2017 UNDERWATER
BRIDGE INSPECTION REPORT
BRIDGE #
DISTRICT: COUNTY: CITY/TOWNSHIP:
Date of Inspection:
Equipment Used:
Inspected By:
Report Written By:
Report Reviewed By:
Final Report Date:
31514
7 AVE over MISSISSIPPI RIVER
District 1 Itasca Grand Rapids
09/28/2016
Ladder, Probing Rod, Chain Drag
Stromberg, Dan
Dan Stromberg
City or Municipal Highway AgencyOwner:
MinnesotaSTATE:
UNDERWATER SUMMARY 3
UNDERWATER INSPECTION 4
UNDERWATER INSPECTION PROCEDURES 6
STRUCTURE INVENTORY 7
ELEMENTS 8
PICTURES 13
BRIDGE 31514 UNDERWATER INSPECTION DRAWINGS2016
16
TABLE OF CONTENTS
PAGE NUMBER
Contractor:
(A) Reinspect the submerged substructure units at the normal maximum recommended (NBIS) interval of sixty (60) months.
Collins Engineers, Inc.
9687Contractor Job Number:
RECOMMENDATIONS
REPORT SUMMARY
UNDERWATER INSPECTION
The substructure units inspected at Bridge No. 31514, Piers 1 and 2, were generally in good condition with no defects of structural significance observed below water. The concrete was relatively smooth and sound with no significant deterioration, and just some light scaling located from the waterline to the channel bottom with typical penetrations of 1/8 inch. Footing and original timber formwork was observed to be exposed and/or protruding from the channel bottom on the channel side of both piers. The top of footing at both piers was typically exposed in and around the footing edges, with sand on top of the footing closer to the pier shafts. The maximum vertical exposure of the footings has increased slightly compared to what was last found in 2012, with maximums of 3.5 feet and 1 feet at Piers 1 and 2, respectively, indicating that some minor channel bottom degradation has occurred.
A. The channel bottom material consisted of sand with scattered 1 foot diameter and smaller rocks allowing a 2 inch maximum probe rod penetration. Armoring, consisting of 2 foot diameter rocks was observed at the upstream and downstream noses of the piers.B. Overall the concrete was smooth and sound with no significant deterioration.C. Light scaling was observed from the waterline to the channel bottom with a typical penetration of 1/8 inch.D. Footing and formwork was exposed 6 feet out from the west face of Pier 2, with the top at 6 feet below waterline. The footing (and formwork) was exposed from 8 feet downstream of the upstream nose to 6 feet from the downstream end of Pier 2. The maximum vertical exposure was 1 foot.E. Footing and some formwork (mostly towards downstream) was observed 6 feet out from the east face of Pier 1 from center of upstream nose to 5 feet upstream of the downstream nose. Top of footing was located 7 feet below waterline and maximum vertical exposure of 3.5 feet was located around the middle of the pier. F. For approximately 8 feet upstream of middle of pier there was slop concrete sticking out up to 3 feet from the footing face. Immediately, downstream of the slop concrete, there was a small cavity at the interface of the footing and seal below. The cavity was approximately 3 feet long by 3 inches high with up to 12 inches of penetration. G. Seal was exposed from upstream corner of footing to approximately 3 feet downstream of the middle of the pier with maximum vertical exposure of 1.5 feet at upstream quarter point of pier. Seal surfaces were very irregular due to section loss and corrugations from being formed with sheeting.
INSPECTION FINDINGS
Page 3 of 17
The top of the concrete parapet at the downstream end of Pier 2.Water Level Reference:
WATERLINE DATUM
Waterline Elevation (feet):
The waterline was located approximately 29.0 feet below the reference.Description:
71.0 feet
4.
Piers 1 and 2Substructure(s) Inspected:
SUBSTRUCTURE INSPECTION DATA
General Shape:
10.2 feetMaximum Water Depth at Substructure(s) Inspected (feet):
The piers each consist of an oblong rectangular shaft with rounded noses, which is founded on a rectangular reinforced concrete, pile supported, footing.
Code:Item 62: Culvert:
7
Y 48 09/2016Code:Item 92B: Underwater Inspection:
Code:
(Minnesota specific codes are used for 92B and 113)
NBIS CODING INFORMATION5.
Item 60: Substructure:
Item 61: Channel and Channel Protection:
7Code:
District 1District:
7 AVE
County:
The superstructure consists of precast concrete beams (3 spans) supporting a reinforced concrete deck. The substructure consists of two reinforced concrete abutments and two reinforced concrete piers designated Piers 1 and 2 from west to east.
Bridge Description:
031 - Itasca
Facility Carried:
BRIDGE DATA1.
UNDERWATER INSPECTION
Bridge #:
MISSISSIPPI RIVERFeature Intersected:
31514
Underwater Visibility (feet):
Sunny, 60°FWeather Conditions:
5.0 feet
3.
1 ft/secWaterway Velocity (ft/sec):
09/28/2016
Professional Engineer/Team Leader:
INSPECTION DATA2.
Daniel G. Stromberg
Date of Underwater Inspection:
Daniel G. StrombergInspection Diver:
Page 4 of 17
Scour 1885 EA 1
220 Reinforced Concrete Footing 49 LF 49
STRUCTURAL ELEMENT CONDITION RATING
Conditions
6.
I
Bridge is scour critical because abutment or pier foundation is rated as unstable due to observed scour at bridge site.
Item 113: Scour Critical Bridge: Code:
No (Mark your selection with an X)Yes X
210
CS3 CS4
Reinforced Concrete Pier Wall 6868 LF
CS2ELEM # Unit CS1Element Description Quantity
Page 5 of 17
The routine underwater inspection of Bridge 31514 (7 Ave over Mississippi River) was completed on September 28, 2016. The underwater inspection was conducted from the shore. The inspection was conducted by a team consisting of a Professional Engineer Diver with a valid MnDOT Team Leader certification, a backup diver and dive tender. The inspection utilized commercial dive equipment and techniques (SSA and/or SCUBA) in accordance with OSHA regulations. Profiles were taken along the upstream and downstream faces of the bridge and around the periphery of substructure units to determine the presence, location, and area of scour.
The bridge elements inspected consisted of two reinforced concrete piers. According to structure inventory, the inspected substructure units are founded on rectangular reinforced concrete footings supported by concrete piles. Inspection procedures followed FHWA guidance and the MnDOT Bridge and Structure Inspection Program Manual with channel bottom probing to search for foundations. The maximum routine underwater inspection frequency is recommended to remain at 60 months based on those findings and risk factors. Also, inspection procedures should continue to follow the above approach and standard guidance with 100% Level I and 10% Level II intensity efforts.
INSPECTION PROCEDURES
UNDERWATER INSPECTION
Page 6 of 17
Spec. Feat.Pier Foundation (Material/Type)
1 - CONCCantilever ID
+ W A T E R W A Y +Number of Spans Historic Status
3 - FTG PILE
Underwater 60Culvert Type 3 - FTG PILE
Pinned Asbly.
09/28/2016
Barrel Length
263.6 ft. Navigation Control
Waterway Opening (sf.) 1767Structure Length
ft. Year Painted
0 - No nav. control on waterwayDeck Width (Out-to-Out) 66.3
+ P A I N T +
APPR: 0 TOTAL:5 - Not eligible
MAIN: 3
Main Span Length 86.2 ft.Drainage Area (sq. mi.) 3370.0
B R I D G E D A T A +Main Span Detail
N - NOT REQUIRED+ M I S C.
Appr. Span Type Structure Flared
GR Termini N - NOT REQUIRED
Appr. Guardrail
Main Span Type 5 - Prestress or Precast Median Width On Bridge
ft. Bridge Railing 1 - MEETS STANDARDS
N - NOT REQUIRED
Main Span Design 01 - Beam Span
ft. GR Transition
Skew 35 RIGHT
Y/N Freq Date
Abutment Foundation (Material/Type)
1 - CONC Frac. Critical
D E P T H I N S P. +Appr. Span Design
0 - No flare+ I N
Appr. Span Detail Field Conn. ID
Parallel Structure N - No parallel structure
Pier Protection
0 - Not Required
Rating Date 4/8/200313702 sq. ft. Traffic
ft. 50B. Rt 6.00Sidewalk Width 50A. Lt 6.00
Roadway Area (Curb-to-Curb)
Posted Load 0 - Not Required
PostingStructure Area (Out-to-Out) 17477 sq. ft.
DBL:VEH: SEMI:
Rt 17 ARail Type Lt 17 C N - N/AN - N/A B N - N/A
N - Not Applicable Overweight Permit CodesCurb Height Lt
ft. Horizontal 0 - Not Required
0.50 ft. Vertical0.50 ft. Rt
Wear Surf Install Year 2001
sq. ft. Nav. Vert. Lift Bridge Clear. (ft.)
I - LOW RISK Year 2006Primer Type MN Scour Code
Painted Area
Unsound Paint % Nav. Clr. (ft.)
!
Deck Material 1 - Concrete Cast-in-Place 0.0Wear Surf Type 4 - Low Slump Concrete
Vert. 0.0 Horiz.
S I G N S +Operating Rating 2 - HS TRUCK
0 - None + B R I D G E
Inventory Rating 2 - HS TRUCK 35.2
51.9Deck Rebars Install Year
Deck Rebars
Finish TypeWear Course/Fill Depth 0.16 ft.
0 - None
Design Load 5 - HS 20
+ C A P A C I T Y R A T I N G S +Deck Membrane
47 ° 13
Inspector Name Stromberg, Dan
Latitude Control Section (TH Only) Status' 50.04 ''
2 - 2-way traffic
Routine Inspection Frequency 24
Sect., Twp., Range
0.2 MI S OF JCT TH 2 Level of Service 1 - MAINLINE
- 25W Roadway Type21 - 055N
Detour Length 1.0 mi.R A T I N G S +
Custodian 04 - City or Municipal Highway Agency 2
Owner 04 - City or Municipal Highway Agency
Deck 7 Unsound Deck %
C O N D I T I O N° 31 '
A - Open
Longitude 93 001+00.220 + N B I 4.52 '' Reference Point
Crew
+ I N S P E C T I O N +
Agency Br. No. 158
District 01
Bridge Match ID (TIS) 0 Userkey
7 AVE over MISSISSIPPI RIVER
Minnesota Structure Inventory Report
Bridge ID: 31514
+ G E N E R A L + + R O A D W A Y +
Date: 01/04/2017
Sufficiency Rating 88.4Roadway Name or Description
119
City Grand Rapids
Routine Inspection Date 11/23/2015
Desc. Loc.
Township 7 AVE
Number
NRoadway O/U Key Route On StructureMaint. Area Structurally Deficient
NRoute Sys 05 - MSASCounty 031 - Itasca Functionally Obsolete
Lanes
Waterway Adequacy 9Max. Vert. Clear.
ft.Legislative District 03Bft.Potential ABC 2 - N/A ft.
ft.On - Off System Roadway Width 52.00 ft.
Vertical Clearance ft.1 - ON
Underclearances N
Service On 5 - Highway-pedestrian Appr. Surface Width+ S A F E T Y F E A T U R E S +
5 - Waterway Bridge Roadway Width 52.0
68.0 ft.
Service Under
ft.
51.9 ft. Approach Alignment 8Horizontal Clear.
ft.
ft.+ S T R U C T U R E + Lateral Clearance
HCADT ADTT7
Year Built 1975
MN Year Reconstructed Functional Class
%Channel 7
Substructure
0Superstructure 7
ON 4 UNDER
998 YEAR 2008BMU Agreement ADT
Structure Evaluation 7If Divided
D I M E N S I O N S +Bridge Plan Location 1 - CENTRAL
7/1/1976Deck Geometry 4
NB-EB SB-WBDate Opened to Traffic
+ R D W Y
FHWA Year Reconstructed
MN Temporary Status
16 - Urban - Minor ArterialCulvert N
A P P R A I S A L R A T I N G S ++ N B I
Page 7 of 17
County:
City:
Township:
Township:Section: Range:
Span Type:
NBI Deck: Super: Sub: Chan: Culv:
Appraisal Ratings - Approach: Waterway:
Required Bridge Signs - Load Posting:
Horizntal:
Traffic:
Vertical:
MN Scour Code:
Open, Posted, Closed:
Location:
Route:
Control Section:
Local Agency Bridge Nbr.:
Ref. Pt.:
Maint. Area:
Length:
Deck Width:
Rdwy. Area/ Pct. Unsnd:
Paint Area/ Pct. Unsnd:
Culvert:
Itasca
Grand Rapids
055N21 25W
5 - Prestressed Concrete 2 -Stringer/Multi-beam or Girder
7 7 7 7 N
8 9
0 - Not Required
0 - Not Required
0 - Not Required
N - Not Applicable
I - LOW RISK
0.2 MI S OF JCT TH 2
05 - MSAS 119 001+00.220
263.6
66.3
13702 sq. ft. / 2%
sq. ft. / %
N/A
A - Open
ft.
ft.
Postings:List:
MINNESOTA BRIDGE INSPECTION REPORT
01/16/2017
Inspector: CO Bridge
BRIDGE 31514 7 AVE OVER MISSISSIPPI RIVER
Unofficial Structurally Deficient N
NUnofficial Functionally Obsolete
Unofficial Sufficiency Rating 88.4
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4REPORT TYPE
Reinforced Concrete Deck 01/04/2017 17477 SF 15729 0 1748 012 Underwater
17477 SF 15729 0 1748 0Migrated Values
Notes: 2015 - This condition is monitored during routine inspections. No appreciable progression has been documented.2014 - No change from 2013 condition. See photos.2013 - No change from 2012 condition. See photos.2012 - No change from 2011 condition.2011 - Cracks and efflourescence noted in all spans and all bays but seems to be concentrated in eastern three bays and in south span.Transverse cracks in bays are spaced regularly at about 8 feet.2010 - Map cracks and efflorescence present in S span, mainly in eastern three bays.
510 - Wearing Surfaces 13702 SF 13428 0 274 0
Notes: Low Slump Overlay with Uncoated Rebar Notes: 2015 - Good condition. Very little sign of delamination. Some minor cracking as perprevious years' inspections.2014 - No apparent change from 2013 condition. Minor cracking noted. Consider chain dragging in future inspections.2013 - No change from 2012 condition.2012 - Minor cracking continues.2011 - Some minor cracking noted in northbound shoulder and edge of lane. No delaminations, potholes or spalls present.2010 - No change from 2009 condition.
Underwater 01/04/2017
13702 SF 13428 0 274 0Migrated Values
Prestressed Concrete OpenGirder/Beam
01/04/2017 1548 LF 1548 0 0 0109 Underwater
1548 LF 1548 0 0 0Migrated Values
Notes: 2015 - No change from 2014 condition.2014 - No change from 2013 condition. Conduit is anchored to east fascia beam. Not advisable to have drilled anchors into the PCB's. Shouldnotify utility owner to relocate and repair holes in beam.2013 - No change from 2012 condition except that damp spots were noted at top flanges of beams and adjacent underside of slab areas onwestern three beams at the north abutment.2012 - No change from 2011 condition.2011 - No change from 2010 condition.2010 - No change from 2009 condition.
Reinforced Concrete Pier Wall 01/04/2017 68 LF 68 0 0 0210 Underwater
68 LF 68 0 0 0Migrated Values
Notes: 2015 - Some discoloration and staining but overall good condition.2014 - No change from 2013 condition. High water at time of inspection.2013 - No change from 2012 condition.2012 - No chage from 2011 condition.2011 - No change from 2010 condition. Low water allowed hands on inspection of most of pier.2010 - No change from 2009 condition.
Page 8 of 17
Reinforced Concrete Abutment 01/04/2017 202 LF 202 0 0 0215 Underwater
202 LF 202 0 0 0Migrated Values
Notes: [2016] Migrator added 40 LF to abutment quantity to account for wingwalls (CS1:40 CS2:0 CS3:0 CS4:0).2015 - Good condition. Minor crack in south abutment back wall from hole for conduit to top of wall.2014 - No change from 2013 condition.2013 - No change from 2012 condition.2012 - No change from 2011 condition.2011 - No change from 2010 condition.2010 - No change from 2009 condition.
Wingwall notes: 2015 - Moved all wings to CS 1 as it is a more appropriate rating.2014 - No change from 2013 condition.2013 - No change from 2012 condition.2012 - No change from 2011 condition.2011 - No change from 2010 condition.2010 - No change from 2009 condition.
Reinforced Concrete Pier Cap 01/04/2017 150 LF 150 0 0 0234 Underwater
150 LF 150 0 0 0Migrated Values
Notes: 2015 - Pier caps in good condition visually. No access to pier caps for this inspection.2014 - No change from 2013 condition.2013 - No change from 2012 condition.2012 - No change from 2011 condition.2011 - No change from 2010 condition.2010 - No change from 2009 condition.
Pourable Joint Seal 01/04/2017 230 LF 57 173 0 0301 Underwater
230 LF 57 173 0 0Migrated Values
Notes: 2015 - Most sealant is failed or missing. Moved to CS 1 & 2 since spalling, while present, is relatively minor.2014 - Most joints are failed as per 2013. Continue to maintain as needed.2013 - Most poured joints are failed.2012 - Joint is failed at each end of bridge.2011 - Joint is failed at each end of bridge.2010 - Abutment joints leaking - abutment backwalls wet.
Movable Bearing 01/04/2017 18 EA 12 6 0 0311 Underwater
18 EA 12 6 0 0Migrated Values
Notes: 2015 - There are 6 at each abutment and 6 at Pier 1 (south pier). Moved bearings at south abutment to CS 2 due to presence of rustand debris that may inhibit movement. No access to pier bearings during this inspection.2014 - No change from 2013 condition.2013 - Light rust noted on expansion bearings at north south abutment. CS 1 still appropriate.2012 - No change from 2011 condition.2011 - No change from 2010 condition.2010 - No change from 2009 condition.
Fixed Bearing 01/04/2017 18 EA 0 18 0 0313 Underwater
18 EA 0 18 0 0Migrated Values
Notes: 2015 - There are 12 at Pier 2 (north pier) and 6 at Pier 1. No access to pier bearings for this inspection.2014 - No change from 2013 condition. Light rust/corrosion forming.2013 - No change from 2012 condition.2012 - No change from 2011 condition.2011 - No change from 2010 condition.2010 - No change from 2009 condition.
Reinforced Concrete Approach Slab 01/04/2017 2720 SF 2720 0 0 0321 Underwater
2720 SF 2720 0 0 0Migrated Values
Notes: [2016] Migrator assumed an approach slab length of 20FT and used the inventory quantity of 68FT for the width.2015 - East side of northbound panels replaced in 2015 during conduit system install. Changed to CS 1 to more accurately reflect condition.2014 - No change from 2013 Condition2013 - No change from 2012 condition.2012 - No change from 2011 condition - adjusted condition state to a more appropriate rating.2011 - No change from 20102010 - No change from 2009 condition.
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4
BRIDGE 31514 7 AVE OVER MISSISSIPPI RIVER
REPORT TYPE
Page 9 of 17
Metal Bridge Railing 01/04/2017 526 LF 526 0 0 0330 Underwater
526 LF 526 0 0 0Migrated Values
Notes: [2016] Migrator assumed concrete/metal combination type rail.2015 - Minor scaling and pop outs & discoloration as per previous inspections. CS 1 is most appropriate for this element at this time.2014 - No change from 2013 condition. Scaling and pop outs noted.2013 - No change from 2012 condition.2012 - No change from 2011 condition.2011 - Concrete parapet is scaled/pitted on traffic side.2010 - No change from 2009 condition.
515 - Steel Protective Coating 999 SF 999 0 0 0
Notes: [2016] Migrator assumed CS1 and a quantity of 999 SF.
Underwater 01/04/2017
999 SF 999 0 0 0Migrated Values
Reinforced Concrete Bridge Railing 01/04/2017 526 LF 526 0 0 0331 Underwater
526 LF 526 0 0 0Migrated Values
Notes: [2016] Migrator assumed concrete/metal combination type rail.2015 - Minor scaling and pop outs & discoloration as per previous inspections. CS 1 is most appropriate for this element at this time.2014 - No change from 2013 condition. Scaling and pop outs noted.2013 - No change from 2012 condition.2012 - No change from 2011 condition.2011 - Concrete parapet is scaled/pitted on traffic side.2010 - No change from 2009 condition.
Critical Deficiencies or Safety Hazards 01/04/2017 1 EA 1 0 0 0800 Underwater
1 EA 1 0 0 0Migrated Values
Notes: NO CRITICAL FINDINGS OBSERVED DURING THE LAST INSPECTION.
Concrete Decks - Cracking & Sealing 01/04/2017 0 LF 0 0 0 0810 Underwater
0 LF 0 0 0 0Migrated Values
Notes: 2015 - CS 2 still appropriate.2014 - No change from 2013 condition.2013 - No change from 2012 condition.2012 - No change from 2011 condition.2011 - Unsealed cracks of moderate density.
Bituminous Approach Roadway 01/04/2017 2 EA 0 2 0 0822 Underwater
2 EA 0 2 0 0Migrated Values
Notes: 2015 - Element added this year to document condition of bituminous approaches on each end.
Concrete Shear Cracking 01/04/2017 1 EA 1 0 0 0883 Underwater
1 EA 1 0 0 0Migrated Values
Notes: No shear cracks are evident.
Slopes & Slope Protection 01/04/2017 1 EA 0 1 0 0892 Underwater
1 EA 0 1 0 0Migrated Values
Notes: 2015 - CS 2 still appropriate. Modular wall at north abutment was repaired this year.2014 - No change from 2013 condition.2013 - No change from 2012 condition.2012 - No change from 2011 condition.2011 - No change from 2010 condition. North slope altered to accommodate a new bike trail.SOME SLOPE EROSION ON S.E. CORNER AT TOP OF SLOPE.[2010] No change from 2009 condition.
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4
BRIDGE 31514 7 AVE OVER MISSISSIPPI RIVER
REPORT TYPE
Page 10 of 17
Deck & Approach Drainage 01/04/2017 1 EA 0 1 0 0894 Underwater
1 EA 0 1 0 0Migrated Values
Notes: 2015 - Two deck drains on east side are plugged. West side drains are clear. Catch basin at south approach panel functioning well.2014 - No change from 2013 condition.2013 - No change from 2012 condition.2012- No change from 2011 condition.2011 - No change from 2010 condition.2010 - No change from 2009 condition.
Sidewalk, Curb, & Median 01/04/2017 1 EA 1 0 0 0895 Underwater
1 EA 1 0 0 0Migrated Values
Notes: 2015 - CS 1 still appropriate. New sidewalks off each end of the bridge on the east side. Appear to be settling already. New sealantbetween end of deck and new sidewalk showing signs of failure, loss of adhesion.2014 - No change from 2013 condition.2013 - No change from 2012 condition. Transverse cracks are spaced at about 6 to 10 feet OC.2012 - No change from 2011 condition.2011 - No change from 2010 condition.2010 - No change from 2009 condition.
Miscellaneous Items 01/04/2017 6 EA 6 0 0 0899 Underwater
6 EA 6 0 0 0Migrated Values
Notes: 2015 - Added this element for bridge lighting and conduits etc. Good condition, some light rust etc.
Protected Species 01/04/2017 1 EA 1 0 0 0900 Underwater
1 EA 1 0 0 0Migrated Values
Notes: Use this element to track the presence of protected species living on this structure.
General Notes: 1998 - Deck delamination continues to progress. Erosion problem noted in 1997 has been corrected with rock gabions 2001 -Bridge rehab project constructed in 2001 including: Mill & overlay deck; r/c approach slabs; railings cleaned & painted2002 - rock gabion slope protection on S bank; new expansion joints at abutment on deck; moveable bearings cleaned &treated.2005 - FIBER OPTIC CONDUIT ALONG E. FASCIA GIRDER HAS BROKEN LOOSE FROM SUPPORT CLAMPS.ALTERNATE MEANS OF ATTACHMENT SHOULD BE USED (AVOID EXP. ANCHORS INTO PRESTRESSED BEAMS).2006 - SOUNDED BOTH PEIR WALLS W/ HAMMER 2006. NO DETERIORATION NOTED.2006 - RANDOM MAP CRACKS NOTED IN OVERLAY. MOSTLY CENTER LANES.2007 - Sounded overlay at pier joints - OK. Continue to monitor.2008 - Little change in condition from 2007 inspection.2009 - Conduit disjointed at N abutment.2011 - Bridge in overall good condition. Bike trail added beneath north abutment slope.2012 - No real change from 2011 condition other than the overlay shows signs of continuing cracking.2013 - No significant change from the 2012 condition. Most floor drains along the east gutter line were plugged andnon-functioning at the time of the inspection. Slight settlement of sidewalk off north end of bridge.2014 - No significant changes from the 2013 inspection. 2014 inspection was done in December. Little or no snow on theground. Snow did not appreciably effect inspection. All major elements were visible.2015 - New conduit system installed in fall of 2015 along easternmost beam bay. Bridge was inspected in November aftersignificant rainfall. Heavy joint leakage was evident at south abutment at joint at top of parapet wall, causing water to pool onabutment seats adjacent to bearings. Contributing to corrosion of bearings. Some leakage noted at north abutment but not assevere. Removed scour smart flag from report this year since scour code is "I-Low Risk". Underwater inspection was done in2012. No undermining or scour was reported. Vertical exposure of Pier 1 footing was 3 feet maximum, vertical exposure ofPier 2 footing was 1 foot maximum. Inspection from ground only in 2015 (no snooper).
58. Deck NBI:
36A. Brdg Railings NBI:
36B. Transitions NBI:
36C. Appr Guardrail NBI:
36D. Appr GuardrailTerminal NBI:
59. Superstructure NBI:
60. Substructure NBI:
61. Channel NBI:
62. Culvert NBI:
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4
BRIDGE 31514 7 AVE OVER MISSISSIPPI RIVER
REPORT TYPE
Page 11 of 17
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4
BRIDGE 31514 7 AVE OVER MISSISSIPPI RIVER
REPORT TYPE
Inspector's Signature Reviewer's Signature
Inventory Notes:
62. Culvert NBI:
71. Waterway Adeq NBI:
72. Appr RoadwayAlignment NBI:
Page 12 of 17
Photo 1 - Overall View of Downstream Fascia, Looking Northwest
Photo 2 - Overall View of Upstream Fascia, Looking Southwest
Pictures
Page 13 of 17
Pictures
Photo 3 - View of Pier 1, Looking Northeast
Photo 4 - View of Pier 2, Looking Southwest
Page 14 of 17
Pictures
Photo 5 - View of Exposed Footing and Formwork at Pier 1, Looking West
Photo 6 - View of Exposed Footing and Formwork at Pier 1, Looking West
Page 15 of 17
Page 16 of 17
Page 17 of 17