2
This is not intended for navigational use. Geographic Response Strategies for Northwest Arctic Subarea, Southern Zone NUKA Research & Planning Group, LLC. June 28, 2011 Brevig Lagoon 0 2 nm 0 2 mi 0 yds 2,000 FO-S 01 FO-S 01 03a EX 03b EX 03c EX 03d EX 02a DV 02b DV SR SR Brevig Lagoon, NWA-S06 Center of map at 65˚ 20'2" N Lat., 166˚ 35'28" W Lon. FO-S Free-oil Recovery Diversion Booming Exclusion Booming Protected-water Boom Legend Map Shoreside Recovery Bears in Area, Guards Recommended An example of the Diversion Booming Tactic. Actual deployment should be adjusted for local conditions. An example of the Exclusion Booming Tactic. Actual deployment should be adjusted for local conditions. Aerial photography of this area is unavailable at this time, but may be included as it becomes available. Possible Recovery Point Tidal-seal Boom Tidal-seal Boom INLET EX Moderate Current Shoreside Recovery Skimmer DV SR

Brevig Lagoon, NWA-S06 - Alaska DEC · Brevig Lagoon Don River a. Lat. 65° 22.41 N Lon. 166°52.94 W Thompson Creek b. Lat. 65° 21.70 N Lon. 166°45.35 W California River c. Lat

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Brevig Lagoon, NWA-S06 - Alaska DEC · Brevig Lagoon Don River a. Lat. 65° 22.41 N Lon. 166°52.94 W Thompson Creek b. Lat. 65° 21.70 N Lon. 166°45.35 W California River c. Lat

This is not intended for navigational use.

Geo

gra

ph

ic R

esp

on

se S

trate

gie

s fo

rN

ort

hw

est

Arc

tic S

ubare

a, S

ou

thern

Zon

e

NUKA Research & Planning Group, LLC.June 28, 2011

Brevig Lagoon

0 2nm

0 2mi

0yds

2,000

FO-S01

FO-S01

02EX03aEX

02EX03bEX

02EX03cEX

02EX03dEX

02EX02aDV 02

EX02bDV

SRSR

Brevig Lagoon, NWA-S06Center of map at 65˚ 20'2" N Lat., 166˚ 35'28" W Lon.

FO-S Free-oil Recovery

Diversion Booming

Exclusion Booming

Protected-water BoomLege

ndMapShoreside Recovery

Bears in Area, Guards Recommended

An example of the Diversion Booming Tactic. Actual deployment should be adjusted for local conditions.

An example of the Exclusion Booming Tactic. Actual deployment should be adjusted for local conditions.

Aerial photography of this area is unavailable at this time, but may be included as it becomes available.

Possible Recovery Point

Tidal-seal Boom

Tidal-seal Boom

INLET

EX

Moderate Current

Shoreside Recovery

Skimmer

DV SR

Page 2: Brevig Lagoon, NWA-S06 - Alaska DEC · Brevig Lagoon Don River a. Lat. 65° 22.41 N Lon. 166°52.94 W Thompson Creek b. Lat. 65° 21.70 N Lon. 166°45.35 W California River c. Lat

NUKA Research & Planning Group, LLC.NOTE: Sensitive resource information can be found on other maps which can be accessed through the sensitive area section of the NWA Sub-Area Contingency Plan: http://dec.alaska.gov/spar/perp/plans/scp_nwa.htm.

Site

Inf

orm

atio

n fo

r N

orth

wes

t Arc

tic,

NW

A-S

06NW Arctic Subarea Geographic Response Strategies DRAFT June 2011

S-06

ID Location and Description Response Strategy Implementation Response Resources Staging Area Site Access Resources Protected (months)

Special Considerations

S-06-01

FO-S

Brevig Lagoon

Nearshore waters in the general area of:

Lat. 65° 19.89 N Lon. 166°34.01 W

Free-oil Recovery

Maximize free-oil recovery in the offshore & nearshore environment of Brevig Lagoon depending on spill location and trajectory.

Deploy free-oil recovery strike teams upwind and up current of Brevig Lagoon.

Use aerial surveillance to locate incoming slicks.

Deploy multiple free-oil recovery strike teams as required to maximize interception of oil before it impacts sensitive areas.

Brevig Mission

Via marine waters

Chart 16006

Same as S-06-02 Vessel master should have local knowledge.

Use extreme caution, shoal waters with numerous reefs and rocks.

S-06-02

DV

Brevig Lagoon

a. Lat. 65° 20.20 N

Lon. 166°35.08 W

b. Lat. 65° 20.29 N Lon. 166°33.64 W

Divert and Collect

At the entrances to the lagoon, divert oil to shore-side collection points determined by spill source and trajectory.

Deploy anchors and boom with skiffs (class 6).

Place protected-water boom at proper angle to divert incoming oil to the collection sites.

Set-up collection sites using shore-side collection units or if oil volume is minimal, use sorbent boom or snare line to provide collection of oil.

Tend throughout the tide.

Boom Lengths: a. 500 ft. b. 600 ft.

Deployment Equipment

1100 ft. protected-water boom 6 ea. small anchor systems 8 ea. anchor stakes 2 ea. shore-side collection units

Vessels 2 ea. class 6 1 ea. helicopter (if needed)

Personnel/Shift 4 ea. vessel crew 4 ea. response techs Tending

Vessels 1 ea. class 6

Personnel/Shift 2 ea. vessel crew 2 ea. response tech

Brevig Mission

Via marine waters

Chart 16006

Fish- herring spawning, white fish, pink salmon

Birds-waterfowl concentration, shorebird concentration, seabird concentration

Habitat- marsh, exposed tidal flats, gravel beaches

Take appropriate measures as outlined in Part 2 of this document to protect the beach at the collection site.

FOSC Historic properties specialist should INSPECT site prior to operations.

Threatened or endangered species/habitat is present or possible in the area. Consult with NOAA and DOI prior to deployment.

S-06-03

EX

Brevig Lagoon

Don River a. Lat. 65° 22.41 N

Lon. 166°52.94 W

Thompson Creek b. Lat. 65° 21.70 N

Lon. 166°45.35 W

California River c. Lat. 65° 21.18 N

Lon. 166° 38.96 W

Fish Creek d. Lat. 65° 20.93 N

Lon. 166°35.86 W

Exclusion

Exclude oil from entering and affecting the streams in the lagoon.

Barrier beach may have breached in different locations. Aerial survey recommended prior to deployment. Adjust equipment requirements to reflect additional breaches.

Deploy anchors and boom with skiffs (class 6).

Place the specified amount of protected water boom in front of the main channels of the rivers in the lagoon.

The lagoon is very shallow. Unless local knowledge is available to navigate the lagoon, helicopter deployment should be utilized.

Tend throughout the tide.

Boom Lengths: a. 550 ft. b. 300 ft. c. 600 ft. d. 500 ft

Deployment Equipment

1950 ft. protected-water boom 10 ea. anchor systems 16 ea. anchor stakes 2 ea. class 6 1 ea. helicopter (if needed)

Personnel/Shift 4 ea. vessel crew Tending

Vessels 1 ea. class 6

Personnel/Shift 2 ea. vessel crew

Brevig Mission

Via marine waters

Chart 16006

Same as S-06-02 Vessel master should have local knowledge.

A population of bears may be present in the area. A bear guard is required during shore operations.

Title 41 permit may be required from ADNR.

Site surveyed: Not surveyed

Tested: not yet