Bridge 180 Under Keel Clearance

Embed Size (px)

DESCRIPTION

Bridge 180 Under Keel Clearance

Citation preview

  • 5/26/2018 Bridge 180 Under Keel Clearance

    1/4

    BRIDGE MANUAL SHIP PROCEDURE

    Card NoBridge-180 Version 01 2013-03-29 Page1 of4UNDER KEEL CLEARANCE

    I. Purpose of the document

    The following Under Keel Clearance procedure is a standardized mandatory company rule meant to supportmasters in theirs choices for safe and secure navigation.

    II. Scope

    Such a procedure will prevent groundings; protect our ships, our crews and captains, and our long termcompany global economic interests. It is in line with IMO recommendations (RESOLUTION A.893(21), 25November 1999), good maritime uses and practices.

    III. Definitions and abbreviations

    Voyage plan

    UKC is a paramount and mandatory element of the passage plan. It is calculated for every voyage leg whetherin open seas, confined waters or in ports as soon as depth is under 1.5 vessel draft.

    Minimum UKC

    Under Keel Clearance isthe distance between the deepest point of the vessel's hull and the sea bed.The company regulation for setting the minimum eligible UKC is as following:

    IV. Contents of the procedure

    1. When established, Port Cards Company Regulations (PCCR) on minimum UKC / Maximumdraft always prevails. They are checked by Fleet Navigation Center captains when meeting withlocal port authorities. The local agencies are responsible to inform the Fleet Navigation Centerwithout delay in case of any port amendments.

    2. National/Local/Port regulations or practices on Maximum Allowable Safe Draft (MASD) are to beused when no PCCR is in force.

    However masters are to challenge the MASD using all available information. This informationmust not be limited to the Port Cards: it must consider the attached UKC calculation form andthe ships stability (draft increasing due to the list). In case of doubts, masters must report to theFleet Navigation Center (Nautical Studies Office: [email protected]) and therelevant Line Ops manager.

    3. Whenever no regulation exists (Nr 1 or 2), minimum UKC is determined using the attachedcalculation form which is based on good seamanship practices. Some Loading software is alsoable to provide UKC calculation. Only UKC limits from the next table are applicable.

  • 5/26/2018 Bridge 180 Under Keel Clearance

    2/4

    BRIDGE MANUAL SHIP PROCEDURE

    Card NoBridge-180 Version 01 2013-03-29 Page2 of4UNDER KEEL CLEARANCE

    Calculation form

    It provides Dynamic/Net UKC calculations and takes in account the squat effect which is the reduction inunder keel clearance due to the ships forward motion through the water. The squat effect increases with thespeed of the ship and when the channel reduces in depth or width.

    The UKC limitations used in the form are as following:

    As a result, the form provides Go/No Go situations based on vessels characteristics, channels characteristics,vessels speed, tide and current.

    Loading software

    The loading software includes a squat sheet which allows to calculate the UKC after taking into account aboveUKC limitations and also perform simulation by varying calculation parameters. This result is viewable on agraph.

    Remark: List

    Several factors may cause list: Tugs actions, combination of helm and speed, swell, wind, improper loading,...and list causes draft increase.

    New draft = 0.5xBeam (m)xsin (list) +Initial draft xcos (list)Draft increase 0.5 xBeam (m)xsin (list)

    Ex. Draft Increase due to list

    List / Beam 20m 30m 40m 50m1 0.17 0.26 0.39 0.435 0.87 1.30 1.7 2.210 1.7 2.6 3.5 4.3

    V. Appendices

    -Calculation form according below screen capture and on excel tool in attachment.

    LocationMinimum net UKC

    20 % staticdraught

    15% staticdraught

    10% staticdraught

    1.0 M 0.6 M or 5%whichever Greater

    Coastal waters x x x x

    Fairways, channels, restricted water x x x

    Moving in port x x

    Alongside vessel over 50,000 MT dwt x

    Alongside vessel under 50,000 MT dwt

  • 5/26/2018 Bridge 180 Under Keel Clearance

    3/4

    BRIDGE MANUAL SHIP PROCEDURE

    Card NoBridge-180 Version 01 2013-03-29 Page3 of4UNDER KEEL CLEARANCE

    Vessel: Date :

    Length (LBP): Port :

    Breadth: Arrival/Departure :

    Displacement :

    Static Mean Draft :

    = Displacement

    L x B x D V = Speed in knots

    L = Length between perpendiculars

    CBx V2

    B = Extreme Breadth underwater

    100 D = Mean draft corresponding to the Displacement

    2 x CBx V2

    1,7

    100

    Squat in Medium waters = Interpollation Open waters / Confined waters for 200 m < channels width

  • 5/26/2018 Bridge 180 Under Keel Clearance

    4/4

    BRIDGE MANUAL SHIP PROCEDURE

    Card NoBridge-180 Version 01 2013-03-29 Page4 of4UNDER KEEL CLEARANCE

    VI. References

    -no references

    VII. Modifications of the document

    Description of theModification

    Date NVersion

    Creation 2013-03-29 1

    VIII. Validation and Approval

    Versionsof the

    document

    Redactorname andfunction

    Date andSignature

    ValidationName andfunction

    Date andSignature

    ApprovalName andFunction

    Date andSignature

    1

    JacquesSubra

    Nauticalstudies

    2013-03-29

    Eric SabrazsMarine

    StandardsManager

    2013-03-29

    FranckMagarianExecutive

    VicePresident

    CMAShips