTED RUBBLE WALL (CONT'D)

Excavate and get out, part return fill in and ram and deposit and spread in making up level where directed and reminder load and cart away from site :-

50mm Thick blinding screed, spread and levelled under concrete base

Steel mesh fabric reinforcement to M.S 145 well lapped at joints including notching around and bending as required (measured nett - no allowance made for laps) as described :-

Edges of concrete exceeding 200mm but not exceeding 300mm high

Stone block in random rubble walling built in approved granite rock sized 150mm-300mm bedded, jointed and neatly pointed in cement mortar (1:3)

50mm Diameter approved earthern ware pipe average length 650mm as weepholes built into rubble wall and including approved geofabric wrapped around 300mm x 300mm x 300mm approved aggregrate as filtering media.

Page 4: BQ V.O for Gabion Wall

VARIATION ORDER NO.1

ITEM DESCRIPTION REF. UNIT QTY RATE

VO 1/2

Page 5: BQ V.O for Gabion Wall

RM

660.00

8,178.72

7,667.55

2,043.80

18,550.07

Page 6: BQ V.O for Gabion Wall

RM

VO 1/1

Page 7: BQ V.O for Gabion Wall

RM

18,550.07

3,140.00

2,004.00

1,755.60

9,070.60

3,548.82

1,861.20

50,094.00

3,613.50

93,637.79

Page 8: BQ V.O for Gabion Wall

RM

VO 1/2

Page 9: BQ V.O for Gabion Wall

VARIATION ORDER NO.1

ITEM DESCRIPTION REF. UNIT QTY RATE

ADDITION

Piling Works

Notes:

__________________________

A

Item -

B Supply only 100mm Diameter bakau piles 5.00m length BQ 3/B/1/B m 16,266 1.76

CBQ 3/B/1/C m 16,266 1.65

DBQ 3/B/1/D No 3,253 2.20

Carried to Collection :

GABION WALL

The works in this section comprises the installation of 3300 Nos 100mm diameter bakau piles.

Piling shall commence from general formation level. Prices for driving shall include for moving of pile frame about the site, arising or lowering them , providing all necessary staging and redriving of heaved piles.

Allow the provision of all necessary piling equipment plants, tools and ancillary equipment and for their transportation to the site, handling, assembling, moving about on the site as required and removal off the site after completion of the work and for 'any idle standing time. This item shall also include any excavation filling earth to make up levels, all to the satisfaction and approval from the S.O

Handle, transport, pitch and drive 100mm diameter bakau piles

Cut-off and remove surplus length of 100mm diameter bakau piles

Page 10: BQ V.O for Gabion Wall

VARIATION ORDER NO.1

ITEM DESCRIPTION REF. UNIT QTY RATE

VO 1/3

Page 11: BQ V.O for Gabion Wall

VARIATION ORDER NO.1

ITEM DESCRIPTION REF. UNIT QTY RATE

Brought Forward :

A Trench for concrete base not exceeding 1.50m deep BQ 3/B/2/A m3 145 10.00

B Ditto exceeding 1.50m and not exceeding 3.00m deep BQ 3/B/3/B m3 - 12.00

Lean concrete Grade 10 as described:-

CBQ 3/B/2/B m2 167 8.40

Vibrated reinforced concrete Grade 25 as described:-

D 150mm Thick base to received rubble wall Agree rate m2 83 26.04

E Ditto 200mm Thick BQ 3/B/2/C m2 45 34.72

F Ditto 250mm Thick Agree rate m2 40 43.40

G A layer of BRC A10 in concrete base BQ 3/B/2/D m2 167 16.98

Use and waste of sawn formwork as described :-

H Agree rate m 140 4.40

J Ditto exceeding 200mm but not exceeding 300mm high BQ 3/B/3/J m 145 6.60

K

Agree rate m3 105 240.00

L

Agree rate m2 349 40.00

Carried to Collection :

ADDITION (CONT'D)

GABION WALL (CONT'D)

Excavate and get out, part return fill in and ram and deposit and spread in making up level where directed and reminder load and cart away from site :-

50mm Thick blinding screed, spread and levelled under concrete base

Steel mesh fabric reinforcement to M.S 145 well lapped at joints including notching around and bending as required (measured nett - no allowance made for laps) as described :-

Edges of concrete exceeding 100mm but not exceeding 200mm high

Supply and install gabion block constructed of approved sized 6" x 9" block stone all as per engineer' detail drawings.

Supply and install blockstone as rip-rap protection overall size 150mm x 225mm including all excavation all as per Engineer's drawing

Page 12: BQ V.O for Gabion Wall

VARIATION ORDER NO.1

ITEM DESCRIPTION REF. UNIT QTY RATE

VO 1/4

Brought Forward :

A BQ 2/F/1/A m2 146 42.37

________________________

B

BQ 2/L/1/A m2 325 12.32

C Plastered wall BQ 2/L/1/F m2 325 6.72

TOTAL ADDITION :

ADDITION (CONT'D)

GABION WALL (CONT'D)

Brickwork in cement and sand brick in cement and sand (1:3) mortar as described :-

One brick (225mm thick) wall, reinforced with and including a layer of 63mm wide `Exmet' at every fourth course

19mm Thick cement and sand (1:6) plaster mixed with an approved plasticiser finish with a wood float as described to wall

Prepare and apply one undercoat and two finishing coats of 'ICI' or other equal and approved emulsion weathershield paint (5 years written warranty) on the following surfaces :-

Page 13: BQ V.O for Gabion Wall

VARIATION ORDER NO.1

ITEM DESCRIPTION REF. UNIT QTY RATE

VO 1/5

Page 14: BQ V.O for Gabion Wall

RM

660.00

28,628.16

26,838.90

7,156.60

63,283.66

Page 15: BQ V.O for Gabion Wall

RM

VO 1/3

Page 16: BQ V.O for Gabion Wall

RM

63,283.66

1,450.00

-

1,402.80

2,161.32

1,562.40

1,736.00

2,835.66

616.00

957.00

25,200.00

13,960.00

115,164.84

Page 17: BQ V.O for Gabion Wall

RM

VO 1/4

115,164.84

6,186.02

4,004.00

2,184.00

127,538.86

Page 18: BQ V.O for Gabion Wall

RM

VO 1/5

Page 19: BQ V.O for Gabion Wall

VARIATION ORDER NO.1

ITEM DESCRIPTION REF. UNIT QTY RATE

COLLECTION

OMISSION

ADDITION

TOTAL ADDITION :

ADDITION (CONT'D)

GABION WALL (CONT'D)

Page 20: BQ V.O for Gabion Wall

VARIATION ORDER NO.1

ITEM DESCRIPTION REF. UNIT QTY RATE

VO 1/6

Page 21: BQ V.O for Gabion Wall

RM ¢

(93,637.79)

127,538.86

33,901.07

Page 22: BQ V.O for Gabion Wall

RM ¢

VO 1/6